Environmental impact
assessment
Presentation author:
Ms. G. Tejasri
Faculty of Engineering Sciences,
NIT AP – 534101.
Sustainable development
• Development that meets the needs of
today’s generation without compromising
those of future generations
EIA
• The environmental impact assessment is
an innovative process recommended by
different international agencies as a valid
environmental protection tool and
endorsed by the experience gained in
developed countries that have
incorporated it into their legal systems.
•It is an early warning process that
verifies the enforcement of
environmental policies.
•It is a preventive tool used to evaluate
the negative and positive environmental
impacts of policies, plans, programs, and
projects.
•The EIA proposes measures to adjust
impacts to acceptable levels.
• EIA is a tool used in planning development
strategies and projects, and its use has
been adopted into planning regulations in
a number of countries, and by a number
of regional groupings and multilateral
agencies
•Environmental impact assessment (EIA) is
a process of identifying, predicting,
evaluating, and mitigating the physical,
chemical, biological, cultural, social, and
other relevant effects of proposed projects,
plans and programs prior to major
decisions and commitments being made.
•The objective of EIA is not to halt the
projects but to bring about project design
changes for reducing negative
environmental impact.
• EIA can be defined as the systematic
identification and evaluation of the
potential impacts of the proposed project,
plans, programs or legislative actions
relative to the physical-chemical,
biological, cultural and socio- economic
components of the total environment.
Principles of EIA administration and practice
Three core values on which the EIA process is
based:
• Integrity– the EIA process should meet
internationally accepted requirements and
standards of practice;
• Utility– the EIA process should provide the
information which is sufficient and relevant for
decision-making; and
• Sustainability– the EIA process should result in
the implementation of environmental safeguards
which are sufficient to mitigate serious adverse
effects and avoid irreversible loss of resource
and ecosystem functions.
Purpose of EIA
• To encourage productive and enjoyable
harmony between man and his environment
• To promote efforts which will prevent or
eliminate damage to the environment and
biosphere and stimulate the health and
welfare of man
• To enrich the understanding of the ecological
systems and natural resources important to
the Nation
• To implement a strategy of sustainable
development, prevent adverse impact on the
environment after the implementation of plans
and construction projects, and promote
coordinated development of the economy, society,
and environment.
• To allow government officials, business leaders,
and all concerned citizens to understand the likely
environmental consequences of proposed
actions, and to cooperate in making wise
decisions that restore and maintain the quality of
our shared environment for future generations.
Important parts of the EIA
process
• To decide in advance whether an environmental impact assessment is necessary.
• To analyze only the actions that may have a significant environmental impact.
• To incorporate beforehand significant impact criteria, such as:
–Air and water pollution.
–Deterioration of protected natural and ecological resources.
–Undesirable impacts such as landscape deterioration, generation of noise, and
others.
–Discharges of toxic or hazardous substances or waste generation.
–Cumulative adverse effects.
–Negative socio cultural impacts.
–Significant public controversy.
Limitations of Environmental
Impact Studies
• It is not always possible to emphasize the interdisciplinary
character, although this is essential.
• They use predictive methods based on scientific
information that is not always available.
• They use abstract concepts which cannot always compete
with sciences that incorporate quantifiable data.
• They need data that are all at the same level and
exchangeable on compatible scales.
• Since they have a varied methodological framework, it is necessary to know the
land or place affected in order to define its use.
• They use the fragility and quality analysis of the affected land, for which there are
often no baseline data available.
• They require detailed information that is not always available or is not compatible
with the study requirements.
• They have to improve the methods of appraisal for analyzing environmental
impacts in the same way as economic and social impacts.
• Some environmental components are difficult to address, such as quality
analysis, fragility of the land, and landscape value, among others.
Benefits and flaws
EIAprocess
Screening
• Screening is the first key decision of the EIA
process.
• Screening is the process used to determine
whether a proposed project or activity requires an
EIA and, if so, what level of environmental review
is necessary.
• The purpose of screening is to determine whether
a proposal requires an EIA or not.
• Some type of screening procedure is necessary
because of the large number of projects and
activities that are potentially subject to EIA.
Scoping
• Scoping is a critical, early step in the preparation
of an EIA.
• The scoping process identifies the issues that are
likely to be of most importance during the EIA and
eliminates those that are of little concern.
• Typically, this process concludes with the
establishment of Terms of Reference for the
preparation of an EIA.
• A quality scoping study reduces the risk of
including inappropriate components or excluding
components which should be addressed in an
environmental assessment.
Preliminary assessment
• The preliminary assessment is useful
insofar as it reviews the required
environmental coverage and provides
decision makers with background data.
• It helps identify requirements that need to
be met if environmental sustainability is to
be achieved.
• A good preliminary assessment requires the
following information:
– General description of the project
– Applicable environmental legislation
– An estimate of significant environmental
impacts
– A general description of the area of influence
– Mitigating measures to manage potential
impacts.
Mitigation
• Mitigation is the design and execution of measures
to reduce, mitigate, or minimize the negative
impacts of a project, work, or activity on human or
natural environments.
• Mitigation can restore one or more environmental
components to pre-impact quality; if this is not
possible, it can reestablish the basic properties.
• Mitigation is the avoidance, elimination, reduction
or control of adverse effects of a project.
• May require changes in planning, design and
engineering, location and timing, and project
management to mitigate adverse effects.
Environmental management plan
• The environmental management plan identifies
measures to mitigate and compensate significant
environmental impacts.
• It ensures mitigation measures are implemented
• It establishes systems and procedures for this
purpose
• It monitors the effectiveness of mitigation
measures
• It takes action when unforeseen impacts occur
Public involvement/ participation
• Public involvement is a fundamental principle of the EIA
process.
• Process through which people who will be affected by or are
interested in a decision, and who have a stake in the
outcome, get a chance to influence its content before it is
made.
• Timely, well planned and appropriately implemented public
involvement programs will contribute to EIA studies and to the
successful design, implementation, operation and
management of proposals.
• Specifically public involvement is a valuable source of
information on key impacts, potential mitigation measures and
the identification and selection of alternatives.
Environmental impact assessment
methods
• a) Meetings of experts: This method is useful when the
impact to be studied is specific and limited. If it is not
so, neither speed nor thoroughness can be demanded
because of interdisciplinary conflicts.
• b) Checklists: Detailed lists to identify impacts rapidly.
There are merely indicative lists and quantitative lists
that use standards to define the main impacts (for
example, air pollution according to number of
households)
• c) Simple cause-effect matrices: They are limited
matrices that relate the affected environmental
variable with the human activity that induces it.
• d) Graphs and flow charts: They seek to
determine chains of primary and secondary
impacts with existing interactions and are
used to define the types of impacts expected.
• e) Environmental cartography or map
overlay: Set of maps that represent the main
environmental characteristics.
• f) Networks: Expanded flow charts with
primary, secondary, and tertiary impacts.
• g) Geographic information systems:
Computer programs that do not identify
impacts, but rather attempt to assess their
importance.
• h) Matrices: Double-input tables with
environmental characteristics and
expected activities of the project. The
corresponding impact is identified by
intersecting each row with each column.
Environmental impact assessment

