SlideShare uma empresa Scribd logo
1 de 53
RISK MANAGEMENT

Topic: Managing Quality Risk
   through control chart
                Presented By:

                    Ritesh Agarwal
                    Sunam Pal        1
Is Risk a symbol of danger
             or
   symbol of opportunity

Answer: Both
Risk Management

Risk
Uncertainty of outcome

Terminologies

•Pure Risk- Always leads to loss
•Speculative Risk- May Result in loss or Gain
•Static Risk- Results in loss
•Dynamic Risk- May Result in loss or Gain
•Acceptable Risk
•Non Acceptable Risk
Control Charts for
    Variables
Types of Risks
•   Material Risk- Building,Plant & Machinery,
    Furniture,Fixtures,fittings,Stocks.
•   Consequential Risk- Loss of production,Loss of
    profit,Loss of market,Good will.
•   Social Risk
•   Legal Risk- Product liability,Public liability.
•   Political Risk- Subsidies,Sanctions etc.
Best Practice Risk Management

• Framework for Risk Management
  can be benchmarked in terms of:



                                         METHO
                                               DO   LOGIE
     »Policies                       S                   S
     »Methodologies           POLICIE
     »Resources
                                    RESOURCES



                                                             6
Risk Evaluation
•   Arrange them in order of priority
•   Provide information for deciding the most
    appropriate way of handling.

      Ranking risks according to :
      2. Frequency of loss
      3. Potential severity of loss.
Risk Analysis

  Risk and Human behavior looks into
  psychology of risk.
 How others look at the risk?
 How they behave in the face of risk?
 How they behave in groups?
  Perception of Risk.
Risk analysis is to be carried out with proper
perception of risk of risk and cost involved in
Analysis.
Not to stick to one method
Understand company and industry
Should be financially reasonable
Accurate record keeping
Amount of imagination of required
Risk Reduction / Loss
    Prevention
1.    Reduce probability of loss and its severity.
2.    Most important for PM process.
3.    Risk Reduction / Prevention can be from –

•     Loss prevention
•     Ensuring Safety
•     Fire protection / Detection
•     Environmental protection
Variation
• It is the measure of deviation from
  mean/average value
• Variation may be quite large or very small.
• If variation is very small, it may appear that
  items are identical, but precision instruments
  will show differences.
Categories of variation
• Within-piece variation
  • One portion of surface is rougher than another
    portion.
• A piece-to-piece variation
  • Variation among pieces produced at the same
    time.
• Time-to-time variation
  • Service given early would be different from that
    given later in the day.
Source of variation
• Equipment
  • Tool wear, machine vibration, …
• Material
  • Raw material quality
• Environment
  • Temperature, pressure, humadity
• Operator
  • Operator performs- physical & emotional
Control Chart Viewpoint

   Variation due to
      Common or chance causes
      Assignable causes




   Control chart may be used to discover
    “assignable causes”
   Run chart - without any upper/lower
    limits
   Specification/tolerance limits
   Control limits - statistical
Control chart functions
• Control charts are powerful aids to understanding the
  performance of a process over time.

                                      Noise

    Input                                                 Output

                     PROCESS

              What’s causing variability?
Control charts identify
variation
• Chance causes - “common cause”
 • inherent to the process or random and not
   controllable
 • if only common cause present, the process is
   considered stable or “in control”
• Assignable causes - “special cause”
 • variation due to outside influences
 • if present, the process is “out of control”
Types of Data

• Continuous data
    • Product characteristic that can be measured
       • Length, size, weight, height, time, velocity


• Discrete data
       Product characteristic evaluated with a discrete choice
        • Good/bad, yes/no
Control chart for variables
• Variables are the measurable characteristics
  of a product or service.

• Measurement data is taken and arrayed on
  charts.
Control charts for variables
• X-bar chart
 • In this chart the sample means are plotted in order to
   control the mean value of a variable (e.g., size of piston
   rings, strength of materials, etc.).
• R chart
 • In this chart, the sample ranges are plotted in order to
   control the variability of a variable.
• S chart
 • In this chart, the sample standard deviations are plotted
   in order to control the variability of a variable.
• S2 chart
 • In this chart, the sample variances are plotted in order
   to control the variability of a variable.
Control chart components
• Centerline
  • shows where the process average is
    centered or the central tendency of the
    data
• Upper control limit (UCL) and Lower
  control limit (LCL)
  • describes the process spread
The Control Chart Method
X bar Control Chart:
UCL = XDmean + A2 x Rmean
LCL = XDmean - A2 x Rmean
CL = XDmean
 R Control Chart:
 UCL = D4 x Rmean
 LCL = D3 x Rmean
 CL = Rmean
 Capability Study:
 PCR = (USL - LSL)/(6s); where s = Rmean /d2
Control Chart Examples


                               UCL
  Variations




                               Nominal
                               LCL

               Sample number
Determine trial centerline
• The centerline should be the population mean, µ
• Since it is unknown, we use X Double bar, or the grand average of
  the subgroup averages.




