SUSANTA KUMAR PANDA
Permanent Address: -NGV/117, Nitai Gaura Vihar, Canal Road, Kandasar
Nalco Nagar Township, Angul, Pin-759145, Odisha, India
Contact: +91 9437110710, +919959988704; +919603559899: +917573997509
Present Address: -Power Mech Residential Complex, Tunda, Mundra, Costal Gujarat
Power Limited, Pin_370421, Gujurat, India
Email:susanta.panda08@gmail.com/rediffmail.com,yoursusant_2k07@yahoo.co.in
Date: - 18.10.2016
To,
The General Manager,
HR Department.
With reference to some reliable source for the above mentioned post lying vacant in your organization
undersigned present myself as an important incumbent for the same.
I am submitting to express my keen interest in the position of AGM-O&M, Sr. Manager Projects, and
Project Manager- Installation/Construction in your company.
Review of my credentials will indicate that I am a qualified and high performing individual with excellent
professional and technical skills achieved via rich cross-functional exposure across the industry. I am an
innovative thinker, able to apply analysis and creativity to problem solving. I am a highly personable, self-
motivated and diligent individual with flexibility to adapt to new situations. An achievement-driven
professional targeting senior level assignments in Maintenance and Project Management preferably in
Power Plant, Steel, Port, Manufacturing industry
As a Mechanical Engineer, offering 15+ years of versatile and value driven experience. Consistent success
providing strategic & operations leadership in uniquely challenging situations. Currently spearheading
functions as AGM O&M with Power Mech Projects Limited. Possessing valuable insights, keen analysis and
team approach to implement best practices, adept at working in high pressure environments with strict
deadlines and multiple deliverables.
My Core Competencies
Project Management ♦ Strategic Planning ♦ Operation and Maintenance ♦ Installation &
Commissioning ♦ Production, Planning & Cost Control ♦ Operations & Preventive Maintenance ♦
Inspection reports & Documentation ♦ Inventory cost control ♦ Resource Procurement ♦ Quality
Management ♦ Workforce Management ♦ Product/ Process Improvements ♦ Safety Measures ♦
Productivity Enhancement ♦ Liaison & Coordination ♦ Training & Development ♦ Troubleshooting ♦
costing ♦ tendering ♦ profit loss analysis♦ Billing ♦reconciliation♦ Planning and Execution
Driven by high energy levels and professional competence I am confident of making visible contribution to
company’s growth and profitability objectives.
A tour through my enclosed resume shall take you through the details and I am confident, in my credentials
you would find a perfect fit for the said job. Thanks for sparing your time.
Thanking you in anticipation, for giving me an opportunity to be a vital part of your organization.
Yours sincerely,
Susanta Kumar Panda
SUSANTA KUMAR PANDA
NGV/117, Nitai Gaura Vihar, Canal Road, Kandasar, Nalco Nagar township, Angul,Pin-
759145 Odisha Contact: +91 9437110710; +919959988704
Email: susanta.panda08@gmail.com, yoursusant_2k07@yahoo.co.in,
susanta.panda08@rediffmail.com,susanta.pandapowermech@gmail.com
AGM – Operation & Maintenance
Offering 15 +years of versatile and value driven experience. Consistent success
providing strategic & operations leadership in uniquely challenging situations.
PROFILE
 Seasoned and technically competent Mechanical/Installation Manager, extending career success in
managing multiple technical functions with reputed companies across industry. Currently spearheading
functions as AGM- Operation and Maintenance with Power Mech projects Limited.
 Possessing valuable insights, keen analysis and team approach to implement best practices, adept at
working in high pressure environments with strict deadlines and multiple deliverables.
 Cost effective professional, successful in leading corporations through critical phase, turnaround and fast-
track growth, honed with demonstrated abilities in achieving cost savings across assignments &
minimizing performance bottlenecks for achieving high productivity with maximization of men, material
& machine.
 Strong communication, collaboration & team building skills with proficiency at grasping new technical
concepts quickly & utilize the same in a productive manner.
 Ability to conceptualize the processing for the product development with careful & sophisticated quality
control measures in compliance to the specified standards while performing root-cause analysis to
prevent any reoccurrences & defective issues.
My Core Competencies
Project Management ♦ Strategic Planning ♦ Operation and Maintenance ♦ Installation &
Commissioning ♦ Production, Planning & Cost Control ♦ Operations & Preventive Maintenance ♦
Inspection reports & Documentation ♦ Inventory cost control ♦ Resource Procurement ♦ Quality
Management ♦ Workforce Management ♦ Product/ Process Improvements ♦ Safety Measures ♦
Productivity Enhancement ♦ Liaison & Coordination ♦ Training & Development ♦ Troubleshooting ♦
costing ♦ tendering ♦ profit loss analysis♦ Billing ♦reconciliation♦ Planning and Execution
PROFESSIONAL EXPERIENCE
Since Aug-16
 POWER MECH PROJECTS LIMITED
AGM –O&M with Planning and Billing
Key Projects handled
o O&M and Housekeeping of Coal Handling Plant Costal Gujarat Power Limited, TATA, Mundra, Gujarat
o This system includes 5 no’s stacker cum reclaimer and 21 no’s Belt conveyor of Max 2400 BW. Coal
unloading from vessel and feeding to bunker for 5X800=4000MW Super critical power plant.
o Costing of all projects and O&M with Housekeeping, tendering, profit and loss analysis and
mobilization specialist with all monthly, weekly and daily reports.
o Accountable for Vessel unloading through GSU and looking after Operation, Maintenance as well as
Housekeeping activities with a team of 480 peoples.
o Strategically analyze, plan & conceptualize the processing for the product development as well as
target fulfillment of the company projects & requirements within the quality parameters while
coordinating with the product development & cross-functional teams.
o Executing the strategic plans for the processing while identifying & inspecting the incoming raw
materials to ensure quality & cost efficient products.
o Planning and billing with maintain the schedule of all requirements with smart cos controller.
o Spare with critical items planning with day to day requirement for O&M.
o Preparing Bills & receiving final certified bill copies from clients.
o Maintaining all types of site records.
o Making Reconciliation statements.
o Contractors Bills checking and our Running account bills preparing and submission to Client.
o Ensuring all the products have clearly defined specifications with careful & sophisticated quality
control measures in compliance to the international standards. Employ the use of various ultra-
modern facilities & sophisticated instruments.
o Performing root-cause analysis of defects while developing & improving the processing by taking
corrective actions to prevent any reoccurrences and defective issues.
o Map the process while conducting the gap analysis for analytical instruments, documenting all work
flows and review of Impact Analysis Document for further processing, ensuring action plan as per
requirement
Brief About Employment:
S.
No
Name Of Organization Customer/Clients From To Designation Strength On
roll/Contractor
1 Power Mech Projects
Limited,Mundra Gujurat
Coastal Gujurat Power
Limited,TATA Company
UMPP 800x5=4000MW
20.08.16 Presently
working
Asst.General
Manager (O&M)
242+248
1 Lucky Minerals Pvt
Ltd,Luthrareal estate,Delhi
Bhushan steel Limited,
Gmr Energy Limited, Tata
steel Limited,Jajpur
01-09-14 15-08-16 G.M Projects 212+468
2 Metso Minerals (i) pvt. Ltd Rourkela steel plant,
Anarak Aluminium plant,
Vizag Steel Plant
14.01.11 29.08.14 Asst.Manager
Instalation
12+120
3 Bhushan Steel Limited Bhushan steel limited 20.02.10 10.01.11 Sr.Engineer 17+112
4 Tecpro Systems Limited Adani power limited,
Nirma Power Limited,
Adani petronet(Dahej)
limited, Bhushan Steel
Limited,
10.11.05 15-02-10 Sr.Erection
Engineer
08+138
5 Hindalco Industries Limited Hindalco Industries
Limited
Nov-
2004
Nov-2005 PDPT Trainee Self
6 ICS Engineering Pvt Ltd NTPC Sipath,Ambuja
Cements Limited
Oct
2003
Oct 2004 Erection
Engineer
04+80
7 MAA Engineering Rungta,Keonjhar Aug-
1999
Jul-2000 Maint Fitter 12
 LUCKY MINERALS PRIVATE LIMITED Sep-14 to Aug 16
General Manager-Projects