Mais conteúdo relacionado

Mais procurados

Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
Chandrakant Singh
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prithvi Ghag
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prateek Bansal
 

Mais procurados (20)

Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
EIA
EIAEIA
EIA
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Esia
EsiaEsia
Esia
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessment
 
IEE and screening in EIA
IEE and screening in EIAIEE and screening in EIA
IEE and screening in EIA
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
EIA process
EIA processEIA process
EIA process
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 

Destaque

Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Bahadur Prasad
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
Intan Ayuna
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
Bibhabasu Mohanty
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
NAVER Engineering
 

Destaque (20)

Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...
 
Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorch
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
 
Deep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive LandscapeDeep learning an Introduction with Competitive Landscape
Deep learning an Introduction with Competitive Landscape
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
 
Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)Methods of eia(environmental impact assessment)
Methods of eia(environmental impact assessment)
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
Pytorch for tf_developers
Pytorch for tf_developersPytorch for tf_developers
Pytorch for tf_developers
 
Environmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of WinnipegEnvironmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of Winnipeg
 
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
 

Semelhante a Environmental impact assessment

Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
thanga2
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
ssusereef268
 

Semelhante a Environmental impact assessment (20)

Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
eia.ppt
eia.ppteia.ppt
eia.ppt
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
Procedure for EIA.pptx
Procedure for EIA.pptxProcedure for EIA.pptx
Procedure for EIA.pptx
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
 
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
NALINI ( topic for M. Sc Ag. Agroforestry assigment EIA and ERA.pptx)
 
Ecw 579 week 13
Ecw 579 week 13Ecw 579 week 13
Ecw 579 week 13
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptx
 