                              m

                            ∑X           i

                X = i=1
                      m
UCL & LCL calculation

 UCL = X + 3σ
LCL = X − 3σ
σ = standard deviation
Determining an alternative value for
the standard deviation
          m

         ∑R       i
  R =    i=
          1

              m

  UCL = + 2 R
       X A

  LCL = − 2 R
       X A
Example: Control Charts for Variable Data
         Slip Ring Diameter (cm)
Sample     1       2      3        4      5      X      R
  1      5.02    5.01   4.94     4.99   4.96    4.98   0.08
  2      5.01    5.03   5.07     4.95   4.96    5.00   0.12
  3      4.99    5.00   4.93     4.92   4.99    4.97   0.08
  4      5.03    4.91   5.01     4.98   4.89    4.96   0.14
  5      4.95    4.92   5.03     5.05   5.01    4.99   0.13
  6      4.97    5.06   5.06     4.96   5.03    5.01   0.10
  7      5.05    5.01   5.10     4.96   4.99    5.02   0.14
  8      5.09    5.10   5.00     4.99   5.08    5.05   0.11
  9      5.14    5.10   4.99     5.08   5.09    5.08   0.15
 10      5.01    4.98   5.08     5.07   4.99    5.03   0.10
                                               50.09   1.15
Calculation
   From Table above:
   • Sigma X-bar = 50.09
   • Sigma R = 1.15
   • m = 10
   Thus;
   • X-Double bar = 50.09/10 = 5.009 cm
   • R-bar = 1.15/10 = 0.115 cm

Note: The control limits are only preliminary with 10 samples.
It is desirable to have at least 25 samples.
3-Sigma Control Chart Factors


Sample size    X-chart           R-chart
    n           A2        D3               D4
     2         1.88        0               3.27
     3         1.02        0               2.57
     4         0.73        0               2.28
     5         0.58        0               2.11
     6         0.48        0               2.00
     7         0.42       0.08             1.92
     8         0.37       0.14             1.86
Trial control limit
X-bar chart

•UCLx-bar = X-D bar + A2 R-bar
          = 5.009 + (0.577)(0.115) = 5.075 cm

•LCLx-bar = X-D bar - A2 R-bar
          = 5.009 - (0.577)(0.115) = 4.943 cm
R-chart

•UCLR = D4R-bar = (2.114)(0.115) = 0.243 cm
•LCLR = D3R-bar = (0)(0.115) = 0 cm
X-bar Chart

           5.10
                                                             UCL
           5.08
           5.06
           5.04
   X bar




           5.02
           5.00                                              CL
           4.98
           4.96                                              LCL
           4.94
                  0   1   2   3   4    5   6     7   8   9   10    11
                                      Subgroup
R Chart
        0.25                                               UCL


        0.20

        0.15
Range




                                                           CL

        0.10

        0.05
                                                           LCL
        0.00
               0   1   2   3   4    5   6     7   8   9   10     11
                                   Subgroup
6.70
                                             6.65

      Run Chart                              6.60




                               Mean, X-bar
                                             6.55
                                             6.50
                                             6.45
                                             6.40
                                             6.35
                                             6.30
                                                    0   5    10        15      20   25
                                                             Subgroup number
           0.35
            0.3
           0.25
Range, R




            0.2
           0.15
            0.1
           0.05
             0
                  0   5   10                    15      20   25
                          Subgroup number
X-bar Chart
R Chart
Trial Control Limits & Revised Control Limit
                6.65

                6.60                                  Revised control limits
                6.55
  Mean, X-bar




                6.50
                                                                    UCL = 6.46
                6.45

                6.40                                                CL = 6.40
                6.35

                6.30                                                LCL = 6.34
                       0   2      4       6   8
                               Subgroup




                0.20                                                 UCL = 0.18

                0.15
  Range, R




                0.10                                                  CL = 0.08
                0.05


                0.00
                       0   2       4      6       8
                                                                      LCL = 0
                               Subgroup
Revise the charts
In certain cases, control limits are revised
because:
  1. out-of-control points were included in
     the calculation of the control limits.
  2. the process is in-control but the within
     subgroup variation significantly
     improves.
The Normal
      Distribution
      σ = Standard deviation

