25. • The shore connection piece shall be
kept near the filling station on either
• The flange made of steel shall be side of the vessel.
installed (welded) at the port & • It shall be kept together with bolts &
starboard shore connections. washers 4sets-16mm (5/8”) x 50mm (2”)
4sets- (5/8” (2”
LG, gasket 1pc-10.5kg/cm2(150 psi)
1pc- psi) 25
yd/0609
27. • The flange made of steel shall
be installed (welded) at the
port & starboard shore
connections.
• This deck facilities is adapted
from the marine pollution
regulation #19
• The flange is designed to
accept pipes up to a max.
internal dia. Of 125mm (5”) &
dia. (5”
shall be flat face
• The flange shall complete
with 6sets-M20 x 60mm LG
6sets-
bolts & nuts with a gasket of
oil proof material, suitable for
service pressure of 0.6mPA
(6 bar). Non asbestos gasket
shall be full face, 1.5mm
thickness & suitable for
service pressure of 1.0mPA
(10bar)
27
yd/0609
28. • The flange made of steel
shall be installed (welded)
at the port & starboard
shore connections
together with blind flange.
• This deck facility is
adapted from the marine
pollution regulation #11
• Both flange shall be flat
face & provided with
4sets-M16 x 60mm LG
4sets-
bolts & nuts together with
a suitable gasket.
• Flange & gasket shall be
suitable for a service
pressure of 0.6mPA (6
bar)
28
yd/0609
46. • THIS TABLE IS APPLICABLE FOR MAX. SPACING BETWEEN PIPE
SUPPORTS FOR HORIZONTAL STRAIGHT RUN OF STANDARD AND
HEAVIER PIPE AT MAX. OPERATING TEMP. OF 750 ºF (300 º C)
46
yd/0609
53. • PIPE SUPPORT DIRECTLY WELDED TO SIDE SHELL
IS NOT ALLOWED. DOUBLER IS TO BE USED.
53
yd/0609
54. • ALL BOLTS AND NUTS TO BE CADMIUM
PLATED SAE J429 Gr.8 AND SAE J995
Gr.8, HEAVY DUTY
• ALL METAL COMPONENTS OF THE
STAUFF CLAMPS TO BE ZINC PLATED.
54
yd/0609