SlideShare uma empresa Scribd logo
1 de 6
Aluminium Formwork
TEO CHIANG LOONG 0323762
WONG SHER SHENG 0329950
YAP CHOE HOONG 0323161
TAN YONG CHIEN 0320200
ALUMINIUM FORMWORK
• Manufactured by using light-weight aluminium content
• Made up of Aluminium frames provide robust & durable mold for
pouring concrete
• It's often known as 'MIVAN formwork' due to the name
of company which invented Aluminium Formwork
Suitability of Aluminium
Formwork
Suited to load bearing wall construction whereas traditional
formwork consisting of plywood and timber is not suitable
to the high pressures of fresh concrete on the wall
Aluminium Formwork panels can be designed for any
condition/component of building such as bay windows,
stairs, balconies and special architectural features.
The structures are more resistant to earthquakes than the
traditional RCC column and beam designs.
Convenient &
Effective
It can complete
assembly by manual
without any machines
assistance Low Carbon
Emission
Some developed
countries have
already stipulated
that cannot apply
wooden formwork
The set of
formwork can be
used more than
300 times in a low
average use-cost.
Good stability
with high
bearing capacity
Advantages of Aluminium
Formwork
1Architectural changes not possible on the
structure.
2Due to the tremendous speed of construction,
working capital finance needs to be planned in
advance
3It's relatively expensive compare to
other formworks
Disadvantages of Aluminium
Formwork
Cost of Aluminium Formwork

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Mivan aluminium formwork
Mivan  aluminium formworkMivan  aluminium formwork
Mivan aluminium formwork
 
Formwork
FormworkFormwork
Formwork
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
Mivan tech
Mivan techMivan tech
Mivan tech
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Framed structures
Framed structures Framed structures
Framed structures
 
Chapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairsChapter 3 materials & techniques for repairs
Chapter 3 materials & techniques for repairs
 
Mivan aluminium formwork
Mivan aluminium formworkMivan aluminium formwork
Mivan aluminium formwork
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
 
About mivan technology
About mivan technologyAbout mivan technology
About mivan technology
 
Mivan form wok - aluminium formwork shuttering tecnology
Mivan form wok - aluminium formwork shuttering tecnologyMivan form wok - aluminium formwork shuttering tecnology
Mivan form wok - aluminium formwork shuttering tecnology
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
073 Modern Method of Construction https://www.blogger.com/profile/0220990482...
073 Modern Method of Construction  https://www.blogger.com/profile/0220990482...073 Modern Method of Construction  https://www.blogger.com/profile/0220990482...
073 Modern Method of Construction https://www.blogger.com/profile/0220990482...
 
JUMP FORM WORK
JUMP FORM WORKJUMP FORM WORK
JUMP FORM WORK
 

Destaque

Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
Abhishek Shah
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
Eveana Crystle
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
Hamdija Velagic
 

Destaque (17)

Major projects aluminium of formwork civil engineering
Major  projects aluminium of formwork civil engineeringMajor  projects aluminium of formwork civil engineering
Major projects aluminium of formwork civil engineering
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Green Metal Formwork for construction of hi-rise building
Green Metal Formwork for construction of hi-rise buildingGreen Metal Formwork for construction of hi-rise building
Green Metal Formwork for construction of hi-rise building
 
Formwork
FormworkFormwork
Formwork
 
Tutorial 4(b)
Tutorial 4(b)Tutorial 4(b)
Tutorial 4(b)
 
Tutorial 4(a) (2)
Tutorial 4(a) (2)Tutorial 4(a) (2)
Tutorial 4(a) (2)
 
Earth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildingsEarth quake response of different shapes of mivan wall tall buildings
Earth quake response of different shapes of mivan wall tall buildings
 
Modular construction
Modular constructionModular construction
Modular construction
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular Construction
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Aluminium
AluminiumAluminium
Aluminium
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Aluminium Ppt
Aluminium PptAluminium Ppt
Aluminium Ppt
 

Semelhante a Aluminium formwork(t 4 a)

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 

Semelhante a Aluminium formwork(t 4 a) (20)

Acp panel
Acp panelAcp panel
Acp panel
 
The steel frame structures
The steel frame structuresThe steel frame structures
The steel frame structures
 
Costruction ppt
Costruction pptCostruction ppt
Costruction ppt
 
Construction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz KhanConstruction Techniques Of framed Industrial Building by Shabaz Khan
Construction Techniques Of framed Industrial Building by Shabaz Khan
 
More About STEEL FRAME STRUCTURES
More About STEEL FRAME STRUCTURESMore About STEEL FRAME STRUCTURES
More About STEEL FRAME STRUCTURES
 
ALUMINIUM COMPOSIT BUILDING CONSTRUCTION
ALUMINIUM COMPOSIT BUILDING CONSTRUCTIONALUMINIUM COMPOSIT BUILDING CONSTRUCTION
ALUMINIUM COMPOSIT BUILDING CONSTRUCTION
 
Shuttering materials
Shuttering materialsShuttering materials
Shuttering materials
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
varun tudu ca1 (1).pptx
varun tudu ca1 (1).pptxvarun tudu ca1 (1).pptx
varun tudu ca1 (1).pptx
 
