Key
Parameters
RMS IFMIS
Project
Duration
4.5 Years
Implementation -1.5 Yr,
Support Extension 3 Yrs.)
5 Years
Implementation -2 Yrs,
Support Extension 3 Yrs.
Geographical
Coverage
20-25 Locations
(Kathmandu and nearby)
All offices of NEA
Functional
Coverage
IFMIS
• Financial Management
• Asset Management
• Inventory Management
• Payroll
• Project Accounting
• Employee Claims &
Retirement Benefits
IFMIS and RMS
• Financial Management
• Asset Management
• Inventory Management
• Payroll
• Human Resource
Management System
• Project Accounting
• Metering
• Billing and Collection
• Energy Audit
2
Scope of Work (RMS & IFMIS)
3
RMS: Scope of Work
 Supply, delivery, design, customization, integration,
implementation, testing, commissioning of Hardware/ software of
the RMS with FMS, including Data Migration & Change
Management and Capacity Building.
 COTS database, Middleware, Network and customer care
equipment and other software in conformance to Industry
standards and installation & maintenance of necessary
infrastructure (at DC &DR).
 Total period of contract is 4.5 years (1.5yrs for Implementation &
FMS and 3yrs for support.) During the FMS period, the SI shall
provide manpower &technical support services.
4
RMS: Key Considerations
 Software License for 6 million consumers. (5.08m, 8%,3%,3%,3%)
 Annual Technical Services (ATS) are computed @ 22% of the RMS
License Cost per year.
 Hardware Infrastructure requirements for DC and DRC
 Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.
 Capacity Building : 700 RMS Users, 14 Executive Users (Abroad).
 FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
5
RMS: Modules
Major Modules FRS Count
1. Metering 21
2. Billing 55
3. Collection 18
4. New Connection, Disconnection & Reconnection 50
5. Energy Audit 7
Supporting Modules
6 Management information System (MIS) 12
7. Document Management System (DMS) 13
8. Customer Relationship Management (CRM) 48
9. Web Portal and Mobile Application 19
10. Customer Care Centre (CCC)
6
RMS: Project Timeline
Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19
Project Initiation
Business Blueprinting
Design & Customization
Data Migration
IT infra setup for DC , DRC & CCC
Pilot Rollout
Training and Change Management
Enterprise wide roll out
Stabilization Support
FMS 3 Yrs
7
RMS: Eligibility Qualification Criteria
Scoring Matrix
SI’s Strength Product OEM’s Strength
RMS Implementation 60 15
Team Composition 10
Approach and Methodology 15
Totals 85 15
Technical Qualifying Score = 60%
Weight for the Bid Price as specified in BDS = 40%
Weight of the Bid Technical score = 60%
Compliance to the Functional Requirement Specifications (FRS) mentioned in the RFP for major modules as
standard is 85% . Less than 85% shall be termed as non-responsive.
8
IFMIS: Scope of work
 Supply, delivery, design, customization, integration,
implementation, testing, commissioning of Hardware/ software of
the IFMIS with FMS, including Data Migration & Change
Management and Capacity Building.
 COTS database, Middleware, Network and customer care
equipment and other software in conformance to Industry
standards and installation & maintenance of necessary
infrastructure (at DC &DR).
 Total period of contract is 5 years (2yrs for Implementation &
FMS and 3yrs for support.) During the FMS period, the SI shall
provide manpower & technical support services.
9
IFMIS: Key Considerations
 Software License for 1600 full enterprise users. Additional 400.
 Annual Technical Services (ATS) are computed @ 22% of the
IFMIS License Cost per year.
