Management Reserve Defined
Management Reserve (MR) is defined in EIA 748 Earned Value Management Systems, the
commercial standard for EVMS, as “An amount of the total budget withheld for management
control purposes, rather than being designated for the accomplishment of a specific task or set
of tasks.” In most programs, particularly developmental efforts, there is considerable
uncertainty regarding timing and/or magnitude of future difficulties such as:
• Growth within currently authorized work scope
• Rate changes (overhead, labor, material, currency, etc.)
• Risk - its probability of occurrence and its impact
• Other program unknowns
Consequently, MR is established to provide a source of budget to plan and execute effort
initially excluded from the project plan, which is necessary to overcome these difficulties and
keep the project on track.
Many people incorrectly view MR as funding contingency. In order to better understand MR, the
difference between funding and budget must be well understood. Budget is the estimated cost
for the planned work agreed to by both contractor and customer. Funding is the amount of
money held by the customer to reimburse the contractor’s actual costs and fees or price
(depending on the contract type).
Figure 1 illustrates the classic relationship between budget elements and funding.
	
Figure	1	Budget/Funding	Relationship
tensix.com	
A customer generally requires funds in excess of the contractor’s budget to pay for contract
changes and overruns (if allowed by the contract).
OMB encourages customers (federal agencies) to
establish program risk-adjusted budgets (PRB) to
provide funding and schedule contingencies to
cover the risk of cost and schedule overruns on a
project.
Figure 2 shows how the MR, which is part of the
contractor’s budget, relates to the customer’s
contingencies comprising the program risk
adjusted budget.
In this diagram you can see the difference between the contractor’s CBB and the customer’s
Program Risk Adjusted Budget (PRB), depicted by the shaded area. The PRB includes the
amount of additional funds and time that the customer has available to handle cost and
schedule growth that may occur on the project. As the name implies, it is based on the risks
identified by the customer for the project, which are usually based upon the customer’s history
and experience with similar projects. The horizontal scale, representing time, shows that the
PRB is planned to a date beyond the contract end date. This is the equivalent of schedule
contingency or reserve that may be held by the customer.
The blue line is the total time phased budget or planned value (PV). The total of the entire
planned budget is the Budget at Completion (BAC). Above that, is the contractor’s
Management Reserve (MR). The BAC + MR = the Contract Budget Base (CBB). This is the
total estimated ‘cost’ of the project.
Above that is fee, which when added to the CBB yields the Contract Target Price (CTP), (not
shown).
Upon completion of a contract, some MR often remains. This may be true whether the
contractor’s final actual cost was over or under the contractor’s planned cost at completion or
BAC. Many people find this bothersome due to their confusion over the differences between
budget and funds. Ultimately, the contractor will be paid, from funding allocated to the contract,
for all contractually allowable costs and fee incurred in performance of the project. This may
end up being in excess of the budget (overrun) or less than the budget (under-run) and any
remaining MR is simply a number in a log.
Figure	2	-	Budget	and	Funding	Profiles
tensix.com	
Estimating Management Reserve
FAR 31.205-7 (c), defines contingency as a possible future event or condition arising from
presently known or unknown causes, the outcome of which is indeterminable at the present time
and indicates that costs for contingencies are generally not allowable. Those which are
foreseeable within reasonable limits of accuracy, e.g., anticipated costs of rejects and defective
work may be included in the estimates of future cost so as to provide the best estimate of
performance cost.
In contrast, Management Reserve (MR) is not foreseeable and should not be included in the
PMB. The challenge then is how to estimate the cost impact of risks, which are uncertain future
events, in the proposal cost estimate, so that sufficient budget is available to plan the know work
and set aside management reserves.
The EIA 748 standard says “MR is not a contingency that can’t be eliminated from prices during
subsequent negotiations or used to absorb the cost of program changes. The budget being
held in reserve must not be viewed by a customer as source of funding for added work scope.”
(Unfortunately, this rule is often violated).
This conflict has perpetuated the mindset that MR should be “buried” within allowable cost
elements proposed on a project, so that once the contract is negotiated, the contractor then sets
aside an amount from the CBB for MR.
In the past, contractors would hold back a percentage (e.g., 10%) from the total negotiated
budget to establish MR and distribute the remainder to the Control Accounts. This is no longer
considered a best practice. These days, risk management is well-integrated with both cost
estimating and earned value management. Proposal costs are estimated by assessing and
quantifying potential risks and opportunities, developing risk and opportunity handling plans, and
including the cost of those handing plans in the proposal estimate. Through Monte Carlo and
other risk analysis techniques, proposal estimates with specific confidence levels can be
developed and proposed based upon a contractor’s risk appetite.
Upon contract award, the risk assessment is updated, and budgets are allocated to control
account plans based on the risk inherent in the control accounts’ work scope. Overall budget
allocation is typically made at a more challenging level of confidence than the proposal cost
estimate, allowing the extra budget for the establishment of management reserve. The
allocation of budget to individual control accounts is risk-based, with more budget allocated to
high-risk project elements; less budget allocated to lower-risk elements.
tensix.com	
The majority of the MR
established should be directly
related to overall project risk. In
addition, MR should be provided
for other unknowns, which will
arise during the project.
One process for assessing and quantifying risk and opportunities and using this information to
establish management reserve is as follows:
1. During the proposal stage, perform a risk analysis. Quantify the probability of
occurrence and the consequences of identified risk events. Identify risk/opportunity
handling plans to mitigate or eliminate risk and capture opportunities. Include the cost of
risk/opportunity handling plans in the proposal cost estimate. For risks that will be
accepted, include the cost of their consequences. Perform additional analysis to
determine the level of confidence in the cost estimate. Determine the confidence level
required for the acquisition based on management’s risk tolerance. For instance, you
may decide to bid a high-risk project with a cost estimate having an 80% confidence
level in order to ensure project success.
2. When the contract is awarded, budget the Control Accounts at a lower overall
confidence level, i.e., selectively issue target budgets lower than the high-confidence
estimate, to the control accounts based on their inherent risk, and retain the remaining
budget in MR.
a. For example; if a task will cost $110,000 with an 80% probability of success; and
b. The Control Account may be budgeted at $100,000 (based on a 50% probability
of success)
c. The remaining $10,000 is maintained in MR
3. Some of the allocated control account budgets should be used to plan risk/opportunity
handling activities. Generally, not all risk/opportunity handling activities are included in
the PMB; usually the handling activities for risks with a high probability of occurrence
and consequences will be initially planned. The remainder of the risks/opportunities will
be carefully monitored. When it becomes obvious that they are elevating in probability
or impact, MR can be issued to prospectively plan risk-handling activities. Therefore,
MR initially set aside should be carefully reviewed to determine if it is sufficient to handle
risks and opportunities not included in the initial PMB. In addition, some amount of MR
is also required for unknown unknowns that typically occur on any project and must be
