WHAT IS A THERMOMODERNISATION FUND
AND A THERMOMODERNISATION BONUS?
They are funds allocated from the State Budget
which are administered by Bank Gospodarstwa Krajowego
[National Economy Bank].
They are intended to support all eligible subjects in performing
actions aiming at lowering energy consumption
and the amount of energy carriers in both communal
and social & living resources.
WHAT IS A THERMOMODERNISATION FUND
AND A THERMOMODERNISATION BONUS?
Thermomodernisation of buildings is usually highly profitable,
yet it requires bearing substantial costs right from the beginning.
That is why, many building owners cannot carry out
thermomodernisation without extra financial support.
The Act on Supporting Thermomodernisation Investments creates
a system for bulding owners which aims at facilitating the process
of financing thermomodernisation so as to finally lower energy
consumption and costs of both heating buildings and producing
domestic hot water.
PRINCIPLES OF SUPPORTING THERMOMODERNISATION
The system of financial help includes thermomodernisation undertakings
in the following buildings:
- multi and single-family buildings irrespective of their legal form
of ownership which means: private, commonhold, housing associations,
company, city and other buildings except for those belonging to budget
entities,
- social collective accommodation buildings such as nursing homes,
halls of residence, dormitories, hostels, retirement homes and the like,
- buildings used for public activities of local government units such
as schools, commune offices and the like,
- local heat sources (housing estate boiler houses and thermal power
stations) or district heating substations and local heating networks
with the power of 11.6 MW.
PRINCIPLES OF SUPPORTING THERMOMODERNISATION
Provisions under the Act on Supporting Thermomodernisation
Investments are also connected with the overall and partial
replacement of an existing energy source with an unconventional
one e.g. solar panels, heat pumps, boilers using biomass
and the like.
The Act provides for a commercial bank loan to be the main source
of financing for thermomodernisation investments. The owner
of the building may finance 100% of investment costs by means
of such a loan. Both the share of the loan in overall costs
and the credit period shall be negotiated between the investor
and the bank granting the loan.
The thermomodernisation bonus is a form of help which an investor may
get from the State Budget and it constitutes 20% of the used loan yet there
are two conditions which must be met:
- it cannot constitute more than 16% of the overall costs
of the undertaking,
- it cannot constitute more than the expected value of two-year savings
determined by means of an energy audit.
There is a rule that forbids combining statutory loans with EU funding.
An energy audit is the ground for statutory funding. It is a document which
includes a technical & economical analysis which determines what shall
be improved in the building to be modernised. The audit points out
technical actions that may be taken and which ones of the planned
actions may bring best economic benefits (optimal solutions).
One can apply for a thermomodernisation bonus provided that such
thermomodernisation will substantially lower the yearly demand
for energy, especially:
- in buildings with only the heating system being modernised –
by at least 10%,
- in buildings which underwent thermomodernisation of the heating
system after year 1984 – by at least 15%,
- in remaining buildings – by at least 25%,
- in local heat sources and local heating networks – decreasing
annual primary energy losses by at least 25% and by replacing local
heat sources and heating networks with a connection
to a centralised heat source (of a city network) – lowering costs of
purchasing heat supplied to the building by at least 20% per annum.
Those who can apply for a thermomodernisation bonus include
owners and administrators of:
- residential buildings,
- collective accommodation buildings,
- public utility buildings owned by local government units
and used by them for performing their public tasks,
- local heating networks,
- local heat sources.
ACQUIRING A LOAN AND A THERMOMODERNISATION BONUS
After deciding upon thermomodernisation, a building owner submits
all necessary documents to the bank which is going to grant the loan.
The documents are as follows:
- a loan application with all annexes required by the bank,
- a thermomodernisation application, and
- an energy audit.
The bank which may grant a loan is the one which has an agreement with
Bank Gospodarstwa Krajowego [National Economy Bank] on granting loans
and procedures of transferring thermomodernisation bonuses provided for
