SlideShare uma empresa Scribd logo
1 de 46
Everything You Should Know About
PMP® & CAPM® Certifications
Seshne Govender
vCare Project Management Session - 6
www.vcareprojectmanagement.com
I am the Founder and Director of Fundamental Project Management, having over 15 years of
experience as a Program and Project Manager managing numerous large successful deliveries
with complex IT components in the Financial Services, Telecommunications, and Retail Sectors
of South Africa. This journey has provided me with invaluable experience in the Project
Management career path.
Started my career as an Engineer, studied Chemical Engineering in South Africa. Within a short
time, found my passion in projects in the Banking Industry. I have worked in diverse roles such
as Process Engineer, Business Analyst, Project Manager, and finally, Program Manager: A
career that provided joy to me for many years.
A certified Program Management Professional (PgMP)® and Project Management Professional
(PMP)®, which were invaluable in my Project Management Journey.
I am passionate about training, coaching, and mentoring people along the Project Management
career path.
Successful Program Manager, Project Manager & Trainer
Seshne Govender
Project Management Expert
PMP® & C
APM® Certifications
What you need to Study? | PMBOK® Based Questions
Session - 6
Key Takeaways
Session - 5 Recap Refresher
What you need to Study?
PMBOK® Based Questions - What to Focus?
Agile, Hybrid - Q&A Approach
Predictive, Agnostic - Q&A Approach
Business Analysis - Q&A Approach
Sample Exam Like Questions
Frequently Asked Questions
Upcoming Session Roadmap
PMP® & C
APM® Certifications
How to clear CAPM® & PMP® Exam in First Attempt?
Session - 5 Recap
Understand the format –
The CAPM® exam comprises 160 questions, and 230 minutes are allocated.
The PMP® exam comprises 180 questions, and 230 minutes are allocated.
The CAPM® & PMP® exam requires significant time
and effort, so be prepared for the journey
The main material (books) that are important
Process Groups
A Practical Guide
PMBOK®
Seventh Edition
The Agile
Practice Guide
PMBOK® Seventh
Edition
Business Analysis for
Practitioners: A Practice
Guide PMI
The Agile Practice
Guide
The PMI Guide to
Business Analysis
(December 2017) PMI
PMP® Domains
42% 50% 8%
People Process
Business
Environment
Start with the Process
Domain and ensure
thorough understanding of
the content before moving
on to the People and
Business Environment.
What you need to do to
earn the CAPM® & PMP®
Credential?
Reach out to accomplished SMEs and professionals in
project management on LinkedIn. Clarify all doubts.
Watch and read the Lessons learned and success
stories from existing CAPM®s & PMP®s.
Choose the Right Trainer & Mentor.
Engage with right study group for exam prep.
Walk into the exam center with confidence.
Use your time wisely.
Answer questions ahead of time.
Read each question carefully and thoroughly.
Read all answers, even if you think that your first choice is correct.
Confirm your answer.
Do not spend too much time on any one question.
If you are stumped by a question, you should guess, mark it for later and move on.
Remember you have only 4 hours i.e. 240 mins and you have under 1.5 mins per question.
If you do not know the answer, guess and review it later.
Make sure you answer each question in the 4 hour time period.
Once all questions are done, you should go back and review your marked questions.
Test Taking Suggestions
How to stay positive and pass
your exam in your first attempt?
Read PMBOK 7th – word-by-word
and key reference books
Build your exam strategy
Mock exam
Don’t panic, keep focus and work
hard
On exam Day: Stay Calm, keep
focused, and read the questions
carefully.
Study hard and prepare
Enough rest before the exam day
Select good mentor, preferably
PMI-REP (Now it is PMI-ATP)
Understand your strength and
weaknesses - work on your week
areas
Maintaining work-study-life balance
Understand the tasks from ECO
Self-Care: Ensure that you take some time to rest, exercise, and eat healthily during this stressful time.
What you need to Study for CAPM®?
Source: PMI, CAPM® New Exam Reference List
What you need to Study for CAPM®?
Source: PMI, CAPM® New Exam Reference List
“The questions are evenly distributed
throughout all chapters. Therefore, pay
attention to the entire PMBOK® Guide.
Don’t skip any concepts. Move on to the
next chapter once you have a good
command of the current one.”
PMBOK® Based Questions
What to Focus? (CAPM® & PMP®)
Agile, Hybrid - Q&A Approach
(CAPM® & PMP® Exam)
Understanding Hybrid Project Life Cycles
Questions Based on “How to select an
appropriate lifecycle for a given situation?
Questions Based on “How would you integrate
Agile and Predictive cycle parts of a project?”
Hybrid Approach
Standard agile methodology.
Tools, and techniques.
How to integrate the agile approach properly into a
project environment, when beneficial.
Agile Approach
The CAPM® &PMP® certification exam requires you to understand
Predictive, Agnostic - Q&A Approach
(CAPM® & PMP® Exam)
Understanding Traditional Methodologies
Predictive Life Cycle vs Adaptive Life Cycle
Understanding when to use Predictive Approach
