SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
March 7, 2010


Randy Maxwell RA LEED BD+C
20 Collier Road
Atlanta, GA 30309
E-mail: rrrmaxwell@comcast.net

To whom it might concern:

My twenty five years of experience include a diverse and well-rounded portfolio with strong capabilities in design, design
leadership and project management as well as technical expertise. Under my design leadership, my portfolio includes
award-winning designs such as the 212 million-dollar Pennsylvania Convention Center in Philadelphia,
www.paconvention.com (see virtual tour), Precision Components International, Inc. Manufacturing Facility and Campus
Master plan, as well as the 60 million-dollar Winship Cancer Institute at Emory University. My current focus is in healthcare
facility design. Over the past 10 years, I have designed and managed the design process of 6 major healthcare facilities, 5
of which have been built and are in successful operation. These major built facilities are Winship Cancer Institute (Emory
University), Shepherd Spinal Center (Atlanta, Georgia), Northside Hospital (Forsyth County, Georgia), Halifax Medical
Center (Daytona Beach, Florida) and Gwinnett Medical Center (Lawrenceville, Georgia). Piedmont Newnan Hospital
(Newnan, Georgia) will be under construction shortly and will be the first certified LEED hospital in the southeast US once it
is completed.

My current position at Perkins+Will is a senior project designer / senior associate backed with experience in facilities master
planning, architectural design and planning in healthcare and corporate / commercial / civic market sectors. Project portfolio
includes major facilities which have received regional and national awards. Expertise as a “design manager” brings a
comprehensive and a "design focus" quality approach throughout the project process. Current responsibilities are to
generate design concepts and objectives, facilitate visualization, imaging generation and communication, and manage
design objectives and quality control throughout entire project phase. Expertise in 3D visualizations and work includes
gestural as well as photorealistic imaging. Design expertise also includes focus on sustainability in design and ways to
make buildings smarter and more responsive to inhabitants as well as the environment.

My skills as a “design manager” are based on the value of a strong design process, rapid concept and image development
and team building. Integrating my knowledge of the design process with an expertise of computer modeling and the speed
and flexibility of freehand sketching overlays, efficiently enhances design production from conception through
documentation. My approach to presentation is diverse and efficient ranging from the more traditional direct media
presentation to the use of the latest in multi-media software such as Sketchup, Layout, Microsoft PowerPoint, Adobe
Photoshop. I have been involved in successful front-end marketing efforts such as project interviews as well as proposal
packaging and have been instrumental key player in successful project wins such as the Shepherd Spinal Center and
Woodward Academy Humanities Building.

Thank you for your interest in my credentials. I look forward to continued new design challenges in my architectural career
as well as contributing to the science and advancement of 3D visualization.

Sincerely yours,




Randy Maxwell RA
RANDY MAXWELL                                                                        20 Collier Road , Unit 18
                                                                                     Atlanta, Georgia 30306
                                                                                     C (404) 427-7756
                                                                                     rrrmaxwell@comcast.net

Registered Architect:                                                                GA 7704
LEED AP with Specialty:                                                              BD+C
Approximate years of experience:                                                     25 years
Total Design and Built influenced Square Footage                                     Approximately 6.2 Million
Total Design and Built influenced Construction Cost:                                 Approximately 825 Million
Total Design and Proposed Square Footage                                             Approximately 6.5 Million

PROFESSIONAL EXPERIENCE

PERKINS+WILL
Position/Tenure:              Senior Designer, Senior Associate                      Atlanta, Georgia
                              May, 2005 - Present
Project Exposure:             St Joseph East Joseph Outpatient Facility              Lake Oconee, Georgia
                              Paidea “Mother Goose” Restoration                      Atlanta, Georgia
                              Latter Day Saints Temple                               Philadelphia, Pennsylvania
                              Cobb Wellstar Lobby Expansion                          Atlanta, Georgia
                              Columbus Regional Lobby and ER Expansion               Columbus, Georgia
                              Piedmont Newnan Patient Tower and ED                   Newnan, Georgia
                              Piedmont Physician’s Building                          Newnan, Georgia
                              Gwinnet Medical Patient Tower and Lobby                Lawrenceville, Georgia
                              Gwinnett Medical Center Open Heart                     Lawrenceville, Georgia
                              Gwinnet Physician’s Building                           Lawrenceville, Georgia
                              Halifax Medical Center Patient Tower and ED            Daytona Beach, Florida
                              CDC 106 Building                                       Atlanta, Georgia
                              Agnes Scott Alumnus House Expansion and Renovation     Decatur, Georgia
Proposals:                    St Joseph Savannah Exterior Reskin Proposal            Savannah, Georgia
                              Mecca (Makkah) Great Mosque Expansion Proposal         Mecca, Saudi Arabia
                              Metro College Science Facility                         Atlanta, Georgia

