SlideShare uma empresa Scribd logo
1 de 10
Baixar para ler offline
Fairfax County
    Department of
    Transportation

                      Dulles Rail Bus Plan
                            Phase I



                     March 30, 2012: Reston for A Lifetime



1
Background
     Plan based on recommendations from the Transit Development Plan (TDP) and
     defined by two different designs
         The realignment, enhancement and addition of new feeder service to the new rail
         stations within Reston and Tysons Corner;
         The implementation of a circulator bus system within Tysons Corner

     The complete plan proposes to
         Modify 22 routes,
         Create 6 new routes,
         Eliminate 8 routes and
         Establish the 5 route internal circulator bus system

     A priority for this plan is to provide linkages with regional transportation service
     providers and transportation modes




2
Proposed Service Changes:
    Tysons Circulator Shuttles

     The circulator bus system is proposed to operate
     seven days a week at 10-minute intervals during
     business hours.

     “Branding” of Circulator routes is undetermined;
     LINK does not represent the “official” name

     Circulator Routes
        Tysons Link Beltway
        Tysons Link Central
        Tysons Link East
        Tysons Link Greensboro
3       Tysons Link West
Proposed Service Changes:
    400 Route Series

              Geographic Area
                         Merrifield/Vienna – Cross County
              Service Adjustments
                         Improved headways/Span of service
              Routing Adjustments
                         462/463

                                              Current Headway                Proposed Headway            Current Span of Service      Proposed Span of Service
       Recommendation
          Description        Route     Peak   Mid-Day   Sat     Sun   Peak   Mid-Day    Sat     Sun   Weekday Saturday     Sunday Weekday Saturday       Sunday

    Cross County Local                                                                                4:20 AM - 5:50 AM - 5:51 AM - 4:20 AM - 5:30 AM - 6:00 AM -
    Service                  401/402    15      30      30      30     15      20       30      30    11:47 PM 10:52 PM 9:20 PM 12:00 AM 11:00 PM 10:00 PM
    DL-Tysons via Electric
    Initial                   462       35      NS      NS      NS     30      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS
                                                                                                                                    5:30 AM - 6:00 AM - 8:00 AM -
    Vienna-Tysons Initial     463      35       NS      NS      NS     30      30       30      60    Peak Only    NS        NS     11:45 PM 11:00 PM 8:00 PM




4
Proposed Service Changes:
    550 Route Series 574 & 585

             Geographic Area
                    Reston
             Service Adjustments
                    Improved headways/Span of Service
             Routing Adjustments
                    Cut Back to Wiehle Station; change in service area

                                       Current Headway                Proposed Headway            Current Span of Service      Proposed Span of Service
       Recommendation
          Description   Route   Peak   Mid-Day   Sat     Sun   Peak   Mid-Day    Sat     Sun   Weekday Saturday     Sunday Weekday Saturday       Sunday



    552 Phase 1         552      30      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS

    553 Phase 1         553      30      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS

    554 Phase 1         554      30      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS

    557 Phase 1         557      30      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS
                                                                                               5:10 AM - 6:10 AM - 6:10 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    Reston-Tysons       574      60      60      60      60    30       60       60      60    11:55 PM 10:00 PM 8:00 PM 11:00 PM 11:00 PM 8:00 PM
                                                                                                                             5:00 AM -
5   585 Phase 1         585      20      NS      NS      NS     15      60       NS      NS    Peak Only    NS        NS      7:30 PM     NS        NS
Proposed Service Changes:
    900 Route Series

              Geographic Area
                         Herndon
              Service Adjustments
                         Improved headways/Span of Service
              Routing Adjustments
                         Access Wiehle via the Toll Road

                                             Current Headway                Proposed Headway            Current Span of Service      Proposed Span of Service
       Recommendation
          Description         Route   Peak   Mid-Day   Sat     Sun   Peak   Mid-Day    Sat     Sun   Weekday Saturday     Sunday Weekday Saturday       Sunday



    924 Phase 1               924      24      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS

    926 Phase 1               926      24      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS
                                                                                                     5:25 AM -                     5:00 AM -
    927 Phase 1               927      30      30      NS      NS     15      30       NS      NS     8:51 PM     NS        NS      9:00 PM     NS        NS

    929 Phase 1               929      30      NS      NS      NS     15      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS
                                                                                                     5:05 AM - 5:56 AM - 5:56 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    Reston - Wiehle Initial   950     30       30      30      30    30       30       30      30    12:55 AM 1:59 AM 12:05 AM 12:00 AM 12:00 AM 12:00 AM


