OUTLINE
 Acknowledgement
 Self Introduction
 Brief on AMR
 Benefits of AMR
 Previous Metering
 Task assigned
 What I Did
 Achievements/Rewards
 Results
 Conclusion
 Recommendations
I am grateful from the core of my heart to
Almighty Allah who bestowed upon me His blessings for
shouldering the responsibilities to prepare and present my
IME.
I am highly grateful to Course Director Mr.
Mubashar Mehmood and Dy. Course Director Mr. Asad Ali of
WAPDA Staff College Islamabad for making excellent
Standards of education and transferring the same to the
training participants with full devotion.
3
Acknowledgement
 Name Muhammad Tahir Rashid
 Qualification: B.E(Electrical) BUET Khuzdar
PGDIT (Network) Comsats
Institute of information
Technology Islamabad
 Was posted SDO G-6 Sector Islamabad
(06/2010-09/2012)
4
Self Introduction
Brief on AMR
Definition
• Automatic Remote Meter Reading .
Automating the process of measurement through digital
communication techniques.
Bring “intelligence” into the revenue cycle and manage it:
Metering Billing Operations Customer Service
6
Components of AMR System
 Energy Meters (Built-in Communication Modules)
 Communications
 Host Central Station (HCS)
AMR Architecture
7
Comparison with old meters
PAST
ELECTRO-MECHANICAL
Low Accuracy
Control – NIL
Communications - Expensive
Theft Detection – Poor
DIGITAL SOLID STATE
High Accuracy
Control – LIMITED
Communications – External through Retrofit
Theft Detection – Node only
NEXT GEN SMART METER & IT SYSTEM
Very High Accuracy
Control – FULL
Communications – Built in (on chip / PCB)
Theft Detection – High (Network level)
CURRENT
LEAPFROG
Data Reading for old system
Reading
 Highly person dependent.
 Accessibility of meter Reading in rural /remote
zones.
 Billing done mainly on estimated / average basis
 Inability to monitor and control discrete loads
 Billing cycle requires excessive time.
Automatic Meter Reading (AMR)
Mobile
Network
GPRS &
GSM
GPRS
BACKBONE
SGSN
GGSN
Firewall
SIM
CARD
MIU
(Modem
GPRS/GSM)
Digital
Meter
DATA
CENTER
Radiotower
Billing
System
Data
Analysis
For Research
Good Service
10
Modes of Communication in AMR
1. GSM Based Communication
• Single stage communication between Meter and
central station through GSM Modem
2. Radio frequency network
• Radio frequency based AMR (handheld,
mobile/drive by, and fixed (Star/Mesh networks)
3. PLC Based Communication
• Electronic data transmitted over power lines -- the
network being the distribution network which the
utility has built and maintains to deliver electric
power.
4. Hybrid Communication
• Two stages of communication in AMR System
11
AMR Architecture (Hybrid) used in our Project
Terminals
Control Room
Database& Communication Server
System Software
Website
Billing Software
Meter
GPRS/GSM
Meter
GPRS/GSM
Gateway
Gateway Gateway
GPRS/GSM
GPRS/GSMGPRS/GSM
RF
RF
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
RF
RF
RF
RF
RF
RF
RF
RF
RF
RF
RF
RF
RF
Mesh
Mesh
Mesh
www.ajked.goajk.pk
12
Automatic
Meter
Reading
Outage
Managem
ent
Pre-payment
Sub-
Metering
Revenue
Protection
Automatic
Metering Active Load
Control
Automatic Metering
Data sources
Users/
Access level
Web Application
Web Power Plus
(www.datamaticmosaic.com
Load Profile
15 min Schedule
Billing Monthly
IESCO MIS IESCO Authorized Customers
Able to view all reports Able to view only
data in his territory
Able to view only
their data
 Ability to detect tamper events and outage occurrences.
 Remotely Connect/ Disconnect power supply through
meter.
 Calculate transformer loading and sizing from interval
data
 15 minute interval data gives accurate load information
for supply scheduling, switching operations, planning etc
 Monitor voltage at each premise to know conditions
when to operate capacitor switches or regulators
Critical Benefits Of AMR
 Which consumers require extra vigilance on account of high
commercial losses?
 Which consumers have violated sanctioned demand more
than 3 times in the last month?
 Which network nodes have reported more than 1 outage
event last week?
 How can I accurately reconcile all my bills with actual
consumption?
 How can I reduce system peak load through feeder
reconfiguration?
Benefits of AMR – Contd…
The Pilot AMR was started in Sector G-6/3 of G-6 sub division
Islamabad circle Islamabad in 2008.The purpose was to check the
results/benefits for future planning.
But due to some reasons it could not be completed till 2010
when Worthy CEO appointed me as SDO G-6 sub division with
task to complete the AMR project and to bring the reading
online(human free) in collaboration with Manager (MIS) and M/s
Telco net .
Task assigned
IESCO AMR Project
 The Situation was
 Meters Installed
 Single Phase : 124
 Three Phase : 249
 CT Meter : 4
 Transformers : 23
 Total : 400
But proper network was not established so reading
was still taken manually by the meter readers .
IESCO AMR Project
Reasons were
 I studied the case thoroughly and sort out that
 Some of the meters installed were defective
whereas some meters were not responding due to
fault in Fire Fly (a unique identification of meter).
 Gate way installed was not at the proper location
resulting slow/disturbed signal.
IESCO AMR Project
What I Did
 I established team of trained staff who installed those meters.
 Visited each and every meter at site.
 Removed discrepancies i.e. burnt meters, replacement of
meters with defective fireflies.
 Coding of transformers for calculating T/F losses.
IESCO AMR Project
IESCO AMR Project
What I Did
 Feeding of transformer wise consumers.
 Meeting s with different suitable building owners for relocation
of gateway.
 Relocation of Gate way at suitable building which resolved the
problem of data transfer
IESCO AMR Project
IESCO AMR Project
• These Steps taken resolved the problem and data transfer
through AMR started and reading was done succesfully
without meter readers just on internet.
• These efforts were highly appreciated by worthy CEO of
IESCO.
• I was nominated for training on AMR in Thailand.
• I am also included in the committee constituted for purchase
of 300,000 AMR meters through ADB loan.
• I have been taken as member of working committee to
finalize the specification of AMR meters to be purchased
through USAID and ADB.
Achievements/Rewards
IESCO AMR Project
Results Net Improvement: 3,79,111 KWH over 12
months Revenue Generated @ Rs 8.33 per unit =
31,57,944.63 PKR Project ROI in 23 Months
Enhancement through AMR
Result
‘‘Service and Technology
IESCO AMR Project
 Nothing is impossible if you work hard with
consistency.
 If one is determined to his goals and work hard
devotedly he can achieve the Targets.
 Team work and positive approach is the key of
success.
 Enhance managerial skills.
CONCLUSION
IESCO AMR Project
It is suggested that hard to reach areas and
sensitive installations such as Parliament lodges,
atomic installations ,embassies etc should
immediately be shifted on AMR GSM based
networks so that manual system be eliminated at
once in order to avoid the errors and ensure
security and to save the precious time of IESCO’s
officers
RECOMMENDATIONS
IESCO AMR Project
IESCO AMR Project