HEERY INTERNATIONAL, INC
Position/Tenure:       Senior Designer, Associate                                    Atlanta, Georgia
                       October, 2002 - April 2005
Project Exposure:      Clemson West End Stadium Expansion                            Clemson, South Carolina
                       University Of Georgia Women’s Softball Stadium                Athens, Georgia
                       Shepherd Spinal Center Expansion                              Atlanta, Georgia
                       Forsyth Hospital Expansion                                    Cummings, Georgia
Proposals:             Emory School of Medicine                                      Atlanta, Georgia
                       Habersham Hospital Master Plan                                Habersham, Georgia
                       Athens Regional Hospital                                      Athens, Georgia

STANLEY BEAMAN SEARS ARCHITECTURE
Position/Tenure:     Design Manager                                                  Atlanta, Georgia
                     August 2000 – October, 2002
Project Exposure:    Cardinal Glennon Children’s Hospital                            St. Louis, Missouri
                     Winship Cancer Institute / Emory University                     Atlanta, Georgia

LEO A DALY COMPANY
Position/Tenure:              Lead Designer / Project Manager / Project Designer     Atlanta, Georgia
                              September 1998 – August 2000
Project Exposure:             Food Processing Technology Building / GA Tech          Atlanta, Georgia
                              Georgia Bureau of Investigation Headquarters           Atlanta, Georgia
                              Laboratory and Morgue
                              Jackson County Court Administration/Court Facility     Jefferson, Georgia
                              Precision Component International, Inc Business Unit
                              Phase I and Master Plan                                Columbus, Georgia
                              Royal Oaks Headquarters Pavilion                       Atlanta, Georgia
Proposals:                    Blades Technologies Inc., North American
                              Headquarters and Master Plan                           Rocky Hill, Connecticut
Awards:                       2000 Design Merit Award for Building Team of
                              the Year, Business Design and Construction
                              Magazine, Industrial Category “Business Unit
                              Phase I Precision Components International”
Publications:                 2000 June Issue, Building Design and Construction

COOPER CARRY
Position/Tenure:              Project Architect / Project Designer                   Atlanta, Georgia
                              April, 1996 – August, 1998
Project Exposure:             Cool Springs Office Phase I                            Nashville, Tennessee
                              Cool Springs Office Phase II                           Nashville, Tennessee
Proposals:                    Church Street Condominium High Rise                    Nashville, Tennessee
                              Peachtree Street Residences High Rise                  Atlanta, Georgia
                              River Place Residences High Rise                       San Antonio, Texas
                              Hillsborough Place                                     Tampa, Florida
NICHOLS CARTER GRANT ARCHITECTS
Position/Tenure:      Associate, Project Architect / Designer / Manager      Atlanta, Georgia
                      April, 1994 – February, 1996
Project Exposure:     Westwinds Condominiums High Rise                       Sandestin, Florida
                      International Zone Design, 1996 Paralympics            Atlanta, Georgia

THOMPSON, VENTULETT, STAINBACK & ASSOCIATES
Position/Tenure:      Associate, Project Architect / Project Designer        Atlanta, Georgia
                      October 1988 – March, 1994
Project Exposure:     Pennsylvania Convention Center Exhibit Facility        Philadelphia, Pennsylvania
                      Pennsylvania Convention Center Train Shed Reuse        Philadelphia, Pennsylvania
                      U.S. Army Chaplain Center and School                   Fort Jackson, South Carolina
                      Georgia International Olympic Plaza, International     Atlanta, Georgia
                      Boulevard Viaduct Redesign
Proposals:            Cleveland Convention Center Design Proposal            Cleveland, Ohio
                      Dallas Convention Center Design Proposal               Dallas, Texas
Awards:               2000 American Institute of Architects Award for
                      Urban Design “Pennsylvania Convention Center”
                      1994 Georgia American Institute of Architects
                      “Pennsylvania Convention Center Exhibit Facility”
                      1994 Georgia American Institute of Architects
                      Sustainable Architecture Category
                      “Pennsylvania Convention Center Train Shed Reuse”

