SlideShare uma empresa Scribd logo
1 de 3
A Crash Course on Creativity

Assignment of Creative   Teams

    Presented by Sam Yeung
        Dated 4 Dec 2012
Most comfortable hat of straw Hat
• Light yellowish straw hat : go to the
  countryside for picnic and provide with
  natural feeling and cooler temperature on
  the head.
Least comfortable of safety hat
• Red safety hat : It is hard and feel hotter
  which is also represented as alarm signal.
  The environment provides with certain
  alert of unsafely and terrified condition.

Mais conteúdo relacionado

Destaque

Long term grants and CRP
Long term grants and CRPLong term grants and CRP
Long term grants and CRP
Anameen
 
Assignmemt 4 for stretching
Assignmemt 4 for stretching Assignmemt 4 for stretching
Assignmemt 4 for stretching
sy2900
 
Challenge assumptions 1 for sleeping ppt.
Challenge assumptions 1 for sleeping ppt.Challenge assumptions 1 for sleeping ppt.
Challenge assumptions 1 for sleeping ppt.
sy2900
 
Assigment of challenge assumptions 3
Assigment of challenge assumptions 3Assigment of challenge assumptions 3
Assigment of challenge assumptions 3
sy2900
 
Strategic Human Resource Management
Strategic Human Resource ManagementStrategic Human Resource Management
Strategic Human Resource Management
Abhay Yadav
 
Analysis of Software Development Life Cycle and Quality Management
Analysis of Software Development Life Cycle and Quality ManagementAnalysis of Software Development Life Cycle and Quality Management
Analysis of Software Development Life Cycle and Quality Management
Abhay Yadav
 
Assignmemt 5 for chang
Assignmemt 5 for changAssignmemt 5 for chang
Assignmemt 5 for chang
sy2900
 
Assignmemt 4
Assignmemt 4Assignmemt 4
Assignmemt 4
sy2900
 
Continuous Improvement
Continuous ImprovementContinuous Improvement
Continuous Improvement
Allan Berry
 
Assignmemt 3
Assignmemt 3Assignmemt 3
Assignmemt 3
sy2900
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
Allan Berry
 
Programme report-Global System and CWR
Programme report-Global System and CWRProgramme report-Global System and CWR
Programme report-Global System and CWR
Anameen
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
Allan Berry
 

Destaque (18)

Long term grants and CRP
Long term grants and CRPLong term grants and CRP
Long term grants and CRP
 
Assignmemt 4 for stretching
Assignmemt 4 for stretching Assignmemt 4 for stretching
Assignmemt 4 for stretching
 
Challenge assumptions 1 for sleeping ppt.
Challenge assumptions 1 for sleeping ppt.Challenge assumptions 1 for sleeping ppt.
Challenge assumptions 1 for sleeping ppt.
 
Assigment of challenge assumptions 3
Assigment of challenge assumptions 3Assigment of challenge assumptions 3
Assigment of challenge assumptions 3
 
Assignmemt 4
Assignmemt 4Assignmemt 4
Assignmemt 4
 
Strategic Human Resource Management
Strategic Human Resource ManagementStrategic Human Resource Management
Strategic Human Resource Management
 
Analysis of Software Development Life Cycle and Quality Management
Analysis of Software Development Life Cycle and Quality ManagementAnalysis of Software Development Life Cycle and Quality Management
Analysis of Software Development Life Cycle and Quality Management
 
Assignmemt 5 for chang
Assignmemt 5 for changAssignmemt 5 for chang
Assignmemt 5 for chang
 
Assignmemt 4
Assignmemt 4Assignmemt 4
Assignmemt 4
 
Continuous Improvement
Continuous ImprovementContinuous Improvement
Continuous Improvement
 
Delegating
DelegatingDelegating
Delegating
 
Project Human Resource Management
Project Human Resource ManagementProject Human Resource Management
Project Human Resource Management
 
Assignmemt 4
Assignmemt 4Assignmemt 4
Assignmemt 4
 
Assignmemt 3
Assignmemt 3Assignmemt 3
Assignmemt 3
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Programme report-Global System and CWR
Programme report-Global System and CWRProgramme report-Global System and CWR
Programme report-Global System and CWR
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 

Mais de sy2900

final assignmant of crasg course
final assignmant of crasg coursefinal assignmant of crasg course
final assignmant of crasg course
sy2900
 
Course reflection
Course reflectionCourse reflection
Course reflection
sy2900
 
Assignment of creative teams
Assignment of creative teamsAssignment of creative teams
Assignment of creative teams
sy2900
 
12施工安全措施
12施工安全措施12施工安全措施
12施工安全措施
sy2900
 
Assignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2pptAssignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2ppt
sy2900
 
Assignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2pptAssignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2ppt
sy2900
 
Assignmemt 4 for stretching
Assignmemt 4 for stretching Assignmemt 4 for stretching
Assignmemt 4 for stretching
sy2900
 
Assignmemt 4 for stretching
Assignmemt 4 for stretching Assignmemt 4 for stretching
Assignmemt 4 for stretching
sy2900
 
Venture assigment 2
Venture  assigment 2Venture  assigment 2
Venture assigment 2
sy2900
 

Mais de sy2900 (11)

final assignmant of crasg course
final assignmant of crasg coursefinal assignmant of crasg course
final assignmant of crasg course
 
Course reflection
Course reflectionCourse reflection
Course reflection
 
Assignment of creative teams
Assignment of creative teamsAssignment of creative teams
Assignment of creative teams
 
12施工安全措施
12施工安全措施12施工安全措施
12施工安全措施
 
Assignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2pptAssignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2ppt
 
Assignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2pptAssignmemt 5 for challenge assumption 2ppt
Assignmemt 5 for challenge assumption 2ppt
 
Challenge assumptions 1 for sleeping ppt.
Challenge assumptions 1 for sleeping ppt.Challenge assumptions 1 for sleeping ppt.
Challenge assumptions 1 for sleeping ppt.
 
Assignmemt 4 for stretching
Assignmemt 4 for stretching Assignmemt 4 for stretching
Assignmemt 4 for stretching
 
Assignmemt 4 for stretching
Assignmemt 4 for stretching Assignmemt 4 for stretching
Assignmemt 4 for stretching
 
Assignmemt 4
Assignmemt 4Assignmemt 4
Assignmemt 4
 
Venture assigment 2
Venture  assigment 2Venture  assigment 2
Venture assigment 2
 

Assignment of creative teams

  • 1. A Crash Course on Creativity Assignment of Creative Teams Presented by Sam Yeung Dated 4 Dec 2012
  • 2. Most comfortable hat of straw Hat • Light yellowish straw hat : go to the countryside for picnic and provide with natural feeling and cooler temperature on the head.
  • 3. Least comfortable of safety hat • Red safety hat : It is hard and feel hotter which is also represented as alarm signal. The environment provides with certain alert of unsafely and terrified condition.