The document summarizes proposed enhancements to the Harbor Bridge Project in Corpus Christi, Texas. It describes enhancements that will improve mobility and connectivity to areas near the port, SEA district, and downtown, including an emphasis on bicycle and pedestrian access and aesthetic features. Specifically, it notes that the enhancements will eliminate six traffic signals to create free-flowing gateways, improve port and refinery access, and enhance the North Beach area with safer connections and a shared use path. The enhancements are part of an ongoing design-build process to achieve the best results for the community.
The document summarizes pending development works and civic issues in the HBR layout, 5th block, 1st stage area. Key points include:
1) Roads and vacant sites need repair and maintenance, including asphalting roads, clearing overgrown vacant lots.
2) Storm water drainage work like fencing and retaining walls is incomplete and drainage is blocked with debris.
3) Other issues include need for bus shelters, street lights, converting an empty lot to a park, and addressing sewage system problems like blocked pipes.
The residents' association of HBR 5th block writes to MLA K.J. George regarding various unfinished development works and issues in their area, including: 1) incomplete tarring of roads leaving many potholes; 2) unfinished fencing of storm water drains; 3) lack of retaining walls for drains allowing dumping of debris; 4) cow menace from vacant sites used for grazing and milking; 5) irregular garbage collection and disposal; and 6) short supply of water for the past 6 months. They request the MLA's assistance to address these issues.
The document summarizes plans to widen Route 1 between Mary's Way and Annapolis Way in Virginia from four to six lanes. The project will include widening the road, constructing a new bridge over Marumsco Creek, adding sidewalks and trails, and undergrounding utilities. Construction is scheduled to be completed in six stages by November 2019. The project aims to introduce the construction team, present the scope of work, construction elements, timeline, and contact information for questions.
Pohick Creek Tributary Stream Restoration ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services restored over 1,300 linear feet of degraded tributary of Pohick Creek using natural channel design techniques. This included establishing a stable channel geometry, reconnecting the channel to its floodplain, installing in-stream structures, and replanting native vegetation. The project aims to reduce erosion and improve habitat while also decreasing nitrogen, phosphorus, and sediment runoff into Pohick Creek. Construction involved excavating the existing channel, installing grade control structures, and cleaning out the existing stormwater pond.
Okeechobee Road (US 27/SR 25) from Krome Avenue (SR 997) to NW 79 Avenue PD&E Study presentation to the Citizens Transportation Advisory Committee (CTAC), July 23, 2014.
9499 Beach Mill Road Channel Restoration ProjectFairfax County
This document provides details about a channel restoration project located at 9499 Beach Mill Road in Great Falls, VA. The project aims to address an incised and eroded channel by raising the channel's bottom elevation with select fill and installing cross vane structures, cascading step-pool structures, and a stone-lined energy dissipation basin. The project will stabilize the channel and prevent future flooding and safety hazards from very steep banks. Environmental Quality Resources, LLC is the contractor for the project which is managed by DPWES staff including Project Manager Ratna Pottumuthu and Construction Manager Yudhie Brownson.
The document summarizes proposed enhancements to the Harbor Bridge Project in Corpus Christi, Texas. It describes enhancements that will improve mobility and connectivity to areas near the port, SEA district, and downtown, including an emphasis on bicycle and pedestrian access and aesthetic features. Specifically, it notes that the enhancements will eliminate six traffic signals to create free-flowing gateways, improve port and refinery access, and enhance the North Beach area with safer connections and a shared use path. The enhancements are part of an ongoing design-build process to achieve the best results for the community.
The document summarizes pending development works and civic issues in the HBR layout, 5th block, 1st stage area. Key points include:
1) Roads and vacant sites need repair and maintenance, including asphalting roads, clearing overgrown vacant lots.
2) Storm water drainage work like fencing and retaining walls is incomplete and drainage is blocked with debris.
3) Other issues include need for bus shelters, street lights, converting an empty lot to a park, and addressing sewage system problems like blocked pipes.
The residents' association of HBR 5th block writes to MLA K.J. George regarding various unfinished development works and issues in their area, including: 1) incomplete tarring of roads leaving many potholes; 2) unfinished fencing of storm water drains; 3) lack of retaining walls for drains allowing dumping of debris; 4) cow menace from vacant sites used for grazing and milking; 5) irregular garbage collection and disposal; and 6) short supply of water for the past 6 months. They request the MLA's assistance to address these issues.
The document summarizes plans to widen Route 1 between Mary's Way and Annapolis Way in Virginia from four to six lanes. The project will include widening the road, constructing a new bridge over Marumsco Creek, adding sidewalks and trails, and undergrounding utilities. Construction is scheduled to be completed in six stages by November 2019. The project aims to introduce the construction team, present the scope of work, construction elements, timeline, and contact information for questions.
Pohick Creek Tributary Stream Restoration ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services restored over 1,300 linear feet of degraded tributary of Pohick Creek using natural channel design techniques. This included establishing a stable channel geometry, reconnecting the channel to its floodplain, installing in-stream structures, and replanting native vegetation. The project aims to reduce erosion and improve habitat while also decreasing nitrogen, phosphorus, and sediment runoff into Pohick Creek. Construction involved excavating the existing channel, installing grade control structures, and cleaning out the existing stormwater pond.
