SlideShare uma empresa Scribd logo
1 de 24
Baixar para ler offline
Het verhaal van een flexibele automatisering
2013
Stefan Maussen

Manufacturing Day
1

Intro

Ferrostaal
Business Units

Ferrostaal Industrial Projects

Ferrostaal Industrial Machinery

Ferrostaal Piping Supply

Ferrostaal Equipment Solutions

Ferrostaal Automotive

Intergrafica Print & Pack

Manufacturing Day

05/11/2013

2
2

SML

SML
A subsidiairy of the Ferrostaal Automotive Group GmbH

FSA SML n.v.
Genk,
Belgium
Manufacturing Day

05/11/2013

3
2

SML

SML
A subsidiairy of the Ferrostaal Automotive Group GmbH

Site 23 - Genk

Steel warehouse - Genk

Site 22 - Genk
Manufacturing Day

05/11/2013

4
2

SML

Key data – eind 2012
•
•
•
•
•
•

Manufacturing Day

05/11/2013

Oppervlakte 60.000m²
Spoorweg
Waterweg
Omzet 32 Mio Euro
Medewerkers 422
Ford Genk 95%

5
2

SML

Logistic operations
Supply chain management
Inbound transport
Warehousing
Outbound transport

Value Added Logistics
Sequencing Operations
Repacking and rekitting
Carpets, Glass, Pannels

After sales
Glass, rear quater trim

Manufacturing Day

05/11/2013

6
2

SML

Contract Manufacturing 1
In-sequence assembly
Process en Manufacturing Engineering
Project management
Quality management
Engine Dress, Front Suspension, Rear axle, Front corners,
Cooler, Fueltank

Contract Manufacturing 2
Procurement
Supplier management
Process en Manufacturing Engineering
Project management
Quality management
Rear axle, Front corners

Manufacturing Day

05/11/2013

7
Uitdagingen

3

Struggle to
survive - 2010

Operational
CHALLENGES
transformation AHEAD!
2011

•

Markt volatiliteit

•

•

Innovatie en

Geïntegreerde business
processen

•

technologie

Betrokken
medewerkers

•

Globalisatie

•

Stijgende complexiteit

•

Individualisering

•

Simultaneous
Engineering

•

product

Business process
innovatie

•

Time to market

•

Stijgende kostendruk

•

Flexibele en wendbare
productie systemen

Manufacturing Day

05/11/2013

8
3

Uitdagingen

SML missie en visie

“Focus on offering customized, flexible and leading edge services leveraged
by SAFE business processes”

Manufacturing Day

05/11/2013

9
4

Een flexibel productiesysteem

Projectfocus
Productie
Systeem
Powertrain

Materiaal
stroom
SMF

Informatie
Andon

Operator
V²
Process
Autobalanc
e

Werkplaats
KIM

Machine
PTS

Manufacturing Day

05/11/2013

10
4

Een flexibel productiesysteem

Productie
Systeem

Powertrain

Manufacturing Day

05/11/2013

11
4

Een flexibel productiesysteem

Framework decision making process

Kost benchmark
Marktonderzoek
technologie

Kost vs. technologie
Technologie keuze

Selectie criteria

Final
recommendat
ion

Ervaring

Kennis

Manufacturing Day

05/11/2013

12
4

Een flexibel productiesysteem

Technology based decision process
•
•

Operatorposten
Lengte

52 ops
+/- 280 m

ZONE 5
TRANSFER
ZONE 2
TRANSMISSION

ZONE 1
ENGINES

ZONE 4
EOL

ZONE 3
DRESSING

Manufacturing Day

05/11/2013

13
4

Een flexibel productiesysteem

Conveyor
Conveyor system on floor
Krups

Pallets - skids
Conveyor system in floor
Eisenmann

AGV
Automated Guided Vehicles
E&K

Manufacturing Day

05/11/2013

14
4

Een flexibel productiesysteem

Objectiviteit
Technologie criteria

Objectieve afweging

A. Maintenance
B. Failure Rate
C. Response Time
D. Maintenance Cost
E. Failure Impact
F. Diagnostics
G. Automation
H. Integration CSG
I. Flexibility for expansion
J. Station Set-Up
K. Logistical Crossing
L. Logistical Space

Team resultaat

M. Carrier Space/Design (Kitting)
N. Operator Influence

AGV
DS

AGV
E&K

O. Accessibility (Ergonomics)

57%

61%

PALLETS PALLETS
ON FLOOR IN FLOOR

75%

77%

P. Engine Accessibility
Q. Sectioning/Buffering
Manufacturing Day

05/11/2013

15
4

Een flexibel productiesysteem

Kost versus technologie
AGV +
2 CONV

AGV+
1 CONV

AGV +
2 CONV +
CSG

PALLET +
2 CONV +
CSG

Investments Prod. Syst.
Investment. Amor. (6%-6y)