based on management judgment, the type work, and past experience with this type of
project.
Figure	2	-	Management	Reserve	Components
tensix.com	
4. In the past contractors would just hold back a percentage (10%) from the negotiated
budget for MR and distribute the remainder to the Control Accounts. That is not a best
practice.
Then there is the issue with a “per-award IBR”. An IBR (Integrated Baseline Review) is
designed to provide a meeting that would assure both the client and contractor have a common
understanding of the scope of work and the risks involved. This has typically been done after
contract award but it is being used more often for follow on contracts and when the bidders list
is narrowed to 2 or 3 contractors. If the IBR is pre-award, then the MR cannot be shown. But
the risks used to establish the MR are part of the review. There is a potential conflict depending
on the experience of the review team.
Once the contract is underway, management reserve can be replenished in two ways.
1. Via changes to the contract
2. Via prospective replanning, to remove budget that will no longer be required due to the
result of opportunity realization.
Planning for contract changes is done exactly the same way as planning the initial PMB. An
amount of the contract target cost is set aside in MR based on the risk inherent in the added
contract scope. Every time you estimate a change that has risks associated with the new work
scope, you should perform a risk analysis, evaluate the cost of the risk and when approved,
withhold the risk amount for MR. It is just as valid for a change, as it is for the original project
planning.
The realization of opportunities, which are identified in the initial risk/opportunity assessment,
and subsequently managed proactively in order to realize them, often results in the elimination
of future work that had been planned in the PMB. Budget for this work, which will no longer be
required, can be transferred back to MR when the work/planning package containing it is
replanned.
The amount of MR needed for a project depends entirely upon the amount of risk it entails.
However, data are available to help a PM determine how much is typically required on several
types of projects. These data can be used as a benchmark. One of the questions often asked
is; “How much MR should I have?” That is an impossible question to answer in general, but
here is some background.
Management Reserve Study
There was one study done on Industry Averages for MR that was published in the Acquisition
Quarterly Review - Summer 2000 by; David Christiansen and Carl Templin. They reviewed data
from the Defense Acquisition Executive Summary (DAES) for the period 1975-1998. This study
included over 500 completed and ongoing contracts. The DAES reports reflect summarization
of information from contractor Contract Performance Reports (CPRs).
tensix.com	
In that report they charted the median percentage of MR by contract category and by acquisition
phase. Here are the charts. Figure 2 shows the median percent of MR by contract category
and Figure 3 shows the median percentage of MR by acquisition phase.
These are median numbers, not averages. That means there are an equal number of data
points above the median as there are below it. The range for the MR percentage was 2.2% to
6.1% where:
MR% = MR budget / Total allocated budget
Notice that for fixed price contracts the percentage is higher. Hopefully that is obvious, as the
risk is all on the contractor so the contractor would plan additional MR.
The MR percentage is higher for development contracts than for production contracts. That
seems obvious also, as there are a lot more risks in development work than in a production
project.
There are a few considerations in establishing and maintaining the MR;
1. Once a contract is awarded, refine / reassess mitigation measure(s) included for each
risk event. Things may have changed since you proposed the contract which will affect
future decisions
a. Reduce / transfer value of high cost risk to MR if mitigation effort was successful
2. Reevaluate risks and associated MR throughout execution of the contract
a. Risks change. When risks are retired, the associated MR is either formally
transferred to other risks or retained as “non-specific”
3. MR allocated during execution of contract should be directly tied to amount associated
with each identified risk
0
0.5
1
1.5
2
2.5
3
3.5
1 2 3 4
% MR
Quarter of Contract Life
Fixed-Price
Cost-Reimb.
Figure	4	–	Median	%	MR		
by	Contract	Category	
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
1 2 3 4
% MR
Quarter of Contract Life
Development
Production
Figure	5	–	Median	%	MR		
by	Acquisition	Phase
tensix.com	
4. MR allocations are part of the change control system. They are internal changes but
require that a change request is issued and the project manager authorizes the change
to the CA(s).
Using Management Reserve
Now we have defined what it is and discussed how it is estimated. Now we need to address
how it is used. The easy response; “it is to plan for new work scope that has not been planned
in the PMB, and is not out of scope to the contract”.
Once you know how much MR that is available, how do you identify and report it?
MR is reported on the Contract Performance Report (CPR) as a lump sum on formats 1 & 2. All
uses of the MR would be seen in the baseline change in CPR/IPMR Format 3 and the
description of the uses would be explained in Format 5. MR usage should be maintained in an
MR Log (or CBB Change Log) that tracks all of the additions to and uses of, MR. This log and
process should be identified in your change control procedures.
The MR log is an internal document but is the basis for changes to the baseline reported on
CPR/IPMR format 3. If you are audited, this is your backup. Inside the log is a cross reference
to the risk log that can support the estimate for all MR in the log.
For an EVM approach to be effective, all work must be planned with a budget. MR allows you
to make sure that this rule is followed. But it is still required to be formally authorized, planned
and tracked in the log.
Here are 2 examples of cases, which require MR;
Example #1 – as part of the development plan, an initial build of a prototype unit was to be
shipped to another facility for testing. While in shipment, the unit sustained $300,000 worth of
damage. The unit will have to be rebuilt and the entire schedule now has to be changed.
Tracking this in-scope change requires that the new work be planned and scheduled.
The budget for the rebuild needs to be planned in the appropriate Control Accounts so the
rebuild progress can be measured, like any other work in the project. It is not a contract
change; you cannot go to the customer for additional budget. This is where MR is used. This
assumes no one identified the accident as a risk, so this change was budgeted from the non-
specific portion of the MR.
Example #2 – the source code development testing and correcting cycle was estimated to
require three repetitions for a 60% probability of success, but could require up to six cycles. If
each of these cycles takes a month and $100,000, each repetition will have a significant impact
tensix.com	
on the project and needs to be tracked. At the end of three cycles, the code was still not error
free enough to pass testing and it was determined that it would take 2 more cycles.
The contract said “test to X standard”, not how many times to test and fix; so it will not be a
contract change. Each additional cycle that is required to meet the technical specifications for
delivery will need to be planned in all the control accounts affected and the budget will come
from MR. Since this was probably identified as a risk to the code development, this MR should
come from the portion estimated for code development risk.
In addition to the types of changes addressed in the two examples above, there are times when
all Control Accounts are affected by an unexpected change. For instance, the labor union won
a 10% pay increase over the amount planned. This means that every production Control
Account is likely to incur a 10% cost variance. If the variance reporting threshold is 10%, every
CAM is likely to have to provide a variance analysis based on something that they had no
control over. In this case, the PM may choose to allocate MR to all affected CA’s to negate the
issue. This “replanning” will have to follow change procedures but is within the purview of the
PM.
Mark Infanti
EVM Subject Matter Expert
Management Reserve