ROBERT T. JACKSON ARCHITECTS
Position / Tenure:    Project Designer / November 1984 - March 1986          Austin, Texas
Project Exposure:     Schlumberger Austin Product Center                     Austin, Texas
                      San Gabriel Condominiums                               Austin, Texas
                      Robert Jackson Residence                               Austin, Texas
                      Brookhollow Retirement Housing Village                 San Antonio, Texas

BRENDLER / DOVE & ASSOCIATES
Position / Tenure:    Project Designer / May 1983 - May 1984                 San Antonio, Texas
Project Exposure:      Whisper Hollow Apartments                             San Antonio, Texas
                      Roanoke Condominiums                                   San Antonio, Texas

SKIDMORE, OWINGS & MERRILL
Position / Tenure:    Designer / January 1981- August 1981                   Houston, Texas
Project Exposure:     San Felipe Plaza                                       Houston, Texas
                      Bank of Southwest Competition                          Houston, Texas
                      Allied Bank Plaza                                      Houston, Texas

COMMUNITY INVOLVEMENT

ST. LUKE’S EPISCOPAL CHURCH NEW MINISTRIES
BUILDING COMMITTEE                                                           Atlanta, Georgia
Contribution:          Programming / Programming and Pre-Design
                       Concepts and Design Manual
DEN LEADER             Cub Scouts Wolves, Bears / Pack 551                   Atlanta, Georgia

RELATED EXPERIENCE

SCHOOL OF ARCHITECTURE, UNIVERSITY OF TEXAS                                  Austin, Texas
Position/Tenure:       Assistant Instructor/ Fall 1986 - Spring 1987
Courses:               1st Year Architectural Design, 1st Year Visual
                       Communications
HISTORIC AMERICAN BUILDING SURVEY                                            Austin, Texas
Position/Tenure:       Recorder, Measurer / Summer 1986

ACADEMIC

MASTER'S OF ARCHITECTURE, UNIVERSITY OF TEXAS 1987                           Austin, Texas
Programs:             Charles Moore Studio, Post Professional Degree
                      Program Workshops in Ornamentation, Color,
                      Mnemonics, (Urban Design Focus)
                      -Oxford Study Abroad Program                           Oxford, England
                      Studies in Architecture, Landscape and Urban Design
Design Thesis:        Towards the Making of Place: Oxford Arts Institute
                      A Design Analysis and Appreciation into Place-Making
                      Advisors: Dr. Charles Moore, FAIA, Simon Atkinson,
                      Lance Tatum
Honors:               3.8 GPA, Phi Kappa Phi Honor Society

BACHELOR OF ENVIRONMENTAL DESIGN
TEXAS A&M UNIVERSITY 1983                                                    College Station, Texas
Honors:                3.5 GPA, Tau Sigma Delta, National Dean's List


REFERENCES:                 Available upon request.

Mais conteúdo relacionado

Destaque

Destaque (9)

Resume2015
Resume2015Resume2015
Resume2015
 
Matt Mcdermott CV
Matt Mcdermott CVMatt Mcdermott CV
Matt Mcdermott CV
 
Matthew Youhess Resume
Matthew Youhess ResumeMatthew Youhess Resume
Matthew Youhess Resume
 
SHERRI'S RESUME REVISED##
SHERRI'S RESUME REVISED##SHERRI'S RESUME REVISED##
SHERRI'S RESUME REVISED##
 
A Taylor CV 2016 aat
A Taylor CV  2016 aatA Taylor CV  2016 aat
A Taylor CV 2016 aat
 
Matthew Holt Resume 2016
Matthew Holt Resume 2016Matthew Holt Resume 2016
Matthew Holt Resume 2016
 
Kristy L Smith Resume
Kristy L Smith ResumeKristy L Smith Resume
Kristy L Smith Resume
 
Ciaran Buckley Resume 2015
Ciaran Buckley Resume 2015Ciaran Buckley Resume 2015
Ciaran Buckley Resume 2015
 
Blackburn Resume
Blackburn ResumeBlackburn Resume
Blackburn Resume
 

Semelhante a 100307 Resume

David h page 2 and 3 resume
David h page 2 and 3 resumeDavid h page 2 and 3 resume
David h page 2 and 3 resume
guestd769e2
 
Bv Sample Projects 19mail
Bv Sample Projects  19mailBv Sample Projects  19mail
Bv Sample Projects 19mail
VinhArchitects
 
