705.12(D) Point of Connection
Utility Interactive Inverters
By
Richard Stovall, CEO SolPowerPeople
#SolarMOOC Webinar 12/19/13
12PM CST
705.12(D)(1)

This change is meant to accommodate
microinverters and AC module systems where
there may be more than one inverter feeding
one OCPD.
705.12(D)(2)

(1)Feeders
(2)Taps
(3)Busbars
705.12(D)(2)(1)
2014: Utility Interactive Inverters
Feeder Conductor Ampere Rating
705.12(D)(2)(1)(a)

225A
100A

200A

400A

.
..
.
..
..

PV – 160A
Continuous

.
.

200A

MLO

200A
200A

200A

200A + (160A x 1.25) =
400A
600kcmil

225A

30A
50A

200A

1000A Bus

200A, 3/0 AWG rated at
200A at 75ºC, Table
310.15(B)(16)

50A

.
.
..
..

50A

50A

400A Bus

The feeder conductor on the load side of the inverter AC output connection
must have an ampacity not less than the feeder overcurrent protective device,
plus 125% of the inverter output AC circuit rating.
Table 310.15(B)(16)
Table 310.15(B)(16)
PV – 160A
Continuous

100A

225A

200A

1000A Bus

200A

200A

200A

225A

200A

200A

200A

400A

.
..
.
..
.. .

.
.. .

2014: Utility Interactive Inverters
Feeder Conductor Ampere Rating
705.12(D)(2)(1)(b)

200A, 3/0 AWG
rated at 200A at
75ºC, Table
310.15(B)(16)
200A Bus

The feeder conductor on the load side of the inverter AC output
connection must have overcurrent protection on the load side of the
inverter output AC connection sized not greater than the ampacity of the
feeder.
Table 310.15(B)(16)
705.12(D)(2)(2)
Feeder – 10 Ft. Tap
705.12(D)(2)(2)

PV – 160A
Continuous

Minimum Feeder Tap
[200A + (160A x 1.25)] x .10 = 40A, but
in no case less than the rating of the
100A OCPD

225A
100A

200A

200A

.
.
. .. .
. .
. .. .
100A

200A
225A

3 AWG rated
100A33 75ºC
at
LOAD
LOAD

30A

20A

200A

1000A Bus

200A

20A

20A

15A

LOAD
LOAD
LOAD

200A

400A

.
..
.
..
..

.
.

.
. .
. .. .
. .. .
30A

50A

50A

50A

50A

LOAD
LOAD

LOADS

100A Bus

400A Bus

Feeder tap between the feeder overcurrent protection device and the
inverter AC output protection device, must have an ampacity not less than
the feeder overcurrent protection device, plus 125% of th e inverter output
AC circuit current rating in accordance with 240.21(B).
Table 310.15(B)(16)
Taps not over 10ft long
• 240.21(B)(1)
Feeder – 25 Ft. Tap
705.12(D)(2)(2)

PV – 160A
Continuous

Minimum Feeder Tap Size
[200A + (160A x 1.25) x .33 = 133A

.
.

200A

225A
100A

.
.
. .. .
. .
. .. .
100A

200A
225A

1/0 AWG rated
33
150A at 75ºC
LOAD
LOAD

30A

20A

200A

1000A Bus

200A

20A

20A

15A

LOAD
LOAD
LOAD

200A

400A

.
..
.
..
..

200A

.
. .
. .. .
. .. .
30A

50A

50A

50A

50A

LOAD
LOAD

LOADS

100A Bus

400A Bus

Feeder tap between the feeder overcurrent protection device and the
inverter AC output protection device, must have an ampacity not less than
the feeder overcurrent protection device, plus 125% of the inverter output AC
circuit current rating in accordance with 240.21(B).
Table 310.15(B)(16)
Taps not over 25ft long
• 240.21(B)(2)
EC&M Article on Feeder Taps
• Written by Mike Holt
• http://ecmweb.com/code-basics/feeder-taps
705.12(D)(2)(3)(a)

