Construction Project Planning
Rashid Hussain
Project Time Management
• Project Time Management: It includes the
processes required to ensure timely
completion of the project.
• It includes:
–Activity
–Activity
definition
sequencing
–Activity resource Estimating
–Activity duration Estimating
–Schedule
–Schedule
development
control
Project Time Management II
• Activity Definition: Identifying the specific
schedule activities that need to be performed to
produce the various project deliverables
• Activity Sequencing: Identifying and documenting
dependencies among schedule activities
• Activity Resource Estimating: Estimating the type
and quantities of resources required to perform
each schedule activity
• Activity Duration Estimating: Estimating the
number of work periods that will be needed to
complete individual schedule activities
Project Time Management III
• Schedule Development: Analyzing activity
sequences, durations, resource requirements, and
schedule constraints to create the project schedule
• Schedule Control: Controlling changes to the
project schedule
4
Planning and Scheduling What?
• What is Planning and Scheduling?
– Planning & Scheduling: provides a project
plan/schedule that is essential in project time
management.
• Project Time Management:
– Planning.
– Scheduling.
– Tracking and Control.
5
Planning and Scheduling Why?
• Why do we Plan and Schedule?
• Planning & Scheduling is needed for:
– Scope recognition.
– Task definition & responsibility identification.
– Effective utilization of resources (labor,
material & equipment).
– Tracking and controlling project time and cost.
– Claims analysis, quantification and defense.
6
Planning and Scheduling How?
• How do we Plan and Schedule?
• Planning Determines:
– What must be done?
– How it is to be performed?
– What sequential order it will follow?
• Planning Requires:
– Ability to visualize discrete work elements.
– Establishing interdependencies.
– Intimate knowledge of construction methods.
7
Planning and Scheduling How?
• Planning Steps:
– Generate WBS & Activity List.
– Estimate Activity Duration/Cost.
– Determine job logic (sequential relationships
among activities).
– Draw graphic presentation in a network.
8
Generating WBS and Activities
• Activity: a single work task that consumes time and
has a recognizable start and finish times.
• Activity: A component of work performed during the
course of a project (PMBOK)
• Schedule Activity: A discrete scheduled
component of work performed during the course of a
project. A schedule activity normally has an
estimated duration, an estimated cost, and
estimated resource requirements. Schedule
activities are connected to other schedule activities
with logical relationships, and are decomposed from
work packages.
9
Generating WBS and Activities
• Guidelines for Identifying Activities:
– Area of responsibility (general contractor,
subcontractor).
– Location on site.
– Structural element (substructure,
superstructure, etc.)
– Craft or crew requirements.
– Equipment requirements.
– Material utilized (concrete, timber, steel, etc.)
10
Generating WBS and Activities
• Factors Affecting Level of Detail (Number
of Activities):
– Nature and size of project.
– Required level of detail.
– Which level of management will use the schedule.
• Schedule Hierarchy:
– Master project plan/schedule.
– Master subproject plan/schedule.
– Detailed subproject plan/schedule.
– Detailed work plan/schedule.
11
Generating WBS and Activities
• Work breakdown structure (WBS):
Describes the project scope of work in a
hierarchy of work packages, where each
abstract work package in the higher levels of
the hierarchy is subdivided into more
detailed work packages in lower levels of the
hierarchy.
12
Generating WBS and Activities