Predictive Approach Agnostic Approach
What should the project manager do next?
What should the project manager do first?
How could have the project manager
prevented the situation from happening?
The CAPM® & PMP® certification exam questions based;
Business Analysis - Q&A Approach
(CAPM® Exam)
Demonstrate an understanding of business analysis
(BA) roles and responsibilities.
Determine how to conduct stakeholder communication.
Determine how to gather requirements.
Demonstrate an understanding of product roadmaps.
Determine how project methodologies influence
business analysis processes.
Validate requirements through product delivery.
Sample Exam Like Questions
To showcase the work done in the last iteration.
To set expectations and establish a shared
understanding at the start of a project or phase.
To review and decide on proposed changes.
To discuss and prioritize the backlog.
a.
b.
c.
d.
What is the primary goal of a
kickoff meeting?
What is the primary goal of a
kickoff meeting?
To showcase the work done in the last iteration.
To set expectations and establish a shared
understanding at the start of a project or phase.
To review and decide on proposed changes.
To discuss and prioritize the backlog.
a.
b.
c.
d.
In agile project management, on what
basis are the requirements or backlog
items typically prioritized?
Based on business value.
Based on date of submission.
Based on alphabetical order of the items.
Based on complexity of implementation.
a.
b.
c.
d.
In agile project management, on what basis are
the requirements or backlog items typically
prioritized?
Based on business value.
Based on date of submission.
Based on alphabetical order of the items.
Based on complexity of implementation.
a.
b.
c.
d.
A project manager notices that some items in the product
backlog are vague and lack details. Which meeting
would be most appropriate to address these issues?
Bidder conference.
Daily standup.
Backlog refinement.
Kickoff.
a.
b.
c.
d.
A project manager notices that some items in the product
backlog are vague and lack details. Which meeting
would be most appropriate to address these issues?
Bidder conference.
Daily standup.
Backlog refinement.
Kickoff.
a.
b.
c.
d.
What is the primary purpose of an
iteration review?
To refine and prioritize the backlog.
To discuss and evaluate procurement needs.
To review and decide on changes.
To showcase the work completed during the iteration.
a.
b.
c.
d.
What is the primary purpose of an
iteration review?
To refine and prioritize the backlog.
To discuss and evaluate procurement needs.
To review and decide on changes.
To showcase the work completed during the iteration.
a.
b.
c.
d.
Which of the following processes is focused on reviewing
requirements for errors and quality, either before or after
validation, to ensure that only "good" requirements are verified?
Verify Requirements.
Peer Reviews.
Control Quality.
Valid Scope.
a.
b.
c.
d.
Which of the following processes is focused on reviewing
requirements for errors and quality, either before or after
validation, to ensure that only "good" requirements are verified?
Verify Requirements.
Peer Reviews.
Control Quality.
Valid Scope.
a.
b.
c.
d.
A textile development project needs a specialized resource to work for
900 hours. The company has decided to outsource these hours.
Because of internal policies, all potential service providers must be
given the same information about the requirements.
Which action should the project manager take to ensure this?
Hold direct negotiations with each service provider.
Conduct a bidder conference with the service providers.
Ensure the procurement management plan is sent to
each service provider.
Add each of the service providers to the stakeholder
register.
a.
b.
c.
d.
A textile development project needs a specialized resource to work for
900 hours. The company has decided to outsource these hours.
Because of internal policies, all potential service providers must be
given the same information about the requirements.
Which action should the project manager take to ensure this?
Hold direct negotiations with each service provider.
Conduct a bidder conference with the service providers.
Ensure the procurement management plan is sent to
each service provider.
Add each of the service providers to the stakeholder
register.
a.
b.
c.
d.
Company P’s IT transformation project has three (3) deliverables, and they have the
following characteristics, according to the project team:
- Deliverable 2 has strictly scheduled milestones, with no expected variation in the
timeline.
- Requirements for deliverables 1 and 3 will change quickly during development.
Which project life cycle should the project manager use for this project?
Select a fully agile project model, with a common user
story and three-week sprints.
Select a waterfall project model for deliverables, with firm
milestones and change control procedures.
Select a hybrid project model; position deliverable 2 as a single
agile sprint embedded in an overall waterfall project.
Select a hybrid project model; position deliverable 2 as a single
waterfall phase embedded in an overall agile project.
a.
b.
