SlideShare uma empresa Scribd logo
Product Requirements Document:
Atlas Solar Robot
1. Overview:
AES is pioneering the transformation of solar installation to make it more accessible, efficient,
and scalable, thereby accelerating global decarbonization efforts. To achieve this vision, AES
has developed Atlas, a groundbreaking solar robot designed to enhance the speed, efficiency,
and safety of solar panel installation. Atlas will revolutionize the solar industry by automating
labor-intensive tasks, reducing costs, and improving project scalability.
2. Objectives:
● Develop a solar robot capable of safely and efficiently installing solar panels.
● Enhance the speed and precision of solar panel installation to meet increasing demand.
● Improve safety for workers by automating heavy lifting and hazardous tasks.
● Enable partners to deploy solar resources faster and with greater reliability.
● Achieve flexibility and scalability to adapt to various project requirements and
environments.
3. Features:
● Automated Installation: Atlas will autonomously perform the placement and attachment
of solar modules, reducing the need for manual labor.
● Heavy Lifting Capability: Equipped with advanced lifting mechanisms, Atlas can handle
the heavy lifting required for solar panel installation.
● Precision and Accuracy: Utilizing advanced sensors and positioning systems, Atlas
ensures precise alignment and placement of solar panels.
● Modular Design: Atlas features a modular design, allowing for easy customization and
scalability to accommodate different project sizes and configurations.
● Safety Protocols: Built-in safety protocols ensure the protection of workers and
equipment during operation.
● Remote Operation: Atlas can be operated remotely, enabling installation in remote or
harsh environments.
● Compatibility: Compatible with various ground and soil types, including landfills, and
resistant to wind and harsh weather conditions.
● Integration: Atlas integrates seamlessly with other energy systems, such as battery
storage, to provide hybrid energy solutions.
4. User Stories:
● As a solar installation company, I want Atlas to automate the labor-intensive tasks
involved in solar panel installation, allowing my workforce to focus on higher-value
activities.
● As a construction worker, I want Atlas to enhance safety by performing heavy lifting and
hazardous tasks, reducing the risk of injuries on-site.
● As a project manager, I want Atlas to improve the speed and efficiency of solar panel
installation, enabling us to meet project deadlines and scale our operations effectively.
5. Technical Requirements:
● Robotic Arm: Atlas will be equipped with a robotic arm capable of lifting and positioning
solar panels with precision.
● Sensors and Cameras: Advanced sensors and cameras will provide real-time feedback
to ensure accurate placement and alignment of solar panels.
● Battery Power: Atlas will be powered by rechargeable batteries, providing sufficient
energy for extended operation periods.
● Wireless Connectivity: Wireless connectivity will enable remote operation and monitoring
of Atlas from a central control station.
6. Design Requirements:
● Compact and Robust: Atlas will have a compact design to maneuver easily on
construction sites while being robust enough to withstand harsh environmental
conditions.
● User-Friendly Interface: An intuitive user interface will allow operators to control Atlas
efficiently and monitor its performance.
● Safety Features: Emergency stop buttons, obstacle detection systems, and fail-safe
mechanisms will be implemented to ensure the safety of workers and equipment.
7. Assumptions and Constraints:
● Atlas will require initial setup and calibration by trained technicians.
● Environmental factors such as terrain and weather conditions may impact Atlas'
performance and operation.
● Regulatory compliance and safety standards must be adhered to during the
development and deployment of Atlas.
8. Acceptance Criteria:
● Atlas successfully installs solar panels with high precision and accuracy.
● Atlas improves the speed and efficiency of solar panel installation compared to manual
methods.
● Atlas operates safely and reliably in various environmental conditions.
● Partners report cost savings and increased productivity as a result of using Atlas for
solar installations.
9. Timeline and Milestones:
● Prototype Development: 6 months
● Testing and Optimization: 3 months
● Pilot Deployment: 6 months
● Full-Scale Deployment: 12 months
10. Stakeholders:
● AES: Responsible for the development, testing, and deployment of Atlas.
● Solar Installation Companies: End-users of Atlas, responsible for integrating it into their
operations.
● Construction Workers: Operators and beneficiaries of Atlas, involved in its day-to-day
use.
● Regulatory Agencies: Ensure compliance with safety and environmental regulations.
11. Risks and Contingency Plans:
● Technical Failures: Regular maintenance and backup systems will mitigate the risk of
technical failures.
● Regulatory Challenges: Close collaboration with regulatory agencies and legal experts
will ensure compliance with relevant regulations.
● Market Acceptance: Continuous feedback collection and product iteration will address
any issues related to market acceptance.
By fulfilling these requirements, Atlas will revolutionize the solar industry, enabling faster, safer,
and more efficient solar panel installations, ultimately contributing to the acceleration of global
decarbonization efforts.
OKR example
1. Big Rocks (Strategic Initiatives/Objectives):
● Big Rock 1: Enhance Solar Installation Efficiency and Safety - This
objective focuses on improving the speed, efficiency, and safety of solar
panel installation using the Atlas solar robot.
● Big Rock 2: Enable Rapid Solar Deployment - This objective aims to
accelerate the deployment of solar energy resources worldwide by
streamlining the installation process with the Atlas robot.
2. OKRs (Objectives and Key Results):
● Objective 1: Enhance Solar Installation Efficiency and Safety
● Key Result 1: Increase the speed of solar panel installation by 50%
within the next six months.
● Key Result 2: Reduce the number of on-site accidents by 30%
within the next year.
● Objective 2: Enable Rapid Solar Deployment
● Key Result 1: Achieve a 3X increase in the rate of solar resource
deployment compared to traditional methods within the next two
years.
● Key Result 2: Expand the geographic reach of solar deployment to
include remote and rural areas within the next 18 months.
3. KPIs (Key Performance Indicators):
● KPI 1: Installation Speed (measuring efficiency)
● KPI 2: Accident Rate (measuring safety)
● KPI 3: Rate of Solar Resource Deployment (measuring scalability)
● KPI 4: Geographic Reach (measuring accessibility)