6   980 Phase 1               980      6       NS      NS      NS     12      NS       NS      NS    Peak Only    NS        NS    Peak Only     NS        NS
Proposed Service Changes:
    RIBS Route Series

               Geographic Area
                     Reston
               Service Adjustments
                     None
               Routing Adjustments
                     None

                                         Current Headway                Proposed Headway            Current Span of Service      Proposed Span of Service
        Recommendation
           Description   Route    Peak   Mid-Day   Sat     Sun   Peak   Mid-Day    Sat     Sun   Weekday Saturday     Sunday Weekday Saturday       Sunday

                                                                                                 5:05 AM - 6:10 AM - 6:05 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    RIBS 1 Initial       RIBS 1   30       30      30      60    30       30       30      60    12:53 AM 11:58 PM 8:56 PM 1:00 AM 12:00 AM 9:00 PM
                                                                                                 5:05 AM - 6:10 AM - 6:05 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    RIBS 2 Initial       RIBS 2   30       30      30      60    30       30       30      60    12:52 AM 11:58 PM 8:58 PM 1:00 AM 12:00 AM 9:00 PM
                                                                                                 5:05 AM - 6:10 AM - 6:10 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    RIBS 3 Initial       RIBS 3   30       30      30      60    30       30       30      60    12:51 AM 11:55 PM 8:55 PM 1:00 AM 12:00 AM 9:00 PM
                                                                                                 6:05 AM - 6:00 AM - 6:00 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    RIBS 4 Initial       RIBS 4   30       30      30      60    30       30       30      60    10:59 PM 10:59 PM 8:59 PM 1:00 AM 12:00 AM 9:00 PM
                                                                                                 6:05 AM - 6:00 AM - 6:00 AM - 5:00 AM - 6:00 AM - 6:00 AM -
    RIBS 5 Initial       RIBS 5   30       30      30      60    30       30       30      60    10:59 PM 10:59 PM 8:59 PM 1:00 AM 12:00 AM 9:00 PM


7
Proposed Service Changes:
    New Routes

              Geographic Area
                        Tysons/Reston
              Service Adjustments
                        New
              Routing Adjustments
                        New

                                          TDP Recommended Headway            Proposed Headway           Current Span of Service     Proposed Span of Service
       Recommendation
          Description           Route   Peak   Mid-Day   Sat    Sun   Peak   Mid-Day    Sat     Sun   Weekday Saturday    Sunday Weekday Saturday      Sunday



    Kirby Road                  433      30      NS      NS     NS    30       NS       NS      NS       -         -         -    Peak Only    NS        NS
    Leesburg Pike Shuttle
    East                         LPE     15      NS      NS     NS    30       NS       NS      NS       -         -         -    Peak Only    NS        NS
                                                                                                                                  6:00 AM - 7:00 AM - 8:00 AM -
    McLean Connector            731      20      20      20     40    20       20       20      40       -         -         -     9:00 PM 8:00 PM 8:00 PM
    Northern McLean
    Connector Initial           733     30       NS      NS     NS    30       NS       NS      NS       -         -         -    Peak Only    NS        NS
    Leesburg Pike Shuttle                                                                                                         5:00 AM -
    West                        LPW      15      60      NS     NS     30      60       NS      NS       -         -         -     9:00 PM     NS        NS
    Sunrise/Sunset Circulator                                                                                                     5:00 AM - 6:00 AM - 6:00 AM -
8   Initial                     959      15      30      30     30    30       30       NS      NS       -         -         -    12:00 AM 12:00 AM 12:00 AM
Proposed Service Changes:
    Eliminated Routes

              Geographic Area
                           Reston/Tysons
              Service Adjustments
                           Elimination
              Routing Adjustments
                           Elimination


                             Reston Area                                 Tysons                                  Express Routes

        Description                        Route       Description                Route           Description                     Route

    Reston Town                                    Tysons-Jones Branch
    Center                                 505     Drive                          425     Pentagon Express                        595
    Reston South-South                             Tysons-Greensboro
    Lakes Drive                            551     Drive                          427     Crystal City Express                    597