                                            Mean
                                -3σ -2σ -1σ     +1σ +2σ +3σ
                                           68.26%
                                           95.44%
LSL                                   USL 99.74%




        -3σ                    +3σ
                  CL
•   34.13% of data lie between µ and 1σ above the mean (µ).
•   34.13% between µ and 1σ below the mean.
•   Approximately two-thirds (68.28 %) within 1σ of the mean.
•   13.59% of the data lie between one and two standard deviations
•   Finally, almost all of the data (99.74%) are within 3σ of the mean.
Normal Distribution Review
   Define the 3-sigma limits for sample means as follows:
                      3σ          3(0.05)
    Upper Limit = µ +    = 5.01 +         = 5.077
                       n              5
                      3σ          3(0.05)
    Lower Limit = µ −    = 5.01 −         = 4.943
                       n              5
   What is the probability that the sample means will lie
    outside 3-sigma limits?
   Note that the 3-sigma limits for sample means are
    different from natural tolerances which are at
       µ ± 3σ
Common Causes
Process Out of Control
• The term out of control is a change in the process due to an
  assignable cause.
• When a point (subgroup value) falls outside its control limits,
  the process is out of control.
Assignable Causes
     Average        (a) Mean




           Grams
Assignable Causes
          Average
                    (b) Spread




          Grams
Assignable Causes
          Average
                    (c) Shape




          Grams
Improvement
Chart zones
• Based on our knowledge of the normal curve, a
  control chart exhibits a state of control when:

  ♥ Two thirds of all points are near the center value.
  ♥ The points appear to float back and forth across
    the centerline.
  ♥ The points are balanced on both sides of the
    centerline.
  ♥ No points beyond the control limits.
  ♥ No patterns or trends.
σ         What Is Six Sigma?

Sigma is a letter   • Degree of variation;
  in the Greek      • Level of performance in terms of defects;
    Alphabet
                    • Statistical measurement of process
                      capability;
                    • Benchmark for comparison;
                    • Process improvement methodology;
                    • It is a Goal;
                    • Strategy for change;
                    • A commitment to customers to achieve
                      an acceptable level of performance


                                                                  48
Six Sigma Definitions

• Business Definition
  A break through strategy to significantly improve
   customer satisfaction and shareholder value by
   reducing variability in every aspect of business.


• Technical Definition
  A statistical term signifying 3.4 defects per million
   opportunities.




                                                           49
Sigma Defects Per Million Rate of
Level Opportunities       Improveme
                          nt
  1σ        690,000
 2σ         308,000        2 times
 3σ         66,800         5 times
 4σ          6,210        11 times
 5σ          230          27 times
 6σ           3.4         68 times
                                      50
Six Sigma Project Methodology
Project Phases

   Define        Measure        Analyze          Improve         Control


 Identify,     Collect data  Analyze        Improvemen  Establish
  evaluate       on size of     data,           t strategy     standards to
  and select     the selected   establish      Develop        maintain
  projects for   problem,       and confirm     ideas to       process;
  improvemen  identify key     the “ vital     remove root  Design the
  t              customer       few “           causes         controls,
 Set goals      requirement    determinant    Design and     implement
 Form teams.    s,             s of the        carry out      and
                Determine      performance     experiments    monitor.
                 key product    .               ,             Evaluate
                 and process  Validate        Optimize       financial
                 characteristi  hypothesis      the process.   impact of
                 c.                            Final          the project
                                                solutions
                                                                              51
Learning Outcome
3.Risk can fixed only when it is scalable
4.More than one form of risk can be present in a
project
5.100% assurance on risk control can be guranteed
6.Reduction in Risk automatically enhances the
quality of product
PSGIM, Coimbatore   E-procurement system of Honeywell & Vedanta




                                                              BENCHMARK – 2 0 1 1
 Questions Please ????
                                                                  53
                                                                Fri
                                                              25 Feb

Mais conteúdo relacionado

Destaque

Project Management
Project ManagementProject Management
Project ManagementSunam Pal
 
Esta no es como la barca del sermón de Buda. Proceso de realización
Esta no es como la barca del sermón de Buda. Proceso de realizaciónEsta no es como la barca del sermón de Buda. Proceso de realización
Esta no es como la barca del sermón de Buda. Proceso de realizaciónLuis José Ferreira Calvo
 
