SlideShare uma empresa Scribd logo
1 de 5
CHENNAI METRO RAIL PROJECT ECV-02 /03<br />WORK METHOD STATEMENT<br />PROCEDURE FOR SURVEY-WMS-1A<br />DISCIPLINECivilMechanicalElectricalGeneral<br />ContactDocument controlNAME:  S.BalajiTopographical SurveyQMS/D/CMP/WMS- 1ATel:09600091870Action RequiredEmail:sbj@lntecc.comFor informationFor Approval<br />Preparation & IssueNamePositionSignatureDatePrepared byS.KavinkumarPlanning Manager02-03-2010Reviewed byK.NarasimhanConstruction Manager02-03-2010Approved byS.BalajiProject Manager03-03-2010This submission is considered ready for review and complies with contract other than stated herewith.Approved by(GCC)<br />This document consists of 5 pages including this page<br />CONTENTS<br />Sl No.ContentPage no.01Preamble302Manpower, Machineries & Equipment303Work Methodology404Environment, Health & Safety505Formats / Reports5<br />SURVEY METHODOLOGY<br />FOR CHENNAI METRO PROJECT-VIADUCT SURVEY CHENNAI<br />INTRODUCTION:<br /> The following mentioned methodology shall be adopted by M/s National Survey and Engineers for carrying out topographical survey for the projects ECV02 & ECV03 of CMRL phase I for the sector Ashok Nagar to St. Thomas mount and from Saidapet to OTA.<br />1. PREAMBLE.<br />The object of this Method Statement is to lay down a procedure for survey works of the Project such as setting out the horizontal and vertical control points, setting out the project highway alignment and taking Original Ground Levels of the project highway etc,. <br />   <br /> 2. MANPOWER, MACHINERY & EQUIPMENT: <br /> 2.1       MANPOWER:<br />Sl.NoDescriptionRequirementRemarks1Survey Engineer12Surveyors23Helper4<br />2.2     MACHINERY & EQUIPMENT: <br />Sl.NoDescriptionRequirementRemarks1Total Station with Sighting Prism22Auto level23Leveling Staff44Measuring Tape45Other ToolsAs per the site Requirement<br />Apparatus:  The following survey instruments shall be deployed for the survey job:<br />Leica GX1230 Differential GPS with L1 and L2 frequency   - 1 Base and 1 Rover.<br />  Electronic Total Station instruments   - 2 to 3 No.<br />Digital Level DN10.<br />3. WORK METHODOLOGY:<br />Pillars Fixing<br />DGPS Network survey for the proposed area.<br />Leveling to connect all network stations<br />Detailed topo Survey.<br /> 3.1 PILLAR FIXING: <br />RCC Pillars of both GPS and secondary pillars as prescribed size shall be fixed at the locations along the stretch as decided by the site Engineer-in-charge.<br /> 3.2 DGPS network Survey:<br />After making reconnaissance survey of the area, DGPS network station is selected to fix          Primary Control Points for the interval of every 5km.<br />Data Collection:<br />Keeping the DGPS Receiver at 0 km chainage and another DGPS Receiver at 5th km control station point, the data shall be collected using satellites for maximum duration of 1 hour simultaneously.   In the similar manner, the data is collected for all other Primary control points.<br />Processing:  <br />The collected DGPS data is downloaded from the Receivers to the Computer and the data is processed using the Leica Geo Office software until the ambiguity is resolved. <br />Processing Parameters: <br />Ellipsoid:                 WGS-84 <br />Semi Major Axis (a):          6378137.00<br />Flattening (1/f):                298.257223563<br />Projection:              UTM <br />Zone width:   6  wide<br />False Easting:        500000 at CM <br />           Scale Factor at CM:  0.9996<br />          False Northing:      0.000 at Equator<br />After processing the data, we get Slope/Grid distance and Azimuth between the stations as well as co-ordinates in WGS-84 system. <br />Chainage marking:<br /> Chainage shall be marked from starting point to end point at every 20 m interval to facilitate to take cross section details<br />Horizontal Traverse Survey:<br />  Horizontal traverse stations at 200-250 m interval shall be established all along the route of survey. Using the Electronic Total Station instrument horizontal traverse shall be carried from one DGPS station to another station taking angles and distance in both faces left and face right values.  In addition to this, we establish Traverse stations at various intervals to facilitate detailed topographical survey. The horizontal traverse accuracy shall be 1 in 20000.<br />3.3 Leveling:<br />     The entire Primary, secondary and all Traverse stations are connected by using Digital level from the known or identified BM to get the elevation or height. The leveling accuracy shall be 12√k.<br />3.4 Detailed Topographical Survey:<br /> From the established primary, secondary and Traverse stations as per specifications all the existing features, shall be captured by using Electronic Total Station.<br />Drawing:<br /> The field data collected with DGPS and Electronic Total Station instruments would be downloaded into computer and as per code drawing will be prepared using Auto CAD. Drawing print out copy shall be taken to field to cross check with ground features.  If there is any omission that shall be rectified.  Final drawing shall be submitted with all field data in soft copy and report in hard copy.<br />4. Environment Health & Safety:<br /> All the staff and work men shall be provided with necessary personal protective equipment.(Safety jackets, safety helmets and safety shoes) always at site.<br />All the works shall be carried out in order to maintain clean environment and no damage will occur to any property or public amenities.<br />5. Reports<br />The field data collected with DGPS and electronic Total station instruments shall be downloaded into computer and as per code drawing shall be prepared in AutoCAD. Drawing printout copy shall be taken to field and physically cross checked. If there is any omissions or commission shall be rectified. Final drawing shall be submitted with all field data in soft copy and reports in hard copy.<br />
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10

