Safety module
Overview of safety hazard:
What is hazard?
A hazard is any sourceof potentialdamage, harmor adversehealth effects on
something or someone under certain condition at work.
How to behave inside the plant:
 No loose clothing.
 Safe distance is to be maintained from rotating machine.
 Any electrical installation should not be touched.
 Safe distance should be kept from bare live terminals.
 Helmet is a must.
 Nobody should move in dark spaces.
 Nobody should move alone.
 Be aware from floor opening.
 Avoid moving on checker plate.
 Nobody should move over the trenches.
 Railing should not be leant upon.
 Moving into confined spaces(congested closed area with lower concentration of
oxygen, and containing mixture of toxic and explosive gases) for eg any flue duct,
furnace, inside the condenser, cooling water duct, sewerage lines is to be avoided.
 One should not move in regions where lifting work is being carried out.
 One should not go into a unit which is under maintainance.
 One must avoid going near welding and gas cutting sparks and must use safety
glasses.
.
SUPPLY OF RAW MATERIALS:
A) COAL:There are 3 sources of coal supply as:
 Lalmatia situated 85 Kms away from the main plant.
 Imported coal from Indonesia.
 Indian railways who supply coal from different mines across the country.
B) WATER:
Feedwater: Collected from feeder canal cut across the river Ganga.
Cooling Water: Collected from the same source.
C) AIR: atmospheric air is used.
D) OIL: HFO is supplied by IOCL.
ASH DISPOSAL:
For the quality of coal used here, approximately 80% Fly Ash and 20% bottom ash is
produced. Ash disposal is a major issue in coal fired power plants.Raw water is mixed with
ash to form slurry and pumped out through series pumps( 3 for Fly ash and 2 for Bottom
ash ) into ash dyke.Fly ash dyke is situated 12 Kms away and Bottom ash dyke MALANCHA
is situated 5 Kms away from the main plant.
DIFFERENT CYCLES INVOLVED IN THE ENTIRE OPERATION:
 FUEL CIRCUIT :
 Coal is brought into CHP with the help of Wagon tipplers or track hoppers
and stored in the bunker.
 From bunker coal is sent to feeder via conveyer.
 The purpose of feeder is to vary the amount of coal as per load requirement.
 From feeder coal is taken to mill where it is pulverized.
 Primary air is sucked from atmosphere through PA fan and takes pulverized
coal to the furnace.
Fig1: Coal circuit
2) AIR & FLUE GAS CIRCUIT:
 Secondary air is sucked from atm. with the help of FD fan(Forced Draught)
for combustion.A fire ball is generated inside the boiler.The temp. of fire ball
is 1000-1100 deg. C.
 Flue gas is generated due to combustion.
 Heat is extracted from flue gas to heat the steam in platen SH, reheater,final
SH, primary SH , economiser and to heat air in air preheater.
 Fly ash particles are collected from flue gas at ESP(Electrostatic Precipitator)
and flue gas is released to atm. with the help of ID fan(Induced Draught)
which is situated at the base of chimney.
Fig2: Air & Flue gas circuit
3) STEAM, CONDENSATE & FEED WATER CYCLE:
 In 200MW unit of the plant the boiler drum is located at the height of 54m.
 Inner wall of the boiler made up of water tubes which originate from bottom
ring header situated 7m from ground level.
 DM water picks up heat from fire ball and goes up as a mixture of steam and
water.Then it reaches drum .As steam being lighter it goes upward.Water
comes down through DOWNCOMER .In 200MW unit no. of downcomers is
6 and natural circulation of steam and water takes place.But in 500MW unit
the boiler drum being at a height of 72m forced circulation is employed by
BCP(Boiler Circulation Pump) through 10 downcomers.
 Steam is separated from water in the boiler drum with the help of CYCLONE
SEPARATOR & SECONDARY SEPARATOR(corrugated sheets) and it follows
the circuit shown below.
Fig 3: Steam,Condensate & Feed Water cycle
4) COOLING WATER CIRCUIT:
 Raw water is taken from the feeder canal through CW pump.
 Raw water is passed through TRASH RACKS and TRAVELLING WATER
SCREENS to remove impurities(animal bodies, planktons etc) of different
sizes.
 Raw water is stored at the water box at the inlet of condenser and it flows
through the innumerable number of condenser tubes. In stage I there are
13000 such tubes. The water comes at the outlet and is stored at the outlet
water box.
 The condensate is stored in the HOTWELL at a temperature of 45 deg C.
 In STAGE-I and STAGE-II,after using in the condenser the hot water is
returned
to the feeder canal, hence it is an open cycle system.
 In STAGE III, Cooling tower is used. After using the water in the condenser it
is recirculated through cooling tower, where the hot water is cooled and
reused. This is a closed cycle system and causes less harm to the environment.
Fig4: Cooling Water circuit
Basic Description of Flow of Coal:
(1) CHP (Coal Handling Plant): The input coal is unloaded at this portion, which passes
it to the next block crusher house.
(2) Crusher house: crusher house crush the unloaded coal coming from the CHP in