AKA 100% RULE
200A MAIN
PV SUPPLY
OCPD

225A BUS
2011 Code is based on the OCPD of the inverter. Therefore the
MAX OCPD fed to this panel in this location is 25A:
225A(busbar rating) minus 200A (main breaker rating) = 25A
200A MAIN
PV 25A
OCPD

225A BUS
2014 Code is based on the 125% of the inverter continuous
output current. Is there a difference? Yes. There may be more
design flexibility with the new rule.
200A MAIN
PV SUPPLY
OCPD

PV SUPPLY
OCPD

225A BUS
Example: 2 branch microinverter circuits. With 25A max
(inverter continuous output x 125%) Assuming M215 (215Wac)
that’s 22 inverters: (25A/(215/240*1.25)=22.32
200A MAIN
PV SUPPLY
OCPD

PV SUPPLY
OCPD

225A BUS
Example: 22 microinverters with allowable 20A OCPD per circuit
(11 each). In 2011 Code this is not allowable because it violates
the 25A max OCPD requirement.
200A MAIN
PV 20A
OCPD

PV 20A
OCPD

225A BUS
705.12(D)(2)(3)(b)

AKA 120% RULE
200A MAIN

PV SUPPLY
OCPD
225A BUS
2011 Code is based on the OCPD of the inverter. Therefore the
MAX OCPD fed to this panel in this location is 70A:
1.2 X 225A(busbar rating) minus 200A (main breaker rating) = 70A
200A MAIN

PV 70A
OCPD
225A BUS
2014 Code is based on the 125% of the inverter continuous
output current. Is there a difference? Yes. There may be more
design flexibility with the new rule.
200A MAIN

PV SUPPLY
OCPD
225A BUS
Example: 4 branch microinverter circuits. With 70A max
(inverter continuous output x 125%) Assuming M215 (215Wac)
that’s 62 inverters: (70A/(215/240*1.25)=62.51
200A MAIN

PV 20A
OCPD

PV 20A
OCPD

PV 20A
OCPD

PV 20A
OCPD
225A BUS

TOTAL: 80A PV OCPD, OKAY IN 2014 CODE
Example: 62 microinverters with 20A OCPD per circuit (15 X 2
and 16 x 2). In 2011 Code this is not allowable because it
violates the 70A max OCPD requirement.
200A MAIN

PV 20A
OCPD

PV 20A
OCPD

PV 20A
OCPD

PV 20A
OCPD
225A BUS
705.12(D)(2)(3)(c)
200A MAIN
20A 2-POLE
PV OCPD

25A 2-POLE

EMPTY

20A 2-POLE
PV OCPD

15A 1-POLE

60A 2-POLE

30A 1-POLE
20A 2-POLE
PV OCPD

50A 2-POLE
225A BUS
LINE A

LINE B

25

25

20

20

20

20

20

20

50

50

60

60

30

15

225

210

200A MAIN
20A 2-POLE
PV OCPD

25A 2-POLE

EMPTY

20A 2-POLE
PV OCPD

15A 1-POLE

60A 2-POLE

30A 1-POLE
20A 2-POLE
PV OCPD

50A 2-POLE
225A BUS
705.12(D)(2)(3)(d)
705.12(D)(3)
705.12(D)(4)
NOT SUITABLE FOR BACKFEED
LOAD

LINE
705.12(D)(5)
705.12(D)(6)
THANK YOU!!
•
•
•
•
•

Richard Stovall
CEO SolPowerPeople
rstovall@solpowerpeople.com
512-825-3051
www.solpowerpeople.com

Mais conteúdo relacionado

Mais procurados

power grid design
power grid designpower grid design
power grid design
susanta das
 
ePortfolio for student assessment
ePortfolio for student assessmentePortfolio for student assessment
ePortfolio for student assessment
samiandtanya
 

Mais procurados (6)

power grid design
power grid designpower grid design
power grid design
 
ePortfolio for student assessment
ePortfolio for student assessmentePortfolio for student assessment
ePortfolio for student assessment
 
Advance Electrical system Design and solar power plant design courses
Advance Electrical system Design and solar power plant design courses Advance Electrical system Design and solar power plant design courses
Advance Electrical system Design and solar power plant design courses
 
UNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAINUNIT - 02 SERVICE MAIN
UNIT - 02 SERVICE MAIN
 
Electric traction on railways
Electric traction on railwaysElectric traction on railways
Electric traction on railways
 
Using facebook in the classroom
Using facebook in the classroomUsing facebook in the classroom
Using facebook in the classroom
 

Destaque

041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat 041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat
solpowerpeople
 
012413 passive solar design
012413 passive solar design012413 passive solar design
012413 passive solar design
solpowerpeople
 
"Grid-Interactive Systems- A Matter of Energy Storage" w/ Dr Jeffery Lee Joh...
"Grid-Interactive Systems- A Matter of Energy Storage" w/  Dr Jeffery Lee Joh..."Grid-Interactive Systems- A Matter of Energy Storage" w/  Dr Jeffery Lee Joh...
"Grid-Interactive Systems- A Matter of Energy Storage" w/ Dr Jeffery Lee Joh...
solpowerpeople
 
053013 pv system site assessment (1)
053013 pv system site assessment (1)053013 pv system site assessment (1)
053013 pv system site assessment (1)
solpowerpeople
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV system
Malik Sameeullah
 

Destaque (20)

10 important safety changes in 2014 nec
10 important safety changes in 2014 nec10 important safety changes in 2014 nec
10 important safety changes in 2014 nec
 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
 
#Solar mooc problem set 1 alternate exercise 1 solution.
#Solar mooc problem set 1 alternate exercise 1 solution.#Solar mooc problem set 1 alternate exercise 1 solution.
#Solar mooc problem set 1 alternate exercise 1 solution.
 
041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat 041813 rs 120 rule and test taking strat
041813 rs 120 rule and test taking strat
 
PV Monitoring Systems w/Arturo Zarate
PV Monitoring Systems w/Arturo ZaratePV Monitoring Systems w/Arturo Zarate
PV Monitoring Systems w/Arturo Zarate
 
#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29#Solar mooc 2009 nabcep study guide solutions 1-29
#Solar mooc 2009 nabcep study guide solutions 1-29
 
Using sohcahtoa
Using sohcahtoaUsing sohcahtoa
Using sohcahtoa
 
012413 passive solar design
012413 passive solar design012413 passive solar design
012413 passive solar design
 
"Grid-Interactive Systems- A Matter of Energy Storage" w/ Dr Jeffery Lee Joh...
"Grid-Interactive Systems- A Matter of Energy Storage" w/  Dr Jeffery Lee Joh..."Grid-Interactive Systems- A Matter of Energy Storage" w/  Dr Jeffery Lee Joh...
"Grid-Interactive Systems- A Matter of Energy Storage" w/ Dr Jeffery Lee Joh...
 
#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations
 
053013 pv system site assessment (1)
053013 pv system site assessment (1)053013 pv system site assessment (1)
053013 pv system site assessment (1)
 
Photovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installationsPhotovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installations
 
Halim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar DomeHalim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar Dome
 
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Photovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial AnalysisPhotovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial Analysis
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-Up
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Tablas nec
Tablas necTablas nec
Tablas nec
 
Design Aspect of Standalone PV system
Design Aspect of Standalone PV systemDesign Aspect of Standalone PV system
Design Aspect of Standalone PV system
 

Semelhante a Changes to 2014 NEC Interconnection Rule 705.12

Advanced motion controls se30a40ac
Advanced motion controls se30a40acAdvanced motion controls se30a40ac
Advanced motion controls se30a40ac
Electromate
 
1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt
Nafir Anas
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004
michaeljmack
 
APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010
APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010
APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010
Steve Mappus
 
Brochure_BMS..08_SG202168BEN_B06-0914
Brochure_BMS..08_SG202168BEN_B06-0914Brochure_BMS..08_SG202168BEN_B06-0914
Brochure_BMS..08_SG202168BEN_B06-0914
Patrick Volluz
 
Advanced motion controls ps50a 1
Advanced motion controls ps50a 1Advanced motion controls ps50a 1
Advanced motion controls ps50a 1
Electromate
 