c.
d.
Company P’s IT transformation project has three (3) deliverables, and they have the
following characteristics, according to the project team:
- Deliverable 2 has strictly scheduled milestones, with no expected variation in the
timeline.
- Requirements for deliverables 1 and 3 will change quickly during development.
Which project life cycle should the project manager use for this project?
Select a fully agile project model, with a common user
story and three-week sprints.
Select a waterfall project model for deliverables, with firm
milestones and change control procedures.
Select a hybrid project model; position deliverable 2 as a single
agile sprint embedded in an overall waterfall project.
Select a hybrid project model; position deliverable 2 as a single
waterfall phase embedded in an overall agile project.
a.
b.
c.
d.
An innovative product fails to satisfy targeted consumers
despite significant investments in quality control and
marketing campaigns.
Which agile practice would best prevent future failures of this
nature?
Run continuous consumer usability testing on
product releases.
Align objectives between the product owner
and marketing.
Broaden the persona type definition of the
target consumer.
Add more features and tests to the
minimum viable product (MVP).
a.
b.
c.
d.
An innovative product fails to satisfy targeted consumers
despite significant investments in quality control and
marketing campaigns.
Which agile practice would best prevent future failures of this
nature?
Run continuous consumer usability testing on
product releases.
Align objectives between the product owner
and marketing.
Broaden the persona type definition of the
target consumer.
Add more features and tests to the
minimum viable product (MVP).
a.
b.
c.
d.
A project team collected sensitive client data during the early
stages of a project to help develop the project management plan.
The team is now working on deliverables for the project when the
compliance managerdiscovers a data breach and alerts the team
toa compliance issue.
Which document should the project manager review first?
Statement of work (SOW)
Issue log
Business case
Risk register
a.
b.
c.
d.
A project team collected sensitive client data during the early
stages of a project to help develop the project management plan.
The team is now working on deliverables for the project when the
compliance managerdiscovers a data breach and alerts the team
toa compliance issue.
Which document should the project manager review first?
Statement of work (SOW)
Issue log
Business case
Risk register
a.
b.
c.
d.
The team working on Project A has resolved a technical issue, and
the project is moving forward. The project manager has been warned
that the same issue will probably arise on similar projects in the
future.
What should the project manager do first when responding to this
warning?
Ensure that the issue log is updated and update the
lessons learned register.
Create a risk report and keep the report current.
Notify the project sponsor about the warning.
Ensure that the lessons learned register is updated.
a.
b.
c.
d.
The team working on Project A has resolved a technical issue, and
the project is moving forward. The project manager has been warned
that the same issue will probably arise on similar projects in the
future.
What should the project manager do first when responding to this
warning?
Ensure that the issue log is updated and update the
lessons learned register.
Create a risk report and keep the report current.
Notify the project sponsor about the warning.
Ensure that the lessons learned register is updated.
a.
b.
c.
d.
What are the ethical
considerations of using AI
in Project Management?
Biased
Algorithms
Responsibility
& Accountability
Employee
Privacy
Ethical AI
Design
Human-AI
Synergy
Avoid
Over-Reliance
Rigorous
Testing
Transparent
Communication
AI
Disruptions
AI
for Good
AI is reshaping project management, but ethical considerations are crucial:
Is Project Management
Truly For You?
Feel Inspired
and
Energized
Constant Change People Over Tasks
Volatile Environment Decision Making on the Fly
End-to-End Ownership Diverse Skill Sets Required
Audience
Questions
PMP® & C
APM® Certifications
Exam Preparation - Practice Questions
Session - 7
Session 1 to Session 6 Recap Refresher
CAPM® & PMP® Exam - Formulas
CAPM® Exam Preparation - Practice Questions
PMP® Exam Preparation - Practice Questions
Frequently Asked Questions
Upcoming Session Roadmap
Session - 7
Agenda
20 December'23
th
UPCOMING
SESSIONS
09:30 AM - 10:30 AM (BST)
10:30 AM - 11:30 AM (CEST/SAST)
11:30 AM - 12:30 PM (EAT/AST)
12:30 PM - 01:30 PM (GST)
02:00 PM - 03:00 PM (IST)
03:30 PM - 04:30 PM (ICT/WIB)
04:30 PM - 05:30 PM (SGT/PHST)
07:30 PM - 08:30 PM (AEDT)
Time:
Session 7: 20 December'23
Session 8: 17 January'24
th
th
C vCare Project Management
seshne@vcareprojectmanagement.com
+27 722997173
Registered Address:
325 N. Saint Paul St, Suite 3100, Dallas, TX 75201, USA
www.vcareprojectmanagement.com
EIN: 35-2657414
Disclaimer
• PMP, PMI, PMBOK, CAPM, PgMP, PfMP, PBA, RMP, ACP, SP, DA, DASM, DASSM, ATP and OPM3 are registered marks of the Project Management Institute, Inc.

