“Layout study of
      220kv/132kv/33kv Substation

                           at Chillakallu”.
Project members
 J.VAMSI KRISHNA    09AJ1A0230
 G.SHAILESH KUMAR   09AJ1A0221
 K.J.SUMANTH        09AJ1A0238
 K.TRINADH VINAY    09AJ1A0242
 A.RAVI             09AJ1A0202
Under the guidance of

 External guide: M. Venkateswarlu (A.D.E)



 Internal guide :P.Bapaiah. M.Tech
                             (Asst.prof.)
CONTENTS

  LAYOUT OF CHILLAKALLU
  SWITCHGEAR & PROTECTION
     EQUIPMENT
    BUS BARS
    TRANSFORMERS
    EARTHING
    PLCC
P.PROL CHILLAKALLU HCL(JPT) COROMANDA TOGARAI KODAD
               SINGLE LINE DIAGRAM OF 220/132/33KV SUB-STATION,                           U                           L
                                                                                                                                  7.2 MVAR
                                 CHILLAKALLU                                          HARINI
                                                                                                5 MVAR                                     5MVAR
                                                                                                        NANDIGAMA KAKATIYA HCL     C.BANK  C.BANK
                                                                                     TEXTILE                         SAIL  AGRO
                                               220K                                             C.BANK
           220KV                                                                     S
                                               V
          BUS PT -I                            BUS -
                                               I
                                 220KV
                                  BUS
                                COUPLE              220KV
     LA         WT                 R                BUS
          CV               CB
                      CT                            -II
          T
                                                                                                                      33KV
220KV KONDAPALLI -I                                                                250KVA                                                         100KVA
                                                                                                                      BUS
                                                                                  STATION            33KV BUS                    33KV             STATIO
                                                                                    TR - II             PT I                     BUS                 N
                                                                                                                                 PT II              TR I
                                                                                                                                            132KV
220KV KONAPALLI -                                                                                                                         NANDIGAM       132KV
II                                                  220/132K                   220/132KV             132/33KV      132/33KV                               MCL
                                                                                                                                              A
                                                    V             20/132KV      100MVA               31.5MVA       31.5 MVA
                                                     100MVA        100MVA        PTR 2                 PTR I        PTR II
                                                      PTR-3         PTR-I        (TELK)               (APEX)         (BB)
                                                      (VIJAI)       (BHEL)
220KV VTS-1
                                                                                                                              132KV
                                                                                                                               BUS
                                                                                                                               PT- 1
                                                                                132KV                    L
                                                                                BUS                      A
220KV VTS-2



                                                            CB
220KV                                                       CT        132KV
NARKETPALLI-1                                                          BUS
                                                                       PT- 2
                                          220KV             CVT
                                         BUS PT -
                                            II
220KV NARKETPALLI-2                                         LA
                                                                                           132KV                   132KV               132KV VEPALA
                                                             132KV                         SCR - I              KUSUMANCHI
                                                            MADHIRA             132KV                                                    SINGARAM
                                                                                                           132KV               132KV                     132KV
                                                                                SCR -                    KHAMMAM               KODAD                  SEETAPURAM
                                                                                  II
SWICTHGEAR & PROTECTION
EQUIPMENT

 INSTRUMENT TRANSFORMERS
 CIRCUIT BREAKERS
 PROTECTIVE RELAYS
 LIGHTENING ARRESTERS
 ISOLATORS
INSTRUMENT TRASFORMERS
 These are used to protect apparatus from
 high voltages and permit use of reasonable
 insulation level and carrying current capacity
 in relays and meters.

