Solar Future II: Thin Film PV 
Bruce Sohn, President
           ,
June 8, 2010
Forward‐Looking Statement

           During the course of this presentation the company will make projections and other 
           statements that are forward‐looking statements within the meaning of the federal 
           securities laws.  The forward‐looking statements in this presentation are based on 
                                                g                   p
           current information and expectations, are subject to uncertainties and changes in 
           circumstances, and do not constitute guarantees of future performance. Those 
           statements involve a number of factors that could cause actual results to differ 
           materially from those statements, including the risks as described in the company’s 
           most recent annual report on Form 10‐K, quarterly report on Form 10‐Q, and other 
           filings with the Securities and Exchange Commission. First Solar assumes no 
           obligation to update any forward‐looking information contained in this presentation  
           or with respect to the announcements described herein. 




© Copyright 2010, First Solar, Inc.                                                                2
Our Mission
                   Our Mission
                   To create enduring value by enabling a world 
                   powered by clean, affordable solar electricity.
                          db l         ff d bl    l    l t i it




© Copyright 2010, First Solar, Inc.   First Solar Confidential & Proprietary   3
Environmental Responsibility
           First Solar's Environmental Plan




                                                          2
                          1                                                   3
                                                Procure, Produce,
                       Convert                                             Reduce
                                                      Use And
                  Mining Byproducts                                     Emissions By
                                              Recycle Solar Modules
                                              Recycle Solar Modules
                      To Clean,                                       Substituting Solar
                                                  In A Perpetual,
                     Renewable                                           Energy For
                                                 Environmentally
                       Energy                                            Fossil Fuels
                                                   Safe Life Cycle




© Copyright 2010, First Solar, Inc.                                                        4
Life Cycle Assessment for PV

        M/Q                           M/Q                M/Q              M/Q             M/Q                     M/Q




        Raw Material                     Material                                              De‐                      Treatment
                                                          Manufacturing         Use
         Acquisition                    Processing                                         commissioning                & Disposal




                                                                                                M/Q
                             E                       E               E                E                 E                            E




                                                                                                      Recycling



      M/Q:                Material and Energy Inputs
      E:                  Effluents (air, water, solid)
                                                                                                                  E

© Copyright 2010, First Solar, Inc.                                                                                                      5
LCA: Global Warming Potential

                                                                      CO2‐eq (g/kWh)
              1000                    900           850
               800
               600                                                  400
               400
               200                                                                  45              24             15                11
                 0
                                      Coal           Oil         Gas CC BioMass  Nuclear  PV CdTe
                                                                 Gas CC BioMass Nuclear PV CdTe                                     Wind
                                                                          CHP     USA
                                      Source:   ExternE project, 2003; Kim and Dale, 2005; Fthenakis and Kim, 2006: Fthenakis and
                                                Alsema, 2006; Fthenakis and Kim, in press.
                                                       ,     ;                   , p
                                                de Wild-Scholten & Schottler, 2009.
                                                Assumptions: PV CdTe based on 9% efficiency at insolation of 1700 kWh/m2

© Copyright 2010, First Solar, Inc.                                                                                                        6
Energy Payback Time

           • EPBT: The Amount of Time a System Must Operate to Produce The Amount 
             of Electricity That Was Required to Fabricate the System

                                                   1.0   EPBT (Years)
           • Objective: Minimize EPBT
                    – Supports Rapid Scalability   0.8
                                                                     BOS
                                                   0.6
                                                   0.4
                                                                    Module
                                                   0.2
                                                   0.0
                                                                     CdT
                                                                     CdTe
                                                          Source:    de Wild-Scholten & Schottler, 2009.

© Copyright 2010, First Solar, Inc.                                                                    7
Cash Pay Back Time
                                         D ll
                                         Dollars




       Investment                                  Payback
                                                                                            Time




   © Copyright 2010, First Solar, Inc.             First Solar Confidential & Proprietary          8
Energy Payback Time
                                                           kWh




                                                                          EPBT
                                                                                                                             Months

‐15      ‐12              ‐9                   ‐6     ‐3         0     3              6               9       12   15   18   21   24



Raw Materials                                       EPC/BOS                                      Production and O&M
                                         ort
                            Mfg
                            M
                                   Transpo




      © Copyright 2010, First Solar, Inc.                            First Solar Confidential & Proprietary                            9
Leadership Across the Value Chain: Delivering Energy
                                                                  VALUE CHAIN


           Module                       Development                     EPC                  O&M                 Financing


                                                              INDUSTRY CONSTRAINTS



     Turnkey Solution 
     T k S l ti                       Long Development 
                                      L    D l       t             High Balance of 
                                                                   Hi h B l      f     Module Lifecycle & 
                                                                                       M d l Lif     l &
                                                                                                             High Cost of Capital
     Pricing too High                    Lead Times                 System Costs         Performance




                                       • OptiSolar (2009)                                                      • Balance Sheet
    • Low Module Cost                                              • Turner (2007)
                                      •Positioned for Near                                                      • Proven Track 
     • Aggressive Cost                                              • EPC Velocity     • Data Monitoring 
                                        Term Execution                                                              Record
   Reduction Roadmap                                                  • BoS Cost        • O&M Program
                                           • Strategic                                                       • Leading Strategic 
          • Scale                                                   Optimization
                                          Partnerships
                                                     p                                                             Partners

                                                              FIRST SOLAR INJECTIONS

© Copyright 2010, First Solar, Inc.                                                                                                 10
Development
Systems Project Cost Structure 




                                                              Module

                                      EPC Standard2



   1   IDC = interest during construction
       IDC = interest during construction
   2   EPC Standard Costs= balance of system costs (inverters, electrical, mounting hardware, project 
        management and engineering, and installation labor)
© Copyright 2010, First Solar, Inc.                                                                      11
Manufacturing Cost per Watt Trend

             $1.59

$1.50
                                  $
                                  $1.40

                                             $1.23

                                                     $1.08
$1.00
                                                              $0.93
                                                                        $0.87   $0.85   $0.84   $0.81