Mais conteúdo relacionado

Semelhante a Session 6 Everything You Should Know About PMP & CAPM Certifications

PMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptxPMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptx
AmjadAlk
 

Semelhante a Session 6 Everything You Should Know About PMP & CAPM Certifications (20)

About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
 
The Agile Way with PMI-ACP
The Agile Way with PMI-ACPThe Agile Way with PMI-ACP
The Agile Way with PMI-ACP
 
PMP Refresher Course
PMP Refresher CoursePMP Refresher Course
PMP Refresher Course
 
PMP Sample Questions Set 5
PMP Sample Questions Set 5PMP Sample Questions Set 5
PMP Sample Questions Set 5
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
How to prepare for PMP Certification.pdf
How to prepare for PMP Certification.pdfHow to prepare for PMP Certification.pdf
How to prepare for PMP Certification.pdf
 
PMI-ACP Agile free sample from EVOLVE
PMI-ACP Agile free sample from EVOLVEPMI-ACP Agile free sample from EVOLVE
PMI-ACP Agile free sample from EVOLVE
 
Demystifying the APMP Foundation Certification
Demystifying the APMP  Foundation Certification Demystifying the APMP  Foundation Certification
Demystifying the APMP Foundation Certification
 
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
 
PMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptxPMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptx
 
PMP Exam Prep_sample slides
PMP Exam Prep_sample slidesPMP Exam Prep_sample slides
PMP Exam Prep_sample slides
 
20150630 나pm17회 pm자격증길라잡이_백훈성
20150630 나pm17회 pm자격증길라잡이_백훈성20150630 나pm17회 pm자격증길라잡이_백훈성
20150630 나pm17회 pm자격증길라잡이_백훈성
 