• Work breakdown structure: A deliverable-
oriented hierarchical decomposition of the work to
be executed by the project team to accomplish the
project objectives and create the required
deliverables
• It recognizes and defines the total scope of the
project
• Each descending level represents an increasingly
detailed definition of the project work
• The WBS is decomposed into work packages
13
Generating WBS and Activities
• Work Package:
– Is a well-defined scope of work that usually
terminates in a deliverable product.
– Each package may vary in size, but must be a
measurable and controllable unit of work to be
performed.
– It must be identifiable in a numerical accounting
system in order to permit the capture of both
budgeted & actual performance information.
– A work package is a work center. (Neil 1982)
14
Generating WBS and Activities
• Other Names of a Work Package:
– Estimating account.
– Line item.
– Cost account.
15
Generating WBS and Activities
• Uses of WBS:
– Identifying scope of work.
– Preparing preliminary budget.
– Cost estimating.
– Scheduling.
– Identifying cost & schedule at various levels of
details.
– Time & cost control.
– Identifying individual or departmental
responsibilities.
16
Generating WBS and Activities
• Types of Coding Systems:
–Standard code
–Project code
• Standard Code: is a systematic classification
& categorization of all items of work or cost
pertaining to a specific type of construction
(e.g. Building construction, Heavy
construction).
17
Generating WBS and Activities
• Purpose of Standard Code:
– Provides a comprehensive checklist of all items
of work that can be found in a specific type of
construction.
– Provides for uniformity, transfer & comparison of
information among projects.
• Example: Masterformat was developed through a
joint effort of 8 industry & professional associations
including:
– Construction Specifications Institute (CSI)
– Construction Specifications Canada (CSC)
18
Generating WBS and Activities
• Divisions:
1.General Requirements.
2.Site work.
3.Concrete.
4.Masonry.
5.Metals.
6.Woods & Plastics.
7.Thermal & Moisture
Protection.
9. Finishes.
10.Specialties.
11.Equipment
12.Furnishings.
13.Special Construction.
14.Conveying Systems.
15.Mechanical.
16.Electrical.
8.Doors & Windows.
Generating WBS and Activities
• Project Code: is
a systematic
classification &
categorization of
all items of work
or cost pertaining
to a specific
project.
20
Estimating Activity Duration
• Rules for Estimating Activity Duration:
– Evaluate activities one at a time.
– Assume normal level of resources.
– Assume normal working hours (No Overtime).
– Use consistent time units.
– Put project completion date OUT OF MIND.
• Activity Duration is often estimated based on:
– Experience and judgment.
– Quantity of work and crew daily output
Quantity of work
Activity Duration =
Crew daily output
21
Estimating Activity Duration
• Factors Affecting Activity Duration:
–Weather.
–Learning Curve.
–Overtime.
–Space Congestion.
–Design Changes & Rework.
22
Estimating Activity Duration
• Learning Curve:
based on the fact that
skill & productivity in
performing tasks
improve with
experience and
practice.
• Example: The tenth
activity takes less
time than the first.
23
Estimating Activity Duration
24
Determining Job Logic
• Construction Planning Restraints:
– Physical: (formwork must precede pouring
concrete).
– Resource:
• Availability of
• Availability of
• Availability of
• Availability of
material.
equipment.
labor.
money.
– Safety.
– Environment:
• Weather.
• Economical.
• Social.
• Political.
Determ
ining Job Logic
• For each activity answer 3 questions:
– Which activities precede this activity?
– Which activities follow this activity?
– Which activities are concurrent with this
activity?