Mais conteúdo relacionado

Mais procurados

Building business continuity through risk management, presented by Kimberley ...
Building business continuity through risk management, presented by Kimberley ...Building business continuity through risk management, presented by Kimberley ...
Building business continuity through risk management, presented by Kimberley ...Association for Project Management
 
Risk Management and Risk Transfer
Risk Management and Risk TransferRisk Management and Risk Transfer
Risk Management and Risk TransferCBIZ, Inc.
 
Risk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesRisk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesILRI
 
Quantification of Risks in Project Management
Quantification of Risks in Project ManagementQuantification of Risks in Project Management
Quantification of Risks in Project ManagementVenkatesh Ganapathy
 
Risk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation SlidesRisk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation SlidesSlideTeam
 
Business Continuity Planning
Business Continuity PlanningBusiness Continuity Planning
Business Continuity PlanningPete DiSantis
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk managementKannan Subbiah
 
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...Association for Project Management
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)rafeeqameen
 
Business risk assessment
Business risk assessmentBusiness risk assessment
Business risk assessmentUzair Khan
 
Payback model of risk management by Dr. B. J. Mohite
Payback model of risk management by Dr. B. J. MohitePayback model of risk management by Dr. B. J. Mohite
Payback model of risk management by Dr. B. J. MohiteZeal Education Society, Pune
 
Risk Management
Risk ManagementRisk Management
Risk Managementysshah
 
Effective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation SlidesEffective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation SlidesSlideTeam
 

Mais procurados (20)

Building business continuity through risk management, presented by Kimberley ...
Building business continuity through risk management, presented by Kimberley ...Building business continuity through risk management, presented by Kimberley ...
Building business continuity through risk management, presented by Kimberley ...
 