Key Projects handled
o O&M and Housekeeping of Coal, Iron and PPF Circuit in Bhushan Steel Plant DKL (Odisha)
o Track hopper project I&II (3.2 Crore’s) in Bhushan Steel Plant DKL (Odisha)
o O&M and Housekeeping of Track Hopper 1&2 in Bhushan Steel Plant DKL (Odisha)
o O&M and Housekeeping of RMHS-II Feeding to Cocoven and Blast Furnace in Bhushan steel Plant DKL
(Odisha)
o O&M and Housekeeping of 4x500TPD DRI with WHRB and Cold ESP, Quality, Connarc
 Costing of all projects and O&M with Housekeeping, tendering, profit and loss analysis and mobilization
specialist with all monthly, weekly and daily reports.
 Accountable for looking after iron circuit consist of crusher and screens with conveyors of RMHS-I and
Track hopper Project with O&M with House keeping with a team of 350 peoples.
 Strategically analyze, plan & conceptualize the processing for the product development as well as target
fulfillment of the company projects & requirements within the quality parameters while coordinating
with the product development & cross-functional teams.
 Executing the strategic plans for the processing while identifying & inspecting the incoming raw
materials to ensure quality & cost efficient products.
 Ensuring all the products have clearly defined specifications with careful & sophisticated quality control
measures in compliance to the international standards. Employ the use of various ultra-modern facilities
& sophisticated instruments.
 Performing root-cause analysis of defects while developing & improving the processing by taking
corrective actions to prevent any reoccurrences and defective issues.
 Map the process while conducting the gap analysis for analytical instruments, documenting all work
flows and review of Impact Analysis Document for further processing, ensuring action plan as per
requirement
 Coordinating with the Maintenance Department for Machine break-down. Process reviewing on the
basis of PQCT (Process Quality Control Table), OCS (Operation Control Standards), FMEA (Failure Mode
Effect Analysis), WI (Work Instruction) etc.
 Preparing Protocol and Specification for Finished Product, Raw Materials Packing Material and Stability
samples. Prepare standard operating procedure and standard testing procedure Finished product, Raw
Materials and Stability samples. Maintain of quality control instruments.
Technical activities
 Project Planning, Monitoring & Controlling, Project Execution & Site Management
 Planning, Scheduling (MS PROJECT) & tracking of projects.
 Coordinating with ED and CEO for implementation of the project.
 Preparing all report and ensuring timely availability of material coordinating with the procurement and
logistic team for the same.
 Keeping the financial track of the project, so that there is no significant variation from the PSE.
 Coordination with Client, Head office and sub – contractors.
 Interacting with all Engineers on various areas for their daily and weekly program / schedule.
 Proper supervision for Equipment’s installation job at site and receiving inspection reports for completed
Assembly strs in proper way and checking all types of ND Test at different fabrication yard.
 Arranging Equipment’s and proving safety warnings to workers for structural Erection job under my
supervision.
 Maintaining records like Inspection reports, planning papers and Drawings all other necessary papers.
 Fixing Technological structures like chutes, brackets, idlers, actuators, pulleys, VGTU, HGTU, etc. at
proper locations.
 Making Reconciliation statements.
Commercial activities
 Preparing Bills & receiving final certified bill copies from clients.
 Maintaining all types of site records.
 Receiving and issued required materials from clients and preparing Reconciliation statements in proper
time.
 Checking all types of required documents from vendor holders properly which comes at the time of
deposition of every month RA bills.
 Running Account Follow up for Supplied and erected items/equipment.
 Making Reconciliation statements.
 Contractors Bills checking and our Running account bills preparing and submission to Client.
 METSO MINERALS (INDIA) PVT LTD Jan’11-Aug 14
ASST MANAGER INSTALATION
Key Projects handled
o Vizag steel Plant in Raw Material Handling Plant in Vizag (Andra Pradesh)
o Anrak Aluminum Project In Alumina Refinery Project in Vizag (Andra Pradesh)
o Rourkela Steel Plant (ORISSA) in OBBP (Ore Bedding & Blending Plant) Expansion project.
 Accountable for looking after slewing & luffing stacker, Bucket Wheel Reclaimer, Apron Feeder, Horintal
Ball Mill (238TPH), Multi Flow Banana Screen (Commissioned) & Vizag steel plant Project 3 no’s stacker
cum reclaimer Erection completed and Commissioning and Load Trail under progress.
 Handling up to 4.2 MTPA equipments of Bucket Wheel Stacker Cum Reclaimer, Bucket Wheel Reclaimer,
Twin Boom Stacker, Barrel Reclaimer, Wagan Tripper including Appron Feder, Track Hopper including
Paddle Feeder etc.
 Strategically analyze, plan & conceptualize the processing for the product development as well as target
fulfillment of the company projects & requirements within the quality parameters while coordinating
with the product development & cross-functional teams.
 Executing the strategic plans for the processing while identifying & inspecting the incoming raw
materials to ensure quality & cost efficient products.
 Ensuring all the products have clearly defined specifications with careful & sophisticated quality control
measures in compliance to the international standards. Employ the use of various ultra-modern facilities
& sophisticated instruments.
 Performing root-cause analysis of defects while developing & improving the processing by taking
corrective actions to prevent any reoccurrences and defective issues.
 Map the process while conducting the gap analysis for analytical instruments, documenting all work
flows and review of Impact Analysis Document for further processing, ensuring action plan as per
requirement.
 Coordinating with the Maintenance Department for Machine break-down. Process reviewing on the basis
of PQCT (Process Quality Control Table), OCS (Operation Control Standards), FMEA (Failure Mode Effect
Analysis), WI (Work Instruction) etc.
 Preparing Protocol and Specification for Finished Product, Raw Materials Packing Material and Stability
samples. Prepare standard operating procedure and standard testing procedure Finished product, Raw
Materials and Stability samples. Maintain of quality control instruments.
Technical activities:-
 Project Planning, Monitoring & Controlling, Project Execution & Site Management
 Planning, Scheduling (MS PROJECT) & tracking of projects.
 Coordinating with Project Manager for implementation of the project.
 Preparing all report and ensuring timely availability of material coordinating with the procurement and
logistic team for the same.
 Keeping the financial track of the project, so that there is no significant variation from the PSE.
 Coordination with Client, Head office and sub – contractors.
 Interacting with all Engineers on various areas for their daily and weekly program / schedule.
 Proper supervision for Equipments installation job at site and receiving inspection reports for completed
Assembly strs in proper way and checking all types of ND Test at different fabrication yard.
 Arranging Equipments and proving safety warnings to workers for structural Erection job under my
supervision.
 Maintaining records like Inspection reports, planning papers and Drawings all other necessary papers.
 Fixing Technological structures like chutes, brackets, idlers, actuators, pulleys, VGTU, HGTU, etc at proper
locations.
 Making Reconciliation statements.
Commercial activities
 Preparing Bills & receiving final certified bill copies from clients.
 Petty cash handling.
 Liasioning with labour officers, HR and all other relevant departments.
 Maintaining all types of site records.
 Receiving and issued required materials from clients and preparing Reconciliation statements in proper
time.
 Checking all types of required documents from vendor holders properly which comes at the time of
deposition of every month RA bills.
 Running Account Follow up for Supplied and erected items/equipments.
 Collecting of E Waybills requirements for transporting.
 Making Reconciliation statements and Excise duties and CST Records.
 Contractors Bills checking and our Running account bills preparing and submission to Client.