Mais conteúdo relacionado

Semelhante a ATLAS - Product Requirement Document.pdf

Automatic Solar Panel Cleaner using Arduino
Automatic Solar Panel Cleaner using ArduinoAutomatic Solar Panel Cleaner using Arduino
Automatic Solar Panel Cleaner using Arduino
IRJET Journal
 
Solar Driven Asia Proposal
Solar Driven Asia Proposal Solar Driven Asia Proposal
Solar Driven Asia Proposal
Maurice Williams
 
REPORT ON SOLAR TRACKING SYSTEM
REPORT ON SOLAR TRACKING SYSTEMREPORT ON SOLAR TRACKING SYSTEM
REPORT ON SOLAR TRACKING SYSTEM
Bhautik Sanandiya
 
SolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesSolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sites
MachinePulse
 
Mechatron
MechatronMechatron
Mechatron
ggeorgoudakis
 
IRJET- Automatic Solar Panel Cleaning System
IRJET-  	  Automatic Solar Panel Cleaning SystemIRJET-  	  Automatic Solar Panel Cleaning System
IRJET- Automatic Solar Panel Cleaning System
IRJET Journal
 
Effects of dual axis solar tracker
Effects of dual axis solar trackerEffects of dual axis solar tracker
Effects of dual axis solar tracker
Yogesh Verma
 
IRJET- Solar Panel Cleaning System with Inbuilt Power Supply
IRJET-  	  Solar Panel Cleaning System with Inbuilt Power SupplyIRJET-  	  Solar Panel Cleaning System with Inbuilt Power Supply
IRJET- Solar Panel Cleaning System with Inbuilt Power Supply
IRJET Journal
 
solar tracking system
solar tracking systemsolar tracking system
solar tracking system
safayet karim ratul
 
Adil Mansoor
Adil MansoorAdil Mansoor
Adil Mansoor
Adil Mansoor
 
Dhaval Patel
Dhaval PatelDhaval Patel
Dhaval Patel
dhavalpatel034
 
L Narayan's Resume
L Narayan's ResumeL Narayan's Resume
L Narayan's Resume
Laxmi Narayan
 