in the Act. Detailed requirements concerning loan applications
and the form of loan collateral are determined individually by each loan-
granting bank.
EFFECTS OF THE THERMOMODERNISATION SUPPORT SYSTEM
EXAMPLE
Residential building of 11 storeys, total floor space 4,880 m2.
Thermomodernisation costs 612.,000 PLN, including:
Own funds 122.,000 PLN (20%)
Loan 490.,000 PLN (80%)
2 x monthly savings 132.2 thousand PLN
Thermomodernisation bonus 98,000 PLN (20% of the loan)
Monthly loan instalment with interest 3.9 thousand PLN (with interest at 12%)
Before thermomodernisation
annual costs of heating and domestic hot water
192.7 thousand PLN
After thermomodernisation
(in the first year of repaying the loan)
annual costs of heating and domestic hot water
126.6 thousand PLN
Annual loan service payments
(12 monthly instalments)
46.8 thousand PLN
Overall costs
(heating + loan service)
173.4 thousand PLN
After repaying the loan
annual costs of heating and domestic hot water
126.6 thousand PLN
EFFECTS:
After modernisation, during the loan repayment period, all expenses
connected with heating and domestic hot water are lowered by
around 10%, and they ultimately lower by 34% after the loan has been
repaid completely.
The thermomodernisation investments support system is beneficial to all
interested parties. It allows an investor to start and carry out investments
which aim at improving conditions of using a residential building
and at the same time lower all the connected costs.
Starting thermomodernisation investments also directly influences
the State by lowering the overall demand for heat. It indirectly leads to
improving ecological conditions and lowering CO2 emissions into
the atmosphere. Thermomodernisation is done using relatively low funds
from the State Budget, yet at the same time, some of the expenses come
back to the budget as taxes on purchased devices and materials as well
as taxes on contractors' income.
THE RULES OF SUPPORTING RENOVATIONS
The Act concerns supporting not only investments connected with
thermomodernisation but also with renovation. Help in form of
a renovation bonus is particularly directed at multi-family residential
buildings which have been used since earlier than 14 August 1961 and its
object is:
- overall renovation of a given building (without renovating flats),
- windows replacement and renovation of balconies even when the only
user is the owner of a given flat,
- alteration of a building leading to its improvement,
- providing building with installations and devices required in buildings
which are currently being open to use in accordance with technical
& construction regulations.
The Act does not concern renovations of single-family buildings.
The renovation bonus may be grated to an investor who is a natural person,
a housing association or a social housing association.
The bonus (as a form of help for the partial repayment of a loan) constitutes
20% of the used loan, yet no more than 15% of the cost of the undertaking.
It is granted if the following conditions are met:
- the renovation undertaking cost indicator is between 0.15 to 0.70 (the ratio
of renovation costs per 1m2 of floor space to the price of 1m2 determined for the purposes
of calculating the guarantee bonus).
- the renovation will lower the annual demand for energy necessary
for heating the building and heating water by at least 10% and when the cost
indicator is over 0.3 – by at least 25%. Lowering the demand for energy is not
required when the building meets the requirements connected with energy
savings determined in valid provisions of technical&construction regulations.
- it is impossible to get a renovation bonus if there is another bank loan with
a thermomodernisation or renovation bonus or if there is any other EU funding.
According to the hereinabove mentioned date for the buildings eligible
for a renovation bonus (year 1961), the Act concerns buildings built about
15 years after the II World War and some older ones, yet it does not concern
any newer buildings e.g. large-panel buildings.
For the buildings mentioned in the Act, there is a possibility of getting a bonus
sometimes more easily than as a thermomodernisation bonus. It is worth
highlighting, that almost any works carried out as thermomodernisation may
also be done as renovation.
The Act states that loans cannot be allotted for financing works for which
there has been granted another loan with a thermomodernisation
or renovation bonus. It means that the same scope of works cannot be
financed from two sources. However, there are no obstacles for using both
a renovation and a thermomodernisation loan for works in the same building,
as long as they are to finance different types of works.
Thank you for your attention!