Scorecard & Dashboards
Scorecard & DashboardsScorecard & Dashboards
Scorecard & DashboardsSunam Pal
 
Arribando a la abstracción 2.Construcciones y fusiones fotográficas
Arribando a la abstracción 2.Construcciones y fusiones fotográficasArribando a la abstracción 2.Construcciones y fusiones fotográficas
Arribando a la abstracción 2.Construcciones y fusiones fotográficasLuis José Ferreira Calvo
 
การฝากไฟล์บนเว็บ
การฝากไฟล์บนเว็บการฝากไฟล์บนเว็บ
การฝากไฟล์บนเว็บmimewww
 
Yaw stability of single versus tandem axle tractors
Yaw stability of single versus tandem axle tractorsYaw stability of single versus tandem axle tractors
Yaw stability of single versus tandem axle tractorsRoberto Davis
 
Case Study on Business Intelliegnce
Case Study on Business IntelliegnceCase Study on Business Intelliegnce
Case Study on Business IntelliegnceSunam Pal
 
Homenaje a Nam June Paik. Proceso de realización
Homenaje a Nam June Paik. Proceso de realizaciónHomenaje a Nam June Paik. Proceso de realización
Homenaje a Nam June Paik. Proceso de realizaciónLuis José Ferreira Calvo
 
Market research on telecom GSM service ppt on
Market research on telecom GSM service ppt on Market research on telecom GSM service ppt on
Market research on telecom GSM service ppt on Sunam Pal
 
Developing Business Plan
Developing Business PlanDeveloping Business Plan
Developing Business PlanSunam Pal
 
Market Feasibility
Market Feasibility Market Feasibility
Market Feasibility Sunam Pal
 
Moringa Leaf Dryer
Moringa Leaf DryerMoringa Leaf Dryer
Moringa Leaf Dryerlopanath
 
Pembangkit listrik tenaga surya
Pembangkit listrik tenaga suryaPembangkit listrik tenaga surya
Pembangkit listrik tenaga suryaHabeb Muhammad
 

Destaque (15)

Project Management
Project ManagementProject Management
Project Management
 
Esta no es como la barca del sermón de Buda. Proceso de realización
Esta no es como la barca del sermón de Buda. Proceso de realizaciónEsta no es como la barca del sermón de Buda. Proceso de realización
Esta no es como la barca del sermón de Buda. Proceso de realización
 
Scorecard & Dashboards
Scorecard & DashboardsScorecard & Dashboards
Scorecard & Dashboards
 
Arribando a la abstracción 2.Construcciones y fusiones fotográficas
Arribando a la abstracción 2.Construcciones y fusiones fotográficasArribando a la abstracción 2.Construcciones y fusiones fotográficas
Arribando a la abstracción 2.Construcciones y fusiones fotográficas
 
04 rull
04 rull04 rull
04 rull
 
การฝากไฟล์บนเว็บ
การฝากไฟล์บนเว็บการฝากไฟล์บนเว็บ
การฝากไฟล์บนเว็บ
 
Yaw stability of single versus tandem axle tractors
Yaw stability of single versus tandem axle tractorsYaw stability of single versus tandem axle tractors
Yaw stability of single versus tandem axle tractors
 
Case Study on Business Intelliegnce
Case Study on Business IntelliegnceCase Study on Business Intelliegnce
Case Study on Business Intelliegnce
 
Homenaje a Nam June Paik. Proceso de realización
Homenaje a Nam June Paik. Proceso de realizaciónHomenaje a Nam June Paik. Proceso de realización
Homenaje a Nam June Paik. Proceso de realización
 
Market research on telecom GSM service ppt on
Market research on telecom GSM service ppt on Market research on telecom GSM service ppt on
Market research on telecom GSM service ppt on
 
Developing Business Plan
Developing Business PlanDeveloping Business Plan
Developing Business Plan
 
Market Feasibility
Market Feasibility Market Feasibility
Market Feasibility
 
Moringa Leaf Dryer
Moringa Leaf DryerMoringa Leaf Dryer
Moringa Leaf Dryer
 
Pembangkit listrik tenaga surya
Pembangkit listrik tenaga suryaPembangkit listrik tenaga surya
Pembangkit listrik tenaga surya
 
Risk management in supply chain
Risk management in supply chain Risk management in supply chain
Risk management in supply chain
 

Semelhante a Managing Quality Risk through Control Charts

14. Statistical Process Control.pptx
14. Statistical Process Control.pptx14. Statistical Process Control.pptx
14. Statistical Process Control.pptxSarthakGupta856447
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control ChartAshish Gupta
 