Risk Management and Risk Transfer
Risk Management and Risk TransferRisk Management and Risk Transfer
Risk Management and Risk Transfer
 
Risk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesRisk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniques
 
Quantification of Risks in Project Management
Quantification of Risks in Project ManagementQuantification of Risks in Project Management
Quantification of Risks in Project Management
 
Risk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation SlidesRisk Mitigation Strategy Powerpoint Presentation Slides
Risk Mitigation Strategy Powerpoint Presentation Slides
 
Basic risk management presentation 17th june 2015
Basic risk management presentation 17th june 2015Basic risk management presentation 17th june 2015
Basic risk management presentation 17th june 2015
 
Business Continuity Planning
Business Continuity PlanningBusiness Continuity Planning
Business Continuity Planning
 
Risk Assessment And Risk Treatment
Risk Assessment And Risk TreatmentRisk Assessment And Risk Treatment
Risk Assessment And Risk Treatment
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk management
 
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
Risk analysis for project decision-making, presented by Keith Gray, 10th Oct ...
 
project risk analysis
project risk analysisproject risk analysis
project risk analysis
 
Risk Mitigation
Risk MitigationRisk Mitigation
Risk Mitigation
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Risk management
Risk managementRisk management
Risk management
 
Project mngmnt risks3.2
Project mngmnt risks3.2Project mngmnt risks3.2
Project mngmnt risks3.2
 
Business risk assessment
Business risk assessmentBusiness risk assessment
Business risk assessment
 
Payback model of risk management by Dr. B. J. Mohite
Payback model of risk management by Dr. B. J. MohitePayback model of risk management by Dr. B. J. Mohite
Payback model of risk management by Dr. B. J. Mohite
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Effective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation SlidesEffective Business Continuity Plan Powerpoint Presentation Slides
Effective Business Continuity Plan Powerpoint Presentation Slides
 
Enterprise risk management presentation to APM SWWE branch
Enterprise risk management presentation to APM SWWE branchEnterprise risk management presentation to APM SWWE branch
Enterprise risk management presentation to APM SWWE branch
 

Destaque

Document Management in the Mobile World
Document Management in the Mobile WorldDocument Management in the Mobile World
Document Management in the Mobile WorldHelpSystems
 
กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐
กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐
กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐ประพันธ์ เวารัมย์
 
Le Bazar des Tendances N°2 (Août 2014)
Le Bazar des Tendances N°2 (Août 2014)Le Bazar des Tendances N°2 (Août 2014)
Le Bazar des Tendances N°2 (Août 2014)archimede7
 
SAP PI-XI Cert(clr)
SAP PI-XI Cert(clr)SAP PI-XI Cert(clr)
SAP PI-XI Cert(clr)George K
 
Fundraising & event planning
Fundraising & event planningFundraising & event planning
Fundraising & event planningJoel Natt
 
English Speaking Club: 2/10 Advertisements
English Speaking Club: 2/10 AdvertisementsEnglish Speaking Club: 2/10 Advertisements
English Speaking Club: 2/10 AdvertisementsJennifer Lee
 
191 نظام التواصل باستبدال الصور
191  نظام التواصل باستبدال الصور191  نظام التواصل باستبدال الصور
191 نظام التواصل باستبدال الصورOsama Madbooly
 
Small_Merchant_Guide_to_Safe_Payments
Small_Merchant_Guide_to_Safe_PaymentsSmall_Merchant_Guide_to_Safe_Payments
Small_Merchant_Guide_to_Safe_PaymentsSteve Abrams
 
life inside an orphanage, by Guna Dwi
life inside an orphanage, by Guna Dwilife inside an orphanage, by Guna Dwi
life inside an orphanage, by Guna DwiSari Asih
 

Destaque (16)

Document Management in the Mobile World
Document Management in the Mobile WorldDocument Management in the Mobile World
Document Management in the Mobile World
 
SMA_CV2
SMA_CV2SMA_CV2
SMA_CV2
 
Humberto Cazarez Marines Resume Feb 2015
Humberto Cazarez Marines  Resume Feb 2015Humberto Cazarez Marines  Resume Feb 2015
Humberto Cazarez Marines Resume Feb 2015
 
กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐
กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐
กฎกระทรวง (พ.ศ.๒๕๔๑) ออกตามความในพระราชบัญญัติข้อมูลข่าวสารของราชการ พ.ศ. ๒๕๔๐
 
Le Bazar des Tendances N°2 (Août 2014)
Le Bazar des Tendances N°2 (Août 2014)Le Bazar des Tendances N°2 (Août 2014)
Le Bazar des Tendances N°2 (Août 2014)
 
SAP PI-XI Cert(clr)
SAP PI-XI Cert(clr)SAP PI-XI Cert(clr)
SAP PI-XI Cert(clr)
 
Certificate
CertificateCertificate
Certificate
 
Heaven ice cream
Heaven ice cream Heaven ice cream
Heaven ice cream
 
Fundraising & event planning
Fundraising & event planningFundraising & event planning
Fundraising & event planning
 