Astronomical Almanac’s Algorithm Based Dual Axis Solar Tracker
Astronomical Almanac’s Algorithm Based Dual Axis Solar TrackerAstronomical Almanac’s Algorithm Based Dual Axis Solar Tracker
Astronomical Almanac’s Algorithm Based Dual Axis Solar Tracker
IRJET Journal
 
Staten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicantsStaten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicants
Rakesh Singh
 
Solar tracking system final report GTU
Solar tracking system final report GTU Solar tracking system final report GTU
Solar tracking system final report GTU
silveroak engineering collage
 
Solar Tracking System for renewable energy system
Solar Tracking System for renewable energy systemSolar Tracking System for renewable energy system
Solar Tracking System for renewable energy system
suresh386785
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
Soralite Power
 
SimCLIM USA
SimCLIM USASimCLIM USA
SimCLIM USA
climsys
 
Solar_Module_Integrated_Converters_as_Power_Genera.pdf
Solar_Module_Integrated_Converters_as_Power_Genera.pdfSolar_Module_Integrated_Converters_as_Power_Genera.pdf
Solar_Module_Integrated_Converters_as_Power_Genera.pdf
huong Tran thu
 
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLCIRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET Journal
 

Semelhante a ATLAS - Product Requirement Document.pdf (20)

Automatic Solar Panel Cleaner using Arduino
Automatic Solar Panel Cleaner using ArduinoAutomatic Solar Panel Cleaner using Arduino
Automatic Solar Panel Cleaner using Arduino
 
Solar Driven Asia Proposal
Solar Driven Asia Proposal Solar Driven Asia Proposal
Solar Driven Asia Proposal
 
REPORT ON SOLAR TRACKING SYSTEM
REPORT ON SOLAR TRACKING SYSTEMREPORT ON SOLAR TRACKING SYSTEM
REPORT ON SOLAR TRACKING SYSTEM
 
SolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sitesSolarPulse solves the problem of managing distributed solar sites
SolarPulse solves the problem of managing distributed solar sites
 
Mechatron
MechatronMechatron
Mechatron
 
IRJET- Automatic Solar Panel Cleaning System
IRJET-  	  Automatic Solar Panel Cleaning SystemIRJET-  	  Automatic Solar Panel Cleaning System
IRJET- Automatic Solar Panel Cleaning System
 
Effects of dual axis solar tracker
Effects of dual axis solar trackerEffects of dual axis solar tracker
Effects of dual axis solar tracker
 
IRJET- Solar Panel Cleaning System with Inbuilt Power Supply
IRJET-  	  Solar Panel Cleaning System with Inbuilt Power SupplyIRJET-  	  Solar Panel Cleaning System with Inbuilt Power Supply
IRJET- Solar Panel Cleaning System with Inbuilt Power Supply
 
solar tracking system
solar tracking systemsolar tracking system
solar tracking system
 
Adil Mansoor
Adil MansoorAdil Mansoor
Adil Mansoor
 
Dhaval Patel
Dhaval PatelDhaval Patel
Dhaval Patel
 
L Narayan's Resume
L Narayan's ResumeL Narayan's Resume
L Narayan's Resume
 
Astronomical Almanac’s Algorithm Based Dual Axis Solar Tracker
Astronomical Almanac’s Algorithm Based Dual Axis Solar TrackerAstronomical Almanac’s Algorithm Based Dual Axis Solar Tracker
Astronomical Almanac’s Algorithm Based Dual Axis Solar Tracker
 
Staten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicantsStaten solarprofile epc for spv power plant applicants
Staten solarprofile epc for spv power plant applicants
 
Solar tracking system final report GTU
Solar tracking system final report GTU Solar tracking system final report GTU
Solar tracking system final report GTU
 
Solar Tracking System for renewable energy system
Solar Tracking System for renewable energy systemSolar Tracking System for renewable energy system
Solar Tracking System for renewable energy system
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 
SimCLIM USA
SimCLIM USASimCLIM USA
SimCLIM USA
 