Formwork
FormworkFormwork
Formwork
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
 
Cement & concrete blocks
Cement & concrete blocksCement & concrete blocks
Cement & concrete blocks
 
Non ferrous metal
Non ferrous metalNon ferrous metal
Non ferrous metal
 
High Rise Building Structure Systems Types
High Rise Building Structure Systems TypesHigh Rise Building Structure Systems Types
High Rise Building Structure Systems Types
 
ALUMINIUM ROOFING.pdf
ALUMINIUM ROOFING.pdfALUMINIUM ROOFING.pdf
ALUMINIUM ROOFING.pdf
 
STEEL PPT FOR UPLOAD.pptx
STEEL PPT FOR UPLOAD.pptxSTEEL PPT FOR UPLOAD.pptx
STEEL PPT FOR UPLOAD.pptx
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
Portal Framed Construction Industry .pdf
Portal Framed Construction Industry .pdfPortal Framed Construction Industry .pdf
Portal Framed Construction Industry .pdf
 
Aluminium
AluminiumAluminium
Aluminium
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 

Mais de w ss

Est 22222
Est 22222Est 22222
Est 22222
w ss
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
w ss
 
Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)
w ss
 
Pp presentation 1
Pp presentation 1Pp presentation 1
Pp presentation 1
w ss
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
w ss
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
w ss
 
Management science
Management scienceManagement science
Management science
w ss
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
w ss
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
w ss
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
w ss
 
Final presentation
Final presentationFinal presentation
Final presentation
w ss
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
w ss
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
w ss
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
w ss
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
w ss
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
w ss
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
w ss
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
w ss
 

Mais de w ss (20)

Est 22222
Est 22222Est 22222
Est 22222
 
Course outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qsCourse outline august 2015 qsb 2813 software application for qs
Course outline august 2015 qsb 2813 software application for qs
 
Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)Structure project brief march 2018 (updated)
Structure project brief march 2018 (updated)
 
Pp presentation 1
Pp presentation 1Pp presentation 1
Pp presentation 1
 
Assignment brief qsb2134 tender
Assignment brief qsb2134 tenderAssignment brief qsb2134 tender
Assignment brief qsb2134 tender
 
Evaluation brief qsb2134 tender
Evaluation brief qsb2134 tenderEvaluation brief qsb2134 tender
Evaluation brief qsb2134 tender
 
Management science
Management scienceManagement science
Management science
 
Ctiii steel framing system [ cold form structures + composite floor slab ]
Ctiii steel framing system  [ cold form structures + composite floor slab ]Ctiii steel framing system  [ cold form structures + composite floor slab ]
Ctiii steel framing system [ cold form structures + composite floor slab ]
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017Group assignment brief ct3-aug2017
Group assignment brief ct3-aug2017
 
Site surveying 2 done
Site surveying 2   done Site surveying 2   done
Site surveying 2 done
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Site surveying 1 - done
Site surveying 1 - done Site surveying 1 - done
Site surveying 1 - done
 
Building services assignment
Building services assignmentBuilding services assignment
Building services assignment
 
Group project bs1
Group project bs1 Group project bs1
Group project bs1
 
M2 project assignment mar 2017
M2 project assignment mar 2017M2 project assignment mar 2017
M2 project assignment mar 2017
 
Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017Assignment 1 bld60204 mac2017
Assignment 1 bld60204 mac2017
 
Assignment 2 bld60204 sketching
Assignment 2 bld60204 sketchingAssignment 2 bld60204 sketching
Assignment 2 bld60204 sketching
 
Flooring presentation(t 4 b)
Flooring presentation(t 4 b)Flooring presentation(t 4 b)
Flooring presentation(t 4 b)
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 

Aluminium formwork(t 4 a)

  • 1. Aluminium Formwork TEO CHIANG LOONG 0323762 WONG SHER SHENG 0329950 YAP CHOE HOONG 0323161 TAN YONG CHIEN 0320200
  • 2. ALUMINIUM FORMWORK • Manufactured by using light-weight aluminium content • Made up of Aluminium frames provide robust & durable mold for pouring concrete • It's often known as 'MIVAN formwork' due to the name of company which invented Aluminium Formwork
  • 3. Suitability of Aluminium Formwork Suited to load bearing wall construction whereas traditional formwork consisting of plywood and timber is not suitable to the high pressures of fresh concrete on the wall Aluminium Formwork panels can be designed for any condition/component of building such as bay windows, stairs, balconies and special architectural features. The structures are more resistant to earthquakes than the traditional RCC column and beam designs.
  • 4. Convenient & Effective It can complete assembly by manual without any machines assistance Low Carbon Emission Some developed countries have already stipulated that cannot apply wooden formwork The set of formwork can be used more than 300 times in a low average use-cost. Good stability with high bearing capacity Advantages of Aluminium Formwork
  • 5. 1Architectural changes not possible on the structure. 2Due to the tremendous speed of construction, working capital finance needs to be planned in advance 3It's relatively expensive compare to other formworks Disadvantages of Aluminium Formwork
  • 6. Cost of Aluminium Formwork