    Sunrise Valley Drive                   951

    Sunset Hills Road                      952

    Sunset Hills P&R                       555

9
Timeline
      January-April 2013:
          First Draft Dulles Rail including timetables and routing
      April 2013:
          Public Meetings presenting First Draft Dulles Rail Bus Service Plan
          Public comment period (April – June)
      July 2013:
          Public Meetings presenting Draft Dulles Rail Bus Service Plan incoporating public
          Comments
          Public Comment period (July – September)
      August 2013
          Rail Turned Over to WMATA for testing/training
      October 2013
          Public Meetings presenting Final Dulles Rail Bus Service Plan
      January 2014
          Dulles Rail Operational, Bus Plan Begins


10

Mais conteúdo relacionado

Mais de Steve Gurney

Dcsrg sibley senior services
Dcsrg sibley senior servicesDcsrg sibley senior services
Dcsrg sibley senior servicesSteve Gurney
 
BIG EVENT 2013 - Survey Results
BIG EVENT 2013 - Survey ResultsBIG EVENT 2013 - Survey Results
BIG EVENT 2013 - Survey ResultsSteve Gurney
 
Belvedere baseball presentation 3 20-13 final
Belvedere baseball presentation 3 20-13 finalBelvedere baseball presentation 3 20-13 final
Belvedere baseball presentation 3 20-13 finalSteve Gurney
 
Loudoun Senior Expo - Exhibitor Bootcamp
Loudoun Senior Expo - Exhibitor BootcampLoudoun Senior Expo - Exhibitor Bootcamp
Loudoun Senior Expo - Exhibitor BootcampSteve Gurney
 
Guardianship Presentation
Guardianship PresentationGuardianship Presentation
Guardianship PresentationSteve Gurney
 
ProAging @ Goodwin House - Creativity in Aging
ProAging @ Goodwin House - Creativity in AgingProAging @ Goodwin House - Creativity in Aging
ProAging @ Goodwin House - Creativity in AgingSteve Gurney
 
Preparingforthe unexpected 11032012
Preparingforthe unexpected 11032012Preparingforthe unexpected 11032012
Preparingforthe unexpected 11032012Steve Gurney
 
Reston Storm Meeting
Reston Storm MeetingReston Storm Meeting
Reston Storm MeetingSteve Gurney
 
Reston for a lifetime Transportation Slidedeck
Reston for a lifetime   Transportation SlidedeckReston for a lifetime   Transportation Slidedeck
Reston for a lifetime Transportation SlidedeckSteve Gurney
 
Fairfax Advocates for Better Bicycling - Reston for a Lifetime
Fairfax Advocates for Better Bicycling - Reston for a LifetimeFairfax Advocates for Better Bicycling - Reston for a Lifetime
Fairfax Advocates for Better Bicycling - Reston for a LifetimeSteve Gurney
 

Mais de Steve Gurney (15)

Dcsrg sibley senior services
Dcsrg sibley senior servicesDcsrg sibley senior services
Dcsrg sibley senior services
 
Fairfaxmarketingi
FairfaxmarketingiFairfaxmarketingi
Fairfaxmarketingi
 
Aginginplace
AginginplaceAginginplace
Aginginplace
 
Worldbank
WorldbankWorldbank
Worldbank
 
Senior.expo.wrap
Senior.expo.wrapSenior.expo.wrap
Senior.expo.wrap
 
BIG EVENT 2013 - Survey Results
BIG EVENT 2013 - Survey ResultsBIG EVENT 2013 - Survey Results
BIG EVENT 2013 - Survey Results
 
Belvedere baseball presentation 3 20-13 final
Belvedere baseball presentation 3 20-13 finalBelvedere baseball presentation 3 20-13 final
Belvedere baseball presentation 3 20-13 final
 
Loudoun Senior Expo - Exhibitor Bootcamp
Loudoun Senior Expo - Exhibitor BootcampLoudoun Senior Expo - Exhibitor Bootcamp
Loudoun Senior Expo - Exhibitor Bootcamp
 
Loudounexpo
LoudounexpoLoudounexpo
Loudounexpo
 
Guardianship Presentation
Guardianship PresentationGuardianship Presentation
Guardianship Presentation
 
ProAging @ Goodwin House - Creativity in Aging
ProAging @ Goodwin House - Creativity in AgingProAging @ Goodwin House - Creativity in Aging
ProAging @ Goodwin House - Creativity in Aging
 
Preparingforthe unexpected 11032012
Preparingforthe unexpected 11032012Preparingforthe unexpected 11032012
Preparingforthe unexpected 11032012
 
Reston Storm Meeting
Reston Storm MeetingReston Storm Meeting
Reston Storm Meeting
 