 Hardware Infrastructure requirements for DC and DRC
 Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.
 Capacity Building : 2000 Users, 15 Executive Users (Abroad).
 FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
10
IFMIS: Project Timeline
Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25
Project Initiation
Business Blueprinting
Design & Customization
Data Migration
IT infra setup for DC , DRC & CCC
Pilot Rollout
Training and Change Management
Enterprise wide roll out
Stabilization Support
FMS 3 Yrs
11
Recommendation
• The extension cost initial quoted, Final
revised and EY estimated = 1.66
• Recommendation from EY to float the RFP
with 3 years extension.
• Extension of 3 years has been considered
with a perception to take over the FMS by
NEA IT team.
12
IFMIS: Modules
Major Modules FRS Count
1. Financial Management 697
2. Material Management 259
3. Human Resource Management 496
4. Project Management 227
5. Maintenance Management 515
6. Production Planning 96
Supporting Modules
6 Linear Asset Management 11
7. Document and File Management 90
8. BI & BW 35
9. Mobile Application 80
10.
Employee Self Services (ESS) & Manager Self Services
(MSS)
87
13
Project Management Consultant
 Expression of Interest (EoI) and Terms of Reference (ToR)
published
 Fourteen International Firms submitted the EoI
 Committee Shortlisted 6 Firms
 RFP to be finalized and submitted to ADB
 Budget approved was 1 million USD and approved was 0.8
million USD excluding applicable taxes and VAT in Nepal.
14
Recommendations Expected–1
 Team Composition:
RMS: Provincial Managers - Bachelor Degree in Electrical/ Electronics/ IT/
Computer Science or related fields and 5 years of experience on RMS
implementation.
IFMIS: Assistant Project Manager - Bachelor Degree in Electrical/ Electronics/ IT/
Computer Science or related fields and 5 years of experience on IFMIS
implementation.
Provincial Managers and Assistant Project Managers are to be deputed from in-
house.
 Evaluation of CVs
RMS: Evaluation of CVs of Project Manager and Provincial Managers only.
IFMIS: Evaluation of Project Manager and Assistant Project Managers only.
CVs of the Key Experts are to be evaluated.
 PQ: The proposed product should be of latest version and the OEM should have a future
Roadmap - for IFMIS required for the next 10 (ten) years and for RMS required for the
15
Recommendations Expected–2
 Technical Score QCBS Requirement :
Minimum Technical Score Required: 60% (IFMIS and RMS)
IFMIS: 60% –30%
RMS: 70% –30%
 ERP Professional User License Requirement
NEA’s License Requirement = 1600
Requirement in PQ/TQ: 300
Bring Down it in PQ/TQ to 200
 Confirmation on Extension period to be considered
16
Recommendations Expected–3
 Potential bidders pool is same for all the three procurements.
 Bidders from the Consultants category such as PwC, Deloitte
and KPMG also fulfill the PQ and TQ criteria set for SIs of
both the procurements.
 All the bidders will be allowed to participate in all the three
tenders.
 Selection of the top three PMC consultants will be done.
 If the bidder selected for consultant also gets selected as SI in
either or both of the procurements, then the bidder has to
work as the SI for NEA.
 This condition is to be included in the RFP for PMC.
17
Recommendations Expected–4
 ToR clearly stating the Scope of Work of the Consultant EY
 Deputed by ADB upon request from NEA
 Need the support from the consultant in bid process
management
 Approach and Methodology evaluation required expert
recommendation
18
Thank You