Solar_Module_Integrated_Converters_as_Power_Genera.pdf
Solar_Module_Integrated_Converters_as_Power_Genera.pdfSolar_Module_Integrated_Converters_as_Power_Genera.pdf
Solar_Module_Integrated_Converters_as_Power_Genera.pdf
 
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLCIRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
 

Mais de Mamoon Ismail Khalid

REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%
REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%
REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%
Mamoon Ismail Khalid
 
Network Traffic Adaptable Image Codec - A solution to make streaming faster
Network Traffic Adaptable Image Codec - A solution to make streaming fasterNetwork Traffic Adaptable Image Codec - A solution to make streaming faster
Network Traffic Adaptable Image Codec - A solution to make streaming faster
Mamoon Ismail Khalid
 
Hospital Management and Inventory Control Solution for Public Hospitals in De...
Hospital Management and Inventory Control Solution for Public Hospitals in De...Hospital Management and Inventory Control Solution for Public Hospitals in De...
Hospital Management and Inventory Control Solution for Public Hospitals in De...
Mamoon Ismail Khalid
 
T(X) Innoway - Prediction Algorithm design.pdf
T(X) Innoway - Prediction Algorithm design.pdfT(X) Innoway - Prediction Algorithm design.pdf
T(X) Innoway - Prediction Algorithm design.pdf
Mamoon Ismail Khalid
 
Joint3DShapeMatching - a fast approach to 3D model matching using MatchALS 3...
Joint3DShapeMatching  - a fast approach to 3D model matching using MatchALS 3...Joint3DShapeMatching  - a fast approach to 3D model matching using MatchALS 3...
Joint3DShapeMatching - a fast approach to 3D model matching using MatchALS 3...
Mamoon Ismail Khalid
 
Golf Swing Analysis and Posture Correction System
Golf Swing Analysis and Posture Correction SystemGolf Swing Analysis and Posture Correction System
Golf Swing Analysis and Posture Correction System
Mamoon Ismail Khalid
 
24 ideas to revive any developing country.pdf
24 ideas to revive any developing country.pdf24 ideas to revive any developing country.pdf
24 ideas to revive any developing country.pdf
Mamoon Ismail Khalid
 
#2 - Smart Bins - Returnable Plastic Ecosystem.pdf
#2 - Smart Bins - Returnable Plastic Ecosystem.pdf#2 - Smart Bins - Returnable Plastic Ecosystem.pdf
#2 - Smart Bins - Returnable Plastic Ecosystem.pdf
Mamoon Ismail Khalid
 
PyTorch to detect Humans Eating Food.pdf
PyTorch to detect Humans Eating Food.pdfPyTorch to detect Humans Eating Food.pdf
PyTorch to detect Humans Eating Food.pdf
Mamoon Ismail Khalid
 
Future of agriculture agriculture - technology is a necessity in 2020 and beyond
Future of agriculture agriculture - technology is a necessity in 2020 and beyondFuture of agriculture agriculture - technology is a necessity in 2020 and beyond
Future of agriculture agriculture - technology is a necessity in 2020 and beyond
Mamoon Ismail Khalid
 
Nano mos25
Nano mos25Nano mos25
Real estate in blockchain (2)
Real estate in blockchain (2)Real estate in blockchain (2)
Real estate in blockchain (2)
Mamoon Ismail Khalid
 
Cohort analysis saa s (1)
Cohort analysis saa s (1)Cohort analysis saa s (1)
Cohort analysis saa s (1)
Mamoon Ismail Khalid
 
ISA backed technology skills platform
ISA backed technology skills platformISA backed technology skills platform
ISA backed technology skills platform
Mamoon Ismail Khalid
 
Start up valuation methods
Start up valuation methodsStart up valuation methods
Start up valuation methods
Mamoon Ismail Khalid
 
Analysis mvp factory
Analysis mvp factoryAnalysis mvp factory
Analysis mvp factory
Mamoon Ismail Khalid
 
Detect Negative and Positive sentiment in user reviews using python word2vec ...
Detect Negative and Positive sentiment in user reviews using python word2vec ...Detect Negative and Positive sentiment in user reviews using python word2vec ...
Detect Negative and Positive sentiment in user reviews using python word2vec ...
Mamoon Ismail Khalid
 