Chap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc HkChap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc Hkajithsrc
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.dvietians
 
cdsfdsfdsssssssssssssssssssssssssssssssssssssssssssssss
cdsfdsfdssssssssssssssssssssssssssssssssssssssssssssssscdsfdsfdsssssssssssssssssssssssssssssssssssssssssssssss
cdsfdsfdsssssssssssssssssssssssssssssssssssssssssssssssChristianQuijiaQueza
 
Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017Rahul Gupta
 
Statistical quality__control_2
Statistical  quality__control_2Statistical  quality__control_2
Statistical quality__control_2Tech_MX
 
Measurement System Analysis - Module 2
Measurement System Analysis - Module 2Measurement System Analysis - Module 2
Measurement System Analysis - Module 2Subhodeep Deb
 
Statistical process control ppt @ doms
Statistical process control ppt @ doms Statistical process control ppt @ doms
Statistical process control ppt @ doms Babasab Patil
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysissigmatest2011
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlNAVEENBANSHIWAL
 
Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01jasonhian
 

Semelhante a Managing Quality Risk through Control Charts (20)

14. Statistical Process Control.pptx
14. Statistical Process Control.pptx14. Statistical Process Control.pptx
14. Statistical Process Control.pptx
 
Ch04
Ch04Ch04
Ch04
 
Qc tools
Qc toolsQc tools
Qc tools
 
Qc tools
Qc toolsQc tools
Qc tools
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control Chart
 
Chap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc HkChap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc Hk
 
Tools of the Trade
Tools of the TradeTools of the Trade
Tools of the Trade
 
Facility Location
Facility Location Facility Location
Facility Location
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
 
cdsfdsfdsssssssssssssssssssssssssssssssssssssssssssssss
cdsfdsfdssssssssssssssssssssssssssssssssssssssssssssssscdsfdsfdsssssssssssssssssssssssssssssssssssssssssssssss
cdsfdsfdsssssssssssssssssssssssssssssssssssssssssssssss
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017
 
Statistical quality__control_2
Statistical  quality__control_2Statistical  quality__control_2
Statistical quality__control_2
 
Measurement System Analysis - Module 2
Measurement System Analysis - Module 2Measurement System Analysis - Module 2
Measurement System Analysis - Module 2
 
TESCO Evaluation of Non-Normal Meter Data
TESCO Evaluation of Non-Normal Meter DataTESCO Evaluation of Non-Normal Meter Data
TESCO Evaluation of Non-Normal Meter Data
 
Statistical process control ppt @ doms
Statistical process control ppt @ doms Statistical process control ppt @ doms
Statistical process control ppt @ doms
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysis
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01
 
BIIntro.ppt
BIIntro.pptBIIntro.ppt
BIIntro.ppt
 

Mais de Sunam Pal

Wedding invitation
Wedding invitation Wedding invitation
Wedding invitation Sunam Pal
 
Wedding Invitation card
Wedding Invitation cardWedding Invitation card
Wedding Invitation cardSunam Pal
 
Indian Telecom GSM Service Ppt
Indian Telecom GSM Service PptIndian Telecom GSM Service Ppt
Indian Telecom GSM Service PptSunam Pal
 
Market Research Report
Market Research ReportMarket Research Report
Market Research ReportSunam Pal
 
Case Study on Business Communication
Case Study on Business Communication Case Study on Business Communication
Case Study on Business Communication Sunam Pal
 
Case Study on Business Intelliegnce
Case Study on Business IntelliegnceCase Study on Business Intelliegnce
Case Study on Business IntelliegnceSunam Pal
 
Case Study on Business Communication
Case Study on Business CommunicationCase Study on Business Communication
Case Study on Business CommunicationSunam Pal
 
Quality Control & operations in Silica plant
Quality Control & operations in Silica plantQuality Control & operations in Silica plant
Quality Control & operations in Silica plantSunam Pal
 
Market research report
Market research reportMarket research report
Market research reportSunam Pal
 

Mais de Sunam Pal (9)

Wedding invitation
Wedding invitation Wedding invitation
Wedding invitation
 
Wedding Invitation card
Wedding Invitation cardWedding Invitation card
Wedding Invitation card
 
Indian Telecom GSM Service Ppt
Indian Telecom GSM Service PptIndian Telecom GSM Service Ppt
Indian Telecom GSM Service Ppt
 
Market Research Report
Market Research ReportMarket Research Report
Market Research Report
 