Pds 3 Llc[1]
Pds 3 Llc[1]Pds 3 Llc[1]
Pds 3 Llc[1]
djpascale
 
Saffran-Kilpatrick Firm Brochure
Saffran-Kilpatrick Firm BrochureSaffran-Kilpatrick Firm Brochure
Saffran-Kilpatrick Firm Brochure
srrexroat
 
1510 James Kringpdf
1510 James Kringpdf1510 James Kringpdf
1510 James Kringpdf
brian3226
 

Semelhante a 100307 Resume (20)

Company Profile
Company ProfileCompany Profile
Company Profile
 
David h page 2 and 3 resume
David h page 2 and 3 resumeDavid h page 2 and 3 resume
David h page 2 and 3 resume
 
Bv Sample Projects 19mail
Bv Sample Projects  19mailBv Sample Projects  19mail
Bv Sample Projects 19mail
 
Pds 3 Llc[1]
Pds 3 Llc[1]Pds 3 Llc[1]
Pds 3 Llc[1]
 
Saffran-Kilpatrick Firm Brochure
Saffran-Kilpatrick Firm BrochureSaffran-Kilpatrick Firm Brochure
Saffran-Kilpatrick Firm Brochure
 
Rachel Lanning Online Portfolio
Rachel Lanning   Online PortfolioRachel Lanning   Online Portfolio
Rachel Lanning Online Portfolio
 
IM_Presentation_2015-03-16_RDX
IM_Presentation_2015-03-16_RDXIM_Presentation_2015-03-16_RDX
IM_Presentation_2015-03-16_RDX
 
I-3 Correctional Work
I-3 Correctional WorkI-3 Correctional Work
I-3 Correctional Work
 
Resume
ResumeResume
Resume
 
Lauren Standish Resume
Lauren Standish ResumeLauren Standish Resume
Lauren Standish Resume
 
Rjw Resume 100805
Rjw Resume 100805Rjw Resume 100805
Rjw Resume 100805
 
Resume_JoshuaDJones
Resume_JoshuaDJonesResume_JoshuaDJones
Resume_JoshuaDJones
 
Construction Experience
Construction ExperienceConstruction Experience
Construction Experience
 
22_0615_BRO_iugis_Education.pdf
22_0615_BRO_iugis_Education.pdf22_0615_BRO_iugis_Education.pdf
22_0615_BRO_iugis_Education.pdf
 
1510 James Kringpdf
1510 James Kringpdf1510 James Kringpdf
1510 James Kringpdf
 
Resume
ResumeResume
Resume
 
dlvarchitectureTEXAS
dlvarchitectureTEXAS dlvarchitectureTEXAS
dlvarchitectureTEXAS
 
Kwalkerresume2011
Kwalkerresume2011Kwalkerresume2011
Kwalkerresume2011
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
 