Reston for a lifetime Transportation Slidedeck
Reston for a lifetime   Transportation SlidedeckReston for a lifetime   Transportation Slidedeck
Reston for a lifetime Transportation Slidedeck
 
Fairfax Advocates for Better Bicycling - Reston for a Lifetime
Fairfax Advocates for Better Bicycling - Reston for a LifetimeFairfax Advocates for Better Bicycling - Reston for a Lifetime
Fairfax Advocates for Better Bicycling - Reston for a Lifetime
 

Último

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Último (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Fairfax County Dept of Transportation - Reston for a Lifetime

  • 1. Fairfax County Department of Transportation Dulles Rail Bus Plan Phase I March 30, 2012: Reston for A Lifetime 1
  • 2. Background Plan based on recommendations from the Transit Development Plan (TDP) and defined by two different designs The realignment, enhancement and addition of new feeder service to the new rail stations within Reston and Tysons Corner; The implementation of a circulator bus system within Tysons Corner The complete plan proposes to Modify 22 routes, Create 6 new routes, Eliminate 8 routes and Establish the 5 route internal circulator bus system A priority for this plan is to provide linkages with regional transportation service providers and transportation modes 2
  • 3. Proposed Service Changes: Tysons Circulator Shuttles The circulator bus system is proposed to operate seven days a week at 10-minute intervals during business hours. “Branding” of Circulator routes is undetermined; LINK does not represent the “official” name Circulator Routes Tysons Link Beltway Tysons Link Central Tysons Link East Tysons Link Greensboro 3 Tysons Link West
  • 4. Proposed Service Changes: 400 Route Series Geographic Area Merrifield/Vienna – Cross County Service Adjustments Improved headways/Span of service Routing Adjustments 462/463 Current Headway Proposed Headway Current Span of Service Proposed Span of Service Recommendation Description Route Peak Mid-Day Sat Sun Peak Mid-Day Sat Sun Weekday Saturday Sunday Weekday Saturday Sunday Cross County Local 4:20 AM - 5:50 AM - 5:51 AM - 4:20 AM - 5:30 AM - 6:00 AM - Service 401/402 15 30 30 30 15 20 30 30 11:47 PM 10:52 PM 9:20 PM 12:00 AM 11:00 PM 10:00 PM DL-Tysons via Electric Initial 462 35 NS NS NS 30 NS NS NS Peak Only NS NS Peak Only NS NS 5:30 AM - 6:00 AM - 8:00 AM - Vienna-Tysons Initial 463 35 NS NS NS 30 30 30 60 Peak Only NS NS 11:45 PM 11:00 PM 8:00 PM 4
  • 5. Proposed Service Changes: 550 Route Series 574 & 585 Geographic Area Reston Service Adjustments Improved headways/Span of Service Routing Adjustments Cut Back to Wiehle Station; change in service area Current Headway Proposed Headway Current Span of Service Proposed Span of Service Recommendation Description Route Peak Mid-Day Sat Sun Peak Mid-Day Sat Sun Weekday Saturday Sunday Weekday Saturday Sunday 552 Phase 1 552 30 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 553 Phase 1 553 30 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 554 Phase 1 554 30 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 557 Phase 1 557 30 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 5:10 AM - 6:10 AM - 6:10 AM - 5:00 AM - 6:00 AM - 6:00 AM - Reston-Tysons 574 60 60 60 60 30 60 60 60 11:55 PM 10:00 PM 8:00 PM 11:00 PM 11:00 PM 8:00 PM 5:00 AM - 5 585 Phase 1 585 20 NS NS NS 15 60 NS NS Peak Only NS NS 7:30 PM NS NS