50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
 
50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper50 secrets-of-the-pmp-exam-white-paper
50 secrets-of-the-pmp-exam-white-paper
 
PMP Orientation Program from MS Academy
PMP Orientation Program from MS AcademyPMP Orientation Program from MS Academy
PMP Orientation Program from MS Academy
 
Session 4 Everything You Should Know About PMP & CAPM Certifications
Session 4 Everything You Should Know About PMP & CAPM CertificationsSession 4 Everything You Should Know About PMP & CAPM Certifications
Session 4 Everything You Should Know About PMP & CAPM Certifications
 
Session 8 Everything You Should Know About PMP & CAPM Certifications
Session 8 Everything You Should Know About PMP & CAPM CertificationsSession 8 Everything You Should Know About PMP & CAPM Certifications
Session 8 Everything You Should Know About PMP & CAPM Certifications
 
Path to PMP!
Path to PMP!Path to PMP!
Path to PMP!
 
Pmp refresher know the exam
Pmp refresher   know the examPmp refresher   know the exam
Pmp refresher know the exam
 
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
 

Último

會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
中 央社
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
ashishpaul799
 
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfFinancial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
MinawBelay
 

Último (20)

Operations Management - Book1.p - Dr. Abdulfatah A. Salem
Operations Management - Book1.p  - Dr. Abdulfatah A. SalemOperations Management - Book1.p  - Dr. Abdulfatah A. Salem
Operations Management - Book1.p - Dr. Abdulfatah A. Salem
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
 
An Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptxAn Overview of the Odoo 17 Discuss App.pptx
An Overview of the Odoo 17 Discuss App.pptx
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17
 
Championnat de France de Tennis de table/
Championnat de France de Tennis de table/Championnat de France de Tennis de table/
Championnat de France de Tennis de table/
 
....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024
 
Essential Safety precautions during monsoon season
Essential Safety precautions during monsoon seasonEssential Safety precautions during monsoon season
Essential Safety precautions during monsoon season
 
How to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 InventoryHow to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 Inventory
 
Discover the Dark Web .pdf InfosecTrain
Discover the Dark Web .pdf  InfosecTrainDiscover the Dark Web .pdf  InfosecTrain
Discover the Dark Web .pdf InfosecTrain
 
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptxREPRODUCTIVE TOXICITY  STUDIE OF MALE AND FEMALEpptx
REPRODUCTIVE TOXICITY STUDIE OF MALE AND FEMALEpptx
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
 
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
 
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfFinancial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17
 