Economic Valuation of Environmental and Natural Resources
Economic Valuation of Environmental and Natural ResourcesEconomic Valuation of Environmental and Natural Resources
Economic Valuation of Environmental and Natural Resources
 
EIA
EIAEIA
EIA
 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
 
SEA.pptx
SEA.pptxSEA.pptx
SEA.pptx
 
EIA Methodologies
EIA MethodologiesEIA Methodologies
EIA Methodologies
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 

Mais de Nanyang Technological University, Singapore

Mais de Nanyang Technological University, Singapore (14)

Ielts – quick tips for over night learners
Ielts – quick tips for over night learnersIelts – quick tips for over night learners
Ielts – quick tips for over night learners
 
Interview hacks
Interview hacksInterview hacks
Interview hacks
 
Video presentation template
Video presentation templateVideo presentation template
Video presentation template
 
World water day
World water dayWorld water day
World water day
 
Air pollution notes
Air pollution notesAir pollution notes
Air pollution notes
 
Ecosystem and biodiversity.compressed
Ecosystem and biodiversity.compressedEcosystem and biodiversity.compressed
Ecosystem and biodiversity.compressed
 
Air pollution
Air pollutionAir pollution
Air pollution
 
Swm notes
Swm notesSwm notes
Swm notes
 
7 r's
7 r's7 r's
7 r's
 
A monograph on sw&m
A monograph on sw&mA monograph on sw&m
A monograph on sw&m
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Pozzocrete
PozzocretePozzocrete
Pozzocrete
 
Introduction to air pollution
Introduction to air pollutionIntroduction to air pollution
Introduction to air pollution
 
Atomic absorption spectrophotometer
Atomic absorption spectrophotometerAtomic absorption spectrophotometer
Atomic absorption spectrophotometer
 

Último

一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
zubnm
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
 

Último (20)

Deforestation
DeforestationDeforestation
Deforestation
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 

