CALIFORNIA LEVEE EVALUATIONS PROGRAMSociety of American Military Engineers2009 Water Conference, October 26-28, 2009Presented by Mike InamineCalifornia Department of Water Resources
Central Valley  Flood Control  System Protects: Over 1/2 million people Over 1.5 million acres of  cultivated land 200,000 structures with an estimated value of $56 billion Public trust resources Water supply to two-thirds of the State’s population and industry The system is aging and under-funded
California Central Valley Challenges Early design and construction inadequate by modern standards. The system was successfully designed to protect pioneer farms. Behind many levees are homes, not farms.
Central Valley Challenges (cont’d) Current system has many deficiencies and is aging. Rivers now erode levees in many reaches. Recently, financial burden shifted to the State. State is liable.  Every taxpayer is affected by failures. Land use decisions often increase risk.
5 FloodSAFE California--a multi-faceted initiative to improve  public safety through integrated flood management  Statewide Program 4 Major Activities Primarily funded by Propositions 1E and 84 Emphasis on State-federal system in Central Valley and Delta 5
FloodSAFE Strategic Plan Work Breakdown of FloodSAFE Implementation ,[object Object]
CVFPP key planning document
Levee Evaluations important component in all functional areasFloodSAFE Implementation Plan Operations and Maintenance Emergency Operations Projects and Grants Planning Evaluation and Engineering Floodplain Risk Management Administration and Management
Central Valley Flood Protection Plan System Analysis
Levee Evaluations Program Purpose In support of the Central Valley Flood Protection Plan (CVFPP) and other flood management related programs, evaluate State/Federal project levees and appurtenant non-project levees, to determine if they meet defined geotechnical criteria and, if appropriate, identify remedial measure(s) to meet those criteria.
Goal #1 – Support the CVFPP and CVFED projects, federal and local flood management projects, local FEMA certification efforts and the legislative mandate of urban, 200-year flood protection by 2025. Goal #2 – Support federal & local flood management programs by providing geotechnical data, analysis and remedial alternatives to local, State and federal stakeholders. Goal #3 – Improve geotechnical information exchange methods between State, local and Federal flood management agencies. Goal #4 - Identify critical levee repairs Levee Evaluation Program Goals
Levee Evaluations Work Breakdown Levee Evaluations  Technical Review Non-Urban  (NULE) Urban  (ULE) Technical Policy Central Valley Flood  Protection Board Seismic Policy Interim Levee Design Criteria Capital Projects Vegetation  Research Corps Projects
Central Valley Levees  Project (State-Federal) Appurtenant Non-Project Other Non-Project Urban Project         350 miles Urban Non-Project           100 miles Urban Total 450 Miles Non-Urban Non-Project 400 miles Non-Urban Project 1250 Miles Non-Urban Total 1650 Miles
ULE STUDY AREA Marysville/Yuba City Detail  Area
NULE STUDY AREA
Overview of ULE and NULE ,[object Object]
Urban Levee EvaluationsPopulations of 10,000 or more 200-year legal mandate helps define deliverable Geotechnical Data Report Geotechnical Evaluation Report ,[object Object],Populations less than 10,000  Partners/stakeholder driven Ongoing CVFMP planning process defines deliverable Geotechnical Data Report Geotechnical Assessment Report Geotechnical Evaluation Report
2 ULE Phased Implementation
NULE Phased Implementation     Phase 2:      Exploration, Testing     & Analysis Geotechnical      Evaluation   Report   Phase 1:     Data Analyses  Geotechnical       Assessment Report Site Reconnaissance, Data Collection &Geomorphic Studies Phase 1 applied throughout study area Phase 2 contingent on Central Valley Flood Management Planning process
NULE Phase 1 Assess levees with respect to design water surface elevations Levee Assessment Tool (LAT) Categorize levee segments as:  ,[object Object]
No obvious deficiencies
Insufficient informationRemedial Alternative Cost Estimate Report (RACER) Phase 2:      Exploration, Testing     & Analysis Geotechnical      Evaluation   Report Phase 1:     Data Analyses  Geotechnical       Assessment Report Site Reconnaissance, Data Collection &Geomorphic Studies
Overview of Development ofLevee Assessment Tool (LAT) Modes of levee failure Associated hazard indicators (existing data) Rating scale for each hazard indicator System for compiling the hazard indicators into a Weighted Hazard Indicator Score (WHIS) Methodology for comparing the WHIS to past performance to categorize the levee
DEFICIENT Underseepage Hazard Score NO OBVIOUS DEFICIENCIES    Sand Boils             Boils               Heavy Seepage     Light Seepage     None Reported                     Documented Past Performance
NULE Phase 2 Early Phase 2 for levees protecting populations of 5,000 or more (“no regrets”) CVFMP process to identify additional locations, such as: ,[object Object]