Detect spam comments youtube videos and app store reviews
Detect spam comments youtube videos and app store reviewsDetect spam comments youtube videos and app store reviews
Detect spam comments youtube videos and app store reviews
Mamoon Ismail Khalid
 
Start Up deal/interaction management workflow
Start Up deal/interaction management workflowStart Up deal/interaction management workflow
Start Up deal/interaction management workflow
Mamoon Ismail Khalid
 
Hunter.io scraper
Hunter.io scraperHunter.io scraper
Hunter.io scraper
Mamoon Ismail Khalid
 

Mais de Mamoon Ismail Khalid (20)

REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%
REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%
REMOTE SOLAR MONITORING SYSTEM - A solution to make battery life extend by 300%
 
Network Traffic Adaptable Image Codec - A solution to make streaming faster
Network Traffic Adaptable Image Codec - A solution to make streaming fasterNetwork Traffic Adaptable Image Codec - A solution to make streaming faster
Network Traffic Adaptable Image Codec - A solution to make streaming faster
 
Hospital Management and Inventory Control Solution for Public Hospitals in De...
Hospital Management and Inventory Control Solution for Public Hospitals in De...Hospital Management and Inventory Control Solution for Public Hospitals in De...
Hospital Management and Inventory Control Solution for Public Hospitals in De...
 
T(X) Innoway - Prediction Algorithm design.pdf
T(X) Innoway - Prediction Algorithm design.pdfT(X) Innoway - Prediction Algorithm design.pdf
T(X) Innoway - Prediction Algorithm design.pdf
 
Joint3DShapeMatching - a fast approach to 3D model matching using MatchALS 3...
Joint3DShapeMatching  - a fast approach to 3D model matching using MatchALS 3...Joint3DShapeMatching  - a fast approach to 3D model matching using MatchALS 3...
Joint3DShapeMatching - a fast approach to 3D model matching using MatchALS 3...
 
Golf Swing Analysis and Posture Correction System
Golf Swing Analysis and Posture Correction SystemGolf Swing Analysis and Posture Correction System
Golf Swing Analysis and Posture Correction System
 
24 ideas to revive any developing country.pdf
24 ideas to revive any developing country.pdf24 ideas to revive any developing country.pdf
24 ideas to revive any developing country.pdf
 
#2 - Smart Bins - Returnable Plastic Ecosystem.pdf
#2 - Smart Bins - Returnable Plastic Ecosystem.pdf#2 - Smart Bins - Returnable Plastic Ecosystem.pdf
#2 - Smart Bins - Returnable Plastic Ecosystem.pdf
 
PyTorch to detect Humans Eating Food.pdf
PyTorch to detect Humans Eating Food.pdfPyTorch to detect Humans Eating Food.pdf
PyTorch to detect Humans Eating Food.pdf
 
Future of agriculture agriculture - technology is a necessity in 2020 and beyond
Future of agriculture agriculture - technology is a necessity in 2020 and beyondFuture of agriculture agriculture - technology is a necessity in 2020 and beyond
Future of agriculture agriculture - technology is a necessity in 2020 and beyond
 
Nano mos25
Nano mos25Nano mos25
Nano mos25
 
Real estate in blockchain (2)
Real estate in blockchain (2)Real estate in blockchain (2)
Real estate in blockchain (2)
 
Cohort analysis saa s (1)
Cohort analysis saa s (1)Cohort analysis saa s (1)
Cohort analysis saa s (1)
 
ISA backed technology skills platform
ISA backed technology skills platformISA backed technology skills platform
ISA backed technology skills platform
 
Start up valuation methods
Start up valuation methodsStart up valuation methods
Start up valuation methods
 
Analysis mvp factory
Analysis mvp factoryAnalysis mvp factory
Analysis mvp factory
 
Detect Negative and Positive sentiment in user reviews using python word2vec ...
Detect Negative and Positive sentiment in user reviews using python word2vec ...Detect Negative and Positive sentiment in user reviews using python word2vec ...
Detect Negative and Positive sentiment in user reviews using python word2vec ...
 