Okeechobee Road (US 27/SR 25) from Krome Avenue (SR 997) to NW 79 Avenue PD&E Study presentation to the Citizens Transportation Advisory Committee (CTAC), July 23, 2014.
9499 Beach Mill Road Channel Restoration ProjectFairfax County
This document provides details about a channel restoration project located at 9499 Beach Mill Road in Great Falls, VA. The project aims to address an incised and eroded channel by raising the channel's bottom elevation with select fill and installing cross vane structures, cascading step-pool structures, and a stone-lined energy dissipation basin. The project will stabilize the channel and prevent future flooding and safety hazards from very steep banks. Environmental Quality Resources, LLC is the contractor for the project which is managed by DPWES staff including Project Manager Ratna Pottumuthu and Construction Manager Yudhie Brownson.
Coon Branch at Annandale Community Park-Stream Restoration ProjectFairfax County
This document discusses plans to restore 1,900 feet of Coon Branch stream located in Annandale Community Park in Fairfax County, VA. The goals of the project are to stabilize the streambed and banks to reduce sediment and nutrient inputs and improve habitat while protecting infrastructure. The existing conditions show erosion undermining trees and infrastructure like sanitary sewer manholes. Typical restoration structures to be used include cross vanes and root wads. Construction is expected to be completed in phases with monitoring in following years to assess project success.
The document discusses some of the challenges involved in managing redevelopment plans (RDPs) in Jersey City, New Jersey. It notes that Jersey City has 87 RDP areas adopted since 1952 to redevelop and revitalize parts of the city. However, RDPs can become outdated and fail to account for changes in surrounding contexts. Other challenges include reconciling density standards between plans, amending plans, and ensuring plans support current trends in mixed-use and transit-oriented development. Redeveloping areas with expired or obsolete plans also poses difficulties.
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
The Miller Heights Outfall Rehabilitation Project was completed on time and within budget. The project involved stabilizing over 250 feet of eroded channel near Miller Road and Miller Heights Road. Natural stream channel design was used, including rock cross vanes, weirs, and plantings to reduce erosion and improve water quality. The project addressed safety concerns and stabilized the channel while providing environmental benefits.
Laird Drive to Don Valley Parkway Update: Environmental Project Report Addend...Crosstown TO
Metrolinx invites you to view a presentation from a follow-up meeting on the east tunnel extension to just east of Don Mills Station. A public meeting was held in December to provide a project update, to present proposed changes to the tunnel alignment, and to receive input from the public on those changes. Now, Metrolinx wants to share the input received and discuss next steps.Have your say at thecrosstown.ca.
The Overly Drive Flood Mitigation Project was completed on time and under budget on June 28, 2013. The project provided an overland relief channel to convey water from an overflowing 54" pipe to an existing junction box and culvert, preventing flooding of five homes. Key elements included constructing a natural stream channel with rock steps, walls, and vegetation to direct water away from homes and toward an outlet under I-495. The project was led by Ratna S Pottumuthu and Mannan Qureshi and addressed a longstanding flooding issue in the area.
The city is conducting a study of the Lawrence Park neighbourhood to address infrastructure problems like deteriorated roads, pedestrian safety issues, poor traffic management, and basement flooding. The study involves assessing the current conditions, getting public input, developing a master plan to address the issues, and undertaking detailed engineering design and construction. Key issues identified include the need to reconstruct aging roads, improve sidewalks and pedestrian connections, enhance traffic safety, upgrade storm and sanitary sewer systems, and address flooding complaints. The process will aim to balance infrastructure upgrades with minimizing tree loss and maintaining neighbourhood character.
WSDOT presented on several major road projects including SR 520, Alaskan Way Viaduct, I-405, I-90 Snoqualmie Pass, Columbia River Crossing, North Spokane Corridor, and Lake Washington congestion management. The presentation covered project descriptions, funding, schedules, and visualizations. It emphasized accelerating pontoon construction for SR 520 to prepare for a potential bridge failure and presented options under consideration.
This document provides information about an upcoming meeting to discuss the Route 7 Widening and Rehabilitation project in Northern Virginia. It includes the agenda, which covers an introduction to the project team, background on the project, key milestones, and a project overview. Construction will involve widening Route 7 and replacing bridges in four phases, with traffic maintained on the Dulles Toll Road and Route 7 through lane shifts and nightly lane closures. The goal is to complete the project by Spring 2018.
This document describes an expansion project of the Stringfellow Road Park and Ride Facility in Fairfax County, VA. The expansion added over 300 new parking spaces, a new transit building, bus bays and shelters, low impact development features like biofilters and porous pavement. The project was completed in May 2016 with a total budget of $7.2 million.
Pohick Creek Restoration Project - Phase 1Fairfax County
The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County Public Works completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole Jr. Pollution Control Plant by June 13, 2016.
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
This document provides information from a training on stormwater management facility maintenance. It includes the schedule for a training session covering the history of stormwater regulations, facility inspections, and common maintenance issues for various facility types. It then focuses on above ground facilities like wet and dry ponds, describing typical components, potential deficiencies, and recommended remedies. Constructed wetlands are also discussed, along with their functions, components, potential deficiencies, and remedies. The training aims to increase awareness of proper privately maintained stormwater facility upkeep.