small size.
(3) Coal Bunker: Coalbunker stores the crushed coal and passes it to the Feeder.
(4) RC Feeder: It is the raw coal feeder. The coal, comes from the crusher house is still of
big size. The feeder controls the quantity of the input coal to the boiler.
(5) Mill/pulveriser: Mill contains three rollers. It crushes it to powder finely. Primary air
takes the pulverized coal from the mill to the boiler.
(6) Furnace : At furnace pulverized coal is combusted with the help of secondary air.
Brief description of system components:
Main components of the power plant are:
1) Boiler:
 In Farakka NTPC, corner fired boilers are used. In stage I, there are 6 mills
situated from a height of 18m to 27m. FIRING FLOORS of mill A is at a height
of 18m and that of mill F is at 27m. Rest of the firing floors are situated in
between. HFO OIL GUNS are situated at heights of AB, CD and EF.
 Purpose of oil gun: a) during boiler start up , b) emergency purpose.
Fig 6: HFO Flow System
 The working oil supplied by IOCL is stored in HFO tank 2. The oil in this tank is
replenished by oil in tanks 1 and 3. The heat lost due to transportation is
compensated by HEATER. HFO Circulation takes place all the time so that
temperature of oil is maintained at 120 deg C when plant is running.
 In case of shut down of any mill, the coal particles on the corresponding floor may
not get sufficient ignition energy and thereby the fireball distorts and subsequently
two separate balls are formed on either side of that mill. In that case HFO injection
makes up that gap and stabilizes the fire ball.
 The coal is composed of 4 parts – fixed carbon(FC),Volatile material(VM),Moisture &
ash. The VM supplies the initial ignition energy for the complete combustion of FC.
If the VM content in the coal used is less the coal particles have to travel a larger
path to attain the required ignition energy and hence the fireball is formed at
greater height.
Fig7: Isometric View of Boiler schematic
Fig8: Top view of firing floor corresponding to mill A
 It is critical to maintain the level of water in boiler drum.
Case 1: level of water goes too high: water may go into the steam circuit. When water hits
the turbine blades, PITTING may occur. (the high velocity water particles may produce
indentations in the turbine blades)
Case 2: level of water goes low: If it is too low, the boiler drum base being close to the fire
ball, its shape gets deformed. Also low water level causes water in the drum to get
evaporated at a faster rate than the rate at which water is returned from hotwell to the
drum
There are mainly three types of heater coils in boiler.
(1) Economiser
(2) Re heater
(3) Super heater
 Economizer:
Economizer is a device in which the feed water is heated before it enters into a
boiler. The heat is being taken from the waste flue gas of the boiler. It ensures economy of
fuel. Hence it is called economizer. The economizer is placed at the second pass of boiler.
The flue gases of the boiler furnace, after working inside the boiler, flows through it before
passing into the chimney.
 Coal bunker-
These are in process storage silos used for storing crushed coal from the coal
handling system. Generally, these are made up of welded steel plates. Normally there are six
such bunkers supplying coal of the corresponding mills. These are located on the top of the
mills so as to aid in gravity feeding of coal.
 P. A. Fan-
The primary air fans (2 per unit-50% capacity each) are designed to suck primary
air from atmosphere. Temperature of PA is increased to 300 deg C after passing through Air
Pre-heater. These fans are located at ‘0’M level near the boiler.
 Burners-
As evident from the name itself, these are used for burning pulverized coal. Every
unit has a set of such burners located at different elevations of the furnace.
 F. D. Fan-
These forced draught fans (2 per unit-50% capacity each) are designed for handling
secondary air for the boiler. These fans are located at ‘0’M level near the P.A Fan.
Electrostatic Precipitator-
 Air Pre-heater-
Air pre heater transfer the heat from the flue gas to cold primary and/or secondary
air by extracting heat from waste flue gas. These are located in the secondary pass of the
furnace at a height of around ‘16’M level. Each 200MW unit is provided with two such air
pre-heaters.
 ID Fans-
These are two induced draught fans per boiler located between the ESP & chimney.
These fans are used for maintaining pressure inside the boiler by releasing flue gas through
chimney.
 Chimney-
These are tall RCC structures with single/multiple flue ducts (one flue duct per
200MW unit). The heights of these chimneys vary, depending upon the location
considerations; anywhere between 150m to 220m.
Steam Circulation System
 Re-heaters-
This is the part of the boiler which receives the steam back from the turbine after it has
given up some of its heat energy in the high pressure section of the turbine. It raises the