Detect spam comments youtube videos and app store reviews
Detect spam comments youtube videos and app store reviewsDetect spam comments youtube videos and app store reviews
Detect spam comments youtube videos and app store reviews
 
Start Up deal/interaction management workflow
Start Up deal/interaction management workflowStart Up deal/interaction management workflow
Start Up deal/interaction management workflow
 
Hunter.io scraper
Hunter.io scraperHunter.io scraper
Hunter.io scraper
 

Último

How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
Tatiana Kojar
 
June Patch Tuesday
June Patch TuesdayJune Patch Tuesday
June Patch Tuesday
Ivanti
 
Project Management Semester Long Project - Acuity
Project Management Semester Long Project - AcuityProject Management Semester Long Project - Acuity
Project Management Semester Long Project - Acuity
jpupo2018
 
Webinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data WarehouseWebinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data Warehouse
Federico Razzoli
 
Recommendation System using RAG Architecture
Recommendation System using RAG ArchitectureRecommendation System using RAG Architecture
Recommendation System using RAG Architecture
fredae14
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
MichaelKnudsen27
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
Chart Kalyan
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
ssuserfac0301
 
UI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentationUI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentation
Wouter Lemaire
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
saastr
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Malak Abu Hammad
 

Último (20)

How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
 
June Patch Tuesday
June Patch TuesdayJune Patch Tuesday
June Patch Tuesday
 
Project Management Semester Long Project - Acuity
Project Management Semester Long Project - AcuityProject Management Semester Long Project - Acuity
Project Management Semester Long Project - Acuity
 
Webinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data WarehouseWebinar: Designing a schema for a Data Warehouse
Webinar: Designing a schema for a Data Warehouse
 
Recommendation System using RAG Architecture
Recommendation System using RAG ArchitectureRecommendation System using RAG Architecture
Recommendation System using RAG Architecture
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdfHow to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
How to Interpret Trends in the Kalyan Rajdhani Mix Chart.pdf
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
 
UI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentationUI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentation
 
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
Deep Dive: AI-Powered Marketing to Get More Leads and Customers with HyperGro...
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdfUnlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
Unlock the Future of Search with MongoDB Atlas_ Vector Search Unleashed.pdf
 