Case Study on Business Communication
Case Study on Business Communication Case Study on Business Communication
Case Study on Business Communication
 
Case Study on Business Intelliegnce
Case Study on Business IntelliegnceCase Study on Business Intelliegnce
Case Study on Business Intelliegnce
 
Case Study on Business Communication
Case Study on Business CommunicationCase Study on Business Communication
Case Study on Business Communication
 
Quality Control & operations in Silica plant
Quality Control & operations in Silica plantQuality Control & operations in Silica plant
Quality Control & operations in Silica plant
 
Market research report
Market research reportMarket research report
Market research report
 

Último

Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 

Último (20)

Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 

Managing Quality Risk through Control Charts

  • 1. RISK MANAGEMENT Topic: Managing Quality Risk through control chart Presented By: Ritesh Agarwal Sunam Pal 1
  • 2. Is Risk a symbol of danger or symbol of opportunity Answer: Both
  • 3. Risk Management Risk Uncertainty of outcome Terminologies •Pure Risk- Always leads to loss •Speculative Risk- May Result in loss or Gain •Static Risk- Results in loss •Dynamic Risk- May Result in loss or Gain •Acceptable Risk •Non Acceptable Risk
  • 4. Control Charts for Variables
  • 5. Types of Risks • Material Risk- Building,Plant & Machinery, Furniture,Fixtures,fittings,Stocks. • Consequential Risk- Loss of production,Loss of profit,Loss of market,Good will. • Social Risk • Legal Risk- Product liability,Public liability. • Political Risk- Subsidies,Sanctions etc.
  • 6. Best Practice Risk Management • Framework for Risk Management can be benchmarked in terms of: METHO DO LOGIE »Policies S S »Methodologies POLICIE »Resources RESOURCES 6
  • 7. Risk Evaluation • Arrange them in order of priority • Provide information for deciding the most appropriate way of handling. Ranking risks according to : 2. Frequency of loss 3. Potential severity of loss.
  • 8. Risk Analysis Risk and Human behavior looks into psychology of risk.  How others look at the risk?  How they behave in the face of risk?  How they behave in groups? Perception of Risk.
  • 9. Risk analysis is to be carried out with proper perception of risk of risk and cost involved in Analysis. Not to stick to one method Understand company and industry Should be financially reasonable Accurate record keeping Amount of imagination of required
  • 10. Risk Reduction / Loss Prevention 1. Reduce probability of loss and its severity. 2. Most important for PM process. 3. Risk Reduction / Prevention can be from – • Loss prevention • Ensuring Safety • Fire protection / Detection • Environmental protection
  • 11. Variation • It is the measure of deviation from mean/average value • Variation may be quite large or very small. • If variation is very small, it may appear that items are identical, but precision instruments will show differences.
  • 12. Categories of variation • Within-piece variation • One portion of surface is rougher than another portion. • A piece-to-piece variation • Variation among pieces produced at the same time. • Time-to-time variation • Service given early would be different from that given later in the day.
  • 13. Source of variation • Equipment • Tool wear, machine vibration, … • Material • Raw material quality • Environment • Temperature, pressure, humadity • Operator • Operator performs- physical & emotional
  • 14. Control Chart Viewpoint  Variation due to  Common or chance causes  Assignable causes  Control chart may be used to discover “assignable causes”
  • 15. Run chart - without any upper/lower limits  Specification/tolerance limits  Control limits - statistical
  • 16. Control chart functions • Control charts are powerful aids to understanding the performance of a process over time. Noise Input Output PROCESS What’s causing variability?
  • 17. Control charts identify variation • Chance causes - “common cause” • inherent to the process or random and not controllable • if only common cause present, the process is considered stable or “in control” • Assignable causes - “special cause” • variation due to outside influences • if present, the process is “out of control”