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu
This document discusses proposals for ecologically restoring the Baseu Vechi and Baseu Rivers in Romania. It was channeled during the communist regime, negatively impacting the ecosystem. The document evaluates two ecotechnical methods for partially diverting the Baseu River flow into the old riverbed of the Baseu Vechi River in order to restore its ecological functions. Method I involves building two connecting ponds, while Method II uses a pipeline directly from the river. Both aim to supply water to revive the Baseu Vechi River ecosystem and create a wetland area. Bank stabilization and planting are also proposed to restore riparian areas.
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services upgraded over 3000 linear feet of stormwater infrastructure in the Franklin Park and Chesterbrook neighborhoods to reduce flooding, improve stormwater flow and water quality. The project was completed on time and on budget in December 2016 through the construction of swales, infiltration trenches, underground storage chambers and permeable surfaces. The project is estimated to reduce nitrogen, phosphorus and sediment runoff into local waterways.
In these slides, we talk about infrastructure.
First tells that what is infrastructure. Secondly, its importance. At last, types of infrastructure.
Hope you enjoy our slides.
Thanks.
SDC workshop on Signature Project Schemedenisleung
The document outlines work targets for the Southern District Council from 2012-2015, including three sentences: Developing the Aberdeen Fish Market into a tourist attraction and seafood hub; creating a waterfront promenade connecting Victoria Road and Sandy Bay in Sandy Bay North; and connecting Sandy Bay waterfront to CyberPort Waterfront Park along Sha Wan Drive. It then discusses plans to expand Waterfall Bay park and add a bridge, and connect areas like Wah Kwai Park, Waterfall Bay Park, and Tin Wan Praya Road with parks and enhanced streetscapes.
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
Design Phase includes:
Finalize sewer alignment
Manhole locations and material selection
Construction phasing plan
Final restoration for former pump station site/access
Existing utility coordination
Easement acquisition (if applicable)
By-pass water & sewer locations
Temporary service outage plan – water/sewer/gas
Traffic control plans
Phasing
Detour and closure plan
Pike Branch at Wilton Road Stream Stabilization ProjectFairfax County
This document provides information about a stream stabilization project along Pike Branch in Fairfax County, VA. The project aims to stabilize approximately 1,300 feet of stream between Telegraph Road and Wilton Road to improve watershed conditions, reduce flooding and erosion, create wildlife habitat, and enhance water quality. The document discusses regulatory drivers for stormwater management, details the project objectives and timeline, describes existing conditions along the stream, and outlines proposed stabilization structures and retaining wall repairs. Next steps outlined include completing design plans and scheduling construction.
La Institución Educativa Aguadita Grande tiene la visión de lograr buenos niveles de calidad educativa para el año 2015, formando a estudiantes con competencias laborales, tecnológicas y científicas que les permitan desempeñarse de manera sostenible y aportar valor a la sociedad y comunidad educativa a través de la interacción y participación, creando espacios escolares y comunitarios que promuevan la formación en valores.
Coon Branch at Annandale Community Park-Stream Restoration ProjectFairfax County
This document discusses plans to restore 1,900 feet of Coon Branch stream located in Annandale Community Park in Fairfax County, VA. The goals of the project are to stabilize the streambed and banks to reduce sediment and nutrient inputs and improve habitat while protecting infrastructure. The existing conditions show erosion undermining trees and infrastructure like sanitary sewer manholes. Typical restoration structures to be used include cross vanes and root wads. Construction is expected to be completed in phases with monitoring in following years to assess project success.
The document discusses some of the challenges involved in managing redevelopment plans (RDPs) in Jersey City, New Jersey. It notes that Jersey City has 87 RDP areas adopted since 1952 to redevelop and revitalize parts of the city. However, RDPs can become outdated and fail to account for changes in surrounding contexts. Other challenges include reconciling density standards between plans, amending plans, and ensuring plans support current trends in mixed-use and transit-oriented development. Redeveloping areas with expired or obsolete plans also poses difficulties.
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
The Miller Heights Outfall Rehabilitation Project was completed on time and within budget. The project involved stabilizing over 250 feet of eroded channel near Miller Road and Miller Heights Road. Natural stream channel design was used, including rock cross vanes, weirs, and plantings to reduce erosion and improve water quality. The project addressed safety concerns and stabilized the channel while providing environmental benefits.
Laird Drive to Don Valley Parkway Update: Environmental Project Report Addend...Crosstown TO
Metrolinx invites you to view a presentation from a follow-up meeting on the east tunnel extension to just east of Don Mills Station. A public meeting was held in December to provide a project update, to present proposed changes to the tunnel alignment, and to receive input from the public on those changes. Now, Metrolinx wants to share the input received and discuss next steps.Have your say at thecrosstown.ca.
The Overly Drive Flood Mitigation Project was completed on time and under budget on June 28, 2013. The project provided an overland relief channel to convey water from an overflowing 54" pipe to an existing junction box and culvert, preventing flooding of five homes. Key elements included constructing a natural stream channel with rock steps, walls, and vegetation to direct water away from homes and toward an outlet under I-495. The project was led by Ratna S Pottumuthu and Mannan Qureshi and addressed a longstanding flooding issue in the area.