3,29M

3,21M

3,91M

4,28M

0,67M

0,65M

0,79M

0,87M

Operational Cost
Direct
Indirect

2,53M

2,50M

2,43M

2,42M

2,21M

2,17M

2,11M

2,11M

0,33M

0,33M

0,33M

0,30M

Space Requirements (m²)
Space Cost

8000

8000

8000

8500

0,48M

0,48M

0,48M

0,51M

Cost (First year)

3,68M

3,63M

3,71M

3,79M

61%

61%

61%

77%

Decision Model Outcome

SAFE
Manufacturing Day

05/11/2013

4

16
4

Een flexibel productiesysteem

MAAR………….
•
•
•
•

Implementatietermijn 3 weken
Customization
Herbruikbaarheid
Integreerbaarheid en uitbreidbaarheid
automatisaties
• Flexibiliteit & standaardisatie

COMBINATIE AGV &
CONVEYOR
Manufacturing Day

05/11/2013

17
4

Een flexibel productiesysteem

Resultaat
Scenario details
• Hoofdlijn: AGV
• Conveyor :
Transmission
• Transfer : AGV
• Engine Picking : AGV

ZONE 5
TRANSFER
ZONE 2
ZONE 1
TRANSMISSION
ENGINES

ZONE 4
EOL

ZONE 3
DRESSING

Voordelen
• Ontkoppeling
conveyors
• Buffering and
sectionering
• Automatisering
• Flexibiliteit en
standaardisering

ZONE 3
DRESSING

Focus

EFFICIËNTIE | EFFECTIVITEIT
Manufacturing Day

05/11/2013

4

18
4

Een flexibel productiesysteem

Informatie
Systeem

ANDON

Manufacturing Day

05/11/2013

19
4

Probleemstelling

Een flexibel productiesysteem

•

Geen transparante en realtime monitoring van het
productieproces,

•

Geen objectieve en
gestructureerde rapportering
(technische storingen,
kwaliteitsproblemen,
logistieke, …)

•

Informatie verspreid over de
organisatie,

•

Ad hoc maatregelen,

•

Opvolging KPI’s top-down,

•

Geen directe feedback naar
operators

Communicatiekanal
en
Manufacturing Day

05/11/2013

20
4

Een flexibel productiesysteem

Andon monitoring
•

Registratie werkpost

•

Operatormelding

•

Integratie van
productiesysteem en
perifierie in PTS

•

Visualisering van
meldingen en status van het
productie

•

Integratie autobalance tool
in PTS

•

‘Look into the future’:
Realtime simulatie met als
doel pro-actief bottlenecks
identificeren

Cultuurswijziging
Manufacturing Day

05/11/2013

21
4

Een flexibel productiesysteem

Implementatie

Aug
Start met analyse RFQ

April
Communicatie,
training medewerkers

Nov
Concept nieuwe productielijnen,
installaties, machines.
Aug
2011

Nov
2011

Jan
2012

Apr
2012

Mei
2012

Mei
Voorbereidende
werken
Jan
Uitbesteding van de
kritische productiesystemen
P.O. Ford Motor Company
Manufacturing Day

05/11/2013

Juli
2012

Aug
Opstart
0  1000
wagens op dag
1

Aug
2012

Summer shutdown
3 weken
Afbouw, Opbouw,
Testing

22
5

Film

Manufacturing Day

05/11/2013

23
6

Fazit

Humancentered
production focused on
• Sustainability
• Agility
• Flexibility
• Efficiency and
Effectiveness

Manufacturing Day

05/11/2013

24

Mais conteúdo relacionado

Mais de Sirris

Presentation - webinar embedded machine learning
Presentation - webinar embedded machine learningPresentation - webinar embedded machine learning
Presentation - webinar embedded machine learningSirris
 
2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.Sirris
 
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelenSirris
 
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereouslySirris
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelecSirris
 
20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crm20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crmSirris
 
Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...Sirris
 
Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...Sirris
 
Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...Sirris
 
Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Sirris
 
Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...Sirris
 
Futureproof by sirris- product of the future
Futureproof by sirris- product of the futureFutureproof by sirris- product of the future
Futureproof by sirris- product of the futureSirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial weldingSirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...Sirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmjSirris
 
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmenSirris
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...Sirris
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...Sirris
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...Sirris
 
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...Sirris
 

Mais de Sirris (20)

Presentation - webinar embedded machine learning
Presentation - webinar embedded machine learningPresentation - webinar embedded machine learning
Presentation - webinar embedded machine learning
 
2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.2 - Pattyn - Smart Products Webinar 03-02-2023.
2 - Pattyn - Smart Products Webinar 03-02-2023.
 