temperature of this steam, usually to its original value, for further expansion in the turbine.
The purpose of this reheating is to add energy to the partially used steam. The construction
& arrangement is similar to super heater. It has two sections- hot & cold Reheat sections.
Due to resistance of flow through the reheat section, the hot reheat steam is at lower
pressure compared to the cold reheat steam.
water treatment plant and storage
USE OF MAKE UP WATER:
Since there is continuous withdrawal of steam and continuous return of condensate to the
boiler, losses due to blow down and leakages have to be made up to maintain a desired
water level in the boiler steam drum. For this, continuous make-up water is added to the
boiler water system.
 Boiler feed pump-
It takes water input from the deaeretor at a very low pressure and pumps it to the
boiler drum at a very high pressure (190Kg).
 Condenser-
 Ejectors-
There are two 100%capacity ejectors of the steam ejecting type. The purpose of the
ejector is to evacuate air and other non-condensing gases from the condensers and thus
maintain the vacuum in the condensers.
 Condensate Extraction Pump-
It extracts the condensate from the hot well of the condenser and pumps it to the de-
aerator.
 L. P. Heaters-
Turbine has been provided with non-controlled extractions which are utilized for
heating the condensate, from turbine bleed steam. There are 4 low pressure heaters in
which last four extractions are used.L.P.Heater-1 has two parts LPH-1A and LPH-1B located
in the upper parts of the condenser A & B respectively. These are of the horizontal type with
shell and tube construction. L.P.H 2,3,4 are of similar construction and they are mounted in
row at 5M level.
 Deaerator-
This is used to remove oxygen. Due to the presence of certain gases like oxygen,
carbon-di-oxide, ammonia, etc. in water then it is considered harmful because of their
corrosive effect on metals, particularly at elevated temperatures. The boiler feed water
should be free from all dissolved gases. This can be achieved by embodying into the boiler
feed system a de-aerating system, whose function is to remove dissolved gases from the feed
water by mechanical means.
 H. P. Heaters-
These are regenerative feed water heaters operating at high pressures and located at
the side of turbine. These are connected in series on feed-water side & by such arrangement
feed-water enters the HP heaters. The steam is supplied to these heaters from the bleed
point of the turbine through motor operated valves. These have a group bypass protection
on the feed waterside. Here the feed water flows through the tube spirals & is heated by
steam around the tubes in the shall of heaters. These heaters are cylindrical vessels with
welded dished ends & with integrated, de-super heating, condensing, & & sub cooling
sections. This design offers the advantage to optimize the arrangement of piping & the
location of the heaters at power station.
2) TURBINE:
Fig 9: Turbine cycle
 Steam after working in the HP turbine temperature is reduced from 540 deg to 340
deg C. Pressure is also substantially reduced. The line of flow of steam from HP
turbine is COLD REHEAT LINE or CRH LINE.
 CRH line again goes to the boiler to be reheated at 540 deg C by the heat of the flue
gas. This line is known as the HOT REHEAT LINE or HRH LINE. HRH Line goes to the
IP Turbine. Exhaust steam from IP Turbine goes to the LP Turbine.
 Exhaust of LP Turbine (80 deg C) goes to CONDENSER. COOLING WATER is
circulated to cool down the steam and the condensate drains into the HOTWELL at
35 deg C.
 From HOTWELL the condensate is sent back to boiler drum through different
processes and reused.
 The pressure of MS line is ~160 Kg/sqcm, that of HRH line is ~33-34 Kg/sq cm and
CRH Line pressure is ~34 Kg/sqcm.
 With the help of modulation of HP Control valves (HPCV) and IPCV alternator
frequency is kept constant by controlling the amount of inlet steam.
 STOP VALVE is used to stop the entry of steam into the turbine.
TurbineSection
 Turbine Lub. Oil System
This consists of Main Oil Pump (MOP), Starting Oil Pump (SOP), AC stand by oil
pumps and emergency DC oil pump and jacking oil pump (JOP) (one each per unit).
 Emergency stop valves and control valves
Turbine is equipped with emergency stop valves to cut off steam supply and with
control valves regulate steam supply. Emergency stop valves (ESV) are provided in the
mainsteam line and interceptor valves are provided in the hot reheat line. Emergency stop
valves are actuated by servomotor controlled by the protection system. Control valves are
actuated by the governing system through servomotors to regulate steam supply as required
by the load.
 Generator
The main shaft of the turbine is connected to the rotor of the main generator. The
shaft rotates the rotor, which cuts the flux of the armature coil, and as a result an induced
emf is produced.
Compressed Air System
There are two types of compressed air system namely Instrument air system or
control air system & Station air system.