Advanced motion controls àps50a lv-1
Advanced motion controls àps50a lv-1Advanced motion controls àps50a lv-1
Advanced motion controls àps50a lv-1
Electromate
 
Catalogue thiet bi dien abb rccb rcbo abb-dienhathe.vn
Catalogue thiet bi dien abb rccb rcbo abb-dienhathe.vnCatalogue thiet bi dien abb rccb rcbo abb-dienhathe.vn
Catalogue thiet bi dien abb rccb rcbo abb-dienhathe.vn
Dien Ha The
 
Advanced motion controls sr30a40ac
Advanced motion controls sr30a40acAdvanced motion controls sr30a40ac
Advanced motion controls sr30a40ac
Electromate
 

Semelhante a Changes to 2014 NEC Interconnection Rule 705.12 (20)

Advanced motion controls se30a40ac
Advanced motion controls se30a40acAdvanced motion controls se30a40ac
Advanced motion controls se30a40ac
 
1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt
 
Cataloge schneider catalogue schneider
Cataloge schneider catalogue schneiderCataloge schneider catalogue schneider
Cataloge schneider catalogue schneider
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004
 
APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010
APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010
APEC 2010 ACDC Live Demo Tech SessionPresentation_Feb 19 2010
 
Brochure_BMS..08_SG202168BEN_B06-0914
Brochure_BMS..08_SG202168BEN_B06-0914Brochure_BMS..08_SG202168BEN_B06-0914
Brochure_BMS..08_SG202168BEN_B06-0914
 
Panel Surya/Solar Cell/ Tenaga Surya
Panel Surya/Solar Cell/ Tenaga SuryaPanel Surya/Solar Cell/ Tenaga Surya
Panel Surya/Solar Cell/ Tenaga Surya
 
Rekoser Inverters Catalog
Rekoser Inverters CatalogRekoser Inverters Catalog
Rekoser Inverters Catalog
 
Cataloge schneider catalogue schneider
Cataloge schneider catalogue schneiderCataloge schneider catalogue schneider
Cataloge schneider catalogue schneider
 
Cataloge schneider catalogue schneider-dienhathe.vn
Cataloge schneider catalogue schneider-dienhathe.vnCataloge schneider catalogue schneider-dienhathe.vn
Cataloge schneider catalogue schneider-dienhathe.vn
 
Cataloge schneider catalogue schneider
Cataloge schneider catalogue schneiderCataloge schneider catalogue schneider
Cataloge schneider catalogue schneider
 
Cataloge schneider catalogue schneider
Cataloge schneider catalogue schneiderCataloge schneider catalogue schneider
Cataloge schneider catalogue schneider
 
Advanced motion controls ps50a 1
Advanced motion controls ps50a 1Advanced motion controls ps50a 1
Advanced motion controls ps50a 1
 
Advanced motion controls àps50a lv-1
Advanced motion controls àps50a lv-1Advanced motion controls àps50a lv-1
Advanced motion controls àps50a lv-1
 
RMR Gas Insulated Switchgear Catalog
RMR Gas Insulated Switchgear CatalogRMR Gas Insulated Switchgear Catalog
RMR Gas Insulated Switchgear Catalog
 
Catalogue thiet bi dien abb rccb rcbo abb-dienhathe.vn
Catalogue thiet bi dien abb rccb rcbo abb-dienhathe.vnCatalogue thiet bi dien abb rccb rcbo abb-dienhathe.vn
Catalogue thiet bi dien abb rccb rcbo abb-dienhathe.vn
 
Catalog rccb va rcbo abb
Catalog rccb va rcbo abbCatalog rccb va rcbo abb
Catalog rccb va rcbo abb
 
Advanced motion controls sr30a40ac
Advanced motion controls sr30a40acAdvanced motion controls sr30a40ac
Advanced motion controls sr30a40ac
 
Ls catalog thiet bi dien ul mccb dienhathe.vn
Ls catalog thiet bi dien ul mccb dienhathe.vnLs catalog thiet bi dien ul mccb dienhathe.vn
Ls catalog thiet bi dien ul mccb dienhathe.vn
 
