Mastering EPC
Project Success:
Real –Time Monitoring
& Control of Key Lead
Indicators
1
2
Real-time monitoring enables swift action,
enhances decision-making, and ultimately
drives sustainable growth and innovation
within the organization. By tracking these
indicators closely and immediately responding
to any deviations, businesses can detect
issues early, make proactive decisions,
optimize resource allocation, track
performance effectively, and foster a culture
of continuous improvement.
3
 Lead Indicators are metrics that show trends of project performance
 Project Performance Indicators shall be
• Actionable
• Credible
• Traceable
Lead & Lag
Project
Indicators
 Lag Indicators of one phase becomes a lead indicator
for the next phase.
E.g.: Actual Progress of the Engineering phase provides lead indication
on what is expected from Procurement & Construction.
Lead &
Lag
Indicators
Lag Indicators
 Actual Progress
 Actual Cost incurred
 Number of milestones achieved
 No of Incidents
 No of NCR’s
 Qty of construction achieved
4
Lead Indicators
 Forecasted completion
 Cost At Completion
 No of near Misses
 No of Quality Observations
 Productivity Trends
 Correspondences sensitivity
Setting up
the Project
5
 Define where we want to reach- Scope
 When we need to reach –Schedule
 Define Milestones
 Logically plan to reach milestones
 Plan resources to reach the
milestone.
Risk Management
6
 Uncertainty and their Risks never go away.
 They are always there.
 They are unavoidable.
 Identifying risks without communicating them is a waste of
time
 Managing in the Presence of uncertainties is critical to
reaching our goal.
Monitor and alert
on the Risk rating
periodically
Safety performance Indicator
7
 Number of observations
• Unsafe Acts
• Unsafe observations
 Near Misses
 Incidents
 Trainings
 Work Permit violations
Measuring Progress
8
Getting Progress from
Planned activities or from
somewhere else?
Project Managers shall not
be complacent with only
the actual progress
percentages
Consolidated
View from
Single
Platform
9
 Capture all the project data in one platform
 One Platform to analyze and provide visualization
of Project KPI’s
 Establish robust plan
 Capture actuals from the source as the action
happens
 Integrate with other applications
 Leverage latest technology
 Provide access-based visibility to stake holders
 Provide deep down views as needed
Key
Presenters
10
Sajith R Nair, PMP
Client Value Maximisation
Director
Manesh Alias
COO , Wrench Solutions
11
Join Us to Know More

Mais conteúdo relacionado

Semelhante a Mastering EPC Project Management | Real Time Monitoring & Control of Key Lead Indicators

significance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsignificance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptx
sarah david
 
Metrics & KPIs to Track for IT Outsourcing companies.pptx
Metrics & KPIs to Track for IT Outsourcing companies.pptxMetrics & KPIs to Track for IT Outsourcing companies.pptx
Metrics & KPIs to Track for IT Outsourcing companies.pptx
Business Thrust Pte. Ltd. (BThrust)
 
IT projects
IT projectsIT projects
IT projects
ArmeniaFED
 
A Gentle Introduction to Deliverables Based Planning
A Gentle Introduction to Deliverables Based PlanningA Gentle Introduction to Deliverables Based Planning
A Gentle Introduction to Deliverables Based Planning
Glen Alleman
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
JamieDornan2
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
Glen Alleman
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptx
djualaja88
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
Glen Alleman
 
Managing Projects with Intelligence
Managing Projects with IntelligenceManaging Projects with Intelligence
Managing Projects with Intelligence
Paul Gerrard
 
Project management chapter 4 - project integration management-1
Project management   chapter 4 - project integration management-1Project management   chapter 4 - project integration management-1
Project management chapter 4 - project integration management-1Eduardo Antero
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHub
RichardNowack
 
Program Management 2.0: Risk Management
Program Management 2.0: Risk ManagementProgram Management 2.0: Risk Management
Program Management 2.0: Risk Management
John Carter
 
20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners
20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners
20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners
Craeg Strong
 
Unveiling the Essence of Key Success Indicators in Project Management.pdf
Unveiling the Essence of Key Success Indicators in Project Management.pdfUnveiling the Essence of Key Success Indicators in Project Management.pdf
Unveiling the Essence of Key Success Indicators in Project Management.pdf
CIOWomenMagazine
 
PRESTO Change Management
PRESTO Change ManagementPRESTO Change Management
PRESTO Change Management
TOPP Tactical Intelligence Ltd
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions Singapore
 
Software project management
Software project managementSoftware project management
Software project management
Indu Sharma Bhardwaj
 