Mais conteúdo relacionado

Mais procurados

3. Integrated Catchment Management - Conceptual understanding
3. Integrated Catchment Management - Conceptual understanding3. Integrated Catchment Management - Conceptual understanding
3. Integrated Catchment Management - Conceptual understanding
Environmental Protection Agency, Ireland
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 Hydro
CEQAplanner
 
joconner_bermejo.ppt
joconner_bermejo.pptjoconner_bermejo.ppt
joconner_bermejo.ppt
Iwl Pcu
 
AGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resAGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low res
Jane C. Glavan
 
League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...
League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...
League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...
Kevin Lovell, PMP
 
Climate Change Water Framework Directive
Climate Change Water Framework DirectiveClimate Change Water Framework Directive
Climate Change Water Framework Directive
Alejandro Maceira
 

Mais procurados (20)

Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report final
 
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
Day 2 UN-ESCWA Alignment with the 10-Year Strategic Plan of UNCCD: Climate Ch...
 
3. Integrated Catchment Management - Conceptual understanding
3. Integrated Catchment Management - Conceptual understanding3. Integrated Catchment Management - Conceptual understanding
3. Integrated Catchment Management - Conceptual understanding
 
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 Hydro
 
10. Preperation of the Flood Risk Management Plans - Mark Adamson
10. Preperation of the Flood Risk Management Plans - Mark Adamson10. Preperation of the Flood Risk Management Plans - Mark Adamson
10. Preperation of the Flood Risk Management Plans - Mark Adamson
 
4. WFD Application update - Brendan Ward
4. WFD Application update - Brendan Ward4. WFD Application update - Brendan Ward
4. WFD Application update - Brendan Ward
 
International Water Resources and Wetlands Conference, Tulcea, Romania
International Water Resources and Wetlands Conference, Tulcea, RomaniaInternational Water Resources and Wetlands Conference, Tulcea, Romania
International Water Resources and Wetlands Conference, Tulcea, Romania
 
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
 
Updating Georgia’s Coastal Maps: Collaboration on my Mind
Updating Georgia’s Coastal Maps: Collaboration on my MindUpdating Georgia’s Coastal Maps: Collaboration on my Mind
Updating Georgia’s Coastal Maps: Collaboration on my Mind
 
joconner_bermejo.ppt
joconner_bermejo.pptjoconner_bermejo.ppt
joconner_bermejo.ppt
 
2 - Characterising Catchments - a shared approach. Jenny Deakin
2 - Characterising Catchments - a shared approach. Jenny Deakin2 - Characterising Catchments - a shared approach. Jenny Deakin
2 - Characterising Catchments - a shared approach. Jenny Deakin
 
Regulatory Overview of Stormwater Management
Regulatory Overview of Stormwater ManagementRegulatory Overview of Stormwater Management
Regulatory Overview of Stormwater Management
 
The North Bay Water Reuse Program - New tools and funding options
The North Bay Water Reuse Program - New tools and funding optionsThe North Bay Water Reuse Program - New tools and funding options
The North Bay Water Reuse Program - New tools and funding options
 
AGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resAGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low res
 
Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009 Current Issues Wetland Mitigation_Irow 2009
Current Issues Wetland Mitigation_Irow 2009
 
SQA Resume
SQA ResumeSQA Resume
SQA Resume
 
League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...
League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...
League of Women Voters Great Lakes Region 2015 Annual Conference Chicago Wate...
 