Mais conteúdo relacionado

Semelhante a ERP implementation and Cost Estimation for an Org.

Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVerma
Ram Verma
 
Ayan Kar
Ayan KarAyan Kar
Ayan Kar
Ayan Kar
 
Career Snapshot
Career SnapshotCareer Snapshot
Career Snapshot
Ayan Kar
 
Rendering Enterprise Content Management Strategies Operational
Rendering Enterprise Content Management Strategies OperationalRendering Enterprise Content Management Strategies Operational
Rendering Enterprise Content Management Strategies Operational
Government Technology Exhibition and Conference
 
cimsBrochure-v3
cimsBrochure-v3cimsBrochure-v3
cimsBrochure-v3
Shivam Saxena
 
Making the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesMaking the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service Capabilities
PTC
 
T. Kiran
T. KiranT. Kiran
XYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDXYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITED
Gautam Vadnere
 
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal MaanAgile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
AgileNetwork
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
nycitstrategist1
 
Service North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journeyService North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journey
Scopism
 
Darshana D Patil
Darshana D PatilDarshana D Patil
Darshana D Patil
Darshana Patil
 
New_Sandeep_Kumar
New_Sandeep_KumarNew_Sandeep_Kumar
New_Sandeep_Kumar
Sandeep Kumar
 
Strategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT EngagementStrategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT Engagement
Tim Groenwals
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
Chandrashekhar Potula
 
TPG CV_update 04042016
TPG CV_update 04042016TPG CV_update 04042016
TPG CV_update 04042016
Nagappan shanmugam
 
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
Ken Blunt
 
HGConcept-CMDB-Blueprint Design
HGConcept-CMDB-Blueprint DesignHGConcept-CMDB-Blueprint Design
HGConcept-CMDB-Blueprint Design
HGConcept Inc.
 
U2 chap1 itsm service design
U2 chap1 itsm service designU2 chap1 itsm service design
U2 chap1 itsm service design
MusTufa Nullwala
 
Hassan Shabir CV 2016-April
Hassan Shabir CV 2016-AprilHassan Shabir CV 2016-April
Hassan Shabir CV 2016-April
Hassan Shubayr
 

Semelhante a ERP implementation and Cost Estimation for an Org. (20)

Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVerma
 
Ayan Kar
Ayan KarAyan Kar
Ayan Kar
 
Career Snapshot
Career SnapshotCareer Snapshot
Career Snapshot
 
Rendering Enterprise Content Management Strategies Operational
Rendering Enterprise Content Management Strategies OperationalRendering Enterprise Content Management Strategies Operational
Rendering Enterprise Content Management Strategies Operational
 
cimsBrochure-v3
cimsBrochure-v3cimsBrochure-v3
cimsBrochure-v3
 
Making the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service CapabilitiesMaking the Business Case for Remote Service Capabilities
Making the Business Case for Remote Service Capabilities
 
T. Kiran
T. KiranT. Kiran
T. Kiran
 
XYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITEDXYNTECH SOLUTIONS (P) LIMITED
XYNTECH SOLUTIONS (P) LIMITED
 
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal MaanAgile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
 
Al Mateus Oct2010 2
Al Mateus Oct2010 2Al Mateus Oct2010 2
Al Mateus Oct2010 2
 
Service North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journeyService North 2018 - ABB's SIAM journey
Service North 2018 - ABB's SIAM journey
 
Darshana D Patil
Darshana D PatilDarshana D Patil
Darshana D Patil
 
New_Sandeep_Kumar
New_Sandeep_KumarNew_Sandeep_Kumar
New_Sandeep_Kumar
 
Strategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT EngagementStrategic Partnership for Rail IT Engagement
Strategic Partnership for Rail IT Engagement
 
Chandrashekhar resume
Chandrashekhar resumeChandrashekhar resume
Chandrashekhar resume
 
TPG CV_update 04042016
TPG CV_update 04042016TPG CV_update 04042016
TPG CV_update 04042016
 
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
SIAM Study - Comparing the Introduction of New IT Services via Simple and Com...
 
HGConcept-CMDB-Blueprint Design
HGConcept-CMDB-Blueprint DesignHGConcept-CMDB-Blueprint Design
HGConcept-CMDB-Blueprint Design
 
U2 chap1 itsm service design
U2 chap1 itsm service designU2 chap1 itsm service design
U2 chap1 itsm service design
 
Hassan Shabir CV 2016-April
Hassan Shabir CV 2016-AprilHassan Shabir CV 2016-April
Hassan Shabir CV 2016-April
 

Mais de Roshni814224

Ecommerce concepts and uses in Business.pptx
Ecommerce concepts and uses in Business.pptxEcommerce concepts and uses in Business.pptx
Ecommerce concepts and uses in Business.pptx
Roshni814224
 
Emerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptxEmerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptx
Roshni814224
 
Emerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptxEmerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptx
Roshni814224
 
Introduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptxIntroduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptx
Roshni814224
 