Certificate
CertificateCertificate
Certificate
 
English Speaking Club: 2/10 Advertisements
English Speaking Club: 2/10 AdvertisementsEnglish Speaking Club: 2/10 Advertisements
English Speaking Club: 2/10 Advertisements
 
La rutina diaria
La rutina diariaLa rutina diaria
La rutina diaria
 
Six steps to add value to your car park
Six steps to add value to your car parkSix steps to add value to your car park
Six steps to add value to your car park
 
191 نظام التواصل باستبدال الصور
191  نظام التواصل باستبدال الصور191  نظام التواصل باستبدال الصور
191 نظام التواصل باستبدال الصور
 
Small_Merchant_Guide_to_Safe_Payments
Small_Merchant_Guide_to_Safe_PaymentsSmall_Merchant_Guide_to_Safe_Payments
Small_Merchant_Guide_to_Safe_Payments
 
life inside an orphanage, by Guna Dwi
life inside an orphanage, by Guna Dwilife inside an orphanage, by Guna Dwi
life inside an orphanage, by Guna Dwi
 

Semelhante a Management Reserve

Integrated Analysis of Schedule and Cost Risk
Integrated Analysis of Schedule and Cost RiskIntegrated Analysis of Schedule and Cost Risk
Integrated Analysis of Schedule and Cost RiskHKA
 
Modelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsModelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsFinancial Modelling Handbook
 
Essential views of the IPMR
Essential views of the IPMREssential views of the IPMR
Essential views of the IPMRGlen Alleman
 
Chapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital BudgetingChapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital BudgetingFiaz Ahmad
 
Chapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital BudgetingChapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital BudgetingInocentshuja Ahmad
 
DIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docx
DIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docxDIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docx
DIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docxduketjoy27252
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docxpauline234567
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)FahadHasan36
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxDr. ABEER KHALID MANSOUR
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
 
CPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfCPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfDejeneTsegaye6
 
CPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfCPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfDejeneTsegaye6
 
340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docxgilbertkpeters11344
 
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docxEM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docxjack60216
 
3 pm3 c_3%20-%20the%20program%20budget
3 pm3 c_3%20-%20the%20program%20budget3 pm3 c_3%20-%20the%20program%20budget
3 pm3 c_3%20-%20the%20program%20budgetharwoodr
 
The word contingency has been given a completelynew meanin.docx
The word contingency has been given a completelynew meanin.docxThe word contingency has been given a completelynew meanin.docx
The word contingency has been given a completelynew meanin.docxarnoldmeredith47041
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsEssam Lotffy, PMP®, CCP®
 

Semelhante a Management Reserve (20)

Integrated Analysis of Schedule and Cost Risk
Integrated Analysis of Schedule and Cost RiskIntegrated Analysis of Schedule and Cost Risk
Integrated Analysis of Schedule and Cost Risk
 
MSP 2011 part 2
MSP 2011 part 2MSP 2011 part 2
MSP 2011 part 2
 
Modelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction ContractsModelling Advance Payments & Retentions In Construction Contracts
Modelling Advance Payments & Retentions In Construction Contracts
 
Essential views of the IPMR
Essential views of the IPMREssential views of the IPMR
Essential views of the IPMR
 
Chapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital BudgetingChapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital Budgeting
 
Chapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital BudgetingChapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital Budgeting
 
DIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docx
DIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docxDIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docx
DIRECTED READING THREE PERCEPTIONS OF PROJECT COST D.H. Hamburg.docx
 
Contingency_Paper
Contingency_PaperContingency_Paper
Contingency_Paper
 
INFORMATION SYTEMS .docx
INFORMATION SYTEMS                                                .docxINFORMATION SYTEMS                                                .docx
INFORMATION SYTEMS .docx
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
engineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptxengineering economics lect 8-10 final.pptx
engineering economics lect 8-10 final.pptx
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
CPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfCPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdf
 
CPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdfCPM lecture note 4,5,6&7.pdf
CPM lecture note 4,5,6&7.pdf
 
340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx340Capital BudgetingTechniquesCertainty and Risk.docx
340Capital BudgetingTechniquesCertainty and Risk.docx
 
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docxEM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
EM660 PROJECT MANAGEMENTClass 6Class 6 Agenda Fi.docx
 
3 pm3 c_3%20-%20the%20program%20budget
3 pm3 c_3%20-%20the%20program%20budget3 pm3 c_3%20-%20the%20program%20budget
3 pm3 c_3%20-%20the%20program%20budget
 
The word contingency has been given a completelynew meanin.docx
The word contingency has been given a completelynew meanin.docxThe word contingency has been given a completelynew meanin.docx
The word contingency has been given a completelynew meanin.docx
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 

Mais de Ten Six Consulting

Primavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingPrimavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingTen Six Consulting
 
Primavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingPrimavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingTen Six Consulting
 
Primavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingPrimavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingTen Six Consulting
 
Deltek Cobra Advanced Training
Deltek Cobra Advanced TrainingDeltek Cobra Advanced Training
Deltek Cobra Advanced TrainingTen Six Consulting
 
Difficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperDifficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperTen Six Consulting
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics trainingTen Six Consulting
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsTen Six Consulting
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsTen Six Consulting
 
Primavera P6 Reports Tab Samples
Primavera P6 Reports Tab SamplesPrimavera P6 Reports Tab Samples
Primavera P6 Reports Tab SamplesTen Six Consulting
 
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Ten Six Consulting
 
Installing Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneInstalling Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneTen Six Consulting
 
Primavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetPrimavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetTen Six Consulting
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexTen Six Consulting
 
Primavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapPrimavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapTen Six Consulting
 
Measurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidMeasurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidTen Six Consulting
 
Earned Value Management Variance
Earned Value Management VarianceEarned Value Management Variance
Earned Value Management VarianceTen Six Consulting
 
Primavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapPrimavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapTen Six Consulting
 
Integrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingIntegrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingTen Six Consulting
 

Mais de Ten Six Consulting (20)

Primavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingPrimavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals Training
 
Primavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingPrimavera P6 Professional Advanced Training
Primavera P6 Professional Advanced Training
 
Primavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingPrimavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator Training
 
Deltek Cobra Advanced Training
Deltek Cobra Advanced TrainingDeltek Cobra Advanced Training
Deltek Cobra Advanced Training
 
Difficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperDifficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White Paper
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics training
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation Instructions
 
Advanced evm workshop
Advanced evm workshopAdvanced evm workshop
Advanced evm workshop
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructions
 
Primavera P6 Reports Tab Samples
Primavera P6 Reports Tab SamplesPrimavera P6 Reports Tab Samples
Primavera P6 Reports Tab Samples
 
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
 
Installing Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneInstalling Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standalone
 
Primavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetPrimavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheet
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets Index
 
Primavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapPrimavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar Map
 
Measurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidMeasurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to Avoid
 
Earned Value Management Variance
Earned Value Management VarianceEarned Value Management Variance
Earned Value Management Variance
 
Primavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapPrimavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar Map
 
Integrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingIntegrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) Training
 
Primavera P6 Hot Keys
Primavera P6 Hot KeysPrimavera P6 Hot Keys
Primavera P6 Hot Keys
 

Último

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Último (20)