 BHUSHAN STEEL LIMITED Feb’10-Jan’11
Senior Engineer
 Spearheaded efforts in Operation & Maintenance of Coal & Iron circuit feeding to DRI, COAL WASHERY &
POWER PLANT including 20 no’s conveyors,2no’s Bucket Wheel Stacker Cum Reclaimer(O&M).
 Responsible for feeding to coal primary bunker and ore primary bunker for RMPP (Raw Material
Processing Plant).
 Deftly coordinated with Truck Tripper & Wagan Tripper for unloading material for stacking & reclaiming
purposes used in Steel Making Shop, Blast Furnace, Sinter plant, Direct Reduced Iron Plant, Coal Washery,
and Power Plants etc.
 Formulated SMP, SOP, Annual/ Monthly Maintenance Plan, History reports, Capital Budgeting plan,
Preventive Maintenance plans, and Inspection reports.
 Handled daily maintenance schedules, Maintenance planning& Inventory cost control & Procurement. (As
per ISO Standards) and documenting the same in conjunction with New Initiatives Department.
 TECPRO SYSTEMS LTD May’09-Feb’10
Senior Erection Engineer
 Accountable for fabrication, erection, mechanical equipment installation & commissioning of Coal
Handling Plant, 180TPH coal handling plant for 2x30MW thermal power project NIRMA POWER LIMITED
Porbandar, Gujarat.
 Handled project drawing study, involved in modification of structural drawing of coal circuit of Thermal
Power plant.
 Efficiently dealt with quality control, different welding rod, welding process, cutting sheet metals, drilling,
grinding and fitting according to the drawing mentioned. Also deals with 900TPH Stacker, Truck Tripper,
Double roll crusher, flow divider, motor, pulley, gearbox, scoop coupling, traveling tripper, magnetic
separator, sump pump, hoists, supervision of civil fronts available by client & other mechanical
equipment installation & alignments with commissioning for 2x30 MW 180 TPH COAL HANDLING
PLANT.
 Responsible for Internal Audits on the line for System, Process and Product as per schedule and ensure
that actions implemented as stated in the action plan submitted and monitoring the effectiveness.
 Prepared SOP, validation protocol & reports and validation master plan. Ensure adequate specification,
test methods, SOPs, reagents and chemicals.
 Responsible for managing the team-QC Officers, Supervisors while training them for the professional &
work developments.
 Managed team’s concerns and grievances while providing them with various accolades to motivate them
on regular basis.
 TECPRO SYSTEMS LTD Dec’07-May’09
Erection Engineer
 Managed fabrication, erection, mechanical equipment installation & commissioning of Coal Handling
Plant, 900TPH coal handling plant for 4x330MW thermal power project Adani Power Limited mundra,
Gujurat.
 I am dealing with project drawing study, involved in modification of structural drawing of coal circuit of
Thermal Power plant. I was dealing with Paddle feeder, ring granulator crusher, flow divider, motor,
pulley, gearbox, scoop coupling, travelling tripper, magnetic separator, sump pump, hoists, supervision of
civil fronts available by client & other mechanical equipment installation & alignments with
commissioning.
 TECPRO SYSTEMS LTD Nov’05-Dec’07
Site Engineer
 Looked after Fabrication, Erection & Commissioning of conveyer systems of power plant, DRI, coal
washery, SMS & blast furnace in Bhushan Steels Limited, Meramundali, and Dhenkanal.
 Looking after material feeding to coal primary bunker and ore primary bunker for RMPP(Raw Material
Processing Plant), Co-ordination with Truck Tripper & Wagan Tripper for unloading material for
stacking & reclaiming purposes used in Steel Making Shop, Blast Furnace, Sinter plant, Direct Reduced
Iron Plant, Coal Washery, and Power Plants etc.
 HINDALCO INDUSTRIES LIMITED Nov’04-Nov’05
DIPLOMA PDPT TRAINEE
 Post Diploma Practical Training in Hindalco, Hirakud Smelter Plant
 Automobile Section:-Overhauling and maintenance of VOLTAS lift trucks, Coles crane etc. Servicing of
mechanical steering and wheel bearing replacement and alignment.
 Hydraulic Equipments:-Overhauling and servicing of hydraulic power pack of different hydraulic
equipments like pullers, planters, hydraulic press, clamps and solenoid valves.
 Pneumatics Equipments:-Operation and maintenance of air compressor of 500CFM capacity.
Servicing and repairing of different size air operated cylinders, valves and air motors.
 Mechanical Equipments:-Repair and maintenance of electrically operated over head crane of capacity
30MT, 20MT,15MT and different types of water centrifugal pumps, gear pumps, vertical pumps etc.
repair and maintenance of material handling equipments like Bucket elevator, Belt conveyor, Ball mill,
Screening system, Screw conveyor, Dust collection system and Cooling towers in the plant .
 Casting Plant:-Repair and maintenance of tilting furnace, Different furnaces, Atomizing blower, DCP
(Direct Chilling Process), Launders and Diafirm valves etc.
 Mechanical Workshop:-Various jobs in lathes, shapers, slotter, planner, grinder, milling machine and
drilling machine. Welding various jobs, thread cutting, facing, grooving, chamfering, under cut and
both types of symmetrical and unsymmetrical jobs.
 ICS ENGG. (P)LTD Oct’03-Oct’04
Site Engineer
Key project Handled
 3x660MW Boiler of NTPC, Sipath, Chhattisgarh.
 I was dealing with structural erection, Thermal Air Pre-Heater, Ducting Systems, Pressure Part Erection,
IDFAN, FDFAN installation of CFBC Boiler. In NTPC Sipath I was working with Pressure part & Structural
work project of South Korea (DOOSAN
 CFBC Boiler 2x30MW work in Gujarat Ambuja Cement Ltd.
 MAA ENGINEERING Aug’99-Jul’00
Maintenance Fitter
Key project Handled
 Gangeigora Crusher Plant, Joda Dist-Keonjhar.
 Involved in the maintenance of 20 no’s of conveyors, different pulleys, plumber blocks, drum pulleys,
gear box, double & triple deck screen, Sandvik jaw crusher 600TPH, cone crusher 425TPH, modification
of feeders, gravity take up and different structures.
SCHOLASTIC PORTFOLIO
MBA in Project management and Production Management; 2008-2010.
Emperial Institute of Management Science and Research, Delhi; 66.5%
BE in Mechanical Engineering; 2004-2007.
Imperial Institute of Management Science and Research, Delhi; 64.54%
Diploma in Mechanical Engineering; 2000-2003
Orissa School of Mining Engineering, Keonjhar; 64.67%
Industrial Training Institute in Machinist Branch; 1997-1999
Govt.I.T.I. Rourkela under the State Council of Vocational Training, BBSR, Orissa; 77.76%
Higher Secondary Certificate; 1997
Board of Secondary Education, Orissa; 73.34%
Trainings & Study Tour Attended
 ITI Study tour-Rourkela Steel Plant, OCL Cement Factory, Bandamunda Railway Engine, L&T Cement
Factory and Auto India Ltd.In diploma study tour attends Orissa Sponge Iron Ltd & Tata Sponge Iron Ltd
of Keonjhar.
 Post diploma practical training in Hindustan Aluminum Company (HINDAL CO) Industries Limited,
Hirakud. Dist-Sambalpur (Orissa).
Computer Proficiencies: Windows XP, Window 7 & VISTA, MSOffice (Word, excel, power point & internet)
Date of Birth: 22nd
June 1982
Sex: - Male
Nationality: - Indian
Linguistic Abilities: English, Hindi, and Oriya, understand & litter bit speak Bengali, Telugu & Gujarati
Hobbies: Playing Cricket & Chess
Permanent Address: Bidharpur, PO- Abhimanpur 754035, District Cuttack (Orissa)
Communication Address: NGV/117, Nitai Gaura Vihar, Canal Road, Kandasar
Nalco Nagar Township, Angul, Pin-759145, Odisha
Mobile No: -9437110710
Mail Id: susanta.panda08@gmail.com,susanta.panda08@rediffmail.com,yoursusant_2k07@yahoo.co.in
Religion: Hindu
Marital Status: Married
Emp. Regn. No-T/825/04, South balanda, Talcher (ORISSA)
Passport No: - L925123
References: Available on Request
• Strengths:
Self motivation, Like Challenges, Adaptability, Strong willpower, Ability to work as team with Punctuality &
obediently, willingness to learn, Responsible, Result-oriented. I am a sincere, self-motivated individual. My
drive for hard work and the ability to take the initiatives under pressure makes me a suitable candidate for
the applied profile.
• Present Salary Drawn: - Rs: - 11.34 Lack’s/annum + Accommodations + Conveyance.
• Expected Salary :- Rs: - 13-14 Lack’s/annum + Accommodations + Conveyance
• Notice period required:-2 month
• Declaration: - I do hereby declare the facts stated above are true & correct to the best of my
knowledge & belief.
Susanta Kumar Panda
TUNDA, MUNDRA, GUJURAT DATE: -18/10/2016