$0.50
                  FY05                FY06    FY07    FY08     Q109      Q209    Q309   Q409    Q110

                                                       Core   SBC     Ramp

© Copyright 2010, First Solar, Inc.                                                                     12
Module Cost Reduction Roadmap 
   $2.94/W
   $2 94/W                            Q1 2010 cost per watt = $0.81
                                      Q1 2010 cost per watt = $0 81
                          $0.93/W
                            100%       18‐25%



                                                     4‐6%


                                                                  4‐6%
                                                                            3 4%
                                                                            3‐4%                    $0.52 ‐ 0.63/W
                                                                                                    $0 52 0 63/W
                                                                                          2%
                                                                                                       56‐68% 



       2004      Q1 09                Efficiency   Throughput   Spending   Low Cost   Plant Scale        2014
     Cost/Watt Cost/Watt                                                   Location                 Cost/Watt Target
© Copyright 2010, First Solar, Inc.                                                                                13
Production Capacity Growth
Total current and announced capacity grows by 780MW to 2.1GW
Total current and announced capacity grows by 780MW to 2.1GW
                                                                                                                                        2,117 MW
                                                                                                                    2,005 MW                  111       France
                                                                                                                           Plant 
                                                                                                                           5 & 6

                                                                                                      1,337MW
                                                                                  1,228 MW                                                               Malaysia
                                                                                                                           1337              1337

                                                                                                           891
                                                                   716 MW                854

                                                                        382                                               Plant 2
                                                 308 MW                                                                                                  Germany
                                                                                                           223              446               446
                                                      176               191              214
                               100 MW
                               100 MW                                                                      223              223               223        Ohio
Capacity 25 MW                                        132               143              160
                   2005              2006              2007            2008               2009             2010             2011             2012
                                     2005 & 2006 based on Q406 run rate; 2007 based on Q407 run rate; 2008 based on Q408 run rate; 2009 based on Q409 run rate, 
 © Copyright 2010, First Solar, Inc. 2010‐2012 based on Q1 2010 run‐rate                                                                                           14
Balance of System* Cost Reduction Roadmap 


         ~$1.40 /W
              100%                    2%
                                                 8%
                                                                  7%                                            $0.91‐0.98/W 
                                                                                   1%              12%              Target
                                                                                                                    T
                                                                                                                     65‐70%




         Q1’09 BOS                   Engr. ,    Mounting         Inverter          Other         Installation     2014 BOS
                                  Proj. Mgmt.   Hardware       Transformer       Electrical
                 * Includes standard EPC costs; excludes site‐specific and development costs, as well as interest during construction
© Copyright 2010, First Solar, Inc.                                                                                                     15
BOS Costs Inverse to Velocity and Constructability




             Site:      Blythe, CA           Site:   Sarnia, Ontario               Site:   Boulder City, NV
  System Size:          21MW          System Size:   20MW => 80 MW in ‘10   System Size:   10MW => 58 MW in ‘10
       Project                            Project                               Project 
                        First Solar    Developer:
                                                     First Solar                           Sempra
    Developer:                                                               Developer:

         Owner:         NRG Energy        Owner:     Enbridge                   Owner:     Sempra



                                               (All MW AC)

© Copyright 2010, First Solar, Inc.                                                                           16
Copper Mountain: 48MWs




© Copyright 2010, First Solar, Inc.   17
Cost Reduction – Solar Electricity (LCOE) 

                     Medium Resource – 1400 hours                                                                  High Resource – 1800 hours

U.S. ¢/kWh                                                                               U.S. ¢/kWh
35                                                                                          35

30                                                                                          30

25                                                                                          25

20                                                                                          20
           Transition                                                                                 Transition
15                                                                                          15
            Sustainable                                                                                Sustainable
                                                                     FSLR 2014




                                                                                                                                                                      2014
10                                                                                          10




                                                                                                                                                                 FSLR 2
 5                                                                                            5

 0                                                                                            0
      $6.00             $5.00           $4.00         $3.00            $2.00                      $6.00           $5.00            $4.00           $3.00              $2.00 


Note: Assumes 7.5% unlevered IRR, 10% ITC, 2.5% electricity power price escalator, FSLR panels, utility scale plant, install labor and site specific cost estimates. Includes 
      owner development costs, financing costs and O&M.
  © Copyright 2010, First Solar, Inc.                                                                                                                                        18
Our Strategy

                                        Leading           Business 
                                      Shares in the      Model that       Sustainable 
    Sustainable                                                                            Enduring 
   Solar Markets                         Most          Drives Superior    Competitive    Business Value
                                       Attractive
                                       Attractive        Returns on
                                                         Returns on       Advantages
                                        Markets            Capital




 • Reduce solar electricity costs to sustainable levels through  technology 
   development, operational excellence and scale
 • Use price adaptive business models and partnerships to expand markets
   Use price, adaptive business models and partnerships to expand markets  
 • Own and develop the technologies necessary to be the low cost provider of 
   solar electricity 
 • Maintain financial discipline that assures superior returns on invested capital 
            f       ld      l     h                                      d       l

© Copyright 2010, First Solar, Inc.                                                                       19
The Migration from Existing Subsidy to Transition Markets  


                                            Sustainable  
                                              Markets 
                                              Markets

                              Transition 
                               Markets 
                               Markets

    Existing Subsidy       Constraints
        Markets 
        Markets




© 2009 First Solar, Inc.                                      20
Growth opportunities
Potential PV Capacity by Region (GW) – Assuming Regulatory Targets and Macro Factor Growth
                                 Sustainable 
                                 Markets

          Other
          Australia
                 l
          GCC
                                 Transition 
          Rest of U.S.                                                                                             1,7001
                                 Markets
          India
          China
          California
          C lif i