The city is conducting a study of the Lawrence Park neighbourhood to address infrastructure problems like deteriorated roads, pedestrian safety issues, poor traffic management, and basement flooding. The study involves assessing the current conditions, getting public input, developing a master plan to address the issues, and undertaking detailed engineering design and construction. Key issues identified include the need to reconstruct aging roads, improve sidewalks and pedestrian connections, enhance traffic safety, upgrade storm and sanitary sewer systems, and address flooding complaints. The process will aim to balance infrastructure upgrades with minimizing tree loss and maintaining neighbourhood character.
WSDOT presented on several major road projects including SR 520, Alaskan Way Viaduct, I-405, I-90 Snoqualmie Pass, Columbia River Crossing, North Spokane Corridor, and Lake Washington congestion management. The presentation covered project descriptions, funding, schedules, and visualizations. It emphasized accelerating pontoon construction for SR 520 to prepare for a potential bridge failure and presented options under consideration.
This document provides information about an upcoming meeting to discuss the Route 7 Widening and Rehabilitation project in Northern Virginia. It includes the agenda, which covers an introduction to the project team, background on the project, key milestones, and a project overview. Construction will involve widening Route 7 and replacing bridges in four phases, with traffic maintained on the Dulles Toll Road and Route 7 through lane shifts and nightly lane closures. The goal is to complete the project by Spring 2018.
This document describes an expansion project of the Stringfellow Road Park and Ride Facility in Fairfax County, VA. The expansion added over 300 new parking spaces, a new transit building, bus bays and shelters, low impact development features like biofilters and porous pavement. The project was completed in May 2016 with a total budget of $7.2 million.
Pohick Creek Restoration Project - Phase 1Fairfax County
The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County Public Works completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole Jr. Pollution Control Plant by June 13, 2016.
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
This document provides information from a training on stormwater management facility maintenance. It includes the schedule for a training session covering the history of stormwater regulations, facility inspections, and common maintenance issues for various facility types. It then focuses on above ground facilities like wet and dry ponds, describing typical components, potential deficiencies, and recommended remedies. Constructed wetlands are also discussed, along with their functions, components, potential deficiencies, and remedies. The training aims to increase awareness of proper privately maintained stormwater facility upkeep.
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Răzvan Voicu - Measures of ecological reconstruction of Baseul Vechi and Base...Răzvan Voicu
This document discusses proposals for ecologically restoring the Baseu Vechi and Baseu Rivers in Romania. It was channeled during the communist regime, negatively impacting the ecosystem. The document evaluates two ecotechnical methods for partially diverting the Baseu River flow into the old riverbed of the Baseu Vechi River in order to restore its ecological functions. Method I involves building two connecting ponds, while Method II uses a pipeline directly from the river. Both aim to supply water to revive the Baseu Vechi River ecosystem and create a wetland area. Bank stabilization and planting are also proposed to restore riparian areas.
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services upgraded over 3000 linear feet of stormwater infrastructure in the Franklin Park and Chesterbrook neighborhoods to reduce flooding, improve stormwater flow and water quality. The project was completed on time and on budget in December 2016 through the construction of swales, infiltration trenches, underground storage chambers and permeable surfaces. The project is estimated to reduce nitrogen, phosphorus and sediment runoff into local waterways.
In these slides, we talk about infrastructure.
First tells that what is infrastructure. Secondly, its importance. At last, types of infrastructure.
Hope you enjoy our slides.
Thanks.
SDC workshop on Signature Project Schemedenisleung
The document outlines work targets for the Southern District Council from 2012-2015, including three sentences: Developing the Aberdeen Fish Market into a tourist attraction and seafood hub; creating a waterfront promenade connecting Victoria Road and Sandy Bay in Sandy Bay North; and connecting Sandy Bay waterfront to CyberPort Waterfront Park along Sha Wan Drive. It then discusses plans to expand Waterfall Bay park and add a bridge, and connect areas like Wah Kwai Park, Waterfall Bay Park, and Tin Wan Praya Road with parks and enhanced streetscapes.
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
Design Phase includes:
Finalize sewer alignment
Manhole locations and material selection
Construction phasing plan
Final restoration for former pump station site/access
Existing utility coordination
Easement acquisition (if applicable)
By-pass water & sewer locations
Temporary service outage plan – water/sewer/gas
Traffic control plans
Phasing
Detour and closure plan
Pike Branch at Wilton Road Stream Stabilization ProjectFairfax County
This document provides information about a stream stabilization project along Pike Branch in Fairfax County, VA. The project aims to stabilize approximately 1,300 feet of stream between Telegraph Road and Wilton Road to improve watershed conditions, reduce flooding and erosion, create wildlife habitat, and enhance water quality. The document discusses regulatory drivers for stormwater management, details the project objectives and timeline, describes existing conditions along the stream, and outlines proposed stabilization structures and retaining wall repairs. Next steps outlined include completing design plans and scheduling construction.
La Institución Educativa Aguadita Grande tiene la visión de lograr buenos niveles de calidad educativa para el año 2015, formando a estudiantes con competencias laborales, tecnológicas y científicas que les permitan desempeñarse de manera sostenible y aportar valor a la sociedad y comunidad educativa a través de la interacción y participación, creando espacios escolares y comunitarios que promuevan la formación en valores.