Mais conteúdo relacionado

Mais procurados

TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............
TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............
TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............
Insiya Ratlamwala
 
Mechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerMechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani Power
Nemish Kanwar
 

Mais procurados (19)

Thermal power point
Thermal power pointThermal power point
Thermal power point
 
Introduction to ppe
Introduction to ppeIntroduction to ppe
Introduction to ppe
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)
 
Power Generation and Steam power plant
Power Generation and Steam power plantPower Generation and Steam power plant
Power Generation and Steam power plant
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Steam Power Plants
Steam Power PlantsSteam Power Plants
Steam Power Plants
 
Schneider process automation power industry solutions
Schneider process automation power industry solutionsSchneider process automation power industry solutions
Schneider process automation power industry solutions
 
Boiler | Boiler In Textile Industry | Overview Of Boiler
Boiler | Boiler In Textile Industry | Overview Of BoilerBoiler | Boiler In Textile Industry | Overview Of Boiler
Boiler | Boiler In Textile Industry | Overview Of Boiler
 
Ppt on boilers
Ppt on boilersPpt on boilers
Ppt on boilers
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............
TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............
TYPES OF BOILER. FIRE, WATER AND ELECTRIC.............
 
Steam Power Plant
Steam Power PlantSteam Power Plant
Steam Power Plant
 
Thermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency ImprovementThermal Power Plant Boiler Efficiency Improvement
Thermal Power Plant Boiler Efficiency Improvement
 
THERMAL
THERMALTHERMAL
THERMAL
 
High pressure boilers (1)
High pressure boilers (1)High pressure boilers (1)
High pressure boilers (1)
 
Mechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani PowerMechanical Maintenance Department-Balance of Power, Adani Power
Mechanical Maintenance Department-Balance of Power, Adani Power
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Presentation on boiler and cogeneration
Presentation on boiler and cogenerationPresentation on boiler and cogeneration
Presentation on boiler and cogeneration
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 

Destaque

New generation of_reactive_dyes_mr_ jean_sire
New generation of_reactive_dyes_mr_ jean_sireNew generation of_reactive_dyes_mr_ jean_sire
New generation of_reactive_dyes_mr_ jean_sire
Giselle EAlex
 

Destaque (20)

Introduction page 2
Introduction page 2Introduction page 2
Introduction page 2
 
La iluminación LED En El Hogar
La iluminación LED En El HogarLa iluminación LED En El Hogar
La iluminación LED En El Hogar
 
Yarn realisation in spinning mills
Yarn realisation in spinning millsYarn realisation in spinning mills
Yarn realisation in spinning mills
 
Innovative Pro Bono
Innovative Pro BonoInnovative Pro Bono
Innovative Pro Bono
 
COMPRESORES DE PISTON SECO
COMPRESORES DE PISTON SECOCOMPRESORES DE PISTON SECO
COMPRESORES DE PISTON SECO
 
NELA-ALS Using the Silhouette Cameo
NELA-ALS Using the Silhouette CameoNELA-ALS Using the Silhouette Cameo
NELA-ALS Using the Silhouette Cameo
 
Acknowledgemet
AcknowledgemetAcknowledgemet
Acknowledgemet
 
Healing After Trauma through the Book Arts and Dreaming
Healing After Trauma through the Book Arts and DreamingHealing After Trauma through the Book Arts and Dreaming
Healing After Trauma through the Book Arts and Dreaming
 
New generation of_reactive_dyes_mr_ jean_sire
New generation of_reactive_dyes_mr_ jean_sireNew generation of_reactive_dyes_mr_ jean_sire
New generation of_reactive_dyes_mr_ jean_sire
 
Practical tipsmakemobilefaster oscon2016
Practical tipsmakemobilefaster oscon2016Practical tipsmakemobilefaster oscon2016
Practical tipsmakemobilefaster oscon2016
 