Mais conteúdo relacionado

Destaque

ArchiCAD 10
ArchiCAD 10ArchiCAD 10
ArchiCAD 10
Wydawnictwo Helion
 
P5. Audyt efektywności
P5. Audyt efektywnościP5. Audyt efektywności
P5. Audyt efektywności
Inwenta
 
2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern
NiceTimeGo
 
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
w_strone_piekna
 
Pamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cachePamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cache
Borek12345
 

Destaque (16)

Legea privind transparenţa în procesul decizional
Legea privind transparenţa în procesul decizionalLegea privind transparenţa în procesul decizional
Legea privind transparenţa în procesul decizional
 
ArchiCAD 10
ArchiCAD 10ArchiCAD 10
ArchiCAD 10
 
Codex Alimentarius
Codex Alimentarius Codex Alimentarius
Codex Alimentarius
 
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
Bezpłatny VePrzewodnik: 10 porad na podniesienie zaangażowania klientów, aby ...
 
The condition of and prospects for the private equity funds market in Poland
The condition of and prospects for the private equity funds market in PolandThe condition of and prospects for the private equity funds market in Poland
The condition of and prospects for the private equity funds market in Poland
 
Dws Gemius 2004
Dws Gemius 2004Dws Gemius 2004
Dws Gemius 2004
 
P5. Audyt efektywności
P5. Audyt efektywnościP5. Audyt efektywności
P5. Audyt efektywności
 
Jak budować zespół, który realizuje cele firmy?
Jak budować zespół, który realizuje cele firmy?Jak budować zespół, który realizuje cele firmy?
Jak budować zespół, który realizuje cele firmy?
 
Zabiegi pielegnacyjne na biust
Zabiegi pielegnacyjne na biustZabiegi pielegnacyjne na biust
Zabiegi pielegnacyjne na biust
 
Despre credinţă - Emanuel Swedenborg
Despre credinţă - Emanuel SwedenborgDespre credinţă - Emanuel Swedenborg
Despre credinţă - Emanuel Swedenborg
 
4.4 Naprawa układu jezdnego
4.4 Naprawa układu jezdnego4.4 Naprawa układu jezdnego
4.4 Naprawa układu jezdnego
 
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
[PL] Mechanizmy bezpieczeństwa w sieciach z rodziny 802.11x
 
2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern2 Organizatia Si Mediul Sau Extern
2 Organizatia Si Mediul Sau Extern
 
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
dr hab. M. Kistowski, prof. UG - Reklama zewnętrzna w krajobrazie Głównego Mi...
 
Pamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cachePamięć wirtualna oraz pamięć cache
Pamięć wirtualna oraz pamięć cache
 
Zmiana kierunku jazdy lub pasa ruchu
Zmiana kierunku jazdy lub pasa ruchu Zmiana kierunku jazdy lub pasa ruchu
Zmiana kierunku jazdy lub pasa ruchu
 

Mais de Step Interreg Ivc

Mais de Step Interreg Ivc (15)

SARGA. Better implementation of sustainable energy policies at local level. D...
SARGA. Better implementation of sustainable energy policies at local level. D...SARGA. Better implementation of sustainable energy policies at local level. D...
SARGA. Better implementation of sustainable energy policies at local level. D...
 
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
Irmeli Mikkonen. "Voluntary tools for increasing energy efficiency"
 
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
Matthias Wagner. "Regional, Rural, Renewable, Financing Tools for energy proj...
 
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
FRANCISCO BERNABE PEREZ. ESCO public private investment model: the case of La...
 
Good Practice Summary. Mid West Regional Authority. Michael Bell
Good Practice Summary. Mid West Regional Authority. Michael BellGood Practice Summary. Mid West Regional Authority. Michael Bell
Good Practice Summary. Mid West Regional Authority. Michael Bell
 
Regional Needs Assessment. Mid West Regional Authority. Michael Bell
Regional Needs Assessment.  Mid West Regional Authority. Michael BellRegional Needs Assessment.  Mid West Regional Authority. Michael Bell
Regional Needs Assessment. Mid West Regional Authority. Michael Bell
 
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona CaseyINNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
INNOVATIVE FINANCING OF ENERGY EFFICIENCY RETROFITS. Triona Casey
 
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán MagyarSUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
SUSTAINABLE ENERGY SYSTEMS IN MUNICIPAL AUTHORITIES. Zoltán Magyar
 
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
WESTLAUSITZ- ON THE WAY TO AN ENERGY SELF SUFFICIENT REGION. Susanne Stump.
 