This document summarizes the design of a photonic integrated circuit (PIC) for a Brillouin optical time domain reflectometry (BOTDR) read-out unit. Key elements of the circuit include a dual laser design that allows for homodyne detection, and a switch that selects the laser and enables coherent detection. A switchable digital delay line circuit is also implemented to tune the frequency spacing between the two lasers to enable detection of the full Brillouin spectrum. The PIC has the potential to provide BOTDR capability at a much lower cost compared to existing instruments, with a spatial resolution of 2m, strain resolution of 0.004% and temperature resolution of 2°C, for a sensor length of 50km
Paul discusses the importance of love over other gifts like faith, prophecy, or knowledge. He states that without love, these gifts mean nothing. Love is described as patient, kind, not envious or boastful, and as enduring all things. Prophecies and tongues will cease but love will never end.
resale open in shankra residency omaxe city jaipur @7503367689sahilkharkara
This document outlines the payment plan and additional charges for a property called Shankra Residency. It lists the price per square foot for a 2BHK (925 sqft) flat as Rs. 1850, totaling Rs. 1,11,000. The booking amount is also Rs. 1,11,000. It then lists the installment structure, with percentages due at different construction milestones from excavation work through to possession. Additional charges include parking, club costs, electrical and fire safety equipment, and maintenance charges. Bank details are provided for payments.
La beca KAIST ofrece oportunidades para estudiar posgrados en Corea del Sur. KAIST es una de las mejores universidades de investigación del mundo con programas en ciencias naturales, bioingeniería, ciencias de la vida, tecnología e información, y artes liberales. Los estudiantes deben postular antes del 17 de abril de 2015 y enviar documentación antes del 29 de mayo. La beca cubre matrícula y estipendio mensual para formar profesionales de vanguardia.
This short document introduces a family consisting of a father called "Papa", a mother called "Mama", a sister called "Ate", and a brother called "Kuya". The family enjoys spending time together and having fun. The narrator expresses their love for their family.
Este documento describe las reglas para combinar pronombres átonos en catalán. 1) Los pronombres átonos deben ir juntos, ya sea antes o después del verbo. Detrás del verbo pueden ir en gerundio, infinitivo o imperativo. 2) Cuando las vocales entran en contacto, pueden darse contracciones o elisiones apostrofando lo más a la derecha posible. 3) Si van detrás del verbo, deben unirse a él y entre sí ya sea con apóstrofe o guión. 4) Cuando dos pronombres átonos entran en contact
resale open in shankra residency omaxe city jaipur @7503367689sahilkharkara
This document outlines the payment plan and additional charges for a property called Shankra Residency. It lists the price per square foot for a 2BHK (925 sqft) flat as Rs. 1,850, totaling Rs. 1,11,000. The booking amount is also Rs. 1,11,000. It then lists the installment structure, with percentages due at different construction milestones from excavation work through to possession. Additional charges include parking, club costs, electrical and plumbing works, and maintenance fees. Bank details are provided for payments.
resale open in shankra residency omaxe city jaipur @7503367689sahilkharkara
This document outlines the payment plan and additional charges for a property called Shankra Residency. It lists the price per square foot for a 2BHK (925 sqft) flat as Rs. 1850, totaling Rs. 1,11,000. The booking amount is also Rs. 1,11,000. It then lists the installment structure, with percentages due at different construction milestones from excavation work through to possession. Additional charges include parking, club costs, electrical and plumbing works, and maintenance fees. Bank details are provided for payments.
Présentation "Un stéthoscope chez les Bleues", Denis GutierrezEditions du Pantheon
"Un stéthoscope chez les Bleues", témoignage de Denis Gutierrez sur ses années en tant que médecin des équipes de France déminines de rugby. Paru aux Éditions du Panthéon, Janvier 2013.
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
The document provides information on the construction of the Eglinton Crosstown LRT project in Toronto, including:
- An overview of Metrolinx and their regional transportation plan which included the Eglinton Crosstown LRT.
- Details on the 19km LRT route, including 15 underground stations, surface stops, maintenance facility, and links to other transit lines.
- An emphasis on safety as the top priority during construction.
- Renderings and descriptions of station designs and their accessibility, environmental, and sustainability features.
- Explanations of the cut-and-cover and mined tunnel construction methods being used.
- Updates on construction progress in 2017, including tunnel excav
Forest Hill Station Open House - June 2017Crosstown TO
The document provides information about the construction of the Eglinton Crosstown LRT project in Toronto. It discusses Metrolinx's regional transportation plan, the project details including a 19km LRT route with underground and surface stations, and safety and accessibility features. It outlines the construction methods using cut-and-cover and mined tunnels. It highlights 2017 construction milestones and provides renderings and progress updates for the Forest Hill station.
Caledonia Station: Preliminary Design ConsultationCrosstown TO
Station design is one of the most exciting -- and most critical -- components of The Crosstown construction. There are a number of major considerations for station design, including: accessibility for people with disabilities, development potential, integration with surrounding communities, and minimizing construction impacts. This is the preliminary station design consultation for Caledonia. Visit www.thecrosstown.ca for more information.
