The document provides an overview of the Mejia Thermal Power Station (MTPS) in West Bengal, India. It discusses:
1. MTPS is operated by Damodar Valley Corporation and has a total installed capacity of 2340 MW generated from various units.
2. The power plant layout includes the main equipment used in the generation process such as the coal handling plant, boiler, turbine, condenser, and cooling towers.
3. The stepwise operation begins with coal being burned in the boiler to produce high pressure steam, which is then used to rotate the turbine and generate electricity via the alternator.
1. MEJIA THERMAL POWER STATION
Presentation By:-
Thermal Power Plant Industrial Training
1.Rantu das
2.Saikat bera
3.Sayan saha
4.Somnath Bhattacharyya
5.Soudip mal
6.Sounak ghosh
7.Sourabh Kumar Bhattacharjee
8.Sourav kanrar
9.Sourav Sarkar
10.Shubhadip som
11.Subharup Chakraborty
12.Subrata kr. Paul
13.Sujoy Bhattacharjee
14.Subrata Mahato
3. Introduction
A Thermal Power Plant converts the heat energy of coal into
electrical energy. Coal is burnt in a boiler which converts water
into steam. The expansion of steam in turbine produces
mechanical power which drives the alternator coupled to the
turbine.Thermal Power Plants contribute maximum to the
generation of Power for any country . Thermal Power Plants
constitute 75.43% of the total installed captive and non-captive
power generation in India . In thermal generating stations coal,
oil, natural gas etc. are employed as primary sources of energy.
4. Overview of MTPS
Damodar Valley Corporation was established on 7th July 1948.
The MTPS underthe DVC is thesecond largest thermal plant in West Bengal.
It has thecapacityof 2340 MW with 4 units of 210 MW each, 2 units of 250 MW
each & 2 units of 500 MW each.
With the introduction of another two units of 500 MW that is in construction itwill be the
largest in WestBengal.
Mejia Thermal Power Station is located in theoutskirtsof Raniganj in Bankura District.
The total power plant campus area is
surrounded by boundarywalls and is basically divided into two majorparts, first the Power
Plant area itself and the second is the Colony area for the residence and other facilities for
MTPSs employees.
5. Diagram of a typical coal-fired thermal power
station
9. MAIN AND AUXILIARY EQUIPMENTS
1. Coal handling plant
2. Pulverizing plant
3. Draft fans
4. Boiler
5. Ash handling plant
6. Turbine
7. Condenser
8. Cooling towers and ponds
9. Feed water heater
10. Economiser
11. Superheater and Reheater
12. Air preheater
10. Coal handling plant
•The function of coal handling plant is automatic feeding of coal to the boiler furnace.
• A thermal power plant burns enormous amounts of coal.
•A 200MW plant may require around 2000 tons of coal daily
11. Pulverising plant
In modern thermal power plant , coal is
pulverised i.e. ground to dust like size and
carried to the furnace in a stream of hotair.
Pulverising is a means of exposing a large
surfacearea to the action of oxygen and
consequently helping combustion.
Pulverising mills are further classifiedas:
1. Contact mill
2. Ball mill
3. Impact mill
12. ASH HANDLING PLANT
The percentage of ash in coal is 5% in good
quality coal & about 40% in poor quality coal.
Power plants generally use poor quality of
coal , thus amount of ash produced by it is quite
large.
A modern 1000MW plant produces about
4800 tons of ash daily.
The stations use some conveyor
arrangement to carry ash to dump sites.
13. Boiler
Boileris an enclosed vessel in which water is
heated and circulated until the water is
turned in tosteamat the required pressure.
Coal is burned inside the combustion
chamber of boiler. The products of
combustion are nothing butgases. These
gases which are at high temperature
vaporize the water inside the boiler to
steam.