          Other
          Ontario
          Italy                                                                             105                     105
                                  Existing 
                                         g
          Spain
          S i
                                  Markets                              105
          France
          Japan                                        65
          Germany
                                                   Existing                             Transition               Sustainable 
                                                   Markets                               Markets                  Markets
                                                                                                                  Markets 
                                                                                                                 2020 ‐ 2050 
  1) Assumes potential solar capacity equal to 6% of total electricity consumption in identified solar markets
  Source: Market analyst estimates; First Solar analysis. Assumes base case scenario.
© Copyright 2010, First Solar, Inc.                                                                                             21
Crossing Over to Sustainable Markets
                                          $0.40

                                          $0.35
                                  /kWh)




                                                                                                            Carbon emissions 
                                          $0 30
                                          $0.30
                    Electricity ($/




                                                                                                            cost adder
                                                                    Price parity with 
                                                                conventional generation                     Conventional,
                                          $0.25                 drives inflection in price                  base cost
                                                                     elastic demand 
                                          $0.20
                                          $0 20                                                             Conventional, ,
       ized Cost of E




                                                                                                            fuel sensitized cost
                                          $0.15                                                             PV cost roadmap

                                          $0.10                                                             Global PV demand
                                                                                                            Global PV demand
  Leveli




                                          $0.05

                                          $0.00
                                                  Gas Peaking    Coal       Gas Combined Cycle    Nuclear

 Note: Conventional generation LCOE, Lazard 2008. Carbon emissions cost assumes $30/ton CO2. 
       High end of coal costs incorporates 90% carbon capture – emissions adder does not apply.
© Copyright 2010, First Solar, Inc.                                                                                                22
Industry Demand – Estimates1 as of 4/16/10
                     9.9 GW in 2010, with a 30% CAGR% 2009‐2012
                     9 9 GW in 2010 with a 30% CAGR% 2009‐2012
      16
    16,000                                                                                                                                                  15.3

      14
    14,000 
                                                                                                                                      12.1
      12
    12,000 

                                                                                                                  9.9
      10
    10,000 
GW
        8
     8,000 
                                                                                             7.0
        6
     6,000 
                                                                         5.9

        4
     4,000 
     4 000
                                                   2.7
        2
     2,000 
                          1.7

         0
         ‐
                          2006                     2007                  2008                2009            2010                     2011                  2012
                                      Germany        Spain      France      Italy      ROE     North America    Japan            China    ROW
                                      1 Forecasts from  Auriga, Barclays, Collins Stewart, Credit Suisse, Deutsche Bank, JP Morgan, Lazard, Morgan Stanley, Raymond 
                                       James, Think Equity, UBS, and Wedbush.  2009 Germany demand from Bundesnetzagentur registration data
© Copyright 2010, First Solar, Inc.                                                                                                                                    23
Good Policy Makes Strong Markets




Source: Meteotest
© Copyright 2010, First Solar, Inc.   24
Solar is still a small portion of total energy production 
Solar represents a small percentage of total energy production, even in the most 
        p                p       g               gy p          ,
mature solar markets, but the growth potential is significant.
                                                 Percent of Total Electricity Production*
                          2.13%                     1.11%                     0.27%                     0.04%                      0.04%                     0.03%
       100%


         90%

         80%
                         97.87%                    98.89%                     99.73%                    99.96%                    99.96%                    99.97%
         70%

         60%

         50%
                          Spain                  Germany                       Italy                   France                     ROEU                         US

                      % of Total Electricity Production from All Other Sources                             % of Total Electricity Production from Solar

Note: *Solar includes both Solar PV & Solar Thermal generation.  2009 data for EU; 2009 US estimate extrapolated from 2008 EIA data based solar capacity added in 2009.
Source: Eurostat: Electricity Estatistics, Provisional Data 2009; EIA; Marketbuzz.
© Copyright 2010, First Solar, Inc.                                                                                                                                       25
…enabling a world powered
  enabling
by clean, affordable solar electricity
   clean,
     © Copyright 2010, First Solar, Inc.                                    26
                                           1.4MW · Dimbach, Germany · Beck Energy

Mais conteúdo relacionado

Mais procurados

Business Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - BrownBusiness Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - Brownsustg
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Burton Lee
 
Thin film and thin wafer PV: challenges for BIPV applications [PV 2009]
Thin film and thin wafer PV: challenges for BIPV applications [PV 2009] Thin film and thin wafer PV: challenges for BIPV applications [PV 2009]
Thin film and thin wafer PV: challenges for BIPV applications [PV 2009] Smithers Apex
 
Invest in NI - Olive Hill - CBI NI Annual Energy Forum
Invest in NI - Olive Hill - CBI NI Annual Energy ForumInvest in NI - Olive Hill - CBI NI Annual Energy Forum
Invest in NI - Olive Hill - CBI NI Annual Energy ForumAJCBI
 
Philippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationPhilippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationGlobal CCS Institute
 
Noether Associates--China Renewable Energy Resources
Noether Associates--China Renewable Energy ResourcesNoether Associates--China Renewable Energy Resources
Noether Associates--China Renewable Energy Resourcessyjnsyy
 
BP Solar: Drivers for Commercial Solar Projects
BP Solar: Drivers for Commercial Solar ProjectsBP Solar: Drivers for Commercial Solar Projects
BP Solar: Drivers for Commercial Solar ProjectsMDV-SEIA
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata PresentationHitReach
 
Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...
Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...
Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...Robert J. (Bob) Morris
 
Solar Pathway & Trail Lighting
Solar Pathway & Trail LightingSolar Pathway & Trail Lighting
Solar Pathway & Trail LightingSol Inc.
 