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Smart Grid Advanced Metering Infrastructure
Smart Grid Advanced Metering InfrastructureSmart Grid Advanced Metering Infrastructure
Smart Grid Advanced Metering Infrastructure
 
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSEAUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
 
AUTOMATIC METER READING BY SAIKIRAN PANJALA
AUTOMATIC METER READING BY SAIKIRAN PANJALAAUTOMATIC METER READING BY SAIKIRAN PANJALA
AUTOMATIC METER READING BY SAIKIRAN PANJALA
 
Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)Advanced Metering Infrastructure (AMI)
Advanced Metering Infrastructure (AMI)
 
SMART METER ppt
SMART METER pptSMART METER ppt
SMART METER ppt
 
Presentation of smart meter
Presentation of smart meterPresentation of smart meter
Presentation of smart meter
 
Power theft detection
Power theft detectionPower theft detection
Power theft detection
 
Smart energy meter ppt
Smart energy meter   pptSmart energy meter   ppt
Smart energy meter ppt
 
An approach to smart energy meter
An approach to smart energy meterAn approach to smart energy meter
An approach to smart energy meter
 
Smart metering-system
Smart metering-systemSmart metering-system
Smart metering-system
 
Power theft detection
Power theft detectionPower theft detection
Power theft detection
 
AUTOMATIC METER READING SYSTEMS
AUTOMATIC METER READING SYSTEMSAUTOMATIC METER READING SYSTEMS
AUTOMATIC METER READING SYSTEMS
 
smart meter technical seminar report
smart meter technical seminar reportsmart meter technical seminar report
smart meter technical seminar report
 
presentation on POWER THEFT IDENTIFICATION SYSTEM
presentation on POWER THEFT IDENTIFICATION SYSTEMpresentation on POWER THEFT IDENTIFICATION SYSTEM
presentation on POWER THEFT IDENTIFICATION SYSTEM
 