 General rating is 5amps and 1amp and
 110volts 50 cycles on secondary side.
These are two types
   Current transformers (CT)


   Potential transformers (PT)
Current transformers
  The CT’s are used to step down the current of
   a circuit to a lower value.
  The CT steps down the incoming 800amps to
   1 amp.
  These are connected in series to the
   equipment in the layout.
Potential transformers
   The PT’S are used to step down the voltage
      of a circuit to a low value that can be
      effectively and safely used for operation of
      instruments.
     The main two functions of the PT
      are
     Measurement
     Protection
     These are connected in parallel to the
      system.
Circuit breakers
   These are used to operate on the fault either
    on line or transformer, depending upon
    where it is connected.
   This isolates the faulty line or equipments
    from the live portion of the substation by
    opening automatically through protective
    relays; control cables etc. in a definite time.
Types of circuit breakers
      Based on the medium used


      A) Air Blast Circuit Breaker
      B) SF6 Circuit Breaker
      C) Vacuum Circuit Breaker
      D) Minimum Oil Circuit Breaker
Air Blast Circuit Breaker
SF6 CIRCUIT BREAKERS
SF6 CIRCUIT BREAKERS
VACCUM CIRCUIT BREAKERS
MINIMUM OIL CIRCUIT
BREAKERS
RELAYS

 A relay is a device that detects the fault &
  initiates the operation of the circuit breaker
  to isolate the defective element from the rest
  of the system

 It detects the abnormal conditions by
  constantly measuring the electrical
  quantities(voltage ,current , frequency &
  phase angle)which are different under
  normal &fault conditions.
Classification of relays
   A) Based on construction and
    principle of operation

   Electromagnetic relays
   Electromagnetic induction simply induction
    relays
   Electro thermal relays
   Physio-electric relays
   Static relays / Numerical relays.
   Electro dynamic relays
B) Based on time of operation

   Instantaneous relays
   Definite time-lag relays
   Inverse time-lag relays
   Inverse -Definite minimum time lag
    relays
220/132KV Relay panel
Lightning arresters

 Lightning arresters are protective devices for
  limiting surge voltages due to lightning
  strikes or equipment faults or other events,
  to prevent damage to equipment and
  disruption of service. Also called surge
  arresters.
Lightning arresters
Isolators
   Isolaters are used in addition to circuit breakers

   These are provided on each side of ckt breaker to
    provide isolation and enable maintenance.

   While openining the circuit, the ckt breaker opens
    first and isolator & while closing the ckt the isolator
    closed first and then ckt breaker.
  Types of isolators
   1.Single break isolators
   2.Double break isolators
Insulator
 The insulator provide necessary insulation
  between line and conductor.
 It acts as support to conductors.
Types of insulators
 a. pin type
 b. suspension type
 c. stray type
 d. shackle type
 e. stay insulator
PIN TYPE & STRAIN TYPE
The causes for failure of insulators
are 
          Cracking of insulators
         Defective insulator material
         Porosity of the material
         Improper glaze
         Flash over
         Mechanical stress
         Short circuit
Bus bars
  Bus bars are nothing but the solid or
   tabular aluminum conductors Supported
   on post insulators bus bar are in the
   generating station and substation form
   Important link between the incoming and
   outgoing circulates.
Transformers
    Transformer is static ac machine which
     transfers the electric power energy from
     one electrical circuit to another electrical
     circuit with same frequency .
    It works on mutual induction (electro-
     magnetic induction) principle.
Ratings of transformer in
         220kv/132kv/33kv

 100MVA         3no’s
 31.5MVA        3no’s
 250KVA         2no’s
Protection schemes of transformers
    1. Differential protection of transformer

    2. Over current protection of transformer

    3. Earth fault protection of transformer

    4. Over-fluxing protection
Earthing
 Connecting of an electrical equipment or
 apparatus to earth with the help of a
 connecting wire of negligible resistance is
 known as earthing or grounding.

Need For Earthing
 To provide low impedance path to the earth
 for currents occurring under normal &
 abnormal conditions.
Earthing materials
Conductors

Connections

Earthing Roads

switchyard
Fence Earthing
PLCC
   The communication and the data
    transmission from one substation to
    another substation is carried out by
    means of power line carrier
    communication PLCC system.

   PLCC utilizes high frequency data is
    transmitted through to power line
    conductors
It consists of
   1. line trap unit
   2. Coupling capacitor
   3. Tuning unit
   4. Transmitter , receiver & other
    electronic equipment
   Applications
        Voice communication
        Tele Protection
        Tele metering
Protection for transmitting signal

     Wave trap or line trap
     Coupling filter or capacitor voltage
        Transformer (CVT)
       Line matching unit
       Balancing transformer
       Lightning arrester
       Earth switch
Wave Trap

    Wave trap is an inductive device, which
     offers high impedance to high frequency
     signals.