SolarPanel MIT Energy Conference 2007
SolarPanel MIT Energy Conference 2007SolarPanel MIT Energy Conference 2007
SolarPanel MIT Energy Conference 2007Dmitry Tseitlin
 
The Future Of Clean Power Generation
The Future Of Clean Power GenerationThe Future Of Clean Power Generation
The Future Of Clean Power GenerationGlenn Klith Andersen
 
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...Blake Morgan
 
Atlanta smart grid presentatin 8 30 2011 r3
Atlanta smart grid presentatin 8 30 2011 r3Atlanta smart grid presentatin 8 30 2011 r3
Atlanta smart grid presentatin 8 30 2011 r3Melanie Brandt
 
Keynote - Joseph Simonelli
Keynote - Joseph SimonelliKeynote - Joseph Simonelli
Keynote - Joseph SimonelliReenergize
 
Issues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sectorIssues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sectorVIKING Life-Saving Equipment A/S
 
Part 3 tipz-utp
Part 3   tipz-utpPart 3   tipz-utp
Part 3 tipz-utpMTZ1227
 

Mais procurados (20)

Business Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - BrownBusiness Forum: Nuclear & Renewable Energy - Brown
Business Forum: Nuclear & Renewable Energy - Brown
 
BrighSourceEnergy 2010
BrighSourceEnergy 2010BrighSourceEnergy 2010
BrighSourceEnergy 2010
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
 
Thin film and thin wafer PV: challenges for BIPV applications [PV 2009]
Thin film and thin wafer PV: challenges for BIPV applications [PV 2009] Thin film and thin wafer PV: challenges for BIPV applications [PV 2009]
Thin film and thin wafer PV: challenges for BIPV applications [PV 2009]
 
Invest in NI - Olive Hill - CBI NI Annual Energy Forum
Invest in NI - Olive Hill - CBI NI Annual Energy ForumInvest in NI - Olive Hill - CBI NI Annual Energy Forum
Invest in NI - Olive Hill - CBI NI Annual Energy Forum
 
Philippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationPhilippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentation
 
Dorset Transition Energy Survey 2009
Dorset Transition Energy Survey 2009Dorset Transition Energy Survey 2009
Dorset Transition Energy Survey 2009
 
Noether Associates--China Renewable Energy Resources
Noether Associates--China Renewable Energy ResourcesNoether Associates--China Renewable Energy Resources
Noether Associates--China Renewable Energy Resources
 
BP Solar: Drivers for Commercial Solar Projects
BP Solar: Drivers for Commercial Solar ProjectsBP Solar: Drivers for Commercial Solar Projects
BP Solar: Drivers for Commercial Solar Projects
 
Ambata Presentation
Ambata PresentationAmbata Presentation
Ambata Presentation
 
Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...
Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...
Global Energy Trends: Role of Renewable Energy, R. J. Morris, AndMore Associa...
 
Solar Pathway & Trail Lighting
Solar Pathway & Trail LightingSolar Pathway & Trail Lighting
Solar Pathway & Trail Lighting
 
Solar Project Acquisitions
Solar Project AcquisitionsSolar Project Acquisitions
Solar Project Acquisitions
 
SolarPanel MIT Energy Conference 2007
SolarPanel MIT Energy Conference 2007SolarPanel MIT Energy Conference 2007
SolarPanel MIT Energy Conference 2007
 
The Future Of Clean Power Generation
The Future Of Clean Power GenerationThe Future Of Clean Power Generation
The Future Of Clean Power Generation
 
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
Blake Lapthorn Green Breakfast with guest speaker Philip Wolfe, Director of W...
 
Atlanta smart grid presentatin 8 30 2011 r3
Atlanta smart grid presentatin 8 30 2011 r3Atlanta smart grid presentatin 8 30 2011 r3
Atlanta smart grid presentatin 8 30 2011 r3
 
Keynote - Joseph Simonelli
Keynote - Joseph SimonelliKeynote - Joseph Simonelli
Keynote - Joseph Simonelli
 
Issues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sectorIssues and challenges with safety equipment for a specialized sector
Issues and challenges with safety equipment for a specialized sector
 
Part 3 tipz-utp
Part 3   tipz-utpPart 3   tipz-utp
Part 3 tipz-utp
 

Destaque

Avaluacio multimedia
Avaluacio multimediaAvaluacio multimedia
Avaluacio multimediaMiriam Robles
 
Capitla humano TIC Argentina 08
Capitla humano TIC Argentina 08Capitla humano TIC Argentina 08
Capitla humano TIC Argentina 08Alejandro Prince
 
Benchmarking Digital: A Digital Experience Index Is Born
Benchmarking Digital: A Digital Experience Index Is BornBenchmarking Digital: A Digital Experience Index Is Born
Benchmarking Digital: A Digital Experience Index Is BornCognizant
 
Jenny valladolid botánica
Jenny valladolid   botánicaJenny valladolid   botánica
Jenny valladolid botánicagabyjen4
 
Co working lloret by esther
Co working lloret   by estherCo working lloret   by esther
Co working lloret by estherCoWorking Lloret
 
Revista som hi 09-10 bona
Revista som hi 09-10 bonaRevista som hi 09-10 bona
Revista som hi 09-10 bonaalbertcamara
 
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag BerlinLeseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag BerlinIngolf Ludmann-Schneider
 
Acampan por Muse
Acampan por MuseAcampan por Muse
Acampan por MuseChekoCG
 
Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013Nicolas Berg
 
120525 af internship invitation
120525 af internship invitation120525 af internship invitation
120525 af internship invitationDenish Anugra
 
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?Alex Rayón Jerez
 
Trucos publicitarios colores
Trucos publicitarios coloresTrucos publicitarios colores
Trucos publicitarios coloresJair Reséndiz
 
El abuso sexual infantil
El abuso sexual infantilEl abuso sexual infantil
El abuso sexual infantilAreli Balboa
 

Destaque (20)

Avaluacio multimedia
Avaluacio multimediaAvaluacio multimedia
Avaluacio multimedia
 
Capitla humano TIC Argentina 08
Capitla humano TIC Argentina 08Capitla humano TIC Argentina 08
Capitla humano TIC Argentina 08
 
Normas
NormasNormas
Normas
 
Benchmarking Digital: A Digital Experience Index Is Born
Benchmarking Digital: A Digital Experience Index Is BornBenchmarking Digital: A Digital Experience Index Is Born
Benchmarking Digital: A Digital Experience Index Is Born
 