Session 6 Everything You Should Know About PMP & CAPM Certifications

  • 1. Everything You Should Know About PMP® & CAPM® Certifications Seshne Govender vCare Project Management Session - 6 www.vcareprojectmanagement.com
  • 2. I am the Founder and Director of Fundamental Project Management, having over 15 years of experience as a Program and Project Manager managing numerous large successful deliveries with complex IT components in the Financial Services, Telecommunications, and Retail Sectors of South Africa. This journey has provided me with invaluable experience in the Project Management career path. Started my career as an Engineer, studied Chemical Engineering in South Africa. Within a short time, found my passion in projects in the Banking Industry. I have worked in diverse roles such as Process Engineer, Business Analyst, Project Manager, and finally, Program Manager: A career that provided joy to me for many years. A certified Program Management Professional (PgMP)® and Project Management Professional (PMP)®, which were invaluable in my Project Management Journey. I am passionate about training, coaching, and mentoring people along the Project Management career path. Successful Program Manager, Project Manager & Trainer Seshne Govender Project Management Expert
  • 3. PMP® & C APM® Certifications What you need to Study? | PMBOK® Based Questions Session - 6
  • 4. Key Takeaways Session - 5 Recap Refresher What you need to Study? PMBOK® Based Questions - What to Focus? Agile, Hybrid - Q&A Approach Predictive, Agnostic - Q&A Approach Business Analysis - Q&A Approach Sample Exam Like Questions Frequently Asked Questions Upcoming Session Roadmap
  • 5. PMP® & C APM® Certifications How to clear CAPM® & PMP® Exam in First Attempt? Session - 5 Recap
  • 6. Understand the format – The CAPM® exam comprises 160 questions, and 230 minutes are allocated. The PMP® exam comprises 180 questions, and 230 minutes are allocated. The CAPM® & PMP® exam requires significant time and effort, so be prepared for the journey The main material (books) that are important Process Groups A Practical Guide PMBOK® Seventh Edition The Agile Practice Guide PMBOK® Seventh Edition Business Analysis for Practitioners: A Practice Guide PMI The Agile Practice Guide The PMI Guide to Business Analysis (December 2017) PMI
  • 7. PMP® Domains 42% 50% 8% People Process Business Environment Start with the Process Domain and ensure thorough understanding of the content before moving on to the People and Business Environment. What you need to do to earn the CAPM® & PMP® Credential? Reach out to accomplished SMEs and professionals in project management on LinkedIn. Clarify all doubts. Watch and read the Lessons learned and success stories from existing CAPM®s & PMP®s. Choose the Right Trainer & Mentor. Engage with right study group for exam prep. Walk into the exam center with confidence.
  • 8. Use your time wisely. Answer questions ahead of time. Read each question carefully and thoroughly. Read all answers, even if you think that your first choice is correct. Confirm your answer. Do not spend too much time on any one question. If you are stumped by a question, you should guess, mark it for later and move on. Remember you have only 4 hours i.e. 240 mins and you have under 1.5 mins per question. If you do not know the answer, guess and review it later. Make sure you answer each question in the 4 hour time period. Once all questions are done, you should go back and review your marked questions. Test Taking Suggestions
  • 9. How to stay positive and pass your exam in your first attempt? Read PMBOK 7th – word-by-word and key reference books Build your exam strategy Mock exam Don’t panic, keep focus and work hard On exam Day: Stay Calm, keep focused, and read the questions carefully. Study hard and prepare Enough rest before the exam day Select good mentor, preferably PMI-REP (Now it is PMI-ATP) Understand your strength and weaknesses - work on your week areas Maintaining work-study-life balance Understand the tasks from ECO Self-Care: Ensure that you take some time to rest, exercise, and eat healthily during this stressful time.
  • 10. What you need to Study for CAPM®? Source: PMI, CAPM® New Exam Reference List
  • 11. What you need to Study for CAPM®? Source: PMI, CAPM® New Exam Reference List
  • 12. “The questions are evenly distributed throughout all chapters. Therefore, pay attention to the entire PMBOK® Guide. Don’t skip any concepts. Move on to the next chapter once you have a good command of the current one.” PMBOK® Based Questions What to Focus? (CAPM® & PMP®)
  • 13. Agile, Hybrid - Q&A Approach (CAPM® & PMP® Exam) Understanding Hybrid Project Life Cycles Questions Based on “How to select an appropriate lifecycle for a given situation? Questions Based on “How would you integrate Agile and Predictive cycle parts of a project?” Hybrid Approach Standard agile methodology. Tools, and techniques. How to integrate the agile approach properly into a project environment, when beneficial. Agile Approach The CAPM® &PMP® certification exam requires you to understand