Boilers are classifiedas:
1. Fire tubeboilers
2. Water tubeboilers
3. Superheater
4. Reheater
15. • The steam produced in the boiler goes
to the steam drum and is then piped
through the primary, platen and final
super-heaters where it reaches the outlet
temperature of 560 C and 160 ksc
pressure
• At this point in the process they have
now turned the water into a very
powerful source of energy
• This rotates the turbine to which
generator is on the other end
• From rotating generator electricity is
produced
16. Reheate
rSome of the heat of superheated
steam is used to rotate the
turbine where it loses some of its
energy. The steam after reheating
is used to rotate the second
steam turbine where the heat is
converted to mechanical energy.
This mechanical energy is used to
run the alternator,
coupled to turbine ,
which is
there by
generating electrical energy.
17. Condenser
Steam afterrotating steam turbinecomes tocondenser. Condenser refers
here to the shell and tube heat exchanger (orsurfacecondenser) installed
at the outlet of every steam turbine in Thermal power stations of utility
companies.
The purpose is to condense the outlet (or exhaust) steam from steam
turbine to obtain maximum efficiency and also to get the condensed
steam in the formof purewater, otherwise known as condensate, back to
steamgeneratoror (boiler) as boiler feed water.
Condensers are classifiedas:
i)Jetcondensers orcontactcondensers,
ii)Surfacecondensers.
18. Primary Air Fan
• Air to blow the coal from the mill to the
boiler, called the primary air, is supplied
by a large fan driven by a variable
speed motor
• When mixed with a stream of air the
powdered coal behaves more like a gas
than a solid
• Primary air does two jobs – heating the
coal powder and secondly lifting it into
the furnace through pipelines
19. Forced Draught (FD) Fan
• Each unit shall have two forced
draught fans
• The fans draw warm air from the top
of the boiler house through large air
heaters becoming the primary and
secondary air used for the boiler
combustion process
• The air heater warms the incoming
air by transferring heat energy from
the outgoing flue gases
Air Pre-Heater
(APH)• The air heaters use the remaining
heat energy in the flue gas to heat up
the combustion air for the boiler
• Efficiency is increased by using this
heat that would otherwise go up the
chimney. The air temperature leaving
the air heaters is at 300 C
• The air heaters use the remaining
heat energy and efficiency is
increased by using this heat that
would otherwise go up the chimney
20. INDUCED DRAUGHT
(ID) FAN
• Two induced draught fans draw
gases out of the boiler
• The gas has already passed
through the air heaters and
precipitators before it has reached
these fans
• The heat from the flue gases or
smoke is used in the air heaters to
heat up the primary and secondary
air
Chimney
• The chimney is 275 meters' high and
50,000 tonnes of reinforced concrete were
used to make it
• It consists of flues each of which serve
typically two or three boilers (two units)
21. • Each boiler has 4 passes with 7 fields each
containing high voltage electrodes
• These attract the dust or ash from the flue gases
• At regular intervals the electrodes are rapped with
motor-driven hammers and the PFAfalls into
hoppers below
• In a year 1,000 MW station may generate 1.5
million ton of ash
• This is one of the ways to clean up the flue gases
or smoke sent up the chimney
• Secondly this ash is used by construction industry
for use in building materials (bricks !!, Cement
Fillers)
Electro-Static
Precipitator
22. Cooling Towers
The condensate (water) formed inthe
condenser after condensation is
initially at high temperature. This hot
water is passed to coolingtowers.
It isa tower- or building-like device in
which atmospheric air (the heat
receiver) circulates in direct or
indirect contact with warmer water
(the heat source) and the water is
therebycooled.
Types Of Cooling Tower-
1. Wet cooling tower
2. Dry cooling tower
23. Economizer
Fluegases coming outof the boilercarry
lot of heat. Function of economizer is to
recover some of the heat from the heat
carried away in the flue gases up the
chimney and utilize for heating the feed
water to theboiler.
It is placed in the passage of flue gases in
between the exit from the boiler and the
entry to thechimney.
The use of economizer results in saving
in coal consumption, increase in
steaming rate and high boiler efficiency
but needs extra investment andincrease
in maintenance costs and floor area
required for theplant.