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
2021 01-27 - webinar - Corrosie van 3D geprinte onderdelen
 
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
2021/0/15 - Solarwinds supply chain attack: why we should take it sereously
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec
 
20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crm20200923 inside metal am webinar sirris-crm
20200923 inside metal am webinar sirris-crm
 
Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...Challenges and solutions for improved durability of materials - Opin summary ...
Challenges and solutions for improved durability of materials - Opin summary ...
 
Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...Challenges and solutions for improved durability of materials - Hybrid joints...
Challenges and solutions for improved durability of materials - Hybrid joints...
 
Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...Challenges and solutions for improved durability of materials - Corrosion mon...
Challenges and solutions for improved durability of materials - Corrosion mon...
 
Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...Challenges and solutions for improved durability of materials - Concrete in m...
Challenges and solutions for improved durability of materials - Concrete in m...
 
Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...Challenges and solutions for improved durability of materials - Coatings done...
Challenges and solutions for improved durability of materials - Coatings done...
 
Futureproof by sirris- product of the future
Futureproof by sirris- product of the futureFutureproof by sirris- product of the future
Futureproof by sirris- product of the future
 
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
2018 11-07-verbinden-ongelijksoortige-materialen-hupico multimaterial welding
 
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
2018 11-07-verbinden-ongelijksoortige-materialen-bil ongelijksoortige materia...
 
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
2018 11-07-verbinden-ongelijksoortige-materialen-sirris bil-flanders_make_mmj
 
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
2018 11-07-verbinden-ongelijksoortige-materialen-ku leuven-lijmen
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Lcv lasercladding for...
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Juno industries mecha...
 
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin  verbinden v...
Slotevent ‘Verbinden van ongelijksoortige materialen’ - Castolin verbinden v...
 
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
Masterclass Mechatronics 4.0 - Indoor and outdoor localisation and positionin...
 