Leaside Station Open House - March 2017Crosstown TO
The document provides information about the construction of the Eglinton Crosstown LRT line in Toronto. It discusses the background and players involved in the project, details about what is being built including its route and features, safety and accessibility considerations, construction methods and timelines, and community benefits initiatives. The specific section on Leaside station provides renderings and details plans for its construction including utility relocations, shoring work, and expected timelines and impacts through 2017.
Cedarvale Station Open House - March 2017Crosstown TO
The document provides information about the construction of the Eglinton Crosstown LRT line in Toronto. It discusses the background and players involved in the project, details about what is being built including key features and design approaches, how construction is taking place through methods like tunnel boring and cut-and-cover stations, community benefits and business support programs, and timelines and expected activities over 2017 at the Cedarvale station site. Safety, accessibility, environment and sustainability considerations are also outlined.
This document provides an overview of bridge engineering concepts and design processes. It discusses:
1. Classifying bridges by type, material, and other factors. It also defines bridge components like superstructure and substructure.
2. Factors considered in preliminary surveys for bridge sites, including hydrology, geotechnical data, and traffic.
3. Hydraulic design processes like determining peak flood flows, afflux, and linear waterway.
4. Structural design of bridge components like slabs, beams, culverts, and foundations. The role of the bridge engineer is also outlined.
Fairbank & Oakwood Stations Open House - April 2017Crosstown TO
The document provides information about the construction of the Eglinton Crosstown LRT project in Toronto, including:
- Metrolinx is overseeing the $50 billion regional transportation plan to integrate transit in the Toronto area.
- The 19km Eglinton Crosstown LRT will run underground and above ground with 25 stations, and is scheduled to open in 2022.
- The document focuses on construction plans and impacts around the Fairbank Station, including traffic staging plans from 2017-2018 to allow excavation and shoring work. Haul routes are identified to transport material on and off site.
Surface Section and Kennedy Station Open House - April 2017Crosstown TO
- The document provides details about the construction of the Eglinton Crosstown LRT project in Toronto. It discusses the history and planning of the project, describes what is being built including underground stations, surface stops and interchange stations, and outlines the construction approach and timelines. Safety, accessibility, and minimizing environmental impact are priorities. The summary highlights construction is underway at all underground stations, with utility relocations and supporting excavations in progress or planned for 2017 at interchange stations like Kennedy. Surface stop road widening and utility work will also begin in 2017.
Sachin Chitnis has over 25 years of experience as a civil engineer working on infrastructure projects in Gulf and Africa regions. He has extensive experience in areas such as foundations, reinforced concrete, structural steel, drainage, roads, bridges, and land development. His most recent roles include serving as Site Engineer for a large economic zone development project in Qatar from 2015-2016 and working on road projects and bridges in Tanzania from 2013-2015.
Sachin Chitnis has over 25 years of experience as a civil engineer working on infrastructure projects in India, the Middle East, and Africa. He has extensive experience supervising construction of foundations, pipelines, buildings, bridges, and more. His background includes roles as a site engineer on projects in Qatar, Tanzania, Oman, Dubai, and India with budgets up to $900 million.
This document provides details about the planning and design of a reinforced concrete bridge at Challathadi, Aivarnadu. A team of civil engineering students conducted surveys of the site, designed a T-beam bridge using limit state methods, and created drawings, estimates, and a model. They reviewed literature on bridge design and failure factors. The objective was to plan, analyze, and design an RCC bridge to connect local villages. The methodology included site visits, surveys, fixation of dimensions, AutoCAD drawings, manual design, estimation, and model making. The work was carried out from December to March under the guidance of a professor.
The document provides information about the construction of the Eglinton Crosstown LRT project in Toronto, including:
- Metrolinx is the agency overseeing regional transportation in the Greater Toronto area, including a $50 billion, 25-year plan.
- The 19-km Eglinton Crosstown LRT will have 15 underground stations, 10 surface stops, a maintenance facility, and links to other transit lines.
- Safety is the top priority during construction, which uses cut-and-cover and mined methods to excavate station areas.
- Upcoming work at the Avenue Station in 2017 includes installing support structures, dewatering wells, and mitigating utilities like sewer lining.
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...Tushar Sonawane
Civil engineering deals with planning, designing, construction and maintenance of infrastructure projects like roads, bridges, buildings, and environmental structures. The document outlines the key areas of civil engineering like transportation engineering, structural engineering, geotechnical engineering, environmental engineering, and construction management. It also describes the roles of civil engineers in infrastructure development and their interdisciplinary work with other branches of engineering.
Eglinton Station Open House - March 2017Crosstown TO
The document provides information about the construction of the Eglinton Crosstown LRT line in Toronto. It discusses the background and players involved in the project, details about what is being built including its route and features, safety and accessibility considerations, and environmental and sustainability efforts. It also outlines the construction approach and methods, as well as summaries of work completed in 2016 and anticipated milestones and impacts for 2017, such as utility relocations and support of excavation at station sites like Eglinton station. Community benefits and ways to stay updated on the project are also mentioned.