Nonpoint Source Management and Wetland Preservation
Nonpoint Source Management and Wetland PreservationNonpoint Source Management and Wetland Preservation
Nonpoint Source Management and Wetland Preservation
 
Climate Change Water Framework Directive
Climate Change Water Framework DirectiveClimate Change Water Framework Directive
Climate Change Water Framework Directive
 

Destaque (9)

Draft Delta Policy Principles, Jan. 26, 2012
Draft Delta Policy Principles, Jan. 26, 2012Draft Delta Policy Principles, Jan. 26, 2012
Draft Delta Policy Principles, Jan. 26, 2012
 
Lynn Sess11 101509
Lynn Sess11 101509Lynn Sess11 101509
Lynn Sess11 101509
 
Bay Delta Alternatives - Mike Wade, California Farm Water Coalition - March 2...
Bay Delta Alternatives - Mike Wade, California Farm Water Coalition - March 2...Bay Delta Alternatives - Mike Wade, California Farm Water Coalition - March 2...
Bay Delta Alternatives - Mike Wade, California Farm Water Coalition - March 2...
 
Millet Sess5 102709
Millet Sess5 102709Millet Sess5 102709
Millet Sess5 102709
 
Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
Cotton Chronicles - January 2014
Cotton Chronicles - January 2014Cotton Chronicles - January 2014
Cotton Chronicles - January 2014
 
Mayer Wed Am 102809
Mayer Wed Am 102809Mayer Wed Am 102809
Mayer Wed Am 102809
 
Bay-Delta Quarterly Update, July 26, 2012
Bay-Delta Quarterly Update, July 26, 2012Bay-Delta Quarterly Update, July 26, 2012
Bay-Delta Quarterly Update, July 26, 2012
 
Bay Delta Portfolio Approach Alternative - Jan. 24, 2013
Bay Delta Portfolio Approach Alternative - Jan. 24, 2013Bay Delta Portfolio Approach Alternative - Jan. 24, 2013
Bay Delta Portfolio Approach Alternative - Jan. 24, 2013
 

Semelhante a Inamine Final Sess4 102709

Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
hydrologyproject001
 
Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...
Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...
Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...
water-decade
 
ASFPM_2010_unique_approach_f
ASFPM_2010_unique_approach_fASFPM_2010_unique_approach_f
ASFPM_2010_unique_approach_f
Danee McGee
 

Semelhante a Inamine Final Sess4 102709 (20)

Mark Cowin Same 10282009
Mark Cowin Same 10282009Mark Cowin Same 10282009
Mark Cowin Same 10282009
 
Floodplain Mapping Status in Wisconsin
Floodplain Mapping Status in WisconsinFloodplain Mapping Status in Wisconsin
Floodplain Mapping Status in Wisconsin
 
Burns Watershed Planning And Regulation
Burns  Watershed Planning And RegulationBurns  Watershed Planning And Regulation
Burns Watershed Planning And Regulation
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010a
 
Georgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPDGeorgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPD
 
Dunn Sess4 101509
Dunn Sess4 101509Dunn Sess4 101509
Dunn Sess4 101509
 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
Mr. Bernado Mazzanti IEWP @ 1st Indo-European Water Forum, 23-24 novembre 2015
 
Stockton Wednesday8am 102809
Stockton Wednesday8am 102809Stockton Wednesday8am 102809
Stockton Wednesday8am 102809
 
Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...
Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...
Academia: Richard Lawford, Morgan State University, 16th January UN Water Zar...
 
Bioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and AssessmentBioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and Assessment
 
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
 
WOCAT-LADA modules: Watershed Management & Climate Change Adaptation
WOCAT-LADA modules: Watershed Management & Climate Change AdaptationWOCAT-LADA modules: Watershed Management & Climate Change Adaptation
WOCAT-LADA modules: Watershed Management & Climate Change Adaptation
 
ASFPM_2010_unique_approach_f
ASFPM_2010_unique_approach_fASFPM_2010_unique_approach_f
ASFPM_2010_unique_approach_f
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
Open house presentation 2013 r2
Open house presentation 2013 r2Open house presentation 2013 r2
Open house presentation 2013 r2
 
Storm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master PlansStorm Water Utility Dev. and Master Plans
Storm Water Utility Dev. and Master Plans
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
 
C4.01: Overview of the Coastal Zone Community of Practice & Services for the ...
C4.01: Overview of the Coastal Zone Community of Practice & Services for the ...C4.01: Overview of the Coastal Zone Community of Practice & Services for the ...
C4.01: Overview of the Coastal Zone Community of Practice & Services for the ...
 

Mais de SAME 2009 California Water Conference

Mais de SAME 2009 California Water Conference (20)

W Wright Sess8 102709
W Wright Sess8 102709W Wright Sess8 102709
W Wright Sess8 102709
 
Wise Sess11 102509
Wise Sess11 102509Wise Sess11 102509
Wise Sess11 102509
 
Wijsman Sess2 102309
Wijsman Sess2 102309Wijsman Sess2 102309
Wijsman Sess2 102309
 
V Wright Sess2 102109
V Wright Sess2 102109V Wright Sess2 102109
V Wright Sess2 102109
 
Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709
 
Tibbitts Sess14 102009
Tibbitts Sess14 102009Tibbitts Sess14 102009
Tibbitts Sess14 102009
 
Suedel Sess5 102309[1]
Suedel Sess5 102309[1]Suedel Sess5 102309[1]
Suedel Sess5 102309[1]
 
Stockton Wed Am 102809
Stockton Wed Am 102809Stockton Wed Am 102809
Stockton Wed Am 102809
 
Sorci Sess7 101309
Sorci Sess7 101309Sorci Sess7 101309
Sorci Sess7 101309
 
Shewbridge Sess05 101309
Shewbridge Sess05 101309Shewbridge Sess05 101309
Shewbridge Sess05 101309
 
Seed Wed Am 102109
Seed Wed Am 102109Seed Wed Am 102109
Seed Wed Am 102109
 
Sabol Sess3 100909
Sabol Sess3 100909Sabol Sess3 100909
Sabol Sess3 100909
 
Riley Sess3 101309
Riley Sess3 101309Riley Sess3 101309
Riley Sess3 101309
 
Ragain Sess1 102209
Ragain Sess1 102209Ragain Sess1 102209
Ragain Sess1 102209
 
Mullins Sess8 101509
Mullins Sess8 101509Mullins Sess8 101509
Mullins Sess8 101509
 
Mc Knight Sess13 102309
Mc Knight Sess13 102309Mc Knight Sess13 102309
Mc Knight Sess13 102309
 
Martin Sess13 101309
Martin Sess13 101309Martin Sess13 101309
Martin Sess13 101309
 
Marks Sess13 102309
Marks Sess13 102309Marks Sess13 102309
Marks Sess13 102309
 
Magness Sess12 102609
Magness Sess12 102609Magness Sess12 102609
Magness Sess12 102609
 
Juricich Sess11 102309
Juricich Sess11 102309Juricich Sess11 102309
Juricich Sess11 102309
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Inamine Final Sess4 102709