Smart meter
Smart meterSmart meter
Smart meter
 
DETECTION OF FAULT LOCATION IN TRANSMISSION LINE USING INTERNET OF THINGS (IOT)
DETECTION OF FAULT LOCATION IN TRANSMISSION LINE USING INTERNET OF THINGS (IOT)DETECTION OF FAULT LOCATION IN TRANSMISSION LINE USING INTERNET OF THINGS (IOT)
DETECTION OF FAULT LOCATION IN TRANSMISSION LINE USING INTERNET OF THINGS (IOT)
 
Smart Meters
Smart MetersSmart Meters
Smart Meters
 
AUTOMATIC METER READING
AUTOMATIC METER READINGAUTOMATIC METER READING
AUTOMATIC METER READING
 
Advanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocolAdvanced Metering Infrastructure Standards and protocol
Advanced Metering Infrastructure Standards and protocol
 
prepaid energy meter
prepaid energy meterprepaid energy meter
prepaid energy meter
 

Destaque

document of prepaid energy meter using gsm
document of prepaid energy meter using gsmdocument of prepaid energy meter using gsm
document of prepaid energy meter using gsm
udaypallyreddy
 
Development and Application of Automatic Meter Reading in Seoul
Development and Application of Automatic Meter Reading in Seoul Development and Application of Automatic Meter Reading in Seoul
Development and Application of Automatic Meter Reading in Seoul
simrc
 
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARDBPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
Nisheeth Srivastava
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm
udaypallyreddy
 
Gsm energy meter
Gsm energy meterGsm energy meter
Gsm energy meter
ikm104
 

Destaque (20)

GSM BASED PREPAID ENERGY METER BILLING VIA SMS
GSM BASED PREPAID ENERGY METER BILLING VIA SMSGSM BASED PREPAID ENERGY METER BILLING VIA SMS
GSM BASED PREPAID ENERGY METER BILLING VIA SMS
 
Smart energy meter (Updated)
Smart energy meter (Updated)Smart energy meter (Updated)
Smart energy meter (Updated)
 
document of prepaid energy meter using gsm
document of prepaid energy meter using gsmdocument of prepaid energy meter using gsm
document of prepaid energy meter using gsm
 
Power sector mis
Power sector misPower sector mis
Power sector mis
 
Final mis power
Final mis powerFinal mis power
Final mis power
 
Information technology implementation in power distribution
Information technology implementation in  power distributionInformation technology implementation in  power distribution
Information technology implementation in power distribution
 
Development and Application of Automatic Meter Reading in Seoul
Development and Application of Automatic Meter Reading in Seoul Development and Application of Automatic Meter Reading in Seoul
Development and Application of Automatic Meter Reading in Seoul
 
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARDBPR CASE- PUNJAB STATE ELECTRICTY BOARD
BPR CASE- PUNJAB STATE ELECTRICTY BOARD
 
Smart Electric Meter
Smart Electric MeterSmart Electric Meter
Smart Electric Meter
 
Smart automatic meter reading platform
Smart automatic meter reading platformSmart automatic meter reading platform
Smart automatic meter reading platform
 
Smart Prepaid Energy Meter using ARM7 & and GSM
Smart Prepaid Energy Meter using ARM7 & and GSMSmart Prepaid Energy Meter using ARM7 & and GSM
Smart Prepaid Energy Meter using ARM7 & and GSM
 
Pre paid energy meter
Pre paid energy meterPre paid energy meter
Pre paid energy meter
 
GSM based Prepaid Electricity Meter
GSM based Prepaid Electricity MeterGSM based Prepaid Electricity Meter
GSM based Prepaid Electricity Meter
 
Power Distribution Overview
Power Distribution OverviewPower Distribution Overview
Power Distribution Overview
 
Energy scenario in India
Energy scenario in IndiaEnergy scenario in India
Energy scenario in India
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 
MIS Presentation
MIS PresentationMIS Presentation
MIS Presentation
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm
 
Gsm energy meter
Gsm energy meterGsm energy meter
Gsm energy meter
 

Semelhante a Automatic Meter reading (amr)

21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx
Naresh Prasad Keshari
 
Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Resume_Ajay_24-9-15
Resume_Ajay_24-9-15
Ajay Late
 
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet KaradenizU.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
Elder
 
Shankar.V-CV
Shankar.V-CVShankar.V-CV
Shankar.V-CV
shankar v
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_Resume
Ankit Tomar
 

Semelhante a Automatic Meter reading (amr) (20)