    Hence it will not allow communication
     signals towards substation equipment.

    Wave trap offers negligible impedance to
     power frequencies hence power flow will
     be unaffected
CVT

  Capacitor voltage transformer in a
   substation will be used for protection as
   well as coupling device in PLCC.
  CVT offers high impedance to power
   frequencies. Hence EHV, power cannot
   enter communication equipment, by the
   action of low pass filter arrangement.
Conclusion

  Enabled to know typical substation
   arrangements.

  Enabled to know different makers of
   equipment.

  Created an interest to go in to the
   designing field after our graduation.
THANK
YOU
QUERIES ????????

Mais conteúdo relacionado

Mais procurados

33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)Prateek Agarwal
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Sakshi Rastogi
 
Water Level Indicator and Alarm System
Water Level Indicator and Alarm SystemWater Level Indicator and Alarm System
Water Level Indicator and Alarm Systemali4wcct
 
Bses powerpoint presentation
Bses powerpoint presentationBses powerpoint presentation
Bses powerpoint presentationAnuj Gupta
 
Waterlevelindicator
WaterlevelindicatorWaterlevelindicator
WaterlevelindicatorShubhi Verma
 
Training report trw
Training report trwTraining report trw
Training report trwChandan Garg
 
Water Level indicator using Ultrasonic sensors
Water Level indicator using Ultrasonic sensorsWater Level indicator using Ultrasonic sensors
Water Level indicator using Ultrasonic sensorsTough_taiga
 
UNDER GROUND CABLE (TYPES OF CABLE)
UNDER GROUND CABLE (TYPES OF CABLE)UNDER GROUND CABLE (TYPES OF CABLE)
UNDER GROUND CABLE (TYPES OF CABLE)dharmesh nakum
 
LED WATER LEVEL INDICATOR WITH ALARM
LED WATER LEVEL INDICATOR WITH ALARM LED WATER LEVEL INDICATOR WITH ALARM
LED WATER LEVEL INDICATOR WITH ALARM Aditya Sharma
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATIONPower System Operation
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv student
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Power cables
Power cablesPower cables
Power cablescollege
 

Mais procurados (20)

132kv G.S.S. Jalore
132kv G.S.S. Jalore132kv G.S.S. Jalore
132kv G.S.S. Jalore
 
Power Grid
Power GridPower Grid
Power Grid
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
Water Level Indicator and Alarm System
Water Level Indicator and Alarm SystemWater Level Indicator and Alarm System
Water Level Indicator and Alarm System
 
Bses powerpoint presentation
Bses powerpoint presentationBses powerpoint presentation
Bses powerpoint presentation
 
Waterlevelindicator
WaterlevelindicatorWaterlevelindicator
Waterlevelindicator
 
Training report trw
Training report trwTraining report trw
Training report trw
 
Water Level indicator using Ultrasonic sensors
Water Level indicator using Ultrasonic sensorsWater Level indicator using Ultrasonic sensors
Water Level indicator using Ultrasonic sensors
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 
UNDER GROUND CABLE (TYPES OF CABLE)
UNDER GROUND CABLE (TYPES OF CABLE)UNDER GROUND CABLE (TYPES OF CABLE)
UNDER GROUND CABLE (TYPES OF CABLE)
 
66 kv substation
66 kv substation66 kv substation
66 kv substation
 
LED WATER LEVEL INDICATOR WITH ALARM
LED WATER LEVEL INDICATOR WITH ALARM LED WATER LEVEL INDICATOR WITH ALARM
LED WATER LEVEL INDICATOR WITH ALARM
 
Singapore Power
Singapore PowerSingapore Power
Singapore Power
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Power cables
Power cablesPower cables
Power cables
 
prepaid energy meter
prepaid energy meterprepaid energy meter
prepaid energy meter
 