Francis Turbine
Francis Turbine Francis Turbine
Francis Turbine
 
Biodiversity
BiodiversityBiodiversity
Biodiversity
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
reciprocating pump Project part 2
reciprocating pump Project part 2reciprocating pump Project part 2
reciprocating pump Project part 2
 
Studying on Mechanical Metrology
 Studying on Mechanical Metrology Studying on Mechanical Metrology
Studying on Mechanical Metrology
 
Emerging Trends of Industrial Inkjet Printing
Emerging Trends of Industrial Inkjet PrintingEmerging Trends of Industrial Inkjet Printing
Emerging Trends of Industrial Inkjet Printing
 
Node JS Express : Steps to Create Restful Web App
Node JS Express : Steps to Create Restful Web AppNode JS Express : Steps to Create Restful Web App
Node JS Express : Steps to Create Restful Web App
 
Lotus violin
Lotus violinLotus violin
Lotus violin
 
Grace violin
Grace violinGrace violin
Grace violin
 
Silence speaks piano+violin
Silence speaks piano+violinSilence speaks piano+violin
Silence speaks piano+violin
 

Semelhante a Ntpc proj

Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
arvind singh rathore
 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23
Munna Sagar
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
Preeti Pradhan
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
arvind singh rathore
 

Semelhante a Ntpc proj (20)

Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Coal Base Thermal Power Plant
Coal Base Thermal Power PlantCoal Base Thermal Power Plant
Coal Base Thermal Power Plant
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Power Plant Engg.pdf
Power Plant Engg.pdfPower Plant Engg.pdf
Power Plant Engg.pdf
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Panipat thermal power station training ppt
Panipat thermal power station training pptPanipat thermal power station training ppt
Panipat thermal power station training ppt
 
COAL BASED THERMAL POWER PLANTS (UNIT-1).pptx
COAL BASED THERMAL POWER PLANTS (UNIT-1).pptxCOAL BASED THERMAL POWER PLANTS (UNIT-1).pptx
COAL BASED THERMAL POWER PLANTS (UNIT-1).pptx
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRIDProject Report on “WORKING MODEL OF POWER GRID/SMART GRID
Project Report on “WORKING MODEL OF POWER GRID/SMART GRID
 
Thermal Power Plant
Thermal Power PlantThermal Power Plant
Thermal Power Plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORTTHERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
THERMAL POWER PLANT TRAINING INDUSTRIAL VISIT REPORT
 
Industrial Traning at SSTPS ppt
Industrial Traning at SSTPS pptIndustrial Traning at SSTPS ppt
Industrial Traning at SSTPS ppt
 
Industrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant pptIndustrial Training at Suratgarh Super Thermal Power Plant ppt
Industrial Training at Suratgarh Super Thermal Power Plant ppt
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 

Mais de Sourav Jana (20)

Hydraulic press3dddd
Hydraulic press3ddddHydraulic press3dddd
Hydraulic press3dddd
 
Hydraulicpress2ddddddd
Hydraulicpress2dddddddHydraulicpress2ddddddd
Hydraulicpress2ddddddd
 
hydraulic press
hydraulic presshydraulic press
hydraulic press
 
hydraulic press
hydraulic presshydraulic press
hydraulic press
 
pump system and curves
pump system and curvespump system and curves
pump system and curves
 
Introduction page 1
Introduction page 1Introduction page 1
Introduction page 1
 
Layout page 3
Layout page 3Layout page 3
Layout page 3
 
Electrostatic precipitator
Electrostatic precipitatorElectrostatic precipitator
Electrostatic precipitator
 
project report for vocational trainee
project report for vocational traineeproject report for vocational trainee
project report for vocational trainee
 
Introduction page 2
Introduction page 2Introduction page 2
Introduction page 2
 
Introduction page 1
Introduction page 1Introduction page 1
Introduction page 1
 
Front page 1
Front page 1Front page 1
Front page 1
 
Dm plant
Dm plantDm plant
Dm plant
 
C shop 1
C shop 1C shop 1
C shop 1
 
Welding shop 1
Welding shop 1Welding shop 1
Welding shop 1
 
Shot blasting machine and flow chart for helical and lhb spring
Shot blasting machine and flow chart for helical and lhb springShot blasting machine and flow chart for helical and lhb spring
Shot blasting machine and flow chart for helical and lhb spring
 
Rail
RailRail
Rail
 
Rail 2
Rail 2Rail 2
Rail 2
 
M shop
M shopM shop
M shop
 
Lhb shop
Lhb shopLhb shop
Lhb shop
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 