Advance autonomous billing system in the EB meter with GSM technology
Advance autonomous billing system in the EB meter with GSM technologyAdvance autonomous billing system in the EB meter with GSM technology
Advance autonomous billing system in the EB meter with GSM technology
 
SAFARICOM REPORT
SAFARICOM REPORTSAFARICOM REPORT
SAFARICOM REPORT
 
GSM Besed prepaid energy meter
GSM Besed prepaid energy meterGSM Besed prepaid energy meter
GSM Besed prepaid energy meter
 
Dnyaneshwar Kumbhar CV
Dnyaneshwar Kumbhar CVDnyaneshwar Kumbhar CV
Dnyaneshwar Kumbhar CV
 
Db24664671
Db24664671Db24664671
Db24664671
 
GSM Handover Optimization.pdf
GSM Handover Optimization.pdfGSM Handover Optimization.pdf
GSM Handover Optimization.pdf
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx21204 - Track Management System (TMS).pptx
21204 - Track Management System (TMS).pptx
 
RESUME_Sumeet
RESUME_SumeetRESUME_Sumeet
RESUME_Sumeet
 
Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Resume_Ajay_24-9-15
Resume_Ajay_24-9-15
 
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet KaradenizU.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
U.S - Turkey Smart Grid Workshop - Mehmet Karadeniz
 
Resume_Bala
Resume_BalaResume_Bala
Resume_Bala
 
Shankar.V-CV
Shankar.V-CVShankar.V-CV
Shankar.V-CV
 
3 months telecom training with guaranteed placement
3 months telecom training with guaranteed placement3 months telecom training with guaranteed placement
3 months telecom training with guaranteed placement
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_Resume
 
Repot on gsm based arm
Repot on gsm based armRepot on gsm based arm
Repot on gsm based arm
 
Ieee projects 2012 2013 - Mobile Computing
Ieee projects 2012 2013 - Mobile ComputingIeee projects 2012 2013 - Mobile Computing
Ieee projects 2012 2013 - Mobile Computing
 
IRJET- Smart Wireless Electronic Energy Meter
IRJET- Smart Wireless Electronic Energy MeterIRJET- Smart Wireless Electronic Energy Meter
IRJET- Smart Wireless Electronic Energy Meter
 
Y4103145147
Y4103145147Y4103145147
Y4103145147
 
Resume
ResumeResume
Resume
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Último (20)

AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

Automatic Meter reading (amr)