24. Steam Turbine
A steam turbine is a device that
extracts thermal energy from
pressurized steam and uses it to
do mechanical work on arotating
outputshaft.
The steam turbine is aform
of heat engine that derives much
of its improvement in
thermodynamic efficiency from
the use of multiple stages in the
expansion of the steam, which
results in a closer approach to the
ideal reversible expansionprocess.
25. Alternator
An alternator is an electromechanical device that converts mechanical
energy to alternating current electrical energy. Most alternators use a
rotating magnetic field. Differentgeometries - such as a linearalternator
forusewith sterling engines - arealsooccasionally used. In principle, any
AC generator can be called an alternator, but usually the word refers to
small rotating machines driven by automotive and other internal
combustionengines.
26. Transformers
It is adevice that transfers electricenergy
from one alternating-current circuit to
one or more other circuits, either
increasing (stepping up) or reducing
(stepping down) thevoltage.
Transformers act through
electromagnetic induction; current in
the primary coil induces current in the
secondary coil. The secondary voltageis
calculated by multiplying the primary
voltage by the ratio of the number of
turns in the secondarycoil to that in the
primary.
28. SWITCH YARD
Placed where switching operation of power distribution isperformed.
Air insulated switch yard of 220KV-400KV are used.
Main Components of SwitchYard:
Circuit breaker
Isolator
Lightening arrester
Bus bar
Current Transformer
Potential Transformer
29. CIRCUIT BREAKER
These are used for automatic switching during normal or abnormal conditions .
Specification:
Manufacturer ABB Limited
Type of Circuit Breaker SF6
Rated Voltage 245 KV
Rated Current
Under Site Condition of 40 0C
Under Site Condition of 50 0C
4000 A
2000 A
Rated Frequency 50 Hz
30. ISOLATOR
These are used to disconnect transmission line under no-load condition for safety,
isolation and maintenance.
Specification:
Rated current for site conditions 2000A
Rated Voltage 245 KV
Rated Frequency 50 Hz
Operating time of Isolator Less than 12 sec.
31. LIGHTENINGARRESTOR
These are used to discharge lightning over voltages and switching over voltages to earth.
Specification:
Manufacturer Crompton Greaves Ltd, Nasik
Model No. ZLA X 25 C
Ref. Standard IEC 99 – 4. 1991
Rated Frequency 50 Hz
Max. Leakage Current 5 mA
32. BUS BAR
The conductors to which several incoming and outgoing
lines are connected.
cables are provided for
They are made up of Cu &Al,
The incoming and outgoing
metering purpose.
33. CURRENT TRANSFORMER
These are used to step-down currents for measurement, control &
protection.
Current transformers are used extensively for measuring current
and monitoring the operation of the power grid.
34. VOLTAGE TRANFORMER
VT measure voltage and this parameter usedfor protection of system.
For high voltage CVT(capacitive voltage transformer) is used instead of VT and
capacitors play divider role.
We can also use these capacitors for PLC system.
35. Stepwise Operation of Thermal Power Plant
1)First the pulverized coal is burnt into the furnaceof boiler.
2) High pressure steam is produced in theboiler.
3) This steam is then passed through the super heater, where it further heated up.
4) This supper heated steam is then entered intoa turbineat high speed.
5)In turbine this steam force rotates the turbine blades that means here in the turbine
the stored potential energy of the high pressured steam is converted into mechanical
energy.
6)Afterrotating the turbine blades, the steam has lost its high pressure, passesoutof
turbine blades and enters intoacondenser.
7) in thecondenserthecold water is circulated with helpof pumpwhich condenses the
low pressure wetsteam.
8)This condensed water is then furthersupplied to low pressurewater heaterwhere the
low pressure steam increases the temperature of this feed water; it is then again heated
in a high pressure heaterwhere the high pressureof steam is used for heating.
9) The turbine in thermal powerstationactsasa prime moverof thealternator.
36. Efficiency of Thermal Power Station or Plant
The overall efficiency of a thermal power station or plant varies from 20% to 26%
and it depends upon plant capacity.