Mais conteúdo relacionado

Mais procurados

MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
Arun Arun
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
SUDARSANAN NANU
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
SURENDRA BABU
 
resume for jayanta das (3)
resume for jayanta das (3)resume for jayanta das (3)
resume for jayanta das (3)
Jayanta Das
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
Mohammed Akbar
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
Asif pasha
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
Saurabh Shah
 

Mais procurados (20)

MEP Supervisor
MEP SupervisorMEP Supervisor
MEP Supervisor
 
MEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANANMEP SUPERVISOR - SUDARSANAN
MEP SUPERVISOR - SUDARSANAN
 
Raghvendra Resume-8+
Raghvendra Resume-8+Raghvendra Resume-8+
Raghvendra Resume-8+
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Kashif CV PDF
Kashif CV PDFKashif CV PDF
Kashif CV PDF
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
vijesh-resume.pdf
vijesh-resume.pdfvijesh-resume.pdf
vijesh-resume.pdf
 
resume for jayanta das (3)
resume for jayanta das (3)resume for jayanta das (3)
resume for jayanta das (3)
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 

Destaque (14)

CV-PRASHANT PATIL
CV-PRASHANT PATILCV-PRASHANT PATIL
CV-PRASHANT PATIL
 
Andrea Nuno Resume
Andrea Nuno ResumeAndrea Nuno Resume
Andrea Nuno Resume
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
Sr. Engineer - MEP - Electrical Professional
Sr. Engineer - MEP - Electrical ProfessionalSr. Engineer - MEP - Electrical Professional
Sr. Engineer - MEP - Electrical Professional
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
experience certificates.PDF
experience  certificates.PDFexperience  certificates.PDF
experience certificates.PDF
 

