1. Sephardic Community Center-Brooklyn 400 Ton Yazaki Gas Chiller Plant provides chilled water for a Nautica Dehumidification System using MSP Technology. Lilker Associates
27. Integrated System Installations City Public Service – San Antonio, TX Renovation of old “box-store” retail space. Transformed into a utility customer service facility. This urban retro-fit project demonstrates state of the art building technology.
28. Integrated System Installations City Public Service – San Antonio, TX Photovoltaic array supplies power for electric car charging stations that are open to the public. Battery night lighting, and DC fluid movers are also supported.
29. Integrated System Installations City Public Service – San Antonio, TX Solar-thermal array supplies hot water to 20RT of Yazaki single-effect chillers. Two 100 RT Gas-fired Yazaki chiller-heaters also serve this facility.
30. Integrated System Installations City Public Service – San Antonio, TX Chilling plant driven by methane-fired boilers awaiting delivery of generators. Flexible system allowed owner to occupy building in shorter time.
31. Integrated System Installations Inland Empire Municipal Utility Waste water treatment plant captures methane that is used to fuel onsite power generation. Waste heat drives 4 Yazaki WFC-SH30 Modules producing over 150 RT of HVAC capacity.