As communities turn from sprawl and work to retrofit existing districts and corridors, misfits between street and land use types often compromise livability, sustainability, and economic development. We’ll look at how some cities have responded by designing streets that go beyond the conventional arterial-collector-local street classification system and have implemented innovative streets with flexible spaces and uses - often overlapping the single-use functions of typical street "zoning." Presentation delivered at CNU 17, Denver, CO on June 12, 2009.
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
The document provides details about the construction of the Eglinton Crosstown LRT project in Toronto. It discusses the background and players involved in the project, as well as details about building the 19-kilometer light rail line which includes 15 underground stations and 10 surface stops. Safety is the top priority during construction. Community benefits and business support programs are being implemented to help local residents and businesses impacted by construction. Regular updates are encouraged by following Crosstown social media channels or visiting one of their local project offices.
APWA Award Winning Roundabout in Ann ArborOHM Advisors
http://www.ohm-advisors.com. This award winning roundabout in Ann Arbor is making the intersection of Huron Parkway and Nixon Road safer, greener, quicker and cheaper. The project was named APWA Michigan Chapter's Project of the Year. Aggressive public outreach efforts that included Russian and Chinese translators and field trips with visually impaired people made this project both an engineering and a public relations success.
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
Metrolinx is updating its Regional Transportation Plan (RTP) to 2041. The draft plan outlines how governments and transit agencies can work together to build an integrated transportation system. Metrolinx has developed the draft plan through consultation and is seeking public review and comment. The Eglinton Crosstown LRT project will include 15 underground stations and 10 surface stops along a 19-kilometre route. Safety is the top priority, and the project aims to minimize environmental impacts and maximize sustainability in design and construction. Community benefits programs also aim to ensure positive impacts for disadvantaged groups.
The document provides information about the construction of the Eglinton Crosstown LRT project in Toronto. It discusses Metrolinx's regional transportation plan, the project details such as the 19km route and 25 stations (9 underground, 10 surface), safety and accessibility features, construction methods like cut-and-cover and sequential excavation mining, and community benefits like a youth-led mural at Laird station. Updates on construction progress in 2016-2017 are also outlined.
Semelhante a City of Rochester, Main Street Makeover (20)
Live, work, shop, play.
A community’s commercial district brings it all together for consumers – a virtual smorgasbord of places to eat and shop, visit and play, live or stay. And what each consumer is looking for is the consistent level of quality and service they come to expect from your brand, regardless of location. Just walk in the door of a national bank branch, quick-service restaurant, or a big-box supermarket. The space will reflect the exact reputation its owner or operator wants to deliver. FTCH understands the need for thoughtful prototype design and site adaptation to deliver the consistent image of your brand across the country.
FTCH is here to help you navigate the many decisions you need to make for your commercial places. Need the right site for a movie theater? What are the newest trends in office environments? Want to reduce energy expenses across the chain? With a multidisciplined approach, FTCH has the experts in civil and site engineering, architecture, systems design, commissioning, and construction management to give you the right answers to appeal to consumers while saving money and opening the doors that much faster.
Imagine working for a firm where your personal growth and professional development are the top priorities. Imagine a place where enthusiasm, creativity, and integrity are just a few of the core values. Imagine working alongside a dynamic, diverse group of peers while learning from the industry’s leading experts.
IMAGINE A CAREER AT FTCH.
Commissioning is the process that ensures a facility and its systems are designed, installed, tested, operated, and maintained to perform as the design intended. This is achieved by implementing and documenting a series of live tests to confirm proper system operation. Commissioning provides written documentation of the owner’s expectations and a process for ensuring they are fulfilled, while also avoiding inevitable operational problems. This is a simplified outline of how the process works.
Commissioning is a process by which a building, facility, or plant and its associated equipment and systems are tested to verify they function according to their design objectives or specifications. As the name implies, EB Cx applies essentially the same process to an existing facility’s systems and equipment, with a particular focus on “investigating, analyzing, and optimizing the performance of building systems through the identification and implementation of low/no-cost and capital-intensive Facility Improvement Measures” to ensure their continued performance.
FTCH is an employee-owned architectural/engineering firm established in Lansing, Michigan in 1956. It has grown to 7 offices across Michigan and Ohio with 360 employees and over 200 shareholders. The firm provides a wide range of architectural, engineering, infrastructure, environmental, and construction services to clients.
By now, we are all familiar with the concept of generating electricity from the sun. The notion is almost an afterthought when we have mobile access to GPS satellites and apps for seemingly anything the mind can imagine. The calculator on my desk, and perhaps on yours, is solar-powered. If your cell phone goes dead on a hiking trip, hook it up to any number of solar phone chargers available on the market and you’re back in
business. Even those GPS satellites are powered by the sun as they whirl through space 12,000 miles above Earth.
Every energy problem solved saves money, reduces pollution, eliminates waste, and gives us a real kick. It’s what we do, and we want to work with you to find your best energy solutions.