Mais conteúdo relacionado

Semelhante a A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf

Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system projectalpha1unity
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptxHafixFarhan
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MIlonaThornburg83
 
L6.2 planing&scheduling
L6.2 planing&schedulingL6.2 planing&scheduling
L6.2 planing&schedulingmanusug
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7Pragmatic Techsoft
 
Odoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementOdoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementpragmatic123
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptxProfDrAnbalaganChinn
 
Time management pressent
Time management pressentTime management pressent
Time management pressentiklil fairuz
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementtanishkagupta907
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 

Semelhante a A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf (20)

system analysis and design Class 3
system analysis and design Class 3system analysis and design Class 3
system analysis and design Class 3
 
EpM
EpMEpM
EpM
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Project Management.pptx
 Project  Management.pptx Project  Management.pptx
Project Management.pptx
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
L6.2 planing&scheduling
L6.2 planing&schedulingL6.2 planing&scheduling
L6.2 planing&scheduling
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7
 
Odoo OpenERP 7 construction management
Odoo OpenERP 7 construction managementOdoo OpenERP 7 construction management
Odoo OpenERP 7 construction management
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx
 
Construction module version 7
Construction module version 7Construction module version 7
Construction module version 7
 
Time management pressent
Time management pressentTime management pressent
Time management pressent
 
Unit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project managementUnit 3 WorkBreakdownStructure.ppt related to project management
Unit 3 WorkBreakdownStructure.ppt related to project management
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Time management
Time managementTime management
Time management
 

Mais de ssuserfc98db

Mais de ssuserfc98db (8)

CI.pptx
CI.pptxCI.pptx
CI.pptx
 
Presentation13.pptx
Presentation13.pptxPresentation13.pptx
Presentation13.pptx
 
Budget3207.pptx
Budget3207.pptxBudget3207.pptx
Budget3207.pptx
 
Equipment Sizing.pdf
Equipment Sizing.pdfEquipment Sizing.pdf
Equipment Sizing.pdf
 
Pid.pdf
Pid.pdfPid.pdf
Pid.pdf
 
Pipeline Construct.pptx
Pipeline Construct.pptxPipeline Construct.pptx
Pipeline Construct.pptx
 
Mangemnt3207.pptx
Mangemnt3207.pptxMangemnt3207.pptx
Mangemnt3207.pptx
 
SP and R.pptx
SP and R.pptxSP and R.pptx
SP and R.pptx
 

Último

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Último (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