Business Information Systems in firms.pptx
Business Information Systems in firms.pptxBusiness Information Systems in firms.pptx
Business Information Systems in firms.pptx
Roshni814224
 
Strategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.pptStrategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.ppt
Roshni814224
 
Management Information System Applications.pptx
Management Information System Applications.pptxManagement Information System Applications.pptx
Management Information System Applications.pptx
Roshni814224
 
The Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptxThe Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptx
Roshni814224
 
Integrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.pptIntegrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.ppt
Roshni814224
 
Data models in Database Management Systems.ppt
Data models in Database Management Systems.pptData models in Database Management Systems.ppt
Data models in Database Management Systems.ppt
Roshni814224
 
Transaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptxTransaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptx
Roshni814224
 
Computer System Software Component Details.pptx
Computer System Software Component Details.pptxComputer System Software Component Details.pptx
Computer System Software Component Details.pptx
Roshni814224
 
Social Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptxSocial Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptx
Roshni814224
 
Cyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptxCyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptx
Roshni814224
 
Information Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptxInformation Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptx
Roshni814224
 
Information Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptxInformation Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptx
Roshni814224
 
Applications of Management Information System.pptx
Applications of Management Information System.pptxApplications of Management Information System.pptx
Applications of Management Information System.pptx
Roshni814224
 
Securing Management Information Systems.ppt
Securing Management Information Systems.pptSecuring Management Information Systems.ppt
Securing Management Information Systems.ppt
Roshni814224
 
relational model in Database Management.ppt.ppt
relational model in Database Management.ppt.pptrelational model in Database Management.ppt.ppt
relational model in Database Management.ppt.ppt
Roshni814224
 
Database Management System Security.pptx
Database Management System  Security.pptxDatabase Management System  Security.pptx
Database Management System Security.pptx
Roshni814224
 

Mais de Roshni814224 (20)

Ecommerce concepts and uses in Business.pptx
Ecommerce concepts and uses in Business.pptxEcommerce concepts and uses in Business.pptx
Ecommerce concepts and uses in Business.pptx
 
Emerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptxEmerging Global Trends in Internet of Things.pptx
Emerging Global Trends in Internet of Things.pptx
 
Emerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptxEmerging IT Trends and Innovation Concepts.pptx
Emerging IT Trends and Innovation Concepts.pptx
 
Introduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptxIntroduction to E-Commerce and Components.pptx
Introduction to E-Commerce and Components.pptx
 
Business Information Systems in firms.pptx
Business Information Systems in firms.pptxBusiness Information Systems in firms.pptx
Business Information Systems in firms.pptx
 
Strategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.pptStrategic Information System in Business Firm.ppt
Strategic Information System in Business Firm.ppt
 
Management Information System Applications.pptx
Management Information System Applications.pptxManagement Information System Applications.pptx
Management Information System Applications.pptx
 
The Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptxThe Concepts of Internet and Networking.pptx
The Concepts of Internet and Networking.pptx
 
Integrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.pptIntegrity Constraints in Database Management System.ppt
Integrity Constraints in Database Management System.ppt
 
Data models in Database Management Systems.ppt
Data models in Database Management Systems.pptData models in Database Management Systems.ppt
Data models in Database Management Systems.ppt
 
Transaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptxTransaction Management, Recovery and Query Processing.pptx
Transaction Management, Recovery and Query Processing.pptx
 
Computer System Software Component Details.pptx
Computer System Software Component Details.pptxComputer System Software Component Details.pptx
Computer System Software Component Details.pptx
 
Social Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptxSocial Engineering and Identity Theft.pptx
Social Engineering and Identity Theft.pptx
 
Cyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptxCyber Security and Data Privacy in Information Systems.pptx
Cyber Security and Data Privacy in Information Systems.pptx
 
Information Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptxInformation Systems, Organizations and Strategy.pptx
Information Systems, Organizations and Strategy.pptx
 
Information Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptxInformation Systems in Global Business Today.pptx
Information Systems in Global Business Today.pptx
 