Portfolio Show
Portfolio ShowPortfolio Show
Portfolio Show
 

100307 Resume

  • 1. March 7, 2010 Randy Maxwell RA LEED BD+C 20 Collier Road Atlanta, GA 30309 E-mail: rrrmaxwell@comcast.net To whom it might concern: My twenty five years of experience include a diverse and well-rounded portfolio with strong capabilities in design, design leadership and project management as well as technical expertise. Under my design leadership, my portfolio includes award-winning designs such as the 212 million-dollar Pennsylvania Convention Center in Philadelphia, www.paconvention.com (see virtual tour), Precision Components International, Inc. Manufacturing Facility and Campus Master plan, as well as the 60 million-dollar Winship Cancer Institute at Emory University. My current focus is in healthcare facility design. Over the past 10 years, I have designed and managed the design process of 6 major healthcare facilities, 5 of which have been built and are in successful operation. These major built facilities are Winship Cancer Institute (Emory University), Shepherd Spinal Center (Atlanta, Georgia), Northside Hospital (Forsyth County, Georgia), Halifax Medical Center (Daytona Beach, Florida) and Gwinnett Medical Center (Lawrenceville, Georgia). Piedmont Newnan Hospital (Newnan, Georgia) will be under construction shortly and will be the first certified LEED hospital in the southeast US once it is completed. My current position at Perkins+Will is a senior project designer / senior associate backed with experience in facilities master planning, architectural design and planning in healthcare and corporate / commercial / civic market sectors. Project portfolio includes major facilities which have received regional and national awards. Expertise as a “design manager” brings a comprehensive and a "design focus" quality approach throughout the project process. Current responsibilities are to generate design concepts and objectives, facilitate visualization, imaging generation and communication, and manage design objectives and quality control throughout entire project phase. Expertise in 3D visualizations and work includes gestural as well as photorealistic imaging. Design expertise also includes focus on sustainability in design and ways to make buildings smarter and more responsive to inhabitants as well as the environment. My skills as a “design manager” are based on the value of a strong design process, rapid concept and image development and team building. Integrating my knowledge of the design process with an expertise of computer modeling and the speed and flexibility of freehand sketching overlays, efficiently enhances design production from conception through documentation. My approach to presentation is diverse and efficient ranging from the more traditional direct media presentation to the use of the latest in multi-media software such as Sketchup, Layout, Microsoft PowerPoint, Adobe Photoshop. I have been involved in successful front-end marketing efforts such as project interviews as well as proposal packaging and have been instrumental key player in successful project wins such as the Shepherd Spinal Center and Woodward Academy Humanities Building. Thank you for your interest in my credentials. I look forward to continued new design challenges in my architectural career as well as contributing to the science and advancement of 3D visualization. Sincerely yours, Randy Maxwell RA
  • 2. RANDY MAXWELL 20 Collier Road , Unit 18 Atlanta, Georgia 30306 C (404) 427-7756 rrrmaxwell@comcast.net Registered Architect: GA 7704 LEED AP with Specialty: BD+C Approximate years of experience: 25 years Total Design and Built influenced Square Footage Approximately 6.2 Million Total Design and Built influenced Construction Cost: Approximately 825 Million Total Design and Proposed Square Footage Approximately 6.5 Million PROFESSIONAL EXPERIENCE PERKINS+WILL Position/Tenure: Senior Designer, Senior Associate Atlanta, Georgia May, 2005 - Present Project Exposure: St Joseph East Joseph Outpatient Facility Lake Oconee, Georgia Paidea “Mother Goose” Restoration Atlanta, Georgia Latter Day Saints Temple Philadelphia, Pennsylvania Cobb Wellstar Lobby Expansion Atlanta, Georgia Columbus Regional Lobby and ER Expansion Columbus, Georgia Piedmont Newnan Patient Tower and ED Newnan, Georgia Piedmont Physician’s Building Newnan, Georgia Gwinnet Medical Patient Tower and Lobby Lawrenceville, Georgia Gwinnett Medical Center Open Heart Lawrenceville, Georgia Gwinnet Physician’s Building Lawrenceville, Georgia Halifax Medical Center Patient Tower and ED Daytona Beach, Florida CDC 106 Building Atlanta, Georgia Agnes Scott Alumnus House Expansion and Renovation Decatur, Georgia Proposals: St Joseph Savannah Exterior Reskin Proposal Savannah, Georgia Mecca (Makkah) Great Mosque Expansion Proposal Mecca, Saudi Arabia Metro College Science Facility Atlanta, Georgia HEERY INTERNATIONAL, INC Position/Tenure: Senior Designer, Associate Atlanta, Georgia October, 2002 - April 2005 Project Exposure: Clemson West End Stadium Expansion Clemson, South