  • 6. Proposed Service Changes: 900 Route Series Geographic Area Herndon Service Adjustments Improved headways/Span of Service Routing Adjustments Access Wiehle via the Toll Road Current Headway Proposed Headway Current Span of Service Proposed Span of Service Recommendation Description Route Peak Mid-Day Sat Sun Peak Mid-Day Sat Sun Weekday Saturday Sunday Weekday Saturday Sunday 924 Phase 1 924 24 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 926 Phase 1 926 24 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 5:25 AM - 5:00 AM - 927 Phase 1 927 30 30 NS NS 15 30 NS NS 8:51 PM NS NS 9:00 PM NS NS 929 Phase 1 929 30 NS NS NS 15 NS NS NS Peak Only NS NS Peak Only NS NS 5:05 AM - 5:56 AM - 5:56 AM - 5:00 AM - 6:00 AM - 6:00 AM - Reston - Wiehle Initial 950 30 30 30 30 30 30 30 30 12:55 AM 1:59 AM 12:05 AM 12:00 AM 12:00 AM 12:00 AM 6 980 Phase 1 980 6 NS NS NS 12 NS NS NS Peak Only NS NS Peak Only NS NS
  • 7. Proposed Service Changes: RIBS Route Series Geographic Area Reston Service Adjustments None Routing Adjustments None Current Headway Proposed Headway Current Span of Service Proposed Span of Service Recommendation Description Route Peak Mid-Day Sat Sun Peak Mid-Day Sat Sun Weekday Saturday Sunday Weekday Saturday Sunday 5:05 AM - 6:10 AM - 6:05 AM - 5:00 AM - 6:00 AM - 6:00 AM - RIBS 1 Initial RIBS 1 30 30 30 60 30 30 30 60 12:53 AM 11:58 PM 8:56 PM 1:00 AM 12:00 AM 9:00 PM 5:05 AM - 6:10 AM - 6:05 AM - 5:00 AM - 6:00 AM - 6:00 AM - RIBS 2 Initial RIBS 2 30 30 30 60 30 30 30 60 12:52 AM 11:58 PM 8:58 PM 1:00 AM 12:00 AM 9:00 PM 5:05 AM - 6:10 AM - 6:10 AM - 5:00 AM - 6:00 AM - 6:00 AM - RIBS 3 Initial RIBS 3 30 30 30 60 30 30 30 60 12:51 AM 11:55 PM 8:55 PM 1:00 AM 12:00 AM 9:00 PM 6:05 AM - 6:00 AM - 6:00 AM - 5:00 AM - 6:00 AM - 6:00 AM - RIBS 4 Initial RIBS 4 30 30 30 60 30 30 30 60 10:59 PM 10:59 PM 8:59 PM 1:00 AM 12:00 AM 9:00 PM 6:05 AM - 6:00 AM - 6:00 AM - 5:00 AM - 6:00 AM - 6:00 AM - RIBS 5 Initial RIBS 5 30 30 30 60 30 30 30 60 10:59 PM 10:59 PM 8:59 PM 1:00 AM 12:00 AM 9:00 PM 7
  • 8. Proposed Service Changes: New Routes Geographic Area Tysons/Reston Service Adjustments New Routing Adjustments New TDP Recommended Headway Proposed Headway Current Span of Service Proposed Span of Service Recommendation Description Route Peak Mid-Day Sat Sun Peak Mid-Day Sat Sun Weekday Saturday Sunday Weekday Saturday Sunday Kirby Road 433 30 NS NS NS 30 NS NS NS - - - Peak Only NS NS Leesburg Pike Shuttle East LPE 15 NS NS NS 30 NS NS NS - - - Peak Only NS NS 6:00 AM - 7:00 AM - 8:00 AM - McLean Connector 731 20 20 20 40 20 20 20 40 - - - 9:00 PM 8:00 PM 8:00 PM Northern McLean Connector Initial 733 30 NS NS NS 30 NS NS NS - - - Peak Only NS NS Leesburg Pike Shuttle 5:00 AM - West LPW 15 60 NS NS 30 60 NS NS - - - 9:00 PM NS NS Sunrise/Sunset Circulator 5:00 AM - 6:00 AM - 6:00 AM - 8 Initial 959 15 30 30 30 30 30 NS NS - - - 12:00 AM 12:00 AM 12:00 AM
  • 9. Proposed Service Changes: Eliminated Routes Geographic Area Reston/Tysons Service Adjustments Elimination Routing Adjustments Elimination Reston Area Tysons Express Routes Description Route Description Route Description Route Reston Town Tysons-Jones Branch Center 505 Drive 425 Pentagon Express 595 Reston South-South Tysons-Greensboro Lakes Drive 551 Drive 427 Crystal City Express 597 Sunrise Valley Drive 951 Sunset Hills Road 952 Sunset Hills P&R 555 9
  • 10. Timeline January-April 2013: First Draft Dulles Rail including timetables and routing April 2013: Public Meetings presenting First Draft Dulles Rail Bus Service Plan Public comment period (April – June) July 2013: Public Meetings presenting Draft Dulles Rail Bus Service Plan incoporating public Comments Public Comment period (July – September) August 2013 Rail Turned Over to WMATA for testing/training October 2013 Public Meetings presenting Final Dulles Rail Bus Service Plan January 2014 Dulles Rail Operational, Bus Plan Begins 10