Tiling 1
35. Civil Engineering Department NPIC
also for the grout joint between the first two rows of tiles. Repeat this with the
chalkline along the other wall; these are your working lines. Fasten a wood
batten (1x2 or1x3) along each line to get rigid guides to butt the tiles against.
Make sure the battens in a corner form a right angle. If they don’t, check your
measurements and adiust as needed. For a concrete floor, you may want to
rely on chalk lines only.
1.2 karerobkar:U)at ³
viFIsaRsþ ³
1. ebokkav ³ esckIþENnaMBIeragcRk nigR)ab;GñkBIreboblaykav nigTMhMsøabRBaebok
GñkRtUvkaredIm,IkMritRsTab;kav)anRtwmRtUv . BinitüemIlTMhMecaHeday Check the
notch size by setting a tile in adhesive, then, removing it. If there are gaps in
the adhesive on the back of the tiLe, the notches are too small. If adhesive
squeezes out the edges of the tilel the notches are too big. The label will give
the open time from 5 to 45 minutes. RKb;kavTaMgGs;/ eTaHbICa thin-set b¤ma:sÞic,
RtUv)anebokdUcKña . cak;C½rkavmYycMnnenAelI backing b¤ eRbIkaMbtcUckavecjBIFg .
Y i u
eRbIsøabRBasMEb:tedIm,IBRgabeGayesIþgelIxñgva . ebokRsTab;TIBIredaysøabRBa
maneFμj/ rkSasøabRBanUvmuM 45 eTA 60 ehIysgát;eGayhab;eTAelICBa¢aMg sib,
o o
nimitþedIm,IeGay mancg¥Úr. eFIVlMnaMenHcuHeLIgenAelIpÞaMgCBa¢aMg.CamYykar:U/ eRbI kav
manRsTab;Rkas;bnþic .kuMlabkaveRcIn ehIyTukecalRbEhl 15 naTI b¤ Rbsin vakk
RsTab;elI ehIyekaskavecj ehIyebokkavfμI .
2. karerobkar:UTImYy ³ erobkar:UTImYyedaydMvaefI²eTAkac;RCugénemeQIBIr . kMurMkil kar:U