A PPT ON CONSTRUction PROJECT PLANNING - RASHID HUSSAIN.pdf

  • 2. Project Time Management • Project Time Management: It includes the processes required to ensure timely completion of the project. • It includes: –Activity –Activity definition sequencing –Activity resource Estimating –Activity duration Estimating –Schedule –Schedule development control
  • 3. Project Time Management II • Activity Definition: Identifying the specific schedule activities that need to be performed to produce the various project deliverables • Activity Sequencing: Identifying and documenting dependencies among schedule activities • Activity Resource Estimating: Estimating the type and quantities of resources required to perform each schedule activity • Activity Duration Estimating: Estimating the number of work periods that will be needed to complete individual schedule activities
  • 4. Project Time Management III • Schedule Development: Analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule • Schedule Control: Controlling changes to the project schedule 4
  • 5. Planning and Scheduling What? • What is Planning and Scheduling? – Planning & Scheduling: provides a project plan/schedule that is essential in project time management. • Project Time Management: – Planning. – Scheduling. – Tracking and Control. 5
  • 6. Planning and Scheduling Why? • Why do we Plan and Schedule? • Planning & Scheduling is needed for: – Scope recognition. – Task definition & responsibility identification. – Effective utilization of resources (labor, material & equipment). – Tracking and controlling project time and cost. – Claims analysis, quantification and defense. 6
  • 7. Planning and Scheduling How? • How do we Plan and Schedule? • Planning Determines: – What must be done? – How it is to be performed? – What sequential order it will follow? • Planning Requires: – Ability to visualize discrete work elements. – Establishing interdependencies. – Intimate knowledge of construction methods. 7
  • 8. Planning and Scheduling How? • Planning Steps: – Generate WBS & Activity List. – Estimate Activity Duration/Cost. – Determine job logic (sequential relationships among activities). – Draw graphic presentation in a network. 8
  • 9. Generating WBS and Activities • Activity: a single work task that consumes time and has a recognizable start and finish times. • Activity: A component of work performed during the course of a project (PMBOK) • Schedule Activity: A discrete scheduled component of work performed during the course of a project. A schedule activity normally has an estimated duration, an estimated cost, and estimated resource requirements. Schedule activities are connected to other schedule activities with logical relationships, and are decomposed from work packages. 9
  • 10. Generating WBS and Activities • Guidelines for Identifying Activities: – Area of responsibility (general contractor, subcontractor). – Location on site. – Structural element (substructure, superstructure, etc.) – Craft or crew requirements. – Equipment requirements. – Material utilized (concrete, timber, steel, etc.) 10
  • 11. Generating WBS and Activities • Factors Affecting Level of Detail (Number of Activities): – Nature and size of project. – Required level of detail. – Which level of management will use the schedule. • Schedule Hierarchy: – Master project plan/schedule. – Master subproject plan/schedule. – Detailed subproject plan/schedule. – Detailed work plan/schedule. 11
  • 12. Generating WBS and Activities • Work breakdown structure (WBS): Describes the project scope of work in a hierarchy of work packages, where each abstract work package in the higher levels of the hierarchy is subdivided into more detailed work packages in lower levels of the hierarchy. 12
  • 13. Generating WBS and Activities • Work breakdown structure: A deliverable- oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables • It recognizes and defines the total scope of the project • Each descending level represents an increasingly detailed definition of the project work • The WBS is decomposed into work packages 13
  • 14. Generating WBS and Activities • Work Package: – Is a well-defined scope of work that usually terminates in a deliverable product. – Each package may vary in size, but must be a measurable and controllable unit of work to be performed. – It must be identifiable in a numerical accounting system in order to permit the capture of both budgeted & actual performance information. – A work package is a work center. (Neil 1982) 14
  • 15. Generating WBS and Activities • Other Names of a Work Package: – Estimating account. – Line item. – Cost account. 15
  • 16. Generating WBS and Activities • Uses of WBS: – Identifying scope of work. – Preparing preliminary budget. – Cost estimating. – Scheduling. – Identifying cost & schedule at various levels of details. – Time & cost control. – Identifying individual or departmental responsibilities. 16
  • 17. Generating WBS and Activities • Types of Coding Systems: –Standard code –Project code • Standard Code: is a systematic classification & categorization of all items of work or cost pertaining to a specific type of construction (e.g. Building construction, Heavy construction). 17
  • 18. Generating WBS and Activities • Purpose of Standard Code: – Provides a comprehensive checklist of all items of work that can be found in a specific type of construction. – Provides for uniformity, transfer & comparison of information among projects. • Example: Masterformat was developed through a joint effort of 8 industry & professional associations including: – Construction Specifications Institute (CSI) – Construction Specifications Canada (CSC) 18
  • 19. Generating WBS and Activities • Divisions: 1.General Requirements. 2.Site work. 3.Concrete. 4.Masonry. 5.Metals. 6.Woods & Plastics. 7.Thermal & Moisture Protection. 9. Finishes. 10.Specialties. 11.Equipment 12.Furnishings. 13.Special Construction. 14.Conveying Systems. 15.Mechanical. 16.Electrical. 8.Doors & Windows.
  • 20. Generating WBS and Activities • Project Code: is a systematic classification & categorization of all items of work or cost pertaining to a specific project. 20
  • 21. Estimating Activity Duration • Rules for Estimating Activity Duration: – Evaluate activities one at a time. – Assume normal level of resources. – Assume normal working hours (No Overtime). – Use consistent time units. – Put project completion date OUT OF MIND. • Activity Duration is often estimated based on: – Experience and judgment. – Quantity of work and crew daily output Quantity of work Activity Duration = Crew daily output 21
  • 22. Estimating Activity Duration • Factors Affecting Activity Duration: –Weather. –Learning Curve. –Overtime. –Space Congestion. –Design Changes & Rework. 22
  • 23. Estimating Activity Duration • Learning Curve: based on the fact that skill & productivity in performing tasks improve with experience and practice. • Example: The tenth activity takes less time than the first. 23
  • 25. Determining Job Logic • Construction Planning Restraints: – Physical: (formwork must precede pouring concrete). – Resource: • Availability of • Availability of • Availability of • Availability of material. equipment. labor. money.
  • 26. – Safety. – Environment: • Weather. • Economical. • Social. • Political. Determ ining Job Logic • For each activity answer 3 questions: – Which activities precede this activity?
  • 27. – Which activities follow this activity? – Which activities are concurrent with this activity?