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Management Reserve

  • 1.
  • 2. tensix.com Management Reserve Defined Management Reserve (MR) is defined in EIA 748 Earned Value Management Systems, the commercial standard for EVMS, as “An amount of the total budget withheld for management control purposes, rather than being designated for the accomplishment of a specific task or set of tasks.” In most programs, particularly developmental efforts, there is considerable uncertainty regarding timing and/or magnitude of future difficulties such as: • Growth within currently authorized work scope • Rate changes (overhead, labor, material, currency, etc.) • Risk - its probability of occurrence and its impact • Other program unknowns Consequently, MR is established to provide a source of budget to plan and execute effort initially excluded from the project plan, which is necessary to overcome these difficulties and keep the project on track. Many people incorrectly view MR as funding contingency. In order to better understand MR, the difference between funding and budget must be well understood. Budget is the estimated cost for the planned work agreed to by both contractor and customer. Funding is the amount of money held by the customer to reimburse the contractor’s actual costs and fees or price (depending on the contract type). Figure 1 illustrates the classic relationship between budget elements and funding. Figure 1 Budget/Funding Relationship
  • 3. tensix.com A customer generally requires funds in excess of the contractor’s budget to pay for contract changes and overruns (if allowed by the contract). OMB encourages customers (federal agencies) to establish program risk-adjusted budgets (PRB) to provide funding and schedule contingencies to cover the risk of cost and schedule overruns on a project. Figure 2 shows how the MR, which is part of the contractor’s budget, relates to the customer’s contingencies comprising the program risk adjusted budget. In this diagram you can see the difference between the contractor’s CBB and the customer’s Program Risk Adjusted Budget (PRB), depicted by the shaded area. The PRB includes the amount of additional funds and time that the customer has available to handle cost and schedule growth that may occur on the project. As the name implies, it is based on the risks identified by the customer for the project, which are usually based upon the customer’s history and experience with similar projects. The horizontal scale, representing time, shows that the PRB is planned to a date beyond the contract end date. This is the equivalent of schedule contingency or reserve that may be held by the customer. The blue line is the total time phased budget or planned value (PV). The total of the entire planned budget is the Budget at Completion (BAC). Above that, is the contractor’s Management Reserve (MR). The BAC + MR = the Contract Budget Base (CBB). This is the total estimated ‘cost’ of the project. Above that is fee, which when added to the CBB yields the Contract Target Price (CTP), (not shown). Upon completion of a contract, some MR often remains. This may be true whether the contractor’s final actual cost was over or under the contractor’s planned cost at completion or BAC. Many people find this bothersome due to their confusion over the differences between budget and funds. Ultimately, the contractor will be paid, from funding allocated to the contract, for all contractually allowable costs and fee incurred in performance of the project. This may end up being in excess of the budget (overrun) or less than the budget (under-run) and any remaining MR is simply a number in a log. Figure 2 - Budget and Funding Profiles
  • 4. tensix.com Estimating Management Reserve FAR 31.205-7 (c), defines contingency as a possible future event or condition arising from presently known or unknown causes, the outcome of which is indeterminable at the present time and indicates that costs for contingencies are generally not allowable. Those which are foreseeable within reasonable limits of accuracy, e.g., anticipated costs of rejects and defective work may be included in the estimates of future cost so as to provide the best estimate of performance cost. In contrast, Management Reserve (MR) is not foreseeable and should not be included in the PMB. The challenge then is how to estimate the cost impact of risks, which are uncertain future events, in the proposal cost estimate, so that sufficient budget is available to plan the know work and set aside management reserves. The EIA 748 standard says “MR is not a contingency that can’t be eliminated from prices during subsequent negotiations or used to absorb the cost of program changes. The budget being held in reserve must not be viewed by a customer as source of funding for added work scope.” (Unfortunately, this rule is often violated). This conflict has perpetuated the mindset that MR should be “buried” within allowable cost elements proposed on a project, so that once the contract is negotiated, the contractor then sets aside an amount from the CBB for MR. In the past, contractors would hold back a percentage (e.g., 10%) from the total negotiated budget to establish MR and distribute the remainder to the Control Accounts. This is no longer considered a best practice. These days, risk management is well-integrated with both cost estimating and earned value management. Proposal costs are estimated by assessing and quantifying potential risks and opportunities, developing risk and opportunity handling plans, and including the cost of those handing plans in the proposal estimate. Through Monte Carlo and other risk analysis techniques, proposal estimates with specific confidence levels can be developed and proposed based upon a contractor’s risk appetite. Upon contract award, the risk assessment is updated, and budgets are allocated to control account plans based on the risk inherent in the control accounts’ work scope. Overall budget allocation is typically made at a more challenging level of confidence than the proposal cost estimate, allowing the extra budget for the establishment of management reserve. The allocation of budget to individual control accounts is risk-based, with more budget allocated to high-risk project elements; less budget allocated to lower-risk elements.
  • 5. tensix.com The majority of the MR established should be directly related to overall project risk. In addition, MR should be provided for other unknowns, which will arise during the project. One process for assessing and quantifying risk and opportunities and using this information to establish management reserve is as follows: 1. During the proposal stage, perform a risk analysis. Quantify the probability of occurrence and the consequences of identified risk events. Identify risk/opportunity handling plans to mitigate or eliminate risk and capture opportunities. Include the cost of risk/opportunity handling plans in the proposal cost estimate. For risks that will be accepted, include the cost of their consequences. Perform additional analysis to determine the level of confidence in the cost estimate. Determine the confidence level required for the acquisition based on management’s risk tolerance. For instance, you may decide to bid a high-risk project with a cost estimate having an 80% confidence level in order to ensure project success. 2. When the contract is awarded, budget the Control Accounts at a lower overall confidence level, i.e., selectively issue target budgets lower than the high-confidence estimate, to the control accounts based on their inherent risk, and retain the remaining budget in MR. a. For example; if a task will cost $110,000 with an 80% probability of success; and b. The Control Account may be budgeted at $100,000 (based on a 50% probability of success) c. The remaining $10,000 is maintained in MR 3. Some of the allocated control account budgets should be used to plan risk/opportunity handling activities. Generally, not all risk/opportunity handling activities are included in the PMB; usually the handling activities for risks with a high probability of occurrence and consequences will be initially planned. The remainder of the risks/opportunities will be carefully monitored. When it becomes obvious that they are elevating in probability or impact, MR can be issued to prospectively plan risk-handling activities. Therefore, MR initially set aside should be carefully reviewed to determine if it is sufficient to handle risks and opportunities not included in the initial PMB. In addition, some amount of MR is also required for unknown unknowns that typically occur on any project and must be based on management judgment, the type work, and past experience with this type of project. Figure 2 - Management Reserve Components