  • 14. Predictive, Agnostic - Q&A Approach (CAPM® & PMP® Exam) Understanding Traditional Methodologies Predictive Life Cycle vs Adaptive Life Cycle Understanding when to use Predictive Approach Predictive Approach Agnostic Approach What should the project manager do next? What should the project manager do first? How could have the project manager prevented the situation from happening? The CAPM® & PMP® certification exam questions based;
  • 15. Business Analysis - Q&A Approach (CAPM® Exam) Demonstrate an understanding of business analysis (BA) roles and responsibilities. Determine how to conduct stakeholder communication. Determine how to gather requirements. Demonstrate an understanding of product roadmaps. Determine how project methodologies influence business analysis processes. Validate requirements through product delivery.
  • 16. Sample Exam Like Questions
  • 17. To showcase the work done in the last iteration. To set expectations and establish a shared understanding at the start of a project or phase. To review and decide on proposed changes. To discuss and prioritize the backlog. a. b. c. d. What is the primary goal of a kickoff meeting?
  • 18. What is the primary goal of a kickoff meeting? To showcase the work done in the last iteration. To set expectations and establish a shared understanding at the start of a project or phase. To review and decide on proposed changes. To discuss and prioritize the backlog. a. b. c. d.
  • 19. In agile project management, on what basis are the requirements or backlog items typically prioritized? Based on business value. Based on date of submission. Based on alphabetical order of the items. Based on complexity of implementation. a. b. c. d.
  • 20. In agile project management, on what basis are the requirements or backlog items typically prioritized? Based on business value. Based on date of submission. Based on alphabetical order of the items. Based on complexity of implementation. a. b. c. d.
  • 21. A project manager notices that some items in the product backlog are vague and lack details. Which meeting would be most appropriate to address these issues? Bidder conference. Daily standup. Backlog refinement. Kickoff. a. b. c. d.
  • 22. A project manager notices that some items in the product backlog are vague and lack details. Which meeting would be most appropriate to address these issues? Bidder conference. Daily standup. Backlog refinement. Kickoff. a. b. c. d.
  • 23. What is the primary purpose of an iteration review? To refine and prioritize the backlog. To discuss and evaluate procurement needs. To review and decide on changes. To showcase the work completed during the iteration. a. b. c. d.
  • 24. What is the primary purpose of an iteration review? To refine and prioritize the backlog. To discuss and evaluate procurement needs. To review and decide on changes. To showcase the work completed during the iteration. a. b. c. d.
  • 25. Which of the following processes is focused on reviewing requirements for errors and quality, either before or after validation, to ensure that only "good" requirements are verified? Verify Requirements. Peer Reviews. Control Quality. Valid Scope. a. b. c. d.
  • 26. Which of the following processes is focused on reviewing requirements for errors and quality, either before or after validation, to ensure that only "good" requirements are verified? Verify Requirements. Peer Reviews. Control Quality. Valid Scope. a. b. c. d.
  • 27. A textile development project needs a specialized resource to work for 900 hours. The company has decided to outsource these hours. Because of internal policies, all potential service providers must be given the same information about the requirements. Which action should the project manager take to ensure this? Hold direct negotiations with each service provider. Conduct a bidder conference with the service providers. Ensure the procurement management plan is sent to each service provider. Add each of the service providers to the stakeholder register. a. b. c. d.
  • 28. A textile development project needs a specialized resource to work for 900 hours. The company has decided to outsource these hours. Because of internal policies, all potential service providers must be given the same information about the requirements. Which action should the project manager take to ensure this? Hold direct negotiations with each service provider. Conduct a bidder conference with the service providers. Ensure the procurement management plan is sent to each service provider. Add each of the service providers to the stakeholder register. a. b. c. d.
  • 29. Company P’s IT transformation project has three (3) deliverables, and they have the following characteristics, according to the project team: - Deliverable 2 has strictly scheduled milestones, with no expected variation in the timeline. - Requirements for deliverables 1 and 3 will change quickly during development. Which project life cycle should the project manager use for this project? Select a fully agile project model, with a common user story and three-week sprints. Select a waterfall project model for deliverables, with firm milestones and change control procedures. Select a hybrid project model; position deliverable 2 as a single agile sprint embedded in an overall waterfall project. Select a hybrid project model; position deliverable 2 as a single waterfall phase embedded in an overall agile project. a. b. c. d.