Edificio vicson margarita danies
Edificio vicson   margarita daniesEdificio vicson   margarita danies
Edificio vicson margarita danies
 
Jenny valladolid botánica
Jenny valladolid   botánicaJenny valladolid   botánica
Jenny valladolid botánica
 
Co working lloret by esther
Co working lloret   by estherCo working lloret   by esther
Co working lloret by esther
 
Revista som hi 09-10 bona
Revista som hi 09-10 bonaRevista som hi 09-10 bona
Revista som hi 09-10 bona
 
Resume revamp
Resume revampResume revamp
Resume revamp
 
Mil millones de bocas
Mil millones de bocasMil millones de bocas
Mil millones de bocas
 
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag BerlinLeseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
 
KASEBA MULANDO CV
KASEBA MULANDO CVKASEBA MULANDO CV
KASEBA MULANDO CV
 
Acampan por Muse
Acampan por MuseAcampan por Muse
Acampan por Muse
 
Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013
 
120525 af internship invitation
120525 af internship invitation120525 af internship invitation
120525 af internship invitation
 
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
 
Trucos publicitarios colores
Trucos publicitarios coloresTrucos publicitarios colores
Trucos publicitarios colores
 
El abuso sexual infantil
El abuso sexual infantilEl abuso sexual infantil
El abuso sexual infantil
 
Cmc origen sistema solar
Cmc origen sistema solarCmc origen sistema solar
Cmc origen sistema solar
 
Unidad3 valoraciones perito
Unidad3 valoraciones peritoUnidad3 valoraciones perito
Unidad3 valoraciones perito
 

Semelhante a The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achieve the mission of module production cost at $0.70/Wp?"

2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance DesignSteve Lojuntin
 
Osmotic power presentation ids xi december 2009 tcm9-7043
Osmotic power presentation ids xi december 2009 tcm9-7043Osmotic power presentation ids xi december 2009 tcm9-7043
Osmotic power presentation ids xi december 2009 tcm9-7043jinxxyd
 
Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)
Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)
Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)mathsmasters
 
How To Get A Green Job Jsana Aug 2009
How To Get A Green Job Jsana Aug 2009How To Get A Green Job Jsana Aug 2009
How To Get A Green Job Jsana Aug 2009Michael Fritsch
 
Neah Power Investor Presentation
Neah Power Investor PresentationNeah Power Investor Presentation
Neah Power Investor Presentationnpwzpr
 
DESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesDESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesIPPAI
 
2011 10-05 smart grids as an opportunity for finland-jki
2011 10-05 smart grids as an opportunity for finland-jki2011 10-05 smart grids as an opportunity for finland-jki
2011 10-05 smart grids as an opportunity for finland-jkiSitra Energia
 
Energy Conservation For Liu
Energy Conservation For LiuEnergy Conservation For Liu
Energy Conservation For Liurolewis1
 
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERTHE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERDv Nareshkumar
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicJeffrey Phillips
 
UBS Australian Utilities Conference
UBS Australian Utilities ConferenceUBS Australian Utilities Conference
UBS Australian Utilities ConferenceAGL Energy Limited
 
2010 03 23 NERA NYC Nuclear Power Briefing Final With Notes
2010 03 23 NERA  NYC Nuclear Power Briefing   Final With Notes2010 03 23 NERA  NYC Nuclear Power Briefing   Final With Notes
2010 03 23 NERA NYC Nuclear Power Briefing Final With NotesEdward Kee
 

Semelhante a The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achieve the mission of module production cost at $0.70/Wp?" (20)

2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design
 
Osmotic power presentation ids xi december 2009 tcm9-7043
Osmotic power presentation ids xi december 2009 tcm9-7043Osmotic power presentation ids xi december 2009 tcm9-7043
Osmotic power presentation ids xi december 2009 tcm9-7043
 
John Thwaites
John ThwaitesJohn Thwaites
John Thwaites
 
Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)
Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)
Adewole J. K.: Membrane Separation Technology in Enhanced Oil Recovery (EOR)
 
How To Get A Green Job Jsana Aug 2009
How To Get A Green Job Jsana Aug 2009How To Get A Green Job Jsana Aug 2009
How To Get A Green Job Jsana Aug 2009
 
Mok Energy
Mok Energy Mok Energy
Mok Energy
 
Bloom box energy
Bloom box energyBloom box energy
Bloom box energy
 
Kpcgroupfull2
Kpcgroupfull2Kpcgroupfull2
Kpcgroupfull2
 
Neah Power Investor Presentation
Neah Power Investor PresentationNeah Power Investor Presentation
Neah Power Investor Presentation
 
DESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesDESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion Technologies
 
2011 10-05 smart grids as an opportunity for finland-jki
2011 10-05 smart grids as an opportunity for finland-jki2011 10-05 smart grids as an opportunity for finland-jki
2011 10-05 smart grids as an opportunity for finland-jki
 
Energy Conservation For Liu
Energy Conservation For LiuEnergy Conservation For Liu
Energy Conservation For Liu
 
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERTHE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For Kpic
 
Vancouver Greentech Exchange Presentation 120118
Vancouver Greentech Exchange Presentation 120118Vancouver Greentech Exchange Presentation 120118
Vancouver Greentech Exchange Presentation 120118
 
UBS Australian Utilities Conference
UBS Australian Utilities ConferenceUBS Australian Utilities Conference
UBS Australian Utilities Conference
 
Sustainable Manufacturing
Sustainable ManufacturingSustainable Manufacturing
Sustainable Manufacturing
 
Sustainable Manufacturing
Sustainable Manufacturing Sustainable Manufacturing
Sustainable Manufacturing
 
Kpcgroupfull
KpcgroupfullKpcgroupfull
Kpcgroupfull
 
2010 03 23 NERA NYC Nuclear Power Briefing Final With Notes
2010 03 23 NERA  NYC Nuclear Power Briefing   Final With Notes2010 03 23 NERA  NYC Nuclear Power Briefing   Final With Notes
2010 03 23 NERA NYC Nuclear Power Briefing Final With Notes
 