Semelhante a CV S.K.Panda (20)

KS RAO CV
KS RAO CVKS RAO CV
KS RAO CV
 
yogesh Resume
yogesh Resumeyogesh Resume
yogesh Resume
 
Resume
ResumeResume
Resume
 
resume updated
resume updatedresume updated
resume updated
 
resume-01
resume-01resume-01
resume-01
 
1.CV_SUDHAKAR PATHAK STORE Manager - Copy
1.CV_SUDHAKAR PATHAK STORE Manager - Copy1.CV_SUDHAKAR PATHAK STORE Manager - Copy
1.CV_SUDHAKAR PATHAK STORE Manager - Copy
 
25.5.16.CV.Bio.data
25.5.16.CV.Bio.data25.5.16.CV.Bio.data
25.5.16.CV.Bio.data
 
Deepak kumar mishra
Deepak kumar mishraDeepak kumar mishra
Deepak kumar mishra
 
Pawan Resume-2014(rev)
Pawan Resume-2014(rev)Pawan Resume-2014(rev)
Pawan Resume-2014(rev)
 
123
123123
123
 
Resume
ResumeResume
Resume
 
CV HENDRA PERMANA R1
CV HENDRA PERMANA R1CV HENDRA PERMANA R1
CV HENDRA PERMANA R1
 
Cv partha
Cv parthaCv partha
Cv partha
 
My resume
My resumeMy resume
My resume
 
MY RESUME_TD.NATHWANI.
MY RESUME_TD.NATHWANI.MY RESUME_TD.NATHWANI.
MY RESUME_TD.NATHWANI.
 
Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).Sathish Palani Resume(7-2-17).
Sathish Palani Resume(7-2-17).
 
Sathishkumar_ Updated
Sathishkumar_ UpdatedSathishkumar_ Updated
Sathishkumar_ Updated
 
CV_COO
CV_COOCV_COO
CV_COO
 
resume_brijpal_singh_25.02.2016
resume_brijpal_singh_25.02.2016resume_brijpal_singh_25.02.2016
resume_brijpal_singh_25.02.2016
 
Balchandra Puranik2002
Balchandra Puranik2002Balchandra Puranik2002
Balchandra Puranik2002
 