ATLAS - Product Requirement Document.pdf

  • 1. Product Requirements Document: Atlas Solar Robot 1. Overview: AES is pioneering the transformation of solar installation to make it more accessible, efficient, and scalable, thereby accelerating global decarbonization efforts. To achieve this vision, AES has developed Atlas, a groundbreaking solar robot designed to enhance the speed, efficiency, and safety of solar panel installation. Atlas will revolutionize the solar industry by automating labor-intensive tasks, reducing costs, and improving project scalability. 2. Objectives: ● Develop a solar robot capable of safely and efficiently installing solar panels. ● Enhance the speed and precision of solar panel installation to meet increasing demand. ● Improve safety for workers by automating heavy lifting and hazardous tasks. ● Enable partners to deploy solar resources faster and with greater reliability. ● Achieve flexibility and scalability to adapt to various project requirements and environments. 3. Features: ● Automated Installation: Atlas will autonomously perform the placement and attachment of solar modules, reducing the need for manual labor. ● Heavy Lifting Capability: Equipped with advanced lifting mechanisms, Atlas can handle the heavy lifting required for solar panel installation. ● Precision and Accuracy: Utilizing advanced sensors and positioning systems, Atlas ensures precise alignment and placement of solar panels. ● Modular Design: Atlas features a modular design, allowing for easy customization and scalability to accommodate different project sizes and configurations. ● Safety Protocols: Built-in safety protocols ensure the protection of workers and equipment during operation. ● Remote Operation: Atlas can be operated remotely, enabling installation in remote or harsh environments. ● Compatibility: Compatible with various ground and soil types, including landfills, and resistant to wind and harsh weather conditions. ● Integration: Atlas integrates seamlessly with other energy systems, such as battery storage, to provide hybrid energy solutions.
  • 2. 4. User Stories: ● As a solar installation company, I want Atlas to automate the labor-intensive tasks involved in solar panel installation, allowing my workforce to focus on higher-value activities. ● As a construction worker, I want Atlas to enhance safety by performing heavy lifting and hazardous tasks, reducing the risk of injuries on-site. ● As a project manager, I want Atlas to improve the speed and efficiency of solar panel installation, enabling us to meet project deadlines and scale our operations effectively. 5. Technical Requirements: ● Robotic Arm: Atlas will be equipped with a robotic arm capable of lifting and positioning solar panels with precision. ● Sensors and Cameras: Advanced sensors and cameras will provide real-time feedback to ensure accurate placement and alignment of solar panels. ● Battery Power: Atlas will be powered by rechargeable batteries, providing sufficient energy for extended operation periods. ● Wireless Connectivity: Wireless connectivity will enable remote operation and monitoring of Atlas from a central control station. 6. Design Requirements: ● Compact and Robust: Atlas will have a compact design to maneuver easily on construction sites while being robust enough to withstand harsh environmental conditions. ● User-Friendly Interface: An intuitive user interface will allow operators to control Atlas efficiently and monitor its performance. ● Safety Features: Emergency stop buttons, obstacle detection systems, and fail-safe mechanisms will be implemented to ensure the safety of workers and equipment. 7. Assumptions and Constraints: ● Atlas will require initial setup and calibration by trained technicians. ● Environmental factors such as terrain and weather conditions may impact Atlas' performance and operation. ● Regulatory compliance and safety standards must be adhered to during the development and deployment of Atlas. 8. Acceptance Criteria:
  • 3. ● Atlas successfully installs solar panels with high precision and accuracy. ● Atlas improves the speed and efficiency of solar panel installation compared to manual methods. ● Atlas operates safely and reliably in various environmental conditions. ● Partners report cost savings and increased productivity as a result of using Atlas for solar installations. 9. Timeline and Milestones: ● Prototype Development: 6 months ● Testing and Optimization: 3 months ● Pilot Deployment: 6 months ● Full-Scale Deployment: 12 months 10. Stakeholders: ● AES: Responsible for the development, testing, and deployment of Atlas. ● Solar Installation Companies: End-users of Atlas, responsible for integrating it into their operations. ● Construction Workers: Operators and beneficiaries of Atlas, involved in its day-to-day use. ● Regulatory Agencies: Ensure compliance with safety and environmental regulations. 11. Risks and Contingency Plans: ● Technical Failures: Regular maintenance and backup systems will mitigate the risk of technical failures. ● Regulatory Challenges: Close collaboration with regulatory agencies and legal experts will ensure compliance with relevant regulations. ● Market Acceptance: Continuous feedback collection and product iteration will address any issues related to market acceptance. By fulfilling these requirements, Atlas will revolutionize the solar industry, enabling faster, safer, and more efficient solar panel installations, ultimately contributing to the acceleration of global decarbonization efforts.
  • 4. OKR example 1. Big Rocks (Strategic Initiatives/Objectives): ● Big Rock 1: Enhance Solar Installation Efficiency and Safety - This objective focuses on improving the speed, efficiency, and safety of solar panel installation using the Atlas solar robot. ● Big Rock 2: Enable Rapid Solar Deployment - This objective aims to accelerate the deployment of solar energy resources worldwide by streamlining the installation process with the Atlas robot. 2. OKRs (Objectives and Key Results): ● Objective 1: Enhance Solar Installation Efficiency and Safety ● Key Result 1: Increase the speed of solar panel installation by 50% within the next six months. ● Key Result 2: Reduce the number of on-site accidents by 30% within the next year. ● Objective 2: Enable Rapid Solar Deployment ● Key Result 1: Achieve a 3X increase in the rate of solar resource deployment compared to traditional methods within the next two years. ● Key Result 2: Expand the geographic reach of solar deployment to include remote and rural areas within the next 18 months. 3. KPIs (Key Performance Indicators): ● KPI 1: Installation Speed (measuring efficiency) ● KPI 2: Accident Rate (measuring safety) ● KPI 3: Rate of Solar Resource Deployment (measuring scalability) ● KPI 4: Geographic Reach (measuring accessibility)