Mais de Paul van der Linden

UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...
UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...
UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...Paul van der Linden
 
UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...
UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...
UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...Paul van der Linden
 
UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...Paul van der Linden
 
UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...
UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...
UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...Paul van der Linden
 
UKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UK
UKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UKUKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UK
UKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UKPaul van der Linden
 
Teun bokhoven the succes of the belgian market as a start for the uk
Teun bokhoven   the succes of the belgian market as a start for the ukTeun bokhoven   the succes of the belgian market as a start for the uk
Teun bokhoven the succes of the belgian market as a start for the ukPaul van der Linden
 
Giuliano digilio the prosperous future and business opportunities for elect...
Giuliano digilio   the prosperous future and business opportunities for elect...Giuliano digilio   the prosperous future and business opportunities for elect...
Giuliano digilio the prosperous future and business opportunities for elect...Paul van der Linden
 
UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...Paul van der Linden
 
UKPVC 2010 - Clive Collison - Experience of a solar pv projects company
UKPVC 2010 - Clive Collison - Experience of a solar pv projects companyUKPVC 2010 - Clive Collison - Experience of a solar pv projects company
UKPVC 2010 - Clive Collison - Experience of a solar pv projects companyPaul van der Linden
 
UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...
UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...
UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...Paul van der Linden
 
Keith duncan delivering a successful gb feed-in tariff
Keith duncan   delivering a successful gb feed-in tariffKeith duncan   delivering a successful gb feed-in tariff
Keith duncan delivering a successful gb feed-in tariffPaul van der Linden
 
UKPVC 2010 Stefanie Rief - mcs presentation
UKPVC 2010 Stefanie Rief -    mcs presentationUKPVC 2010 Stefanie Rief -    mcs presentation
UKPVC 2010 Stefanie Rief - mcs presentationPaul van der Linden
 
UKPVC 2010 Philip Wolfe the fi ts for the uk explained
UKPVC 2010 Philip Wolfe   the fi ts for the uk explainedUKPVC 2010 Philip Wolfe   the fi ts for the uk explained
UKPVC 2010 Philip Wolfe the fi ts for the uk explainedPaul van der Linden
 
UKPVC 2010 Edwin koot - Global PV Trends
UKPVC 2010 Edwin koot - Global PV TrendsUKPVC 2010 Edwin koot - Global PV Trends
UKPVC 2010 Edwin koot - Global PV TrendsPaul van der Linden
 
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"Paul van der Linden
 
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"Paul van der Linden
 
The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...
The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...
The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...Paul van der Linden
 
The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...
The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...
The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...Paul van der Linden
 

Mais de Paul van der Linden (20)

Epia Sunbelt Winfried Hoffmann
Epia Sunbelt Winfried HoffmannEpia Sunbelt Winfried Hoffmann
Epia Sunbelt Winfried Hoffmann
 
Epia Sunbelt Adel el Gammal
Epia Sunbelt Adel el GammalEpia Sunbelt Adel el Gammal
Epia Sunbelt Adel el Gammal
 
UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...
UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...
UKPVC 2010 Paul Lewis - The Energy Performance Guarantee - overcoming the com...
 
UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...
UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...
UKPVC 2010 Bruce Huber - The business opportunities according to a leading in...
 
UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the UK PV market- what do...
 
UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...
UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...
UKPVC 2010 - Ben Hill - Why crystalline technology is the right solution for ...
 
UKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UK
UKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UKUKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UK
UKPVC 2010 Thomas Wedde - New inverter developments for solar pv in the UK
 
Teun bokhoven the succes of the belgian market as a start for the uk
Teun bokhoven   the succes of the belgian market as a start for the ukTeun bokhoven   the succes of the belgian market as a start for the uk
Teun bokhoven the succes of the belgian market as a start for the uk
 
Giuliano digilio the prosperous future and business opportunities for elect...
Giuliano digilio   the prosperous future and business opportunities for elect...Giuliano digilio   the prosperous future and business opportunities for elect...
Giuliano digilio the prosperous future and business opportunities for elect...
 
UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...
UKPVC 2010 Jeremy Leggett - Customer experiences in the uk pv market- what do...
 
UKPVC 2010 - Clive Collison - Experience of a solar pv projects company
UKPVC 2010 - Clive Collison - Experience of a solar pv projects companyUKPVC 2010 - Clive Collison - Experience of a solar pv projects company
UKPVC 2010 - Clive Collison - Experience of a solar pv projects company
 
UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...
UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...
UKPVC 2010 Ray Noble - Where do business opportunities lie for the uk solar p...
 
Keith duncan delivering a successful gb feed-in tariff
Keith duncan   delivering a successful gb feed-in tariffKeith duncan   delivering a successful gb feed-in tariff
Keith duncan delivering a successful gb feed-in tariff
 
UKPVC 2010 Stefanie Rief - mcs presentation
UKPVC 2010 Stefanie Rief -    mcs presentationUKPVC 2010 Stefanie Rief -    mcs presentation
UKPVC 2010 Stefanie Rief - mcs presentation
 
UKPVC 2010 Philip Wolfe the fi ts for the uk explained
UKPVC 2010 Philip Wolfe   the fi ts for the uk explainedUKPVC 2010 Philip Wolfe   the fi ts for the uk explained
UKPVC 2010 Philip Wolfe the fi ts for the uk explained
 
UKPVC 2010 Edwin koot - Global PV Trends
UKPVC 2010 Edwin koot - Global PV TrendsUKPVC 2010 Edwin koot - Global PV Trends
UKPVC 2010 Edwin koot - Global PV Trends
 
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
 
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
The Solar Future DE - Matt Cheney "A new large-scale solar initiative"
 
The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...
The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...
The Solar Future DE - Karl Kuhlman "Can solar PV compete with grid energy in ...
 
The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...
The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...
The Solar Future DE - Ingmar Wilhelm "Can solar PV compete with grid energy i...
 

Último

Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 

Último (20)

Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 

The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achieve the mission of module production cost at $0.70/Wp?"