  • 18. Types of Data • Continuous data • Product characteristic that can be measured • Length, size, weight, height, time, velocity • Discrete data Product characteristic evaluated with a discrete choice • Good/bad, yes/no
  • 19. Control chart for variables • Variables are the measurable characteristics of a product or service. • Measurement data is taken and arrayed on charts.
  • 20. Control charts for variables • X-bar chart • In this chart the sample means are plotted in order to control the mean value of a variable (e.g., size of piston rings, strength of materials, etc.). • R chart • In this chart, the sample ranges are plotted in order to control the variability of a variable. • S chart • In this chart, the sample standard deviations are plotted in order to control the variability of a variable. • S2 chart • In this chart, the sample variances are plotted in order to control the variability of a variable.
  • 21. Control chart components • Centerline • shows where the process average is centered or the central tendency of the data • Upper control limit (UCL) and Lower control limit (LCL) • describes the process spread
  • 22. The Control Chart Method X bar Control Chart: UCL = XDmean + A2 x Rmean LCL = XDmean - A2 x Rmean CL = XDmean R Control Chart: UCL = D4 x Rmean LCL = D3 x Rmean CL = Rmean Capability Study: PCR = (USL - LSL)/(6s); where s = Rmean /d2
  • 23. Control Chart Examples UCL Variations Nominal LCL Sample number
  • 24. Determine trial centerline • The centerline should be the population mean, µ • Since it is unknown, we use X Double bar, or the grand average of the subgroup averages. m ∑X i X = i=1 m
  • 25. UCL & LCL calculation UCL = X + 3σ LCL = X − 3σ σ = standard deviation
  • 26. Determining an alternative value for the standard deviation m ∑R i R = i= 1 m UCL = + 2 R X A LCL = − 2 R X A
  • 27. Example: Control Charts for Variable Data Slip Ring Diameter (cm) Sample 1 2 3 4 5 X R 1 5.02 5.01 4.94 4.99 4.96 4.98 0.08 2 5.01 5.03 5.07 4.95 4.96 5.00 0.12 3 4.99 5.00 4.93 4.92 4.99 4.97 0.08 4 5.03 4.91 5.01 4.98 4.89 4.96 0.14 5 4.95 4.92 5.03 5.05 5.01 4.99 0.13 6 4.97 5.06 5.06 4.96 5.03 5.01 0.10 7 5.05 5.01 5.10 4.96 4.99 5.02 0.14 8 5.09 5.10 5.00 4.99 5.08 5.05 0.11 9 5.14 5.10 4.99 5.08 5.09 5.08 0.15 10 5.01 4.98 5.08 5.07 4.99 5.03 0.10 50.09 1.15
  • 28. Calculation From Table above: • Sigma X-bar = 50.09 • Sigma R = 1.15 • m = 10 Thus; • X-Double bar = 50.09/10 = 5.009 cm • R-bar = 1.15/10 = 0.115 cm Note: The control limits are only preliminary with 10 samples. It is desirable to have at least 25 samples.
  • 29. 3-Sigma Control Chart Factors Sample size X-chart R-chart n A2 D3 D4 2 1.88 0 3.27 3 1.02 0 2.57 4 0.73 0 2.28 5 0.58 0 2.11 6 0.48 0 2.00 7 0.42 0.08 1.92 8 0.37 0.14 1.86
  • 30. Trial control limit X-bar chart •UCLx-bar = X-D bar + A2 R-bar = 5.009 + (0.577)(0.115) = 5.075 cm •LCLx-bar = X-D bar - A2 R-bar = 5.009 - (0.577)(0.115) = 4.943 cm R-chart •UCLR = D4R-bar = (2.114)(0.115) = 0.243 cm •LCLR = D3R-bar = (0)(0.115) = 0 cm
  • 31. X-bar Chart 5.10 UCL 5.08 5.06 5.04 X bar 5.02 5.00 CL 4.98 4.96 LCL 4.94 0 1 2 3 4 5 6 7 8 9 10 11 Subgroup
  • 32. R Chart 0.25 UCL 0.20 0.15 Range CL 0.10 0.05 LCL 0.00 0 1 2 3 4 5 6 7 8 9 10 11 Subgroup
  • 33. 6.70 6.65 Run Chart 6.60 Mean, X-bar 6.55 6.50 6.45 6.40 6.35 6.30 0 5 10 15 20 25 Subgroup number 0.35 0.3 0.25 Range, R 0.2 0.15 0.1 0.05 0 0 5 10 15 20 25 Subgroup number
  • 36. Trial Control Limits & Revised Control Limit 6.65 6.60 Revised control limits 6.55 Mean, X-bar 6.50 UCL = 6.46 6.45 6.40 CL = 6.40 6.35 6.30 LCL = 6.34 0 2 4 6 8 Subgroup 0.20 UCL = 0.18 0.15 Range, R 0.10 CL = 0.08 0.05 0.00 0 2 4 6 8 LCL = 0 Subgroup
  • 37. Revise the charts In certain cases, control limits are revised because: 1. out-of-control points were included in the calculation of the control limits. 2. the process is in-control but the within subgroup variation significantly improves.
  • 38. The Normal Distribution σ = Standard deviation Mean -3σ -2σ -1σ +1σ +2σ +3σ 68.26% 95.44% LSL USL 99.74% -3σ +3σ CL
  • 39. 34.13% of data lie between µ and 1σ above the mean (µ). • 34.13% between µ and 1σ below the mean. • Approximately two-thirds (68.28 %) within 1σ of the mean. • 13.59% of the data lie between one and two standard deviations • Finally, almost all of the data (99.74%) are within 3σ of the mean.