  • 1. CALIFORNIA LEVEE EVALUATIONS PROGRAMSociety of American Military Engineers2009 Water Conference, October 26-28, 2009Presented by Mike InamineCalifornia Department of Water Resources
  • 2. Central Valley Flood Control System Protects: Over 1/2 million people Over 1.5 million acres of cultivated land 200,000 structures with an estimated value of $56 billion Public trust resources Water supply to two-thirds of the State’s population and industry The system is aging and under-funded
  • 3. California Central Valley Challenges Early design and construction inadequate by modern standards. The system was successfully designed to protect pioneer farms. Behind many levees are homes, not farms.
  • 4. Central Valley Challenges (cont’d) Current system has many deficiencies and is aging. Rivers now erode levees in many reaches. Recently, financial burden shifted to the State. State is liable. Every taxpayer is affected by failures. Land use decisions often increase risk.
  • 5. 5 FloodSAFE California--a multi-faceted initiative to improve public safety through integrated flood management Statewide Program 4 Major Activities Primarily funded by Propositions 1E and 84 Emphasis on State-federal system in Central Valley and Delta 5
  • 6.
  • 8. Levee Evaluations important component in all functional areasFloodSAFE Implementation Plan Operations and Maintenance Emergency Operations Projects and Grants Planning Evaluation and Engineering Floodplain Risk Management Administration and Management
  • 9. Central Valley Flood Protection Plan System Analysis
  • 10. Levee Evaluations Program Purpose In support of the Central Valley Flood Protection Plan (CVFPP) and other flood management related programs, evaluate State/Federal project levees and appurtenant non-project levees, to determine if they meet defined geotechnical criteria and, if appropriate, identify remedial measure(s) to meet those criteria.
  • 11. Goal #1 – Support the CVFPP and CVFED projects, federal and local flood management projects, local FEMA certification efforts and the legislative mandate of urban, 200-year flood protection by 2025. Goal #2 – Support federal & local flood management programs by providing geotechnical data, analysis and remedial alternatives to local, State and federal stakeholders. Goal #3 – Improve geotechnical information exchange methods between State, local and Federal flood management agencies. Goal #4 - Identify critical levee repairs Levee Evaluation Program Goals
  • 12. Levee Evaluations Work Breakdown Levee Evaluations Technical Review Non-Urban (NULE) Urban (ULE) Technical Policy Central Valley Flood Protection Board Seismic Policy Interim Levee Design Criteria Capital Projects Vegetation Research Corps Projects
  • 13. Central Valley Levees Project (State-Federal) Appurtenant Non-Project Other Non-Project Urban Project 350 miles Urban Non-Project 100 miles Urban Total 450 Miles Non-Urban Non-Project 400 miles Non-Urban Project 1250 Miles Non-Urban Total 1650 Miles
  • 14. ULE STUDY AREA Marysville/Yuba City Detail Area
  • 16.
  • 17.
  • 18. 2 ULE Phased Implementation
  • 19. NULE Phased Implementation Phase 2: Exploration, Testing & Analysis Geotechnical Evaluation Report Phase 1: Data Analyses Geotechnical Assessment Report Site Reconnaissance, Data Collection &Geomorphic Studies Phase 1 applied throughout study area Phase 2 contingent on Central Valley Flood Management Planning process
  • 20.
  • 22. Insufficient informationRemedial Alternative Cost Estimate Report (RACER) Phase 2: Exploration, Testing & Analysis Geotechnical Evaluation Report Phase 1: Data Analyses Geotechnical Assessment Report Site Reconnaissance, Data Collection &Geomorphic Studies
  • 23. Overview of Development ofLevee Assessment Tool (LAT) Modes of levee failure Associated hazard indicators (existing data) Rating scale for each hazard indicator System for compiling the hazard indicators into a Weighted Hazard Indicator Score (WHIS) Methodology for comparing the WHIS to past performance to categorize the levee
  • 24. DEFICIENT Underseepage Hazard Score NO OBVIOUS DEFICIENCIES Sand Boils Boils Heavy Seepage Light Seepage None Reported Documented Past Performance
  • 25.
  • 26. Levees with critical damage sites
  • 27.
  • 28. Top of levee checkUpdate RACER Phase 2: Exploration, Testing & Analysis Geotechnical Evaluation Report Phase 1: Data Analyses Geotechnical Assessment Report Site Reconnaissance, Data Collection &Geomorphic Studies
  • 29.
  • 39.
  • 40. Time and Money Schedule: ULE final deliverable: March 2011 NULE final deliverable: August 2011 Interim deliverables available as produced Cost: ULE $113M NULE $ 87M Total $210M
  • 41.
  • 42. Concurrent design and construction projectsState budget complications Unprecedented scope