  • 2. Forward‐Looking Statement During the course of this presentation the company will make projections and other  statements that are forward‐looking statements within the meaning of the federal  securities laws.  The forward‐looking statements in this presentation are based on  g p current information and expectations, are subject to uncertainties and changes in  circumstances, and do not constitute guarantees of future performance. Those  statements involve a number of factors that could cause actual results to differ  materially from those statements, including the risks as described in the company’s  most recent annual report on Form 10‐K, quarterly report on Form 10‐Q, and other  filings with the Securities and Exchange Commission. First Solar assumes no  obligation to update any forward‐looking information contained in this presentation   or with respect to the announcements described herein.  © Copyright 2010, First Solar, Inc. 2
  • 3. Our Mission Our Mission To create enduring value by enabling a world  powered by clean, affordable solar electricity. db l ff d bl l l t i it © Copyright 2010, First Solar, Inc. First Solar Confidential & Proprietary 3
  • 4. Environmental Responsibility First Solar's Environmental Plan 2 1 3 Procure, Produce, Convert Reduce Use And Mining Byproducts  Emissions By Recycle Solar Modules Recycle Solar Modules To Clean, Substituting Solar In A Perpetual, Renewable Energy For Environmentally Energy Fossil Fuels Safe Life Cycle © Copyright 2010, First Solar, Inc. 4
  • 5. Life Cycle Assessment for PV M/Q M/Q M/Q M/Q M/Q M/Q Raw Material  Material  De‐ Treatment Manufacturing Use Acquisition Processing commissioning & Disposal M/Q E E E E E E Recycling M/Q: Material and Energy Inputs E: Effluents (air, water, solid) E © Copyright 2010, First Solar, Inc. 5
  • 6. LCA: Global Warming Potential CO2‐eq (g/kWh) 1000 900 850 800 600 400 400 200 45 24 15 11 0 Coal Oil Gas CC BioMass  Nuclear  PV CdTe Gas CC BioMass Nuclear PV CdTe Wind CHP USA Source: ExternE project, 2003; Kim and Dale, 2005; Fthenakis and Kim, 2006: Fthenakis and Alsema, 2006; Fthenakis and Kim, in press. , ; , p de Wild-Scholten & Schottler, 2009. Assumptions: PV CdTe based on 9% efficiency at insolation of 1700 kWh/m2 © Copyright 2010, First Solar, Inc. 6
  • 7. Energy Payback Time • EPBT: The Amount of Time a System Must Operate to Produce The Amount  of Electricity That Was Required to Fabricate the System 1.0 EPBT (Years) • Objective: Minimize EPBT – Supports Rapid Scalability 0.8 BOS 0.6 0.4 Module 0.2 0.0 CdT CdTe Source: de Wild-Scholten & Schottler, 2009. © Copyright 2010, First Solar, Inc. 7
  • 8. Cash Pay Back Time D ll Dollars Investment Payback Time © Copyright 2010, First Solar, Inc. First Solar Confidential & Proprietary 8
  • 9. Energy Payback Time kWh EPBT Months ‐15 ‐12 ‐9 ‐6 ‐3 0 3 6 9 12 15 18 21 24 Raw Materials   EPC/BOS Production and O&M ort Mfg M Transpo © Copyright 2010, First Solar, Inc. First Solar Confidential & Proprietary 9
  • 10. Leadership Across the Value Chain: Delivering Energy VALUE CHAIN Module Development EPC O&M Financing INDUSTRY CONSTRAINTS Turnkey Solution  T k S l ti Long Development  L D l t High Balance of  Hi h B l f Module Lifecycle &  M d l Lif l & High Cost of Capital Pricing too High Lead Times System Costs Performance • OptiSolar (2009) • Balance Sheet • Low Module Cost • Turner (2007) •Positioned for Near  • Proven Track  • Aggressive Cost  • EPC Velocity • Data Monitoring  Term Execution Record Reduction Roadmap • BoS Cost  • O&M Program • Strategic  • Leading Strategic  • Scale Optimization Partnerships p Partners FIRST SOLAR INJECTIONS © Copyright 2010, First Solar, Inc. 10
  • 11. Development Systems Project Cost Structure  Module EPC Standard2 1 IDC = interest during construction IDC = interest during construction 2 EPC Standard Costs= balance of system costs (inverters, electrical, mounting hardware, project  management and engineering, and installation labor) © Copyright 2010, First Solar, Inc. 11
  • 12. Manufacturing Cost per Watt Trend $1.59 $1.50 $ $1.40 $1.23 $1.08 $1.00 $0.93 $0.87 $0.85 $0.84 $0.81 $0.50 FY05 FY06 FY07 FY08 Q109 Q209 Q309 Q409 Q110 Core SBC Ramp © Copyright 2010, First Solar, Inc. 12
  • 13. Module Cost Reduction Roadmap  $2.94/W $2 94/W Q1 2010 cost per watt = $0.81 Q1 2010 cost per watt = $0 81 $0.93/W 100%  18‐25% 4‐6% 4‐6% 3 4% 3‐4% $0.52 ‐ 0.63/W $0 52 0 63/W 2% 56‐68%  2004 Q1 09 Efficiency Throughput Spending Low Cost Plant Scale 2014 Cost/Watt Cost/Watt Location Cost/Watt Target © Copyright 2010, First Solar, Inc. 13
  • 14. Production Capacity Growth Total current and announced capacity grows by 780MW to 2.1GW Total current and announced capacity grows by 780MW to 2.1GW 2,117 MW 2,005 MW 111 France Plant  5 & 6 1,337MW 1,228 MW Malaysia 1337 1337 891 716 MW 854 382 Plant 2 308 MW Germany 223 446 446 176 191 214 100 MW 100 MW 223 223 223 Ohio Capacity 25 MW 132 143 160 2005 2006 2007 2008 2009 2010 2011 2012 2005 & 2006 based on Q406 run rate; 2007 based on Q407 run rate; 2008 based on Q408 run rate; 2009 based on Q409 run rate,  © Copyright 2010, First Solar, Inc. 2010‐2012 based on Q1 2010 run‐rate 14