Semelhante a Mastering EPC Project Management | Real Time Monitoring & Control of Key Lead Indicators (20)

significance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptxsignificance_of_test_estimating_in_the_software_development.pptx
significance_of_test_estimating_in_the_software_development.pptx
 
Metrics & KPIs to Track for IT Outsourcing companies.pptx
Metrics & KPIs to Track for IT Outsourcing companies.pptxMetrics & KPIs to Track for IT Outsourcing companies.pptx
Metrics & KPIs to Track for IT Outsourcing companies.pptx
 
IT projects
IT projectsIT projects
IT projects
 
Michigan Agile Presentation
Michigan Agile PresentationMichigan Agile Presentation
Michigan Agile Presentation
 
Disaster Risk Management
Disaster Risk ManagementDisaster Risk Management
Disaster Risk Management
 
A Gentle Introduction to Deliverables Based Planning
A Gentle Introduction to Deliverables Based PlanningA Gentle Introduction to Deliverables Based Planning
A Gentle Introduction to Deliverables Based Planning
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptx
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
 
Managing Projects with Intelligence
Managing Projects with IntelligenceManaging Projects with Intelligence
Managing Projects with Intelligence
 
Project management chapter 4 - project integration management-1
Project management   chapter 4 - project integration management-1Project management   chapter 4 - project integration management-1
Project management chapter 4 - project integration management-1
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHub
 
Program Management 2.0: Risk Management
Program Management 2.0: Risk ManagementProgram Management 2.0: Risk Management
Program Management 2.0: Risk Management
 
20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners
20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners
20200205 DHS Agile Center of Excellence Agile Governance Ariel Partners
 
Unveiling the Essence of Key Success Indicators in Project Management.pdf
Unveiling the Essence of Key Success Indicators in Project Management.pdfUnveiling the Essence of Key Success Indicators in Project Management.pdf
Unveiling the Essence of Key Success Indicators in Project Management.pdf
 
Stepwise planning
Stepwise planningStepwise planning
Stepwise planning
 
PRESTO Change Management
PRESTO Change ManagementPRESTO Change Management
PRESTO Change Management
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation Approach
 
Software project management
Software project managementSoftware project management
Software project management
 

Último

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 

Último (20)

MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 

Mastering EPC Project Management | Real Time Monitoring & Control of Key Lead Indicators

  • 1. Mastering EPC Project Success: Real –Time Monitoring & Control of Key Lead Indicators 1
  • 2. 2 Real-time monitoring enables swift action, enhances decision-making, and ultimately drives sustainable growth and innovation within the organization. By tracking these indicators closely and immediately responding to any deviations, businesses can detect issues early, make proactive decisions, optimize resource allocation, track performance effectively, and foster a culture of continuous improvement.
  • 3. 3  Lead Indicators are metrics that show trends of project performance  Project Performance Indicators shall be • Actionable • Credible • Traceable Lead & Lag Project Indicators  Lag Indicators of one phase becomes a lead indicator for the next phase. E.g.: Actual Progress of the Engineering phase provides lead indication on what is expected from Procurement & Construction.
  • 4. Lead & Lag Indicators Lag Indicators  Actual Progress  Actual Cost incurred  Number of milestones achieved  No of Incidents  No of NCR’s  Qty of construction achieved 4 Lead Indicators  Forecasted completion  Cost At Completion  No of near Misses  No of Quality Observations  Productivity Trends  Correspondences sensitivity
  • 5. Setting up the Project 5  Define where we want to reach- Scope  When we need to reach –Schedule  Define Milestones  Logically plan to reach milestones  Plan resources to reach the milestone.
  • 6. Risk Management 6  Uncertainty and their Risks never go away.  They are always there.  They are unavoidable.  Identifying risks without communicating them is a waste of time  Managing in the Presence of uncertainties is critical to reaching our goal. Monitor and alert on the Risk rating periodically
  • 7. Safety performance Indicator 7  Number of observations • Unsafe Acts • Unsafe observations  Near Misses  Incidents  Trainings  Work Permit violations
  • 8. Measuring Progress 8 Getting Progress from Planned activities or from somewhere else? Project Managers shall not be complacent with only the actual progress percentages
  • 9. Consolidated View from Single Platform 9  Capture all the project data in one platform  One Platform to analyze and provide visualization of Project KPI’s  Establish robust plan  Capture actuals from the source as the action happens  Integrate with other applications  Leverage latest technology  Provide access-based visibility to stake holders  Provide deep down views as needed
  • 10. Key Presenters 10 Sajith R Nair, PMP Client Value Maximisation Director Manesh Alias COO , Wrench Solutions
  • 11. 11 Join Us to Know More