  • 1. 1 In the name of Allah, the Most Gracious, the Most Merciful
  • 2. OUTLINE  Acknowledgement  Self Introduction  Brief on AMR  Benefits of AMR  Previous Metering  Task assigned  What I Did  Achievements/Rewards  Results  Conclusion  Recommendations
  • 3. I am grateful from the core of my heart to Almighty Allah who bestowed upon me His blessings for shouldering the responsibilities to prepare and present my IME. I am highly grateful to Course Director Mr. Mubashar Mehmood and Dy. Course Director Mr. Asad Ali of WAPDA Staff College Islamabad for making excellent Standards of education and transferring the same to the training participants with full devotion. 3 Acknowledgement
  • 4.  Name Muhammad Tahir Rashid  Qualification: B.E(Electrical) BUET Khuzdar PGDIT (Network) Comsats Institute of information Technology Islamabad  Was posted SDO G-6 Sector Islamabad (06/2010-09/2012) 4 Self Introduction
  • 5. Brief on AMR Definition • Automatic Remote Meter Reading . Automating the process of measurement through digital communication techniques. Bring “intelligence” into the revenue cycle and manage it: Metering Billing Operations Customer Service
  • 6. 6 Components of AMR System  Energy Meters (Built-in Communication Modules)  Communications  Host Central Station (HCS) AMR Architecture
  • 7. 7 Comparison with old meters PAST ELECTRO-MECHANICAL Low Accuracy Control – NIL Communications - Expensive Theft Detection – Poor DIGITAL SOLID STATE High Accuracy Control – LIMITED Communications – External through Retrofit Theft Detection – Node only NEXT GEN SMART METER & IT SYSTEM Very High Accuracy Control – FULL Communications – Built in (on chip / PCB) Theft Detection – High (Network level) CURRENT LEAPFROG
  • 8. Data Reading for old system Reading  Highly person dependent.  Accessibility of meter Reading in rural /remote zones.  Billing done mainly on estimated / average basis  Inability to monitor and control discrete loads  Billing cycle requires excessive time.
  • 9. Automatic Meter Reading (AMR) Mobile Network GPRS & GSM GPRS BACKBONE SGSN GGSN Firewall SIM CARD MIU (Modem GPRS/GSM) Digital Meter DATA CENTER Radiotower Billing System Data Analysis For Research Good Service
  • 10. 10 Modes of Communication in AMR 1. GSM Based Communication • Single stage communication between Meter and central station through GSM Modem 2. Radio frequency network • Radio frequency based AMR (handheld, mobile/drive by, and fixed (Star/Mesh networks) 3. PLC Based Communication • Electronic data transmitted over power lines -- the network being the distribution network which the utility has built and maintains to deliver electric power. 4. Hybrid Communication • Two stages of communication in AMR System
  • 11. 11 AMR Architecture (Hybrid) used in our Project Terminals Control Room Database& Communication Server System Software Website Billing Software Meter GPRS/GSM Meter GPRS/GSM Gateway Gateway Gateway GPRS/GSM GPRS/GSMGPRS/GSM RF RF Meter Meter Meter Meter Meter Meter Meter Meter RF RF RF RF RF RF RF RF RF RF RF RF RF Mesh Mesh Mesh
  • 13. Data sources Users/ Access level Web Application Web Power Plus (www.datamaticmosaic.com Load Profile 15 min Schedule Billing Monthly IESCO MIS IESCO Authorized Customers Able to view all reports Able to view only data in his territory Able to view only their data
  • 14.  Ability to detect tamper events and outage occurrences.  Remotely Connect/ Disconnect power supply through meter.  Calculate transformer loading and sizing from interval data  15 minute interval data gives accurate load information for supply scheduling, switching operations, planning etc  Monitor voltage at each premise to know conditions when to operate capacitor switches or regulators Critical Benefits Of AMR
  • 15.  Which consumers require extra vigilance on account of high commercial losses?  Which consumers have violated sanctioned demand more than 3 times in the last month?  Which network nodes have reported more than 1 outage event last week?  How can I accurately reconcile all my bills with actual consumption?  How can I reduce system peak load through feeder reconfiguration? Benefits of AMR – Contd…
  • 16. The Pilot AMR was started in Sector G-6/3 of G-6 sub division Islamabad circle Islamabad in 2008.The purpose was to check the results/benefits for future planning. But due to some reasons it could not be completed till 2010 when Worthy CEO appointed me as SDO G-6 sub division with task to complete the AMR project and to bring the reading online(human free) in collaboration with Manager (MIS) and M/s Telco net . Task assigned
  • 17. IESCO AMR Project  The Situation was  Meters Installed  Single Phase : 124  Three Phase : 249  CT Meter : 4  Transformers : 23  Total : 400 But proper network was not established so reading was still taken manually by the meter readers .
  • 18. IESCO AMR Project Reasons were  I studied the case thoroughly and sort out that  Some of the meters installed were defective whereas some meters were not responding due to fault in Fire Fly (a unique identification of meter).  Gate way installed was not at the proper location resulting slow/disturbed signal.
  • 19. IESCO AMR Project What I Did  I established team of trained staff who installed those meters.  Visited each and every meter at site.  Removed discrepancies i.e. burnt meters, replacement of meters with defective fireflies.  Coding of transformers for calculating T/F losses. IESCO AMR Project
  • 20. IESCO AMR Project What I Did  Feeding of transformer wise consumers.  Meeting s with different suitable building owners for relocation of gateway.  Relocation of Gate way at suitable building which resolved the problem of data transfer IESCO AMR Project
  • 21. IESCO AMR Project • These Steps taken resolved the problem and data transfer through AMR started and reading was done succesfully without meter readers just on internet. • These efforts were highly appreciated by worthy CEO of IESCO. • I was nominated for training on AMR in Thailand. • I am also included in the committee constituted for purchase of 300,000 AMR meters through ADB loan. • I have been taken as member of working committee to finalize the specification of AMR meters to be purchased through USAID and ADB. Achievements/Rewards
  • 22. IESCO AMR Project Results Net Improvement: 3,79,111 KWH over 12 months Revenue Generated @ Rs 8.33 per unit = 31,57,944.63 PKR Project ROI in 23 Months Enhancement through AMR Result ‘‘Service and Technology
  • 23. IESCO AMR Project  Nothing is impossible if you work hard with consistency.  If one is determined to his goals and work hard devotedly he can achieve the Targets.  Team work and positive approach is the key of success.  Enhance managerial skills. CONCLUSION
  • 24. IESCO AMR Project It is suggested that hard to reach areas and sensitive installations such as Parliament lodges, atomic installations ,embassies etc should immediately be shifted on AMR GSM based networks so that manual system be eliminated at once in order to avoid the errors and ensure security and to save the precious time of IESCO’s officers RECOMMENDATIONS