CV S.K.Panda

  • 1. SUSANTA KUMAR PANDA Permanent Address: -NGV/117, Nitai Gaura Vihar, Canal Road, Kandasar Nalco Nagar Township, Angul, Pin-759145, Odisha, India Contact: +91 9437110710, +919959988704; +919603559899: +917573997509 Present Address: -Power Mech Residential Complex, Tunda, Mundra, Costal Gujarat Power Limited, Pin_370421, Gujurat, India Email:susanta.panda08@gmail.com/rediffmail.com,yoursusant_2k07@yahoo.co.in Date: - 18.10.2016 To, The General Manager, HR Department. With reference to some reliable source for the above mentioned post lying vacant in your organization undersigned present myself as an important incumbent for the same. I am submitting to express my keen interest in the position of AGM-O&M, Sr. Manager Projects, and Project Manager- Installation/Construction in your company. Review of my credentials will indicate that I am a qualified and high performing individual with excellent professional and technical skills achieved via rich cross-functional exposure across the industry. I am an innovative thinker, able to apply analysis and creativity to problem solving. I am a highly personable, self- motivated and diligent individual with flexibility to adapt to new situations. An achievement-driven professional targeting senior level assignments in Maintenance and Project Management preferably in Power Plant, Steel, Port, Manufacturing industry As a Mechanical Engineer, offering 15+ years of versatile and value driven experience. Consistent success providing strategic & operations leadership in uniquely challenging situations. Currently spearheading functions as AGM O&M with Power Mech Projects Limited. Possessing valuable insights, keen analysis and team approach to implement best practices, adept at working in high pressure environments with strict deadlines and multiple deliverables. My Core Competencies Project Management ♦ Strategic Planning ♦ Operation and Maintenance ♦ Installation & Commissioning ♦ Production, Planning & Cost Control ♦ Operations & Preventive Maintenance ♦ Inspection reports & Documentation ♦ Inventory cost control ♦ Resource Procurement ♦ Quality Management ♦ Workforce Management ♦ Product/ Process Improvements ♦ Safety Measures ♦ Productivity Enhancement ♦ Liaison & Coordination ♦ Training & Development ♦ Troubleshooting ♦ costing ♦ tendering ♦ profit loss analysis♦ Billing ♦reconciliation♦ Planning and Execution Driven by high energy levels and professional competence I am confident of making visible contribution to company’s growth and profitability objectives. A tour through my enclosed resume shall take you through the details and I am confident, in my credentials you would find a perfect fit for the said job. Thanks for sparing your time. Thanking you in anticipation, for giving me an opportunity to be a vital part of your organization. Yours sincerely, Susanta Kumar Panda SUSANTA KUMAR PANDA
  • 2. NGV/117, Nitai Gaura Vihar, Canal Road, Kandasar, Nalco Nagar township, Angul,Pin- 759145 Odisha Contact: +91 9437110710; +919959988704 Email: susanta.panda08@gmail.com, yoursusant_2k07@yahoo.co.in, susanta.panda08@rediffmail.com,susanta.pandapowermech@gmail.com AGM – Operation & Maintenance Offering 15 +years of versatile and value driven experience. Consistent success providing strategic & operations leadership in uniquely challenging situations. PROFILE  Seasoned and technically competent Mechanical/Installation Manager, extending career success in managing multiple technical functions with reputed companies across industry. Currently spearheading functions as AGM- Operation and Maintenance with Power Mech projects Limited.  Possessing valuable insights, keen analysis and team approach to implement best practices, adept at working in high pressure environments with strict deadlines and multiple deliverables.  Cost effective professional, successful in leading corporations through critical phase, turnaround and fast- track growth, honed with demonstrated abilities in achieving cost savings across assignments & minimizing performance bottlenecks for achieving high productivity with maximization of men, material & machine.  Strong communication, collaboration & team building skills with proficiency at grasping new technical concepts quickly & utilize the same in a productive manner.  Ability to conceptualize the processing for the product development with careful & sophisticated quality control measures in compliance to the specified standards while performing root-cause analysis to prevent any reoccurrences & defective issues. My Core Competencies Project Management ♦ Strategic Planning ♦ Operation and Maintenance ♦ Installation & Commissioning ♦ Production, Planning & Cost Control ♦ Operations & Preventive Maintenance ♦ Inspection reports & Documentation ♦ Inventory cost control ♦ Resource Procurement ♦ Quality Management ♦ Workforce Management ♦ Product/ Process Improvements ♦ Safety Measures ♦ Productivity Enhancement ♦ Liaison & Coordination ♦ Training & Development ♦ Troubleshooting ♦ costing ♦ tendering ♦ profit loss analysis♦ Billing ♦reconciliation♦ Planning and Execution PROFESSIONAL EXPERIENCE Since Aug-16  POWER MECH PROJECTS LIMITED AGM –O&M with Planning and Billing Key Projects handled o O&M and Housekeeping of Coal Handling Plant Costal Gujarat Power Limited, TATA, Mundra, Gujarat o This system includes 5 no’s stacker cum reclaimer and 21 no’s Belt conveyor of Max 2400 BW. Coal unloading from vessel and feeding to bunker for 5X800=4000MW Super critical power plant. o Costing of all projects and O&M with Housekeeping, tendering, profit and loss analysis and mobilization specialist with all monthly, weekly and daily reports. o Accountable for Vessel unloading through GSU and looking after Operation, Maintenance as well as Housekeeping activities with a team of 480 peoples. o Strategically analyze, plan & conceptualize the processing for the product development as well as target fulfillment of the company projects & requirements within the quality parameters while coordinating with the product development & cross-functional teams.
  • 3. o Executing the strategic plans for the processing while identifying & inspecting the incoming raw materials to ensure quality & cost efficient products. o Planning and billing with maintain the schedule of all requirements with smart cos controller. o Spare with critical items planning with day to day requirement for O&M. o Preparing Bills & receiving final certified bill copies from clients. o Maintaining all types of site records. o Making Reconciliation statements. o Contractors Bills checking and our Running account bills preparing and submission to Client. o Ensuring all the products have clearly defined specifications with careful & sophisticated quality control measures in compliance to the international standards. Employ the use of various ultra- modern facilities & sophisticated instruments. o Performing root-cause analysis of defects while developing & improving the processing by taking corrective actions to prevent any reoccurrences and defective issues. o Map the process while conducting the gap analysis for analytical instruments, documenting all work flows and review of Impact Analysis Document for further processing, ensuring action plan as per requirement Brief About Employment: S. No Name Of Organization Customer/Clients From To Designation Strength On roll/Contractor 1 Power Mech Projects Limited,Mundra Gujurat Coastal Gujurat Power Limited,TATA Company UMPP 800x5=4000MW 20.08.16 Presently working Asst.General Manager (O&M) 242+248 1 Lucky Minerals Pvt Ltd,Luthrareal estate,Delhi Bhushan steel Limited, Gmr Energy Limited, Tata steel Limited,Jajpur 01-09-14 15-08-16 G.M Projects 212+468 2 Metso Minerals (i) pvt. Ltd Rourkela steel plant, Anarak Aluminium plant, Vizag Steel Plant 14.01.11 29.08.14 Asst.Manager Instalation 12+120 3 Bhushan Steel Limited Bhushan steel limited 20.02.10 10.01.11 Sr.Engineer 17+112 4 Tecpro Systems Limited Adani power limited, Nirma Power Limited, Adani petronet(Dahej) limited, Bhushan Steel Limited, 10.11.05 15-02-10 Sr.Erection Engineer 08+138 5 Hindalco Industries Limited Hindalco Industries Limited Nov- 2004 Nov-2005 PDPT Trainee Self 6 ICS Engineering Pvt Ltd NTPC Sipath,Ambuja Cements Limited Oct 2003 Oct 2004 Erection Engineer 04+80 7 MAA Engineering Rungta,Keonjhar Aug- 1999 Jul-2000 Maint Fitter 12  LUCKY MINERALS PRIVATE LIMITED Sep-14 to Aug 16 General Manager-Projects