Ls catalog thiet bi dien ul mccb
Ls catalog thiet bi dien ul mccbLs catalog thiet bi dien ul mccb
Ls catalog thiet bi dien ul mccb
 

Mais de solpowerpeople

#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
solpowerpeople
 

Mais de solpowerpeople (10)

Metering Solutions
Metering SolutionsMetering Solutions
Metering Solutions
 
Inter row shading 4-19-12
Inter row shading 4-19-12Inter row shading 4-19-12
Inter row shading 4-19-12
 
PV Installations & Errors
PV Installations & ErrorsPV Installations & Errors
PV Installations & Errors
 
Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system Webinar 03 electrical installation of pv system
Webinar 03 electrical installation of pv system
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsyst
 
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
#SolarMOOC: Webinar on Project Management of Solar PV with Jeffery Lee Johnso...
 
What is a triangle
What is a triangleWhat is a triangle
What is a triangle
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
 
Final trig problem solution
Final trig problem solutionFinal trig problem solution
Final trig problem solution
 
#Solarmooc Arctan Solution
#Solarmooc Arctan Solution#Solarmooc Arctan Solution
#Solarmooc Arctan Solution
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 

Changes to 2014 NEC Interconnection Rule 705.12

  • 1. 705.12(D) Point of Connection Utility Interactive Inverters By Richard Stovall, CEO SolPowerPeople #SolarMOOC Webinar 12/19/13 12PM CST
  • 2. 705.12(D)(1) This change is meant to accommodate microinverters and AC module systems where there may be more than one inverter feeding one OCPD.
  • 5. 2014: Utility Interactive Inverters Feeder Conductor Ampere Rating 705.12(D)(2)(1)(a) 225A 100A 200A 400A . .. . .. .. PV – 160A Continuous . . 200A MLO 200A 200A 200A 200A + (160A x 1.25) = 400A 600kcmil 225A 30A 50A 200A 1000A Bus 200A, 3/0 AWG rated at 200A at 75ºC, Table 310.15(B)(16) 50A . . .. .. 50A 50A 400A Bus The feeder conductor on the load side of the inverter AC output connection must have an ampacity not less than the feeder overcurrent protective device, plus 125% of the inverter output AC circuit rating.
  • 8. PV – 160A Continuous 100A 225A 200A 1000A Bus 200A 200A 200A 225A 200A 200A 200A 400A . .. . .. .. . . .. . 2014: Utility Interactive Inverters Feeder Conductor Ampere Rating 705.12(D)(2)(1)(b) 200A, 3/0 AWG rated at 200A at 75ºC, Table 310.15(B)(16) 200A Bus The feeder conductor on the load side of the inverter AC output connection must have overcurrent protection on the load side of the inverter output AC connection sized not greater than the ampacity of the feeder.
  • 11. Feeder – 10 Ft. Tap 705.12(D)(2)(2) PV – 160A Continuous Minimum Feeder Tap [200A + (160A x 1.25)] x .10 = 40A, but in no case less than the rating of the 100A OCPD 225A 100A 200A 200A . . . .. . . . . .. . 100A 200A 225A 3 AWG rated 100A33 75ºC at LOAD LOAD 30A 20A 200A 1000A Bus 200A 20A 20A 15A LOAD LOAD LOAD 200A 400A . .. . .. .. . . . . . . .. . . .. . 30A 50A 50A 50A 50A LOAD LOAD LOADS 100A Bus 400A Bus Feeder tap between the feeder overcurrent protection device and the inverter AC output protection device, must have an ampacity not less than the feeder overcurrent protection device, plus 125% of th e inverter output AC circuit current rating in accordance with 240.21(B).