Gss herapura report
Gss herapura reportGss herapura report
Gss herapura report
 

Semelhante a My ppt

Eliwell 2011 catalogue_rus_a4_high 59
Eliwell 2011 catalogue_rus_a4_high 59Eliwell 2011 catalogue_rus_a4_high 59
Eliwell 2011 catalogue_rus_a4_high 59TinikDesignStudio
 
Life with an Electric Car
Life with an Electric CarLife with an Electric Car
Life with an Electric CarPhillip Crippen
 
Valve & Amplifier Design, EL34 (6CA7) Data, Mullard Valves
Valve & Amplifier Design, EL34 (6CA7) Data, Mullard ValvesValve & Amplifier Design, EL34 (6CA7) Data, Mullard Valves
Valve & Amplifier Design, EL34 (6CA7) Data, Mullard ValvesValve Data
 
132kv Substation demo
132kv Substation demo132kv Substation demo
132kv Substation demoPravesh Kafle
 
132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02Shabith Ahamed
 
Controles remotos
Controles remotosControles remotos
Controles remotoschamako08
 
Smart Grid:Electric Utility Scada DMS OMS GIS
Smart Grid:Electric Utility Scada DMS OMS GISSmart Grid:Electric Utility Scada DMS OMS GIS
Smart Grid:Electric Utility Scada DMS OMS GISHIMADRI BANERJI
 
132kv Substation
132kv Substation132kv Substation
132kv Substationguestecdd58
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfAmitKunduDVC
 
Multiple well cathodic protection
Multiple well cathodic protectionMultiple well cathodic protection
Multiple well cathodic protectionAsif Sheriff
 
Danapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelDanapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelMd Ishteyaque
 
ppt on industrial training of final year studen from ptcul 132kv substation ...
ppt on industrial training of final year studen  from ptcul 132kv substation ...ppt on industrial training of final year studen  from ptcul 132kv substation ...
ppt on industrial training of final year studen from ptcul 132kv substation ...surendra rawat
 
デザインキット・DCDCコンバータによる昇圧回路の解説書
デザインキット・DCDCコンバータによる昇圧回路の解説書デザインキット・DCDCコンバータによる昇圧回路の解説書
デザインキット・DCDCコンバータによる昇圧回路の解説書Tsuyoshi Horigome
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentationkumarmayursinha
 

Semelhante a My ppt (17)

Eliwell 2011 catalogue_rus_a4_high 59
Eliwell 2011 catalogue_rus_a4_high 59Eliwell 2011 catalogue_rus_a4_high 59
Eliwell 2011 catalogue_rus_a4_high 59
 
Life with an Electric Car
Life with an Electric CarLife with an Electric Car
Life with an Electric Car
 
Valve & Amplifier Design, EL34 (6CA7) Data, Mullard Valves
Valve & Amplifier Design, EL34 (6CA7) Data, Mullard ValvesValve & Amplifier Design, EL34 (6CA7) Data, Mullard Valves
Valve & Amplifier Design, EL34 (6CA7) Data, Mullard Valves
 
132kv Substation demo
132kv Substation demo132kv Substation demo
132kv Substation demo
 
132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02132kvsub stvisit-090328064243-phpapp02
132kvsub stvisit-090328064243-phpapp02
 
Controles remotos
Controles remotosControles remotos
Controles remotos
 
Unifilar
UnifilarUnifilar
Unifilar
 
Unifilar
UnifilarUnifilar
Unifilar
 
Smart Grid:Electric Utility Scada DMS OMS GIS
Smart Grid:Electric Utility Scada DMS OMS GISSmart Grid:Electric Utility Scada DMS OMS GIS
Smart Grid:Electric Utility Scada DMS OMS GIS
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
Multiple well cathodic protection
Multiple well cathodic protectionMultiple well cathodic protection
Multiple well cathodic protection
 
Danapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final ModelDanapur Electrical LayOut-Final Model
Danapur Electrical LayOut-Final Model
 
ppt on industrial training of final year studen from ptcul 132kv substation ...
ppt on industrial training of final year studen  from ptcul 132kv substation ...ppt on industrial training of final year studen  from ptcul 132kv substation ...
ppt on industrial training of final year studen from ptcul 132kv substation ...
 