Applications of Management Information System.pptx
Applications of Management Information System.pptxApplications of Management Information System.pptx
Applications of Management Information System.pptx
 
Securing Management Information Systems.ppt
Securing Management Information Systems.pptSecuring Management Information Systems.ppt
Securing Management Information Systems.ppt
 
relational model in Database Management.ppt.ppt
relational model in Database Management.ppt.pptrelational model in Database Management.ppt.ppt
relational model in Database Management.ppt.ppt
 
Database Management System Security.pptx
Database Management System  Security.pptxDatabase Management System  Security.pptx
Database Management System Security.pptx
 

Último

বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
sayalidalavi006
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 

Último (20)

বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5Community pharmacy- Social and preventive pharmacy UNIT 5
Community pharmacy- Social and preventive pharmacy UNIT 5
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 

ERP implementation and Cost Estimation for an Org.

  • 1. 1 ERP Implement November 18, 2022 Presentation on Procurement of 1) IFMIS 2) RMS & 3) PM Consultancy
  • 2. Key Parameters RMS IFMIS Project Duration 4.5 Years Implementation -1.5 Yr, Support Extension 3 Yrs.) 5 Years Implementation -2 Yrs, Support Extension 3 Yrs. Geographical Coverage 20-25 Locations (Kathmandu and nearby) All offices of NEA Functional Coverage IFMIS • Financial Management • Asset Management • Inventory Management • Payroll • Project Accounting • Employee Claims & Retirement Benefits IFMIS and RMS • Financial Management • Asset Management • Inventory Management • Payroll • Human Resource Management System • Project Accounting • Metering • Billing and Collection • Energy Audit 2 Scope of Work (RMS & IFMIS)
  • 3. 3 RMS: Scope of Work  Supply, delivery, design, customization, integration, implementation, testing, commissioning of Hardware/ software of the RMS with FMS, including Data Migration & Change Management and Capacity Building.  COTS database, Middleware, Network and customer care equipment and other software in conformance to Industry standards and installation & maintenance of necessary infrastructure (at DC &DR).  Total period of contract is 4.5 years (1.5yrs for Implementation & FMS and 3yrs for support.) During the FMS period, the SI shall provide manpower &technical support services.
  • 4. 4 RMS: Key Considerations  Software License for 6 million consumers. (5.08m, 8%,3%,3%,3%)  Annual Technical Services (ATS) are computed @ 22% of the RMS License Cost per year.  Hardware Infrastructure requirements for DC and DRC  Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.  Capacity Building : 700 RMS Users, 14 Executive Users (Abroad).  FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
  • 5. 5 RMS: Modules Major Modules FRS Count 1. Metering 21 2. Billing 55 3. Collection 18 4. New Connection, Disconnection & Reconnection 50 5. Energy Audit 7 Supporting Modules 6 Management information System (MIS) 12 7. Document Management System (DMS) 13 8. Customer Relationship Management (CRM) 48 9. Web Portal and Mobile Application 19 10. Customer Care Centre (CCC)
  • 6. 6 RMS: Project Timeline Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 Project Initiation Business Blueprinting Design & Customization Data Migration IT infra setup for DC , DRC & CCC Pilot Rollout Training and Change Management Enterprise wide roll out Stabilization Support FMS 3 Yrs
  • 7. 7 RMS: Eligibility Qualification Criteria Scoring Matrix SI’s Strength Product OEM’s Strength RMS Implementation 60 15 Team Composition 10 Approach and Methodology 15 Totals 85 15 Technical Qualifying Score = 60% Weight for the Bid Price as specified in BDS = 40% Weight of the Bid Technical score = 60% Compliance to the Functional Requirement Specifications (FRS) mentioned in the RFP for major modules as standard is 85% . Less than 85% shall be termed as non-responsive.