Ntpc proj

  • 1. Safety module Overview of safety hazard: What is hazard? A hazard is any sourceof potentialdamage, harmor adversehealth effects on something or someone under certain condition at work. How to behave inside the plant:  No loose clothing.  Safe distance is to be maintained from rotating machine.  Any electrical installation should not be touched.  Safe distance should be kept from bare live terminals.  Helmet is a must.  Nobody should move in dark spaces.  Nobody should move alone.  Be aware from floor opening.  Avoid moving on checker plate.  Nobody should move over the trenches.  Railing should not be leant upon.  Moving into confined spaces(congested closed area with lower concentration of oxygen, and containing mixture of toxic and explosive gases) for eg any flue duct, furnace, inside the condenser, cooling water duct, sewerage lines is to be avoided.  One should not move in regions where lifting work is being carried out.  One should not go into a unit which is under maintainance.  One must avoid going near welding and gas cutting sparks and must use safety glasses. . SUPPLY OF RAW MATERIALS: A) COAL:There are 3 sources of coal supply as:  Lalmatia situated 85 Kms away from the main plant.  Imported coal from Indonesia.  Indian railways who supply coal from different mines across the country. B) WATER:
  • 2. Feedwater: Collected from feeder canal cut across the river Ganga. Cooling Water: Collected from the same source. C) AIR: atmospheric air is used. D) OIL: HFO is supplied by IOCL. ASH DISPOSAL: For the quality of coal used here, approximately 80% Fly Ash and 20% bottom ash is produced. Ash disposal is a major issue in coal fired power plants.Raw water is mixed with ash to form slurry and pumped out through series pumps( 3 for Fly ash and 2 for Bottom ash ) into ash dyke.Fly ash dyke is situated 12 Kms away and Bottom ash dyke MALANCHA is situated 5 Kms away from the main plant. DIFFERENT CYCLES INVOLVED IN THE ENTIRE OPERATION:  FUEL CIRCUIT :  Coal is brought into CHP with the help of Wagon tipplers or track hoppers and stored in the bunker.  From bunker coal is sent to feeder via conveyer.  The purpose of feeder is to vary the amount of coal as per load requirement.  From feeder coal is taken to mill where it is pulverized.  Primary air is sucked from atmosphere through PA fan and takes pulverized coal to the furnace. Fig1: Coal circuit 2) AIR & FLUE GAS CIRCUIT:
  • 3.  Secondary air is sucked from atm. with the help of FD fan(Forced Draught) for combustion.A fire ball is generated inside the boiler.The temp. of fire ball is 1000-1100 deg. C.  Flue gas is generated due to combustion.  Heat is extracted from flue gas to heat the steam in platen SH, reheater,final SH, primary SH , economiser and to heat air in air preheater.  Fly ash particles are collected from flue gas at ESP(Electrostatic Precipitator) and flue gas is released to atm. with the help of ID fan(Induced Draught) which is situated at the base of chimney. Fig2: Air & Flue gas circuit 3) STEAM, CONDENSATE & FEED WATER CYCLE:  In 200MW unit of the plant the boiler drum is located at the height of 54m.  Inner wall of the boiler made up of water tubes which originate from bottom ring header situated 7m from ground level.  DM water picks up heat from fire ball and goes up as a mixture of steam and water.Then it reaches drum .As steam being lighter it goes upward.Water comes down through DOWNCOMER .In 200MW unit no. of downcomers is 6 and natural circulation of steam and water takes place.But in 500MW unit the boiler drum being at a height of 72m forced circulation is employed by BCP(Boiler Circulation Pump) through 10 downcomers.  Steam is separated from water in the boiler drum with the help of CYCLONE SEPARATOR & SECONDARY SEPARATOR(corrugated sheets) and it follows the circuit shown below.
  • 4. Fig 3: Steam,Condensate & Feed Water cycle 4) COOLING WATER CIRCUIT:  Raw water is taken from the feeder canal through CW pump.  Raw water is passed through TRASH RACKS and TRAVELLING WATER SCREENS to remove impurities(animal bodies, planktons etc) of different sizes.  Raw water is stored at the water box at the inlet of condenser and it flows through the innumerable number of condenser tubes. In stage I there are 13000 such tubes. The water comes at the outlet and is stored at the outlet water box.  The condensate is stored in the HOTWELL at a temperature of 45 deg C.  In STAGE-I and STAGE-II,after using in the condenser the hot water is returned to the feeder canal, hence it is an open cycle system.  In STAGE III, Cooling tower is used. After using the water in the condenser it is recirculated through cooling tower, where the hot water is cooled and reused. This is a closed cycle system and causes less harm to the environment.