デザインキット・DCDCコンバータによる昇圧回路の解説書
デザインキット・DCDCコンバータによる昇圧回路の解説書デザインキット・DCDCコンバータによる昇圧回路の解説書
デザインキット・DCDCコンバータによる昇圧回路の解説書
 
Nanoscale Vacuum Tubes
Nanoscale Vacuum Tubes Nanoscale Vacuum Tubes
Nanoscale Vacuum Tubes
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 

Último

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Último (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

My ppt

  • 1. “Layout study of 220kv/132kv/33kv Substation at Chillakallu”.
  • 2. Project members  J.VAMSI KRISHNA 09AJ1A0230  G.SHAILESH KUMAR 09AJ1A0221  K.J.SUMANTH 09AJ1A0238  K.TRINADH VINAY 09AJ1A0242  A.RAVI 09AJ1A0202
  • 3. Under the guidance of  External guide: M. Venkateswarlu (A.D.E)  Internal guide :P.Bapaiah. M.Tech (Asst.prof.)
  • 4. CONTENTS  LAYOUT OF CHILLAKALLU  SWITCHGEAR & PROTECTION EQUIPMENT  BUS BARS  TRANSFORMERS  EARTHING  PLCC
  • 5. P.PROL CHILLAKALLU HCL(JPT) COROMANDA TOGARAI KODAD SINGLE LINE DIAGRAM OF 220/132/33KV SUB-STATION, U L 7.2 MVAR CHILLAKALLU HARINI 5 MVAR 5MVAR NANDIGAMA KAKATIYA HCL C.BANK C.BANK TEXTILE SAIL AGRO 220K C.BANK 220KV S V BUS PT -I BUS - I 220KV BUS COUPLE 220KV LA WT R BUS CV CB CT -II T 33KV 220KV KONDAPALLI -I 250KVA 100KVA BUS STATION 33KV BUS 33KV STATIO TR - II PT I BUS N PT II TR I 132KV 220KV KONAPALLI - NANDIGAM 132KV II 220/132K 220/132KV 132/33KV 132/33KV MCL A V 20/132KV 100MVA 31.5MVA 31.5 MVA 100MVA 100MVA PTR 2 PTR I PTR II PTR-3 PTR-I (TELK) (APEX) (BB) (VIJAI) (BHEL) 220KV VTS-1 132KV BUS PT- 1 132KV L BUS A 220KV VTS-2 CB 220KV CT 132KV NARKETPALLI-1 BUS PT- 2 220KV CVT BUS PT - II 220KV NARKETPALLI-2 LA 132KV 132KV 132KV VEPALA 132KV SCR - I KUSUMANCHI MADHIRA 132KV SINGARAM 132KV 132KV 132KV SCR - KHAMMAM KODAD SEETAPURAM II
  • 6. SWICTHGEAR & PROTECTION EQUIPMENT  INSTRUMENT TRANSFORMERS  CIRCUIT BREAKERS  PROTECTIVE RELAYS  LIGHTENING ARRESTERS  ISOLATORS
  • 7. INSTRUMENT TRASFORMERS  These are used to protect apparatus from high voltages and permit use of reasonable insulation level and carrying current capacity in relays and meters.  General rating is 5amps and 1amp and 110volts 50 cycles on secondary side.
  • 8. These are two types  Current transformers (CT)  Potential transformers (PT)
  • 9. Current transformers  The CT’s are used to step down the current of a circuit to a lower value.  The CT steps down the incoming 800amps to 1 amp.  These are connected in series to the equipment in the layout.
  • 10.
  • 11. Potential transformers  The PT’S are used to step down the voltage of a circuit to a low value that can be effectively and safely used for operation of instruments.  The main two functions of the PT are  Measurement  Protection  These are connected in parallel to the system.
  • 12.
  • 13. Circuit breakers  These are used to operate on the fault either on line or transformer, depending upon where it is connected.  This isolates the faulty line or equipments from the live portion of the substation by opening automatically through protective relays; control cables etc. in a definite time.
  • 14. Types of circuit breakers  Based on the medium used  A) Air Blast Circuit Breaker  B) SF6 Circuit Breaker  C) Vacuum Circuit Breaker  D) Minimum Oil Circuit Breaker
  • 15. Air Blast Circuit Breaker
  • 20. RELAYS  A relay is a device that detects the fault & initiates the operation of the circuit breaker to isolate the defective element from the rest of the system  It detects the abnormal conditions by constantly measuring the electrical quantities(voltage ,current , frequency & phase angle)which are different under normal &fault conditions.
  • 21. Classification of relays  A) Based on construction and principle of operation  Electromagnetic relays  Electromagnetic induction simply induction relays  Electro thermal relays  Physio-electric relays  Static relays / Numerical relays.  Electro dynamic relays