  • 30. Company P’s IT transformation project has three (3) deliverables, and they have the following characteristics, according to the project team: - Deliverable 2 has strictly scheduled milestones, with no expected variation in the timeline. - Requirements for deliverables 1 and 3 will change quickly during development. Which project life cycle should the project manager use for this project? Select a fully agile project model, with a common user story and three-week sprints. Select a waterfall project model for deliverables, with firm milestones and change control procedures. Select a hybrid project model; position deliverable 2 as a single agile sprint embedded in an overall waterfall project. Select a hybrid project model; position deliverable 2 as a single waterfall phase embedded in an overall agile project. a. b. c. d.
  • 31. An innovative product fails to satisfy targeted consumers despite significant investments in quality control and marketing campaigns. Which agile practice would best prevent future failures of this nature? Run continuous consumer usability testing on product releases. Align objectives between the product owner and marketing. Broaden the persona type definition of the target consumer. Add more features and tests to the minimum viable product (MVP). a. b. c. d.
  • 32. An innovative product fails to satisfy targeted consumers despite significant investments in quality control and marketing campaigns. Which agile practice would best prevent future failures of this nature? Run continuous consumer usability testing on product releases. Align objectives between the product owner and marketing. Broaden the persona type definition of the target consumer. Add more features and tests to the minimum viable product (MVP). a. b. c. d.
  • 33. A project team collected sensitive client data during the early stages of a project to help develop the project management plan. The team is now working on deliverables for the project when the compliance managerdiscovers a data breach and alerts the team toa compliance issue. Which document should the project manager review first? Statement of work (SOW) Issue log Business case Risk register a. b. c. d.
  • 34. A project team collected sensitive client data during the early stages of a project to help develop the project management plan. The team is now working on deliverables for the project when the compliance managerdiscovers a data breach and alerts the team toa compliance issue. Which document should the project manager review first? Statement of work (SOW) Issue log Business case Risk register a. b. c. d.
  • 35. The team working on Project A has resolved a technical issue, and the project is moving forward. The project manager has been warned that the same issue will probably arise on similar projects in the future. What should the project manager do first when responding to this warning? Ensure that the issue log is updated and update the lessons learned register. Create a risk report and keep the report current. Notify the project sponsor about the warning. Ensure that the lessons learned register is updated. a. b. c. d.
  • 36. The team working on Project A has resolved a technical issue, and the project is moving forward. The project manager has been warned that the same issue will probably arise on similar projects in the future. What should the project manager do first when responding to this warning? Ensure that the issue log is updated and update the lessons learned register. Create a risk report and keep the report current. Notify the project sponsor about the warning. Ensure that the lessons learned register is updated. a. b. c. d.
  • 37.
  • 38. What are the ethical considerations of using AI in Project Management?
  • 41. Feel Inspired and Energized Constant Change People Over Tasks Volatile Environment Decision Making on the Fly End-to-End Ownership Diverse Skill Sets Required
  • 43. PMP® & C APM® Certifications Exam Preparation - Practice Questions Session - 7
  • 44. Session 1 to Session 6 Recap Refresher CAPM® & PMP® Exam - Formulas CAPM® Exam Preparation - Practice Questions PMP® Exam Preparation - Practice Questions Frequently Asked Questions Upcoming Session Roadmap Session - 7 Agenda 20 December'23 th
  • 45. UPCOMING SESSIONS 09:30 AM - 10:30 AM (BST) 10:30 AM - 11:30 AM (CEST/SAST) 11:30 AM - 12:30 PM (EAT/AST) 12:30 PM - 01:30 PM (GST) 02:00 PM - 03:00 PM (IST) 03:30 PM - 04:30 PM (ICT/WIB) 04:30 PM - 05:30 PM (SGT/PHST) 07:30 PM - 08:30 PM (AEDT) Time: Session 7: 20 December'23 Session 8: 17 January'24 th th
  • 46. C vCare Project Management seshne@vcareprojectmanagement.com +27 722997173 Registered Address: 325 N. Saint Paul St, Suite 3100, Dallas, TX 75201, USA www.vcareprojectmanagement.com EIN: 35-2657414 Disclaimer • PMP, PMI, PMBOK, CAPM, PgMP, PfMP, PBA, RMP, ACP, SP, DA, DASM, DASSM, ATP and OPM3 are registered marks of the Project Management Institute, Inc.