  • 5. Fig4: Cooling Water circuit Basic Description of Flow of Coal: (1) CHP (Coal Handling Plant): The input coal is unloaded at this portion, which passes it to the next block crusher house. (2) Crusher house: crusher house crush the unloaded coal coming from the CHP in small size. (3) Coal Bunker: Coalbunker stores the crushed coal and passes it to the Feeder. (4) RC Feeder: It is the raw coal feeder. The coal, comes from the crusher house is still of big size. The feeder controls the quantity of the input coal to the boiler. (5) Mill/pulveriser: Mill contains three rollers. It crushes it to powder finely. Primary air takes the pulverized coal from the mill to the boiler. (6) Furnace : At furnace pulverized coal is combusted with the help of secondary air. Brief description of system components: Main components of the power plant are: 1) Boiler:  In Farakka NTPC, corner fired boilers are used. In stage I, there are 6 mills situated from a height of 18m to 27m. FIRING FLOORS of mill A is at a height of 18m and that of mill F is at 27m. Rest of the firing floors are situated in between. HFO OIL GUNS are situated at heights of AB, CD and EF.  Purpose of oil gun: a) during boiler start up , b) emergency purpose.
  • 6. Fig 6: HFO Flow System  The working oil supplied by IOCL is stored in HFO tank 2. The oil in this tank is replenished by oil in tanks 1 and 3. The heat lost due to transportation is compensated by HEATER. HFO Circulation takes place all the time so that temperature of oil is maintained at 120 deg C when plant is running.  In case of shut down of any mill, the coal particles on the corresponding floor may not get sufficient ignition energy and thereby the fireball distorts and subsequently two separate balls are formed on either side of that mill. In that case HFO injection makes up that gap and stabilizes the fire ball.  The coal is composed of 4 parts – fixed carbon(FC),Volatile material(VM),Moisture & ash. The VM supplies the initial ignition energy for the complete combustion of FC. If the VM content in the coal used is less the coal particles have to travel a larger path to attain the required ignition energy and hence the fireball is formed at greater height. Fig7: Isometric View of Boiler schematic Fig8: Top view of firing floor corresponding to mill A  It is critical to maintain the level of water in boiler drum.
  • 7. Case 1: level of water goes too high: water may go into the steam circuit. When water hits the turbine blades, PITTING may occur. (the high velocity water particles may produce indentations in the turbine blades) Case 2: level of water goes low: If it is too low, the boiler drum base being close to the fire ball, its shape gets deformed. Also low water level causes water in the drum to get evaporated at a faster rate than the rate at which water is returned from hotwell to the drum There are mainly three types of heater coils in boiler. (1) Economiser (2) Re heater (3) Super heater  Economizer: Economizer is a device in which the feed water is heated before it enters into a boiler. The heat is being taken from the waste flue gas of the boiler. It ensures economy of fuel. Hence it is called economizer. The economizer is placed at the second pass of boiler. The flue gases of the boiler furnace, after working inside the boiler, flows through it before passing into the chimney.  Coal bunker- These are in process storage silos used for storing crushed coal from the coal handling system. Generally, these are made up of welded steel plates. Normally there are six such bunkers supplying coal of the corresponding mills. These are located on the top of the mills so as to aid in gravity feeding of coal.  P. A. Fan-
  • 8. The primary air fans (2 per unit-50% capacity each) are designed to suck primary air from atmosphere. Temperature of PA is increased to 300 deg C after passing through Air Pre-heater. These fans are located at ‘0’M level near the boiler.  Burners- As evident from the name itself, these are used for burning pulverized coal. Every unit has a set of such burners located at different elevations of the furnace.  F. D. Fan- These forced draught fans (2 per unit-50% capacity each) are designed for handling secondary air for the boiler. These fans are located at ‘0’M level near the P.A Fan. Electrostatic Precipitator-  Air Pre-heater- Air pre heater transfer the heat from the flue gas to cold primary and/or secondary air by extracting heat from waste flue gas. These are located in the secondary pass of the furnace at a height of around ‘16’M level. Each 200MW unit is provided with two such air pre-heaters.  ID Fans- These are two induced draught fans per boiler located between the ESP & chimney. These fans are used for maintaining pressure inside the boiler by releasing flue gas through chimney.  Chimney- These are tall RCC structures with single/multiple flue ducts (one flue duct per 200MW unit). The heights of these chimneys vary, depending upon the location considerations; anywhere between 150m to 220m.