  • 8. 8 IFMIS: Scope of work  Supply, delivery, design, customization, integration, implementation, testing, commissioning of Hardware/ software of the IFMIS with FMS, including Data Migration & Change Management and Capacity Building.  COTS database, Middleware, Network and customer care equipment and other software in conformance to Industry standards and installation & maintenance of necessary infrastructure (at DC &DR).  Total period of contract is 5 years (2yrs for Implementation & FMS and 3yrs for support.) During the FMS period, the SI shall provide manpower & technical support services.
  • 9. 9 IFMIS: Key Considerations  Software License for 1600 full enterprise users. Additional 400.  Annual Technical Services (ATS) are computed @ 22% of the IFMIS License Cost per year.  Hardware Infrastructure requirements for DC and DRC  Annual Maintenance Cost (AMC) @ 10% of HW Cost per year.  Capacity Building : 2000 Users, 15 Executive Users (Abroad).  FMS: Man-month Rate : Same till Go-Live, 10% Y-o-Y thereafter.
  • 10. 10 IFMIS: Project Timeline Project Activities M01 M02 M03 M04 M05 M06 M07 M08 M09 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 Project Initiation Business Blueprinting Design & Customization Data Migration IT infra setup for DC , DRC & CCC Pilot Rollout Training and Change Management Enterprise wide roll out Stabilization Support FMS 3 Yrs
  • 11. 11 Recommendation • The extension cost initial quoted, Final revised and EY estimated = 1.66 • Recommendation from EY to float the RFP with 3 years extension. • Extension of 3 years has been considered with a perception to take over the FMS by NEA IT team.
  • 12. 12 IFMIS: Modules Major Modules FRS Count 1. Financial Management 697 2. Material Management 259 3. Human Resource Management 496 4. Project Management 227 5. Maintenance Management 515 6. Production Planning 96 Supporting Modules 6 Linear Asset Management 11 7. Document and File Management 90 8. BI & BW 35 9. Mobile Application 80 10. Employee Self Services (ESS) & Manager Self Services (MSS) 87
  • 13. 13 Project Management Consultant  Expression of Interest (EoI) and Terms of Reference (ToR) published  Fourteen International Firms submitted the EoI  Committee Shortlisted 6 Firms  RFP to be finalized and submitted to ADB  Budget approved was 1 million USD and approved was 0.8 million USD excluding applicable taxes and VAT in Nepal.
  • 14. 14 Recommendations Expected–1  Team Composition: RMS: Provincial Managers - Bachelor Degree in Electrical/ Electronics/ IT/ Computer Science or related fields and 5 years of experience on RMS implementation. IFMIS: Assistant Project Manager - Bachelor Degree in Electrical/ Electronics/ IT/ Computer Science or related fields and 5 years of experience on IFMIS implementation. Provincial Managers and Assistant Project Managers are to be deputed from in- house.  Evaluation of CVs RMS: Evaluation of CVs of Project Manager and Provincial Managers only. IFMIS: Evaluation of Project Manager and Assistant Project Managers only. CVs of the Key Experts are to be evaluated.  PQ: The proposed product should be of latest version and the OEM should have a future Roadmap - for IFMIS required for the next 10 (ten) years and for RMS required for the
  • 15. 15 Recommendations Expected–2  Technical Score QCBS Requirement : Minimum Technical Score Required: 60% (IFMIS and RMS) IFMIS: 60% –30% RMS: 70% –30%  ERP Professional User License Requirement NEA’s License Requirement = 1600 Requirement in PQ/TQ: 300 Bring Down it in PQ/TQ to 200  Confirmation on Extension period to be considered
  • 16. 16 Recommendations Expected–3  Potential bidders pool is same for all the three procurements.  Bidders from the Consultants category such as PwC, Deloitte and KPMG also fulfill the PQ and TQ criteria set for SIs of both the procurements.  All the bidders will be allowed to participate in all the three tenders.  Selection of the top three PMC consultants will be done.  If the bidder selected for consultant also gets selected as SI in either or both of the procurements, then the bidder has to work as the SI for NEA.  This condition is to be included in the RFP for PMC.
  • 17. 17 Recommendations Expected–4  ToR clearly stating the Scope of Work of the Consultant EY  Deputed by ADB upon request from NEA  Need the support from the consultant in bid process management  Approach and Methodology evaluation required expert recommendation