Carolina University Of Georgia Women’s Softball Stadium Athens, Georgia Shepherd Spinal Center Expansion Atlanta, Georgia Forsyth Hospital Expansion Cummings, Georgia Proposals: Emory School of Medicine Atlanta, Georgia Habersham Hospital Master Plan Habersham, Georgia Athens Regional Hospital Athens, Georgia STANLEY BEAMAN SEARS ARCHITECTURE Position/Tenure: Design Manager Atlanta, Georgia August 2000 – October, 2002 Project Exposure: Cardinal Glennon Children’s Hospital St. Louis, Missouri Winship Cancer Institute / Emory University Atlanta, Georgia LEO A DALY COMPANY Position/Tenure: Lead Designer / Project Manager / Project Designer Atlanta, Georgia September 1998 – August 2000 Project Exposure: Food Processing Technology Building / GA Tech Atlanta, Georgia Georgia Bureau of Investigation Headquarters Atlanta, Georgia Laboratory and Morgue Jackson County Court Administration/Court Facility Jefferson, Georgia Precision Component International, Inc Business Unit Phase I and Master Plan Columbus, Georgia Royal Oaks Headquarters Pavilion Atlanta, Georgia Proposals: Blades Technologies Inc., North American Headquarters and Master Plan Rocky Hill, Connecticut Awards: 2000 Design Merit Award for Building Team of the Year, Business Design and Construction Magazine, Industrial Category “Business Unit Phase I Precision Components International” Publications: 2000 June Issue, Building Design and Construction COOPER CARRY Position/Tenure: Project Architect / Project Designer Atlanta, Georgia April, 1996 – August, 1998 Project Exposure: Cool Springs Office Phase I Nashville, Tennessee Cool Springs Office Phase II Nashville, Tennessee Proposals: Church Street Condominium High Rise Nashville, Tennessee Peachtree Street Residences High Rise Atlanta, Georgia River Place Residences High Rise San Antonio, Texas Hillsborough Place Tampa, Florida
  • 3. NICHOLS CARTER GRANT ARCHITECTS Position/Tenure: Associate, Project Architect / Designer / Manager Atlanta, Georgia April, 1994 – February, 1996 Project Exposure: Westwinds Condominiums High Rise Sandestin, Florida International Zone Design, 1996 Paralympics Atlanta, Georgia THOMPSON, VENTULETT, STAINBACK & ASSOCIATES Position/Tenure: Associate, Project Architect / Project Designer Atlanta, Georgia October 1988 – March, 1994 Project Exposure: Pennsylvania Convention Center Exhibit Facility Philadelphia, Pennsylvania Pennsylvania Convention Center Train Shed Reuse Philadelphia, Pennsylvania U.S. Army Chaplain Center and School Fort Jackson, South Carolina Georgia International Olympic Plaza, International Atlanta, Georgia Boulevard Viaduct Redesign Proposals: Cleveland Convention Center Design Proposal Cleveland, Ohio Dallas Convention Center Design Proposal Dallas, Texas Awards: 2000 American Institute of Architects Award for Urban Design “Pennsylvania Convention Center” 1994 Georgia American Institute of Architects “Pennsylvania Convention Center Exhibit Facility” 1994 Georgia American Institute of Architects Sustainable Architecture Category “Pennsylvania Convention Center Train Shed Reuse” ROBERT T. JACKSON ARCHITECTS Position / Tenure: Project Designer / November 1984 - March 1986 Austin, Texas Project Exposure: Schlumberger Austin Product Center Austin, Texas San Gabriel Condominiums Austin, Texas Robert Jackson Residence Austin, Texas Brookhollow Retirement Housing Village San Antonio, Texas BRENDLER / DOVE & ASSOCIATES Position / Tenure: Project Designer / May 1983 - May 1984 San Antonio, Texas Project Exposure: Whisper Hollow Apartments San Antonio, Texas Roanoke Condominiums San Antonio, Texas SKIDMORE, OWINGS & MERRILL Position / Tenure: Designer / January 1981- August 1981 Houston, Texas Project Exposure: San Felipe Plaza Houston, Texas Bank of Southwest Competition Houston, Texas Allied Bank Plaza Houston, Texas COMMUNITY INVOLVEMENT ST. LUKE’S EPISCOPAL CHURCH NEW MINISTRIES BUILDING COMMITTEE Atlanta, Georgia Contribution: Programming / Programming and Pre-Design Concepts and Design Manual DEN LEADER Cub Scouts Wolves, Bears / Pack 551 Atlanta, Georgia RELATED EXPERIENCE SCHOOL OF ARCHITECTURE, UNIVERSITY OF TEXAS Austin, Texas Position/Tenure: Assistant Instructor/ Fall 1986 - Spring 1987 Courses: 1st Year Architectural Design, 1st Year Visual Communications HISTORIC AMERICAN BUILDING SURVEY Austin, Texas Position/Tenure: Recorder, Measurer / Summer 1986 ACADEMIC MASTER'S OF ARCHITECTURE, UNIVERSITY OF TEXAS 1987 Austin, Texas Programs: Charles Moore Studio, Post Professional Degree Program Workshops in Ornamentation, Color, Mnemonics, (Urban Design Focus) -Oxford Study Abroad Program Oxford, England Studies in Architecture, Landscape and Urban Design Design Thesis: Towards the Making of Place: Oxford Arts Institute A Design Analysis and Appreciation into Place-Making Advisors: Dr. Charles Moore, FAIA, Simon Atkinson, Lance Tatum Honors: 3.8 GPA, Phi Kappa Phi Honor Society BACHELOR OF ENVIRONMENTAL DESIGN TEXAS A&M UNIVERSITY 1983 College Station, Texas Honors: 3.5 GPA, Tau Sigma Delta, National Dean's List REFERENCES: Available upon request.