  • 4. Key Projects handled o O&M and Housekeeping of Coal, Iron and PPF Circuit in Bhushan Steel Plant DKL (Odisha) o Track hopper project I&II (3.2 Crore’s) in Bhushan Steel Plant DKL (Odisha) o O&M and Housekeeping of Track Hopper 1&2 in Bhushan Steel Plant DKL (Odisha) o O&M and Housekeeping of RMHS-II Feeding to Cocoven and Blast Furnace in Bhushan steel Plant DKL (Odisha) o O&M and Housekeeping of 4x500TPD DRI with WHRB and Cold ESP, Quality, Connarc  Costing of all projects and O&M with Housekeeping, tendering, profit and loss analysis and mobilization specialist with all monthly, weekly and daily reports.  Accountable for looking after iron circuit consist of crusher and screens with conveyors of RMHS-I and Track hopper Project with O&M with House keeping with a team of 350 peoples.  Strategically analyze, plan & conceptualize the processing for the product development as well as target fulfillment of the company projects & requirements within the quality parameters while coordinating with the product development & cross-functional teams.  Executing the strategic plans for the processing while identifying & inspecting the incoming raw materials to ensure quality & cost efficient products.  Ensuring all the products have clearly defined specifications with careful & sophisticated quality control measures in compliance to the international standards. Employ the use of various ultra-modern facilities & sophisticated instruments.  Performing root-cause analysis of defects while developing & improving the processing by taking corrective actions to prevent any reoccurrences and defective issues.  Map the process while conducting the gap analysis for analytical instruments, documenting all work flows and review of Impact Analysis Document for further processing, ensuring action plan as per requirement  Coordinating with the Maintenance Department for Machine break-down. Process reviewing on the basis of PQCT (Process Quality Control Table), OCS (Operation Control Standards), FMEA (Failure Mode Effect Analysis), WI (Work Instruction) etc.  Preparing Protocol and Specification for Finished Product, Raw Materials Packing Material and Stability samples. Prepare standard operating procedure and standard testing procedure Finished product, Raw Materials and Stability samples. Maintain of quality control instruments. Technical activities  Project Planning, Monitoring & Controlling, Project Execution & Site Management  Planning, Scheduling (MS PROJECT) & tracking of projects.  Coordinating with ED and CEO for implementation of the project.  Preparing all report and ensuring timely availability of material coordinating with the procurement and logistic team for the same.  Keeping the financial track of the project, so that there is no significant variation from the PSE.  Coordination with Client, Head office and sub – contractors.  Interacting with all Engineers on various areas for their daily and weekly program / schedule.  Proper supervision for Equipment’s installation job at site and receiving inspection reports for completed Assembly strs in proper way and checking all types of ND Test at different fabrication yard.  Arranging Equipment’s and proving safety warnings to workers for structural Erection job under my supervision.  Maintaining records like Inspection reports, planning papers and Drawings all other necessary papers.  Fixing Technological structures like chutes, brackets, idlers, actuators, pulleys, VGTU, HGTU, etc. at proper locations.  Making Reconciliation statements.
  • 5. Commercial activities  Preparing Bills & receiving final certified bill copies from clients.  Maintaining all types of site records.  Receiving and issued required materials from clients and preparing Reconciliation statements in proper time.  Checking all types of required documents from vendor holders properly which comes at the time of deposition of every month RA bills.  Running Account Follow up for Supplied and erected items/equipment.  Making Reconciliation statements.  Contractors Bills checking and our Running account bills preparing and submission to Client.  METSO MINERALS (INDIA) PVT LTD Jan’11-Aug 14 ASST MANAGER INSTALATION Key Projects handled o Vizag steel Plant in Raw Material Handling Plant in Vizag (Andra Pradesh) o Anrak Aluminum Project In Alumina Refinery Project in Vizag (Andra Pradesh) o Rourkela Steel Plant (ORISSA) in OBBP (Ore Bedding & Blending Plant) Expansion project.  Accountable for looking after slewing & luffing stacker, Bucket Wheel Reclaimer, Apron Feeder, Horintal Ball Mill (238TPH), Multi Flow Banana Screen (Commissioned) & Vizag steel plant Project 3 no’s stacker cum reclaimer Erection completed and Commissioning and Load Trail under progress.  Handling up to 4.2 MTPA equipments of Bucket Wheel Stacker Cum Reclaimer, Bucket Wheel Reclaimer, Twin Boom Stacker, Barrel Reclaimer, Wagan Tripper including Appron Feder, Track Hopper including Paddle Feeder etc.  Strategically analyze, plan & conceptualize the processing for the product development as well as target fulfillment of the company projects & requirements within the quality parameters while coordinating with the product development & cross-functional teams.  Executing the strategic plans for the processing while identifying & inspecting the incoming raw materials to ensure quality & cost efficient products.  Ensuring all the products have clearly defined specifications with careful & sophisticated quality control measures in compliance to the international standards. Employ the use of various ultra-modern facilities & sophisticated instruments.  Performing root-cause analysis of defects while developing & improving the processing by taking corrective actions to prevent any reoccurrences and defective issues.  Map the process while conducting the gap analysis for analytical instruments, documenting all work flows and review of Impact Analysis Document for further processing, ensuring action plan as per requirement.  Coordinating with the Maintenance Department for Machine break-down. Process reviewing on the basis of PQCT (Process Quality Control Table), OCS (Operation Control Standards), FMEA (Failure Mode Effect Analysis), WI (Work Instruction) etc.  Preparing Protocol and Specification for Finished Product, Raw Materials Packing Material and Stability samples. Prepare standard operating procedure and standard testing procedure Finished product, Raw Materials and Stability samples. Maintain of quality control instruments. Technical activities:-  Project Planning, Monitoring & Controlling, Project Execution & Site Management  Planning, Scheduling (MS PROJECT) & tracking of projects.  Coordinating with Project Manager for implementation of the project.  Preparing all report and ensuring timely availability of material coordinating with the procurement and logistic team for the same.
  • 6.  Keeping the financial track of the project, so that there is no significant variation from the PSE.  Coordination with Client, Head office and sub – contractors.  Interacting with all Engineers on various areas for their daily and weekly program / schedule.  Proper supervision for Equipments installation job at site and receiving inspection reports for completed Assembly strs in proper way and checking all types of ND Test at different fabrication yard.  Arranging Equipments and proving safety warnings to workers for structural Erection job under my supervision.  Maintaining records like Inspection reports, planning papers and Drawings all other necessary papers.  Fixing Technological structures like chutes, brackets, idlers, actuators, pulleys, VGTU, HGTU, etc at proper locations.  Making Reconciliation statements. Commercial activities  Preparing Bills & receiving final certified bill copies from clients.  Petty cash handling.  Liasioning with labour officers, HR and all other relevant departments.  Maintaining all types of site records.  Receiving and issued required materials from clients and preparing Reconciliation statements in proper time.  Checking all types of required documents from vendor holders properly which comes at the time of deposition of every month RA bills.  Running Account Follow up for Supplied and erected items/equipments.  Collecting of E Waybills requirements for transporting.  Making Reconciliation statements and Excise duties and CST Records.  Contractors Bills checking and our Running account bills preparing and submission to Client.  BHUSHAN STEEL LIMITED Feb’10-Jan’11 Senior Engineer  Spearheaded efforts in Operation & Maintenance of Coal & Iron circuit feeding to DRI, COAL WASHERY & POWER PLANT including 20 no’s conveyors,2no’s Bucket Wheel Stacker Cum Reclaimer(O&M).  Responsible for feeding to coal primary bunker and ore primary bunker for RMPP (Raw Material Processing Plant).  Deftly coordinated with Truck Tripper & Wagan Tripper for unloading material for stacking & reclaiming purposes used in Steel Making Shop, Blast Furnace, Sinter plant, Direct Reduced Iron Plant, Coal Washery, and Power Plants etc.  Formulated SMP, SOP, Annual/ Monthly Maintenance Plan, History reports, Capital Budgeting plan, Preventive Maintenance plans, and Inspection reports.  Handled daily maintenance schedules, Maintenance planning& Inventory cost control & Procurement. (As per ISO Standards) and documenting the same in conjunction with New Initiatives Department.  TECPRO SYSTEMS LTD May’09-Feb’10 Senior Erection Engineer  Accountable for fabrication, erection, mechanical equipment installation & commissioning of Coal Handling Plant, 180TPH coal handling plant for 2x30MW thermal power project NIRMA POWER LIMITED Porbandar, Gujarat.