Mais conteúdo relacionado

Mais de Siddhartha Bhamidipati (19)

Gen. ref. book
Gen. ref. bookGen. ref. book
Gen. ref. book
 
Ch 4-water
Ch 4-waterCh 4-water
Ch 4-water
 
ISO 9001 -2008
ISO  9001 -2008ISO  9001 -2008
ISO 9001 -2008
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
 
4648
46484648
4648
 
432 1
432 1432 1
432 1
 
1200 5
1200 51200 5
1200 5
 
1200 5
1200 51200 5
1200 5
 
1200 4
1200 41200 4
1200 4
 
1200 3
1200 31200 3
1200 3
 
1200 2
1200 21200 2
1200 2
 
1200 1
1200 11200 1
1200 1
 
1199
11991199
1199
 
784
784784
784
 
783
783783
783
 
Ac02 nit
Ac02 nitAc02 nit
Ac02 nit
 
Ac02 itt
Ac02 ittAc02 itt
Ac02 itt
 
Axial%20 load%20test%20procedures%20for%20pile%20foundations
Axial%20 load%20test%20procedures%20for%20pile%20foundationsAxial%20 load%20test%20procedures%20for%20pile%20foundations
Axial%20 load%20test%20procedures%20for%20pile%20foundations
 
construction safety
construction safetyconstruction safety
construction safety
 

Último

Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
FIDO Alliance
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
FIDO Alliance
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
UK Journal
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
UXDXConf
 

Último (20)

Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Oauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoftOauth 2.0 Introduction and Flows with MuleSoft
Oauth 2.0 Introduction and Flows with MuleSoft
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The InsideCollecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdfBreaking Down the Flutterwave Scandal What You Need to Know.pdf
Breaking Down the Flutterwave Scandal What You Need to Know.pdf
 
Structuring Teams and Portfolios for Success
Structuring Teams and Portfolios for SuccessStructuring Teams and Portfolios for Success
Structuring Teams and Portfolios for Success
 