  • 9. Steam Circulation System  Re-heaters- This is the part of the boiler which receives the steam back from the turbine after it has given up some of its heat energy in the high pressure section of the turbine. It raises the temperature of this steam, usually to its original value, for further expansion in the turbine. The purpose of this reheating is to add energy to the partially used steam. The construction & arrangement is similar to super heater. It has two sections- hot & cold Reheat sections. Due to resistance of flow through the reheat section, the hot reheat steam is at lower pressure compared to the cold reheat steam. water treatment plant and storage USE OF MAKE UP WATER: Since there is continuous withdrawal of steam and continuous return of condensate to the boiler, losses due to blow down and leakages have to be made up to maintain a desired water level in the boiler steam drum. For this, continuous make-up water is added to the boiler water system.  Boiler feed pump-
  • 10. It takes water input from the deaeretor at a very low pressure and pumps it to the boiler drum at a very high pressure (190Kg).  Condenser-  Ejectors- There are two 100%capacity ejectors of the steam ejecting type. The purpose of the ejector is to evacuate air and other non-condensing gases from the condensers and thus maintain the vacuum in the condensers.  Condensate Extraction Pump- It extracts the condensate from the hot well of the condenser and pumps it to the de- aerator.  L. P. Heaters- Turbine has been provided with non-controlled extractions which are utilized for heating the condensate, from turbine bleed steam. There are 4 low pressure heaters in which last four extractions are used.L.P.Heater-1 has two parts LPH-1A and LPH-1B located in the upper parts of the condenser A & B respectively. These are of the horizontal type with shell and tube construction. L.P.H 2,3,4 are of similar construction and they are mounted in row at 5M level.  Deaerator- This is used to remove oxygen. Due to the presence of certain gases like oxygen, carbon-di-oxide, ammonia, etc. in water then it is considered harmful because of their corrosive effect on metals, particularly at elevated temperatures. The boiler feed water should be free from all dissolved gases. This can be achieved by embodying into the boiler feed system a de-aerating system, whose function is to remove dissolved gases from the feed water by mechanical means.  H. P. Heaters- These are regenerative feed water heaters operating at high pressures and located at the side of turbine. These are connected in series on feed-water side & by such arrangement feed-water enters the HP heaters. The steam is supplied to these heaters from the bleed point of the turbine through motor operated valves. These have a group bypass protection on the feed waterside. Here the feed water flows through the tube spirals & is heated by steam around the tubes in the shall of heaters. These heaters are cylindrical vessels with welded dished ends & with integrated, de-super heating, condensing, & & sub cooling sections. This design offers the advantage to optimize the arrangement of piping & the location of the heaters at power station. 2) TURBINE:
  • 11. Fig 9: Turbine cycle  Steam after working in the HP turbine temperature is reduced from 540 deg to 340 deg C. Pressure is also substantially reduced. The line of flow of steam from HP turbine is COLD REHEAT LINE or CRH LINE.  CRH line again goes to the boiler to be reheated at 540 deg C by the heat of the flue gas. This line is known as the HOT REHEAT LINE or HRH LINE. HRH Line goes to the IP Turbine. Exhaust steam from IP Turbine goes to the LP Turbine.  Exhaust of LP Turbine (80 deg C) goes to CONDENSER. COOLING WATER is circulated to cool down the steam and the condensate drains into the HOTWELL at 35 deg C.  From HOTWELL the condensate is sent back to boiler drum through different processes and reused.  The pressure of MS line is ~160 Kg/sqcm, that of HRH line is ~33-34 Kg/sq cm and CRH Line pressure is ~34 Kg/sqcm.
  • 12.  With the help of modulation of HP Control valves (HPCV) and IPCV alternator frequency is kept constant by controlling the amount of inlet steam.  STOP VALVE is used to stop the entry of steam into the turbine. TurbineSection  Turbine Lub. Oil System This consists of Main Oil Pump (MOP), Starting Oil Pump (SOP), AC stand by oil pumps and emergency DC oil pump and jacking oil pump (JOP) (one each per unit).  Emergency stop valves and control valves Turbine is equipped with emergency stop valves to cut off steam supply and with control valves regulate steam supply. Emergency stop valves (ESV) are provided in the mainsteam line and interceptor valves are provided in the hot reheat line. Emergency stop valves are actuated by servomotor controlled by the protection system. Control valves are actuated by the governing system through servomotors to regulate steam supply as required by the load.  Generator The main shaft of the turbine is connected to the rotor of the main generator. The shaft rotates the rotor, which cuts the flux of the armature coil, and as a result an induced emf is produced. Compressed Air System There are two types of compressed air system namely Instrument air system or control air system & Station air system.