  • 13. Taps not over 10ft long • 240.21(B)(1)
  • 14. Feeder – 25 Ft. Tap 705.12(D)(2)(2) PV – 160A Continuous Minimum Feeder Tap Size [200A + (160A x 1.25) x .33 = 133A . . 200A 225A 100A . . . .. . . . . .. . 100A 200A 225A 1/0 AWG rated 33 150A at 75ºC LOAD LOAD 30A 20A 200A 1000A Bus 200A 20A 20A 15A LOAD LOAD LOAD 200A 400A . .. . .. .. 200A . . . . .. . . .. . 30A 50A 50A 50A 50A LOAD LOAD LOADS 100A Bus 400A Bus Feeder tap between the feeder overcurrent protection device and the inverter AC output protection device, must have an ampacity not less than the feeder overcurrent protection device, plus 125% of the inverter output AC circuit current rating in accordance with 240.21(B).
  • 16. Taps not over 25ft long • 240.21(B)(2)
  • 17. EC&M Article on Feeder Taps • Written by Mike Holt • http://ecmweb.com/code-basics/feeder-taps
  • 20. 2011 Code is based on the OCPD of the inverter. Therefore the MAX OCPD fed to this panel in this location is 25A: 225A(busbar rating) minus 200A (main breaker rating) = 25A 200A MAIN PV 25A OCPD 225A BUS
  • 21. 2014 Code is based on the 125% of the inverter continuous output current. Is there a difference? Yes. There may be more design flexibility with the new rule. 200A MAIN PV SUPPLY OCPD PV SUPPLY OCPD 225A BUS
  • 22. Example: 2 branch microinverter circuits. With 25A max (inverter continuous output x 125%) Assuming M215 (215Wac) that’s 22 inverters: (25A/(215/240*1.25)=22.32 200A MAIN PV SUPPLY OCPD PV SUPPLY OCPD 225A BUS
  • 23. Example: 22 microinverters with allowable 20A OCPD per circuit (11 each). In 2011 Code this is not allowable because it violates the 25A max OCPD requirement. 200A MAIN PV 20A OCPD PV 20A OCPD 225A BUS
  • 26. 2011 Code is based on the OCPD of the inverter. Therefore the MAX OCPD fed to this panel in this location is 70A: 1.2 X 225A(busbar rating) minus 200A (main breaker rating) = 70A 200A MAIN PV 70A OCPD 225A BUS
  • 27. 2014 Code is based on the 125% of the inverter continuous output current. Is there a difference? Yes. There may be more design flexibility with the new rule. 200A MAIN PV SUPPLY OCPD 225A BUS
  • 28. Example: 4 branch microinverter circuits. With 70A max (inverter continuous output x 125%) Assuming M215 (215Wac) that’s 62 inverters: (70A/(215/240*1.25)=62.51 200A MAIN PV 20A OCPD PV 20A OCPD PV 20A OCPD PV 20A OCPD 225A BUS TOTAL: 80A PV OCPD, OKAY IN 2014 CODE
  • 29. Example: 62 microinverters with 20A OCPD per circuit (15 X 2 and 16 x 2). In 2011 Code this is not allowable because it violates the 70A max OCPD requirement. 200A MAIN PV 20A OCPD PV 20A OCPD PV 20A OCPD PV 20A OCPD 225A BUS
  • 31. 200A MAIN 20A 2-POLE PV OCPD 25A 2-POLE EMPTY 20A 2-POLE PV OCPD 15A 1-POLE 60A 2-POLE 30A 1-POLE 20A 2-POLE PV OCPD 50A 2-POLE 225A BUS
  • 32. LINE A LINE B 25 25 20 20 20 20 20 20 50 50 60 60 30 15 225 210 200A MAIN 20A 2-POLE PV OCPD 25A 2-POLE EMPTY 20A 2-POLE PV OCPD 15A 1-POLE 60A 2-POLE 30A 1-POLE 20A 2-POLE PV OCPD 50A 2-POLE 225A BUS
  • 34.
  • 35.
  • 38. NOT SUITABLE FOR BACKFEED LOAD LINE
  • 41. THANK YOU!! • • • • • Richard Stovall CEO SolPowerPeople rstovall@solpowerpeople.com 512-825-3051 www.solpowerpeople.com

Notas do Editor

  1. Slide reproduction from page 6
  2. From page 7 – 705.12(D)(2)(b)(1)
  3. Slide reproduction from page 6
  4. 705.12(D)2(2) 02Page 8