  • 6. tensix.com 4. In the past contractors would just hold back a percentage (10%) from the negotiated budget for MR and distribute the remainder to the Control Accounts. That is not a best practice. Then there is the issue with a “per-award IBR”. An IBR (Integrated Baseline Review) is designed to provide a meeting that would assure both the client and contractor have a common understanding of the scope of work and the risks involved. This has typically been done after contract award but it is being used more often for follow on contracts and when the bidders list is narrowed to 2 or 3 contractors. If the IBR is pre-award, then the MR cannot be shown. But the risks used to establish the MR are part of the review. There is a potential conflict depending on the experience of the review team. Once the contract is underway, management reserve can be replenished in two ways. 1. Via changes to the contract 2. Via prospective replanning, to remove budget that will no longer be required due to the result of opportunity realization. Planning for contract changes is done exactly the same way as planning the initial PMB. An amount of the contract target cost is set aside in MR based on the risk inherent in the added contract scope. Every time you estimate a change that has risks associated with the new work scope, you should perform a risk analysis, evaluate the cost of the risk and when approved, withhold the risk amount for MR. It is just as valid for a change, as it is for the original project planning. The realization of opportunities, which are identified in the initial risk/opportunity assessment, and subsequently managed proactively in order to realize them, often results in the elimination of future work that had been planned in the PMB. Budget for this work, which will no longer be required, can be transferred back to MR when the work/planning package containing it is replanned. The amount of MR needed for a project depends entirely upon the amount of risk it entails. However, data are available to help a PM determine how much is typically required on several types of projects. These data can be used as a benchmark. One of the questions often asked is; “How much MR should I have?” That is an impossible question to answer in general, but here is some background. Management Reserve Study There was one study done on Industry Averages for MR that was published in the Acquisition Quarterly Review - Summer 2000 by; David Christiansen and Carl Templin. They reviewed data from the Defense Acquisition Executive Summary (DAES) for the period 1975-1998. This study included over 500 completed and ongoing contracts. The DAES reports reflect summarization of information from contractor Contract Performance Reports (CPRs).
  • 7. tensix.com In that report they charted the median percentage of MR by contract category and by acquisition phase. Here are the charts. Figure 2 shows the median percent of MR by contract category and Figure 3 shows the median percentage of MR by acquisition phase. These are median numbers, not averages. That means there are an equal number of data points above the median as there are below it. The range for the MR percentage was 2.2% to 6.1% where: MR% = MR budget / Total allocated budget Notice that for fixed price contracts the percentage is higher. Hopefully that is obvious, as the risk is all on the contractor so the contractor would plan additional MR. The MR percentage is higher for development contracts than for production contracts. That seems obvious also, as there are a lot more risks in development work than in a production project. There are a few considerations in establishing and maintaining the MR; 1. Once a contract is awarded, refine / reassess mitigation measure(s) included for each risk event. Things may have changed since you proposed the contract which will affect future decisions a. Reduce / transfer value of high cost risk to MR if mitigation effort was successful 2. Reevaluate risks and associated MR throughout execution of the contract a. Risks change. When risks are retired, the associated MR is either formally transferred to other risks or retained as “non-specific” 3. MR allocated during execution of contract should be directly tied to amount associated with each identified risk 0 0.5 1 1.5 2 2.5 3 3.5 1 2 3 4 % MR Quarter of Contract Life Fixed-Price Cost-Reimb. Figure 4 – Median % MR by Contract Category 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 1 2 3 4 % MR Quarter of Contract Life Development Production Figure 5 – Median % MR by Acquisition Phase
  • 8. tensix.com 4. MR allocations are part of the change control system. They are internal changes but require that a change request is issued and the project manager authorizes the change to the CA(s). Using Management Reserve Now we have defined what it is and discussed how it is estimated. Now we need to address how it is used. The easy response; “it is to plan for new work scope that has not been planned in the PMB, and is not out of scope to the contract”. Once you know how much MR that is available, how do you identify and report it? MR is reported on the Contract Performance Report (CPR) as a lump sum on formats 1 & 2. All uses of the MR would be seen in the baseline change in CPR/IPMR Format 3 and the description of the uses would be explained in Format 5. MR usage should be maintained in an MR Log (or CBB Change Log) that tracks all of the additions to and uses of, MR. This log and process should be identified in your change control procedures. The MR log is an internal document but is the basis for changes to the baseline reported on CPR/IPMR format 3. If you are audited, this is your backup. Inside the log is a cross reference to the risk log that can support the estimate for all MR in the log. For an EVM approach to be effective, all work must be planned with a budget. MR allows you to make sure that this rule is followed. But it is still required to be formally authorized, planned and tracked in the log. Here are 2 examples of cases, which require MR; Example #1 – as part of the development plan, an initial build of a prototype unit was to be shipped to another facility for testing. While in shipment, the unit sustained $300,000 worth of damage. The unit will have to be rebuilt and the entire schedule now has to be changed. Tracking this in-scope change requires that the new work be planned and scheduled. The budget for the rebuild needs to be planned in the appropriate Control Accounts so the rebuild progress can be measured, like any other work in the project. It is not a contract change; you cannot go to the customer for additional budget. This is where MR is used. This assumes no one identified the accident as a risk, so this change was budgeted from the non- specific portion of the MR. Example #2 – the source code development testing and correcting cycle was estimated to require three repetitions for a 60% probability of success, but could require up to six cycles. If each of these cycles takes a month and $100,000, each repetition will have a significant impact
  • 9. tensix.com on the project and needs to be tracked. At the end of three cycles, the code was still not error free enough to pass testing and it was determined that it would take 2 more cycles. The contract said “test to X standard”, not how many times to test and fix; so it will not be a contract change. Each additional cycle that is required to meet the technical specifications for delivery will need to be planned in all the control accounts affected and the budget will come from MR. Since this was probably identified as a risk to the code development, this MR should come from the portion estimated for code development risk. In addition to the types of changes addressed in the two examples above, there are times when all Control Accounts are affected by an unexpected change. For instance, the labor union won a 10% pay increase over the amount planned. This means that every production Control Account is likely to incur a 10% cost variance. If the variance reporting threshold is 10%, every CAM is likely to have to provide a variance analysis based on something that they had no control over. In this case, the PM may choose to allocate MR to all affected CA’s to negate the issue. This “replanning” will have to follow change procedures but is within the purview of the PM. Mark Infanti EVM Subject Matter Expert