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYISUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
SUSTAINABLE ENERGY SYSTEMS IN PECS, HUNGARY. AKOS HEGYI
 
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCECOVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
COVENANT OF MAYORS - KERRY COUNTY COUNCIL EXPERIENCE
 
LAUNCH OF MWRA GP TRANSFER
LAUNCH OF MWRA GP TRANSFERLAUNCH OF MWRA GP TRANSFER
LAUNCH OF MWRA GP TRANSFER
 
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECTLAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
LAOIS COUNTY COUNCIL, ROAD RECYCLING PROJECT
 
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
RENEWABLE ENERGY PLAN OF ARAGON, STATE OF SITUATION, OBJECTIVES & FUNDING TOOLS
 
FINANCING ENERGY EFFICIENCY PROJECTS
FINANCING ENERGY EFFICIENCY PROJECTS FINANCING ENERGY EFFICIENCY PROJECTS
FINANCING ENERGY EFFICIENCY PROJECTS
 

Último

Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 

Katarzyna Matijczak. Loans and thermo-modernisation bonuses as innovative financial tools-good practice from Poland

  • 1. Regional Development Agency ARLEG S.A. Katarzyna Matijczak, Murcia, 17.10.2013
  • 2. Location of the practice Country Poland NUTS 1 NUTS 2 Lower Silesia City Poland (good practice is widespread in Poland) Lower Silesia Voivodeship
  • 3. WHAT IS A THERMOMODERNISATION FUND AND A THERMOMODERNISATION BONUS? They are funds allocated from the State Budget which are administered by Bank Gospodarstwa Krajowego [National Economy Bank]. They are intended to support all eligible subjects in performing actions aiming at lowering energy consumption and the amount of energy carriers in both communal and social & living resources.
  • 4. WHAT IS A THERMOMODERNISATION FUND AND A THERMOMODERNISATION BONUS? Thermomodernisation of buildings is usually highly profitable, yet it requires bearing substantial costs right from the beginning. That is why, many building owners cannot carry out thermomodernisation without extra financial support. The Act on Supporting Thermomodernisation Investments creates a system for bulding owners which aims at facilitating the process of financing thermomodernisation so as to finally lower energy consumption and costs of both heating buildings and producing domestic hot water.
  • 5. PRINCIPLES OF SUPPORTING THERMOMODERNISATION The system of financial help includes thermomodernisation undertakings in the following buildings: - multi and single-family buildings irrespective of their legal form of ownership which means: private, commonhold, housing associations, company, city and other buildings except for those belonging to budget entities, - social collective accommodation buildings such as nursing homes, halls of residence, dormitories, hostels, retirement homes and the like, - buildings used for public activities of local government units such as schools, commune offices and the like, - local heat sources (housing estate boiler houses and thermal power stations) or district heating substations and local heating networks with the power of 11.6 MW.
  • 6. PRINCIPLES OF SUPPORTING THERMOMODERNISATION Provisions under the Act on Supporting Thermomodernisation Investments are also connected with the overall and partial replacement of an existing energy source with an unconventional one e.g. solar panels, heat pumps, boilers using biomass and the like. The Act provides for a commercial bank loan to be the main source of financing for thermomodernisation investments. The owner of the building may finance 100% of investment costs by means of such a loan. Both the share of the loan in overall costs and the credit period shall be negotiated between the investor and the bank granting the loan.
  • 7. The thermomodernisation bonus is a form of help which an investor may get from the State Budget and it constitutes 20% of the used loan yet there are two conditions which must be met: - it cannot constitute more than 16% of the overall costs of the undertaking, - it cannot constitute more than the expected value of two-year savings determined by means of an energy audit. There is a rule that forbids combining statutory loans with EU funding. An energy audit is the ground for statutory funding. It is a document which includes a technical & economical analysis which determines what shall be improved in the building to be modernised. The audit points out technical actions that may be taken and which ones of the planned actions may bring best economic benefits (optimal solutions).
  • 8. One can apply for a thermomodernisation bonus provided that such thermomodernisation will substantially lower the yearly demand for energy, especially: - in buildings with only the heating system being modernised – by at least 10%, - in buildings which underwent thermomodernisation of the heating system after year 1984 – by at least 15%, - in remaining buildings – by at least 25%, - in local heat sources and local heating networks – decreasing annual primary energy losses by at least 25% and by replacing local heat sources and heating networks with a connection to a centralised heat source (of a city network) – lowering costs of purchasing heat supplied to the building by at least 20% per annum.
  • 9. Those who can apply for a thermomodernisation bonus include owners and administrators of: - residential buildings, - collective accommodation buildings, - public utility buildings owned by local government units and used by them for performing their public tasks, - local heating networks, - local heat sources.