GIS has improved infrastructure planning by allowing storage and analysis of important information about infrastructure systems, including age, condition, and capacity. This integrated data supports planning decisions and documentation of progress. Potholes and structurally deficient bridges negatively impact the economic scheme by reducing productivity and restricting economic growth through lost business. Wastewater infrastructure, though seldom seen, operates continually and must be effective, efficient, economical and reliable to maintain community health and attract residents and businesses. FTCH helps cities improve wastewater infrastructure to better utilize resources and reinvest savings in upgrades. FTCH promotes innovative stormwater solutions that serve multiple purposes and strengthen communities through improved public health, safety and welfare. Good infrastructure like roads and bridges is important to sustain
Three-dimensional (3D) laser scanning
uses light detection and ranging (LIDAR)
measurement techniques to quickly and
accurately collect data on the size and shape
of an object or environment. Through the
years, the cost to purchase and operate
stationary and mobile scanning has decreased
and is now changing the way 3D data is
captured and interpreted.
Five cities are collaborating to foster interconnectedness, sustainability, and diversity, resulting in many shared assets including:
- A prosperous business climate
- High levels of employment and education
- Thriving downtown and commercial areas
- Engaged residents
- Mature, vibrant neighborhoods
How are they making this happen? Here is a report that details the planning process and quantitative indicators used as a baseline for measuring progress.
FTC&H’s diverse staff of engineers, scientists, architects, and
construction professionals continually interact to benefit our
clients with a full-service approach to projects. Responsive
communication, budget and schedule sensitivity, and our constant
pursuit of technical excellence and innovation help us transform
ideas into reality. FTC&H values our clients and seeks to establish
long-term relationships. Our goal is to exceed your expectations
by providing extraordinary client service.
FTC&H provides civil engineering, environmental, architectural/engineering, and construction services for regional, national, and international clients.
For more than 50 years, FTC&H has built a reputation for quality, value, and excellence. We offer our clients unique value with a broad spectrum of award-winning professional services.
Building Information Modeling (BIM) is more than a new technology;
it is an innovative approach to the entire design, construction, and
maintenance process. Many of the agencies and organizations
involved in the building industry have their own definitions of BIM,
but they all have a similar feel to that of the National BIM Standard
definition
Mais de Fishbeck, Thompson, Carr & Huber, Inc. (13)
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Designforuminternational
India’s architectural landscape is a vibrant tapestry that weaves together the country's rich cultural heritage and its modern aspirations. From majestic historical structures to cutting-edge contemporary designs, the work of Indian architects is celebrated worldwide. Among the many firms shaping this dynamic field, Design Forum International stands out as a leader in innovative and sustainable architecture. This blog explores some of the best Indian architects, highlighting their contributions and showcasing the most famous architects in India.
ARENA - Young adults in the workplace (Knight Moves).pdfKnight Moves
Presentations of Bavo Raeymaekers (Project lead youth unemployment at the City of Antwerp), Suzan Martens (Service designer at Knight Moves) and Adriaan De Keersmaeker (Community manager at Talk to C)
during the 'Arena • Young adults in the workplace' conference hosted by Knight Moves.
Practical eLearning Makeovers for EveryoneBianca Woods
Welcome to Practical eLearning Makeovers for Everyone. In this presentation, we’ll take a look at a bunch of easy-to-use visual design tips and tricks. And we’ll do this by using them to spruce up some eLearning screens that are in dire need of a new look.
International Upcycling Research Network advisory board meeting 4Kyungeun Sung
Slides used for the International Upcycling Research Network advisory board 4 (last one). The project is based at De Montfort University in Leicester, UK, and funded by the Arts and Humanities Research Council.
Fonts play a crucial role in both User Interface (UI) and User Experience (UX) design. They affect readability, accessibility, aesthetics, and overall user perception.
1. P R O J E C T T E A M
City of Rochester
MAKEOVER
AIN STREET
Owners
Michigan Department of Transportation
City of Rochester Rochester DDA
Construction Engineer
Fishbeck, Thompson, Carr & Huber Inc.
Engineers | Architects | Scientists | Constructors
What
Providing services for over 50 years.
Contractor Design Engineers was
Angelo Iafrate Construction Co. NCI Engineering
Hubbell Roth & Clark Inc.
done?
• Reconstruction of downtown Main Street
Questions? between the Clinton River Bridge and Paint
Creek Bridge.
Jaymes Vettraino Tom Gray II, P.E. • Water main replacement and utility upgrades.
City Manager Vice President/Senior Civil Engineer • Traffic signal and sign upgrades.
jvettraino@rochestermi.org tlgray@ftch.com • Streetscape and lighting improvements.
248.609.0606 248.324.2133
2. M-150
11.21
RECONSTRUCTION
PROJECT OPEN
TO TRAFFIC
• Full closure opened to traffic.
• One lane of traffic in each direction and a center
Full closure starts turn lane is opened to traffic between Second
• Single lane closures begin Exposed aggregate
between Second Street Street and University Drive.
along NB and SB M-150. sidewalk complete.
• Pavement removal begins and University Drive. Concrete paving begins.
Water main complete.
• Sidewalk removal begins.
• Pedestrian traffic is maintained
07.09 08.02 10.15
04.24 06.01
along sidewalk adjacent to
building using temporary fence.
07.17 09.27 11.17
05.15 06.04
04.22 Placement of concrete
pavement is completed.
Exposed aggregate sidewalk
RT
construction begins.
STA
Water main installation begins. Human remains discovered in front of
Home Bakery at the NE corner of Third
Street and Main Street.
Human remains discovered in
front of bridal shop at the SE
corner of Third Street and Main
Street.