Environmental impact assessment

  • 1. Environmental impact assessment Presentation author: Ms. G. Tejasri Faculty of Engineering Sciences, NIT AP – 534101.
  • 2. Sustainable development • Development that meets the needs of today’s generation without compromising those of future generations
  • 3. EIA • The environmental impact assessment is an innovative process recommended by different international agencies as a valid environmental protection tool and endorsed by the experience gained in developed countries that have incorporated it into their legal systems.
  • 4. •It is an early warning process that verifies the enforcement of environmental policies. •It is a preventive tool used to evaluate the negative and positive environmental impacts of policies, plans, programs, and projects. •The EIA proposes measures to adjust impacts to acceptable levels.
  • 5. • EIA is a tool used in planning development strategies and projects, and its use has been adopted into planning regulations in a number of countries, and by a number of regional groupings and multilateral agencies
  • 6. •Environmental impact assessment (EIA) is a process of identifying, predicting, evaluating, and mitigating the physical, chemical, biological, cultural, social, and other relevant effects of proposed projects, plans and programs prior to major decisions and commitments being made. •The objective of EIA is not to halt the projects but to bring about project design changes for reducing negative environmental impact.
  • 7. • EIA can be defined as the systematic identification and evaluation of the potential impacts of the proposed project, plans, programs or legislative actions relative to the physical-chemical, biological, cultural and socio- economic components of the total environment.
  • 8. Principles of EIA administration and practice Three core values on which the EIA process is based: • Integrity– the EIA process should meet internationally accepted requirements and standards of practice; • Utility– the EIA process should provide the information which is sufficient and relevant for decision-making; and • Sustainability– the EIA process should result in the implementation of environmental safeguards which are sufficient to mitigate serious adverse effects and avoid irreversible loss of resource and ecosystem functions.
  • 9. Purpose of EIA • To encourage productive and enjoyable harmony between man and his environment • To promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man • To enrich the understanding of the ecological systems and natural resources important to the Nation
  • 10. • To implement a strategy of sustainable development, prevent adverse impact on the environment after the implementation of plans and construction projects, and promote coordinated development of the economy, society, and environment. • To allow government officials, business leaders, and all concerned citizens to understand the likely environmental consequences of proposed actions, and to cooperate in making wise decisions that restore and maintain the quality of our shared environment for future generations.
  • 11.
  • 12. Important parts of the EIA process • To decide in advance whether an environmental impact assessment is necessary. • To analyze only the actions that may have a significant environmental impact. • To incorporate beforehand significant impact criteria, such as: –Air and water pollution. –Deterioration of protected natural and ecological resources. –Undesirable impacts such as landscape deterioration, generation of noise, and others. –Discharges of toxic or hazardous substances or waste generation. –Cumulative adverse effects. –Negative socio cultural impacts. –Significant public controversy.
  • 13. Limitations of Environmental Impact Studies • It is not always possible to emphasize the interdisciplinary character, although this is essential. • They use predictive methods based on scientific information that is not always available. • They use abstract concepts which cannot always compete with sciences that incorporate quantifiable data. • They need data that are all at the same level and exchangeable on compatible scales.
  • 14. • Since they have a varied methodological framework, it is necessary to know the land or place affected in order to define its use. • They use the fragility and quality analysis of the affected land, for which there are often no baseline data available. • They require detailed information that is not always available or is not compatible with the study requirements. • They have to improve the methods of appraisal for analyzing environmental impacts in the same way as economic and social impacts. • Some environmental components are difficult to address, such as quality analysis, fragility of the land, and landscape value, among others.
  • 17.
  • 18. Screening • Screening is the first key decision of the EIA process. • Screening is the process used to determine whether a proposed project or activity requires an EIA and, if so, what level of environmental review is necessary. • The purpose of screening is to determine whether a proposal requires an EIA or not. • Some type of screening procedure is necessary because of the large number of projects and activities that are potentially subject to EIA.
  • 19. Scoping • Scoping is a critical, early step in the preparation of an EIA. • The scoping process identifies the issues that are likely to be of most importance during the EIA and eliminates those that are of little concern. • Typically, this process concludes with the establishment of Terms of Reference for the preparation of an EIA. • A quality scoping study reduces the risk of including inappropriate components or excluding components which should be addressed in an environmental assessment.
  • 20. Preliminary assessment • The preliminary assessment is useful insofar as it reviews the required environmental coverage and provides decision makers with background data. • It helps identify requirements that need to be met if environmental sustainability is to be achieved.
  • 21. • A good preliminary assessment requires the following information: – General description of the project – Applicable environmental legislation – An estimate of significant environmental impacts – A general description of the area of influence – Mitigating measures to manage potential impacts.
  • 22. Mitigation • Mitigation is the design and execution of measures to reduce, mitigate, or minimize the negative impacts of a project, work, or activity on human or natural environments. • Mitigation can restore one or more environmental components to pre-impact quality; if this is not possible, it can reestablish the basic properties. • Mitigation is the avoidance, elimination, reduction or control of adverse effects of a project. • May require changes in planning, design and engineering, location and timing, and project management to mitigate adverse effects.
  • 23.
  • 24. Environmental management plan • The environmental management plan identifies measures to mitigate and compensate significant environmental impacts. • It ensures mitigation measures are implemented • It establishes systems and procedures for this purpose • It monitors the effectiveness of mitigation measures • It takes action when unforeseen impacts occur
  • 25.
  • 26. Public involvement/ participation • Public involvement is a fundamental principle of the EIA process. • Process through which people who will be affected by or are interested in a decision, and who have a stake in the outcome, get a chance to influence its content before it is made. • Timely, well planned and appropriately implemented public involvement programs will contribute to EIA studies and to the successful design, implementation, operation and management of proposals. • Specifically public involvement is a valuable source of information on key impacts, potential mitigation measures and the identification and selection of alternatives.
  • 27. Environmental impact assessment methods • a) Meetings of experts: This method is useful when the impact to be studied is specific and limited. If it is not so, neither speed nor thoroughness can be demanded because of interdisciplinary conflicts. • b) Checklists: Detailed lists to identify impacts rapidly. There are merely indicative lists and quantitative lists that use standards to define the main impacts (for example, air pollution according to number of households) • c) Simple cause-effect matrices: They are limited matrices that relate the affected environmental variable with the human activity that induces it.
  • 28. • d) Graphs and flow charts: They seek to determine chains of primary and secondary impacts with existing interactions and are used to define the types of impacts expected. • e) Environmental cartography or map overlay: Set of maps that represent the main environmental characteristics. • f) Networks: Expanded flow charts with primary, secondary, and tertiary impacts.
  • 29. • g) Geographic information systems: Computer programs that do not identify impacts, but rather attempt to assess their importance. • h) Matrices: Double-input tables with environmental characteristics and expected activities of the project. The corresponding impact is identified by intersecting each row with each column.