Sirris manufacturing day 2013 SML - Stefan Maussen

  • 1. Het verhaal van een flexibele automatisering 2013 Stefan Maussen Manufacturing Day
  • 2. 1 Intro Ferrostaal Business Units Ferrostaal Industrial Projects Ferrostaal Industrial Machinery Ferrostaal Piping Supply Ferrostaal Equipment Solutions Ferrostaal Automotive Intergrafica Print & Pack Manufacturing Day 05/11/2013 2
  • 3. 2 SML SML A subsidiairy of the Ferrostaal Automotive Group GmbH FSA SML n.v. Genk, Belgium Manufacturing Day 05/11/2013 3
  • 4. 2 SML SML A subsidiairy of the Ferrostaal Automotive Group GmbH Site 23 - Genk Steel warehouse - Genk Site 22 - Genk Manufacturing Day 05/11/2013 4
  • 5. 2 SML Key data – eind 2012 • • • • • • Manufacturing Day 05/11/2013 Oppervlakte 60.000m² Spoorweg Waterweg Omzet 32 Mio Euro Medewerkers 422 Ford Genk 95% 5
  • 6. 2 SML Logistic operations Supply chain management Inbound transport Warehousing Outbound transport Value Added Logistics Sequencing Operations Repacking and rekitting Carpets, Glass, Pannels After sales Glass, rear quater trim Manufacturing Day 05/11/2013 6
  • 7. 2 SML Contract Manufacturing 1 In-sequence assembly Process en Manufacturing Engineering Project management Quality management Engine Dress, Front Suspension, Rear axle, Front corners, Cooler, Fueltank Contract Manufacturing 2 Procurement Supplier management Process en Manufacturing Engineering Project management Quality management Rear axle, Front corners Manufacturing Day 05/11/2013 7
  • 8. Uitdagingen 3 Struggle to survive - 2010 Operational CHALLENGES transformation AHEAD! 2011 • Markt volatiliteit • • Innovatie en Geïntegreerde business processen • technologie Betrokken medewerkers • Globalisatie • Stijgende complexiteit • Individualisering • Simultaneous Engineering • product Business process innovatie • Time to market • Stijgende kostendruk • Flexibele en wendbare productie systemen Manufacturing Day 05/11/2013 8
  • 9. 3 Uitdagingen SML missie en visie “Focus on offering customized, flexible and leading edge services leveraged by SAFE business processes” Manufacturing Day 05/11/2013 9
  • 12. 4 Een flexibel productiesysteem Framework decision making process Kost benchmark Marktonderzoek technologie Kost vs. technologie Technologie keuze Selectie criteria Final recommendat ion Ervaring Kennis Manufacturing Day 05/11/2013 12
  • 13. 4 Een flexibel productiesysteem Technology based decision process • • Operatorposten Lengte 52 ops +/- 280 m ZONE 5 TRANSFER ZONE 2 TRANSMISSION ZONE 1 ENGINES ZONE 4 EOL ZONE 3 DRESSING Manufacturing Day 05/11/2013 13
  • 14. 4 Een flexibel productiesysteem Conveyor Conveyor system on floor Krups Pallets - skids Conveyor system in floor Eisenmann AGV Automated Guided Vehicles E&K Manufacturing Day 05/11/2013 14
  • 15. 4 Een flexibel productiesysteem Objectiviteit Technologie criteria Objectieve afweging A. Maintenance B. Failure Rate C. Response Time D. Maintenance Cost E. Failure Impact F. Diagnostics G. Automation H. Integration CSG I. Flexibility for expansion J. Station Set-Up K. Logistical Crossing L. Logistical Space Team resultaat M. Carrier Space/Design (Kitting) N. Operator Influence AGV DS AGV E&K O. Accessibility (Ergonomics) 57% 61% PALLETS PALLETS ON FLOOR IN FLOOR 75% 77% P. Engine Accessibility Q. Sectioning/Buffering Manufacturing Day 05/11/2013 15
  • 16. 4 Een flexibel productiesysteem Kost versus technologie AGV + 2 CONV AGV+ 1 CONV AGV + 2 CONV + CSG PALLET + 2 CONV + CSG Investments Prod. Syst. Investment. Amor. (6%-6y) 3,29M 3,21M 3,91M 4,28M 0,67M 0,65M 0,79M 0,87M Operational Cost Direct Indirect 2,53M 2,50M 2,43M 2,42M 2,21M 2,17M 2,11M 2,11M 0,33M 0,33M 0,33M 0,30M Space Requirements (m²) Space Cost 8000 8000 8000 8500 0,48M 0,48M 0,48M 0,51M Cost (First year) 3,68M 3,63M 3,71M 3,79M 61% 61% 61% 77% Decision Model Outcome SAFE Manufacturing Day 05/11/2013 4 16
  • 17. 4 Een flexibel productiesysteem MAAR…………. • • • • Implementatietermijn 3 weken Customization Herbruikbaarheid Integreerbaarheid en uitbreidbaarheid automatisaties • Flexibiliteit & standaardisatie COMBINATIE AGV & CONVEYOR Manufacturing Day 05/11/2013 17
  • 18. 4 Een flexibel productiesysteem Resultaat Scenario details • Hoofdlijn: AGV • Conveyor : Transmission • Transfer : AGV • Engine Picking : AGV ZONE 5 TRANSFER ZONE 2 ZONE 1 TRANSMISSION ENGINES ZONE 4 EOL ZONE 3 DRESSING Voordelen • Ontkoppeling conveyors • Buffering and sectionering • Automatisering • Flexibiliteit en standaardisering ZONE 3 DRESSING Focus EFFICIËNTIE | EFFECTIVITEIT Manufacturing Day 05/11/2013 4 18
  • 20. 4 Probleemstelling Een flexibel productiesysteem • Geen transparante en realtime monitoring van het productieproces, • Geen objectieve en gestructureerde rapportering (technische storingen, kwaliteitsproblemen, logistieke, …) • Informatie verspreid over de organisatie, • Ad hoc maatregelen, • Opvolging KPI’s top-down, • Geen directe feedback naar operators Communicatiekanal en Manufacturing Day 05/11/2013 20
  • 21. 4 Een flexibel productiesysteem Andon monitoring • Registratie werkpost • Operatormelding • Integratie van productiesysteem en perifierie in PTS • Visualisering van meldingen en status van het productie • Integratie autobalance tool in PTS • ‘Look into the future’: Realtime simulatie met als doel pro-actief bottlenecks identificeren Cultuurswijziging Manufacturing Day 05/11/2013 21
  • 22. 4 Een flexibel productiesysteem Implementatie Aug Start met analyse RFQ April Communicatie, training medewerkers Nov Concept nieuwe productielijnen, installaties, machines. Aug 2011 Nov 2011 Jan 2012 Apr 2012 Mei 2012 Mei Voorbereidende werken Jan Uitbesteding van de kritische productiesystemen P.O. Ford Motor Company Manufacturing Day 05/11/2013 Juli 2012 Aug Opstart 0  1000 wagens op dag 1 Aug 2012 Summer shutdown 3 weken Afbouw, Opbouw, Testing 22
  • 24. 6 Fazit Humancentered production focused on • Sustainability • Agility • Flexibility • Efficiency and Effectiveness Manufacturing Day 05/11/2013 24