  • 15. Balance of System* Cost Reduction Roadmap  ~$1.40 /W 100% 2% 8% 7% $0.91‐0.98/W  1% 12% Target T 65‐70% Q1’09 BOS Engr. ,  Mounting Inverter Other Installation 2014 BOS Proj. Mgmt. Hardware Transformer Electrical * Includes standard EPC costs; excludes site‐specific and development costs, as well as interest during construction © Copyright 2010, First Solar, Inc. 15
  • 16. BOS Costs Inverse to Velocity and Constructability Site: Blythe, CA Site: Sarnia, Ontario Site: Boulder City, NV System Size: 21MW System Size: 20MW => 80 MW in ‘10 System Size: 10MW => 58 MW in ‘10 Project  Project  Project  First Solar Developer: First Solar Sempra Developer: Developer: Owner: NRG Energy Owner: Enbridge Owner: Sempra (All MW AC) © Copyright 2010, First Solar, Inc. 16
  • 18. Cost Reduction – Solar Electricity (LCOE)  Medium Resource – 1400 hours High Resource – 1800 hours U.S. ¢/kWh U.S. ¢/kWh 35 35 30 30 25 25 20 20 Transition Transition 15 15 Sustainable Sustainable FSLR 2014 2014 10 10 FSLR 2 5 5 0 0 $6.00  $5.00  $4.00  $3.00  $2.00  $6.00  $5.00  $4.00  $3.00  $2.00  Note: Assumes 7.5% unlevered IRR, 10% ITC, 2.5% electricity power price escalator, FSLR panels, utility scale plant, install labor and site specific cost estimates. Includes  owner development costs, financing costs and O&M. © Copyright 2010, First Solar, Inc. 18
  • 19. Our Strategy Leading  Business  Shares in the  Model that  Sustainable  Sustainable   Enduring  Solar Markets Most  Drives Superior  Competitive  Business Value Attractive Attractive  Returns on Returns on  Advantages Markets  Capital • Reduce solar electricity costs to sustainable levels through  technology  development, operational excellence and scale • Use price adaptive business models and partnerships to expand markets Use price, adaptive business models and partnerships to expand markets   • Own and develop the technologies necessary to be the low cost provider of  solar electricity  • Maintain financial discipline that assures superior returns on invested capital  f ld l h d l © Copyright 2010, First Solar, Inc. 19
  • 20. The Migration from Existing Subsidy to Transition Markets   Sustainable   Markets  Markets Transition  Markets  Markets Existing Subsidy  Constraints Markets  Markets © 2009 First Solar, Inc. 20
  • 21. Growth opportunities Potential PV Capacity by Region (GW) – Assuming Regulatory Targets and Macro Factor Growth Sustainable  Markets Other Australia l GCC Transition  Rest of U.S. 1,7001 Markets India China California C lif i Other Ontario Italy 105 105 Existing  g Spain S i Markets 105 France Japan 65 Germany Existing  Transition  Sustainable  Markets Markets Markets Markets  2020 ‐ 2050  1) Assumes potential solar capacity equal to 6% of total electricity consumption in identified solar markets Source: Market analyst estimates; First Solar analysis. Assumes base case scenario. © Copyright 2010, First Solar, Inc. 21
  • 22. Crossing Over to Sustainable Markets $0.40 $0.35 /kWh) Carbon emissions  $0 30 $0.30 Electricity ($/ cost adder Price parity with  conventional generation  Conventional, $0.25 drives inflection in price  base cost elastic demand  $0.20 $0 20 Conventional, , ized Cost of E fuel sensitized cost $0.15 PV cost roadmap $0.10 Global PV demand Global PV demand Leveli $0.05 $0.00 Gas Peaking Coal Gas Combined Cycle Nuclear Note: Conventional generation LCOE, Lazard 2008. Carbon emissions cost assumes $30/ton CO2.  High end of coal costs incorporates 90% carbon capture – emissions adder does not apply. © Copyright 2010, First Solar, Inc. 22
  • 23. Industry Demand – Estimates1 as of 4/16/10 9.9 GW in 2010, with a 30% CAGR% 2009‐2012 9 9 GW in 2010 with a 30% CAGR% 2009‐2012 16 16,000  15.3 14 14,000  12.1 12 12,000  9.9 10 10,000  GW 8 8,000  7.0 6 6,000  5.9 4 4,000  4 000 2.7 2 2,000  1.7 0 ‐ 2006 2007 2008 2009 2010 2011 2012 Germany Spain France Italy ROE North America Japan China ROW 1 Forecasts from  Auriga, Barclays, Collins Stewart, Credit Suisse, Deutsche Bank, JP Morgan, Lazard, Morgan Stanley, Raymond  James, Think Equity, UBS, and Wedbush.  2009 Germany demand from Bundesnetzagentur registration data © Copyright 2010, First Solar, Inc. 23
  • 25. Solar is still a small portion of total energy production  Solar represents a small percentage of total energy production, even in the most  p p g gy p , mature solar markets, but the growth potential is significant. Percent of Total Electricity Production* 2.13% 1.11% 0.27% 0.04% 0.04% 0.03% 100% 90% 80% 97.87% 98.89% 99.73% 99.96% 99.96% 99.97% 70% 60% 50% Spain Germany Italy France ROEU US % of Total Electricity Production from All Other Sources % of Total Electricity Production from Solar Note: *Solar includes both Solar PV & Solar Thermal generation.  2009 data for EU; 2009 US estimate extrapolated from 2008 EIA data based solar capacity added in 2009. Source: Eurostat: Electricity Estatistics, Provisional Data 2009; EIA; Marketbuzz. © Copyright 2010, First Solar, Inc. 25
  • 26. …enabling a world powered enabling by clean, affordable solar electricity clean, © Copyright 2010, First Solar, Inc. 26 1.4MW · Dimbach, Germany · Beck Energy