  • 10. ACQUIRING A LOAN AND A THERMOMODERNISATION BONUS After deciding upon thermomodernisation, a building owner submits all necessary documents to the bank which is going to grant the loan. The documents are as follows: - a loan application with all annexes required by the bank, - a thermomodernisation application, and - an energy audit. The bank which may grant a loan is the one which has an agreement with Bank Gospodarstwa Krajowego [National Economy Bank] on granting loans and procedures of transferring thermomodernisation bonuses provided for in the Act. Detailed requirements concerning loan applications and the form of loan collateral are determined individually by each loan- granting bank.
  • 11. EFFECTS OF THE THERMOMODERNISATION SUPPORT SYSTEM EXAMPLE Residential building of 11 storeys, total floor space 4,880 m2. Thermomodernisation costs 612.,000 PLN, including: Own funds 122.,000 PLN (20%) Loan 490.,000 PLN (80%) 2 x monthly savings 132.2 thousand PLN Thermomodernisation bonus 98,000 PLN (20% of the loan) Monthly loan instalment with interest 3.9 thousand PLN (with interest at 12%)
  • 12. Before thermomodernisation annual costs of heating and domestic hot water 192.7 thousand PLN After thermomodernisation (in the first year of repaying the loan) annual costs of heating and domestic hot water 126.6 thousand PLN Annual loan service payments (12 monthly instalments) 46.8 thousand PLN Overall costs (heating + loan service) 173.4 thousand PLN After repaying the loan annual costs of heating and domestic hot water 126.6 thousand PLN EFFECTS:
  • 13. After modernisation, during the loan repayment period, all expenses connected with heating and domestic hot water are lowered by around 10%, and they ultimately lower by 34% after the loan has been repaid completely. The thermomodernisation investments support system is beneficial to all interested parties. It allows an investor to start and carry out investments which aim at improving conditions of using a residential building and at the same time lower all the connected costs. Starting thermomodernisation investments also directly influences the State by lowering the overall demand for heat. It indirectly leads to improving ecological conditions and lowering CO2 emissions into the atmosphere. Thermomodernisation is done using relatively low funds from the State Budget, yet at the same time, some of the expenses come back to the budget as taxes on purchased devices and materials as well as taxes on contractors' income.
  • 14.
  • 15.
  • 16. THE RULES OF SUPPORTING RENOVATIONS The Act concerns supporting not only investments connected with thermomodernisation but also with renovation. Help in form of a renovation bonus is particularly directed at multi-family residential buildings which have been used since earlier than 14 August 1961 and its object is: - overall renovation of a given building (without renovating flats), - windows replacement and renovation of balconies even when the only user is the owner of a given flat, - alteration of a building leading to its improvement, - providing building with installations and devices required in buildings which are currently being open to use in accordance with technical & construction regulations. The Act does not concern renovations of single-family buildings.
  • 17. The renovation bonus may be grated to an investor who is a natural person, a housing association or a social housing association. The bonus (as a form of help for the partial repayment of a loan) constitutes 20% of the used loan, yet no more than 15% of the cost of the undertaking. It is granted if the following conditions are met: - the renovation undertaking cost indicator is between 0.15 to 0.70 (the ratio of renovation costs per 1m2 of floor space to the price of 1m2 determined for the purposes of calculating the guarantee bonus). - the renovation will lower the annual demand for energy necessary for heating the building and heating water by at least 10% and when the cost indicator is over 0.3 – by at least 25%. Lowering the demand for energy is not required when the building meets the requirements connected with energy savings determined in valid provisions of technical&construction regulations. - it is impossible to get a renovation bonus if there is another bank loan with a thermomodernisation or renovation bonus or if there is any other EU funding.
  • 18. According to the hereinabove mentioned date for the buildings eligible for a renovation bonus (year 1961), the Act concerns buildings built about 15 years after the II World War and some older ones, yet it does not concern any newer buildings e.g. large-panel buildings. For the buildings mentioned in the Act, there is a possibility of getting a bonus sometimes more easily than as a thermomodernisation bonus. It is worth highlighting, that almost any works carried out as thermomodernisation may also be done as renovation. The Act states that loans cannot be allotted for financing works for which there has been granted another loan with a thermomodernisation or renovation bonus. It means that the same scope of works cannot be financed from two sources. However, there are no obstacles for using both a renovation and a thermomodernisation loan for works in the same building, as long as they are to finance different types of works.