  • 22. B) Based on time of operation  Instantaneous relays  Definite time-lag relays  Inverse time-lag relays  Inverse -Definite minimum time lag relays
  • 24. Lightning arresters  Lightning arresters are protective devices for limiting surge voltages due to lightning strikes or equipment faults or other events, to prevent damage to equipment and disruption of service. Also called surge arresters.
  • 26. Isolators  Isolaters are used in addition to circuit breakers  These are provided on each side of ckt breaker to provide isolation and enable maintenance.  While openining the circuit, the ckt breaker opens first and isolator & while closing the ckt the isolator closed first and then ckt breaker. Types of isolators 1.Single break isolators 2.Double break isolators
  • 27.
  • 28. Insulator  The insulator provide necessary insulation between line and conductor.  It acts as support to conductors. Types of insulators  a. pin type  b. suspension type  c. stray type  d. shackle type  e. stay insulator
  • 29. PIN TYPE & STRAIN TYPE
  • 30. The causes for failure of insulators are  Cracking of insulators  Defective insulator material  Porosity of the material  Improper glaze  Flash over  Mechanical stress  Short circuit
  • 31. Bus bars  Bus bars are nothing but the solid or tabular aluminum conductors Supported on post insulators bus bar are in the generating station and substation form Important link between the incoming and outgoing circulates.
  • 32.
  • 33. Transformers  Transformer is static ac machine which transfers the electric power energy from one electrical circuit to another electrical circuit with same frequency .  It works on mutual induction (electro- magnetic induction) principle.
  • 34. Ratings of transformer in 220kv/132kv/33kv  100MVA 3no’s  31.5MVA 3no’s  250KVA 2no’s
  • 35.
  • 36.
  • 37. Protection schemes of transformers 1. Differential protection of transformer 2. Over current protection of transformer 3. Earth fault protection of transformer 4. Over-fluxing protection
  • 38. Earthing Connecting of an electrical equipment or apparatus to earth with the help of a connecting wire of negligible resistance is known as earthing or grounding. Need For Earthing To provide low impedance path to the earth for currents occurring under normal & abnormal conditions.
  • 40. PLCC  The communication and the data transmission from one substation to another substation is carried out by means of power line carrier communication PLCC system.  PLCC utilizes high frequency data is transmitted through to power line conductors
  • 41. It consists of 1. line trap unit 2. Coupling capacitor 3. Tuning unit 4. Transmitter , receiver & other electronic equipment Applications Voice communication Tele Protection Tele metering
  • 42. Protection for transmitting signal  Wave trap or line trap  Coupling filter or capacitor voltage Transformer (CVT)  Line matching unit  Balancing transformer  Lightning arrester  Earth switch
  • 43. Wave Trap  Wave trap is an inductive device, which offers high impedance to high frequency signals.  Hence it will not allow communication signals towards substation equipment.  Wave trap offers negligible impedance to power frequencies hence power flow will be unaffected
  • 44.
  • 45. CVT  Capacitor voltage transformer in a substation will be used for protection as well as coupling device in PLCC.  CVT offers high impedance to power frequencies. Hence EHV, power cannot enter communication equipment, by the action of low pass filter arrangement.
  • 46.
  • 47. Conclusion  Enabled to know typical substation arrangements.  Enabled to know different makers of equipment.  Created an interest to go in to the designing field after our graduation.