  • 40. Normal Distribution Review  Define the 3-sigma limits for sample means as follows: 3σ 3(0.05) Upper Limit = µ + = 5.01 + = 5.077 n 5 3σ 3(0.05) Lower Limit = µ − = 5.01 − = 4.943 n 5  What is the probability that the sample means will lie outside 3-sigma limits?  Note that the 3-sigma limits for sample means are different from natural tolerances which are at µ ± 3σ
  • 42. Process Out of Control • The term out of control is a change in the process due to an assignable cause. • When a point (subgroup value) falls outside its control limits, the process is out of control.
  • 43. Assignable Causes Average (a) Mean Grams
  • 44. Assignable Causes Average (b) Spread Grams
  • 45. Assignable Causes Average (c) Shape Grams
  • 47. Chart zones • Based on our knowledge of the normal curve, a control chart exhibits a state of control when: ♥ Two thirds of all points are near the center value. ♥ The points appear to float back and forth across the centerline. ♥ The points are balanced on both sides of the centerline. ♥ No points beyond the control limits. ♥ No patterns or trends.
  • 48. σ What Is Six Sigma? Sigma is a letter • Degree of variation; in the Greek • Level of performance in terms of defects; Alphabet • Statistical measurement of process capability; • Benchmark for comparison; • Process improvement methodology; • It is a Goal; • Strategy for change; • A commitment to customers to achieve an acceptable level of performance 48
  • 49. Six Sigma Definitions • Business Definition  A break through strategy to significantly improve customer satisfaction and shareholder value by reducing variability in every aspect of business. • Technical Definition  A statistical term signifying 3.4 defects per million opportunities. 49
  • 50. Sigma Defects Per Million Rate of Level Opportunities Improveme nt 1σ 690,000 2σ 308,000 2 times 3σ 66,800 5 times 4σ 6,210 11 times 5σ 230 27 times 6σ 3.4 68 times 50
  • 51. Six Sigma Project Methodology Project Phases Define Measure Analyze Improve Control  Identify,  Collect data  Analyze  Improvemen  Establish evaluate on size of data, t strategy standards to and select the selected establish  Develop maintain projects for problem, and confirm ideas to process; improvemen  identify key the “ vital remove root  Design the t customer few “ causes controls,  Set goals requirement determinant  Design and implement  Form teams. s, s of the carry out and  Determine performance experiments monitor. key product . ,  Evaluate and process  Validate  Optimize financial characteristi hypothesis the process. impact of c.  Final the project solutions 51
  • 52. Learning Outcome 3.Risk can fixed only when it is scalable 4.More than one form of risk can be present in a project 5.100% assurance on risk control can be guranteed 6.Reduction in Risk automatically enhances the quality of product
  • 53. PSGIM, Coimbatore E-procurement system of Honeywell & Vedanta BENCHMARK – 2 0 1 1 Questions Please ???? 53 Fri 25 Feb

Notas do Editor

  1. PSG Institute of Management,Coimbatore E-procurement System at Honeywell & Vedanta
  2. CIBC’s framework for MRM can be benchmarked in terms of Policies Methodologies and Infrastructure Risk wears many disguises. One can ensure maximum transparency of risk through implementing an independent first class proactive market risk management program. Click
  3. 05/03/12 Statistics 30 And finally, this chart shows a process with two points actually outside the control limits, an easy indicator to detect but not the only one. These rules, there are a few more, are commonly referred to as the Western Electric Rules and can be found in any advanced quality reference.
  4. 05/03/12 Statistics Example4.3
  5. 05/03/12 Statistics 20 And at +/- 3 sigma, the most common choice of confidence/control limits in quality control application, the area is 99.97%.
  6. 05/03/12 Statistics 2 The first set of slides presents the various aspects of common and assignable causes. This slide and the two following show a normal process distribution and how it allows for expected variability which is termed common causes.
  7. 05/03/12 Statistics 7 The new distribution will look as shown in this slide.
  8. 05/03/12 Statistics 9 The new distribution has a much greater spread (higher standard deviation).
  9. 05/03/12 Statistics 11 A skewed (non-normal) distribution will result in a different pattern of variability.