  • 7.  Handled project drawing study, involved in modification of structural drawing of coal circuit of Thermal Power plant.  Efficiently dealt with quality control, different welding rod, welding process, cutting sheet metals, drilling, grinding and fitting according to the drawing mentioned. Also deals with 900TPH Stacker, Truck Tripper, Double roll crusher, flow divider, motor, pulley, gearbox, scoop coupling, traveling tripper, magnetic separator, sump pump, hoists, supervision of civil fronts available by client & other mechanical equipment installation & alignments with commissioning for 2x30 MW 180 TPH COAL HANDLING PLANT.  Responsible for Internal Audits on the line for System, Process and Product as per schedule and ensure that actions implemented as stated in the action plan submitted and monitoring the effectiveness.  Prepared SOP, validation protocol & reports and validation master plan. Ensure adequate specification, test methods, SOPs, reagents and chemicals.  Responsible for managing the team-QC Officers, Supervisors while training them for the professional & work developments.  Managed team’s concerns and grievances while providing them with various accolades to motivate them on regular basis.  TECPRO SYSTEMS LTD Dec’07-May’09 Erection Engineer  Managed fabrication, erection, mechanical equipment installation & commissioning of Coal Handling Plant, 900TPH coal handling plant for 4x330MW thermal power project Adani Power Limited mundra, Gujurat.  I am dealing with project drawing study, involved in modification of structural drawing of coal circuit of Thermal Power plant. I was dealing with Paddle feeder, ring granulator crusher, flow divider, motor, pulley, gearbox, scoop coupling, travelling tripper, magnetic separator, sump pump, hoists, supervision of civil fronts available by client & other mechanical equipment installation & alignments with commissioning.  TECPRO SYSTEMS LTD Nov’05-Dec’07 Site Engineer  Looked after Fabrication, Erection & Commissioning of conveyer systems of power plant, DRI, coal washery, SMS & blast furnace in Bhushan Steels Limited, Meramundali, and Dhenkanal.  Looking after material feeding to coal primary bunker and ore primary bunker for RMPP(Raw Material Processing Plant), Co-ordination with Truck Tripper & Wagan Tripper for unloading material for stacking & reclaiming purposes used in Steel Making Shop, Blast Furnace, Sinter plant, Direct Reduced Iron Plant, Coal Washery, and Power Plants etc.  HINDALCO INDUSTRIES LIMITED Nov’04-Nov’05 DIPLOMA PDPT TRAINEE  Post Diploma Practical Training in Hindalco, Hirakud Smelter Plant  Automobile Section:-Overhauling and maintenance of VOLTAS lift trucks, Coles crane etc. Servicing of mechanical steering and wheel bearing replacement and alignment.  Hydraulic Equipments:-Overhauling and servicing of hydraulic power pack of different hydraulic equipments like pullers, planters, hydraulic press, clamps and solenoid valves.  Pneumatics Equipments:-Operation and maintenance of air compressor of 500CFM capacity. Servicing and repairing of different size air operated cylinders, valves and air motors.
  • 8.  Mechanical Equipments:-Repair and maintenance of electrically operated over head crane of capacity 30MT, 20MT,15MT and different types of water centrifugal pumps, gear pumps, vertical pumps etc. repair and maintenance of material handling equipments like Bucket elevator, Belt conveyor, Ball mill, Screening system, Screw conveyor, Dust collection system and Cooling towers in the plant .  Casting Plant:-Repair and maintenance of tilting furnace, Different furnaces, Atomizing blower, DCP (Direct Chilling Process), Launders and Diafirm valves etc.  Mechanical Workshop:-Various jobs in lathes, shapers, slotter, planner, grinder, milling machine and drilling machine. Welding various jobs, thread cutting, facing, grooving, chamfering, under cut and both types of symmetrical and unsymmetrical jobs.  ICS ENGG. (P)LTD Oct’03-Oct’04 Site Engineer Key project Handled  3x660MW Boiler of NTPC, Sipath, Chhattisgarh.  I was dealing with structural erection, Thermal Air Pre-Heater, Ducting Systems, Pressure Part Erection, IDFAN, FDFAN installation of CFBC Boiler. In NTPC Sipath I was working with Pressure part & Structural work project of South Korea (DOOSAN  CFBC Boiler 2x30MW work in Gujarat Ambuja Cement Ltd.  MAA ENGINEERING Aug’99-Jul’00 Maintenance Fitter Key project Handled  Gangeigora Crusher Plant, Joda Dist-Keonjhar.  Involved in the maintenance of 20 no’s of conveyors, different pulleys, plumber blocks, drum pulleys, gear box, double & triple deck screen, Sandvik jaw crusher 600TPH, cone crusher 425TPH, modification of feeders, gravity take up and different structures. SCHOLASTIC PORTFOLIO MBA in Project management and Production Management; 2008-2010. Emperial Institute of Management Science and Research, Delhi; 66.5% BE in Mechanical Engineering; 2004-2007. Imperial Institute of Management Science and Research, Delhi; 64.54% Diploma in Mechanical Engineering; 2000-2003 Orissa School of Mining Engineering, Keonjhar; 64.67% Industrial Training Institute in Machinist Branch; 1997-1999 Govt.I.T.I. Rourkela under the State Council of Vocational Training, BBSR, Orissa; 77.76% Higher Secondary Certificate; 1997 Board of Secondary Education, Orissa; 73.34% Trainings & Study Tour Attended
  • 9.  ITI Study tour-Rourkela Steel Plant, OCL Cement Factory, Bandamunda Railway Engine, L&T Cement Factory and Auto India Ltd.In diploma study tour attends Orissa Sponge Iron Ltd & Tata Sponge Iron Ltd of Keonjhar.  Post diploma practical training in Hindustan Aluminum Company (HINDAL CO) Industries Limited, Hirakud. Dist-Sambalpur (Orissa). Computer Proficiencies: Windows XP, Window 7 & VISTA, MSOffice (Word, excel, power point & internet) Date of Birth: 22nd June 1982 Sex: - Male Nationality: - Indian Linguistic Abilities: English, Hindi, and Oriya, understand & litter bit speak Bengali, Telugu & Gujarati Hobbies: Playing Cricket & Chess Permanent Address: Bidharpur, PO- Abhimanpur 754035, District Cuttack (Orissa) Communication Address: NGV/117, Nitai Gaura Vihar, Canal Road, Kandasar Nalco Nagar Township, Angul, Pin-759145, Odisha Mobile No: -9437110710 Mail Id: susanta.panda08@gmail.com,susanta.panda08@rediffmail.com,yoursusant_2k07@yahoo.co.in Religion: Hindu Marital Status: Married Emp. Regn. No-T/825/04, South balanda, Talcher (ORISSA) Passport No: - L925123 References: Available on Request • Strengths: Self motivation, Like Challenges, Adaptability, Strong willpower, Ability to work as team with Punctuality & obediently, willingness to learn, Responsible, Result-oriented. I am a sincere, self-motivated individual. My drive for hard work and the ability to take the initiatives under pressure makes me a suitable candidate for the applied profile. • Present Salary Drawn: - Rs: - 11.34 Lack’s/annum + Accommodations + Conveyance. • Expected Salary :- Rs: - 13-14 Lack’s/annum + Accommodations + Conveyance • Notice period required:-2 month • Declaration: - I do hereby declare the facts stated above are true & correct to the best of my knowledge & belief. Susanta Kumar Panda
  • 10. TUNDA, MUNDRA, GUJURAT DATE: -18/10/2016