Cmp wms -1 a-survey-rev.1- 03-03-10

  • 1. CHENNAI METRO RAIL PROJECT ECV-02 /03<br />WORK METHOD STATEMENT<br />PROCEDURE FOR SURVEY-WMS-1A<br />DISCIPLINECivilMechanicalElectricalGeneral<br />ContactDocument controlNAME: S.BalajiTopographical SurveyQMS/D/CMP/WMS- 1ATel:09600091870Action RequiredEmail:sbj@lntecc.comFor informationFor Approval<br />Preparation & IssueNamePositionSignatureDatePrepared byS.KavinkumarPlanning Manager02-03-2010Reviewed byK.NarasimhanConstruction Manager02-03-2010Approved byS.BalajiProject Manager03-03-2010This submission is considered ready for review and complies with contract other than stated herewith.Approved by(GCC)<br />This document consists of 5 pages including this page<br />CONTENTS<br />Sl No.ContentPage no.01Preamble302Manpower, Machineries & Equipment303Work Methodology404Environment, Health & Safety505Formats / Reports5<br />SURVEY METHODOLOGY<br />FOR CHENNAI METRO PROJECT-VIADUCT SURVEY CHENNAI<br />INTRODUCTION:<br /> The following mentioned methodology shall be adopted by M/s National Survey and Engineers for carrying out topographical survey for the projects ECV02 & ECV03 of CMRL phase I for the sector Ashok Nagar to St. Thomas mount and from Saidapet to OTA.<br />1. PREAMBLE.<br />The object of this Method Statement is to lay down a procedure for survey works of the Project such as setting out the horizontal and vertical control points, setting out the project highway alignment and taking Original Ground Levels of the project highway etc,. <br /> <br /> 2. MANPOWER, MACHINERY & EQUIPMENT: <br /> 2.1 MANPOWER:<br />Sl.NoDescriptionRequirementRemarks1Survey Engineer12Surveyors23Helper4<br />2.2 MACHINERY & EQUIPMENT: <br />Sl.NoDescriptionRequirementRemarks1Total Station with Sighting Prism22Auto level23Leveling Staff44Measuring Tape45Other ToolsAs per the site Requirement<br />Apparatus: The following survey instruments shall be deployed for the survey job:<br />Leica GX1230 Differential GPS with L1 and L2 frequency - 1 Base and 1 Rover.<br /> Electronic Total Station instruments - 2 to 3 No.<br />Digital Level DN10.<br />3. WORK METHODOLOGY:<br />Pillars Fixing<br />DGPS Network survey for the proposed area.<br />Leveling to connect all network stations<br />Detailed topo Survey.<br /> 3.1 PILLAR FIXING: <br />RCC Pillars of both GPS and secondary pillars as prescribed size shall be fixed at the locations along the stretch as decided by the site Engineer-in-charge.<br /> 3.2 DGPS network Survey:<br />After making reconnaissance survey of the area, DGPS network station is selected to fix Primary Control Points for the interval of every 5km.<br />Data Collection:<br />Keeping the DGPS Receiver at 0 km chainage and another DGPS Receiver at 5th km control station point, the data shall be collected using satellites for maximum duration of 1 hour simultaneously. In the similar manner, the data is collected for all other Primary control points.<br />Processing: <br />The collected DGPS data is downloaded from the Receivers to the Computer and the data is processed using the Leica Geo Office software until the ambiguity is resolved. <br />Processing Parameters: <br />Ellipsoid: WGS-84 <br />Semi Major Axis (a): 6378137.00<br />Flattening (1/f): 298.257223563<br />Projection: UTM <br />Zone width: 6 wide<br />False Easting: 500000 at CM <br /> Scale Factor at CM: 0.9996<br /> False Northing: 0.000 at Equator<br />After processing the data, we get Slope/Grid distance and Azimuth between the stations as well as co-ordinates in WGS-84 system. <br />Chainage marking:<br /> Chainage shall be marked from starting point to end point at every 20 m interval to facilitate to take cross section details<br />Horizontal Traverse Survey:<br /> Horizontal traverse stations at 200-250 m interval shall be established all along the route of survey. Using the Electronic Total Station instrument horizontal traverse shall be carried from one DGPS station to another station taking angles and distance in both faces left and face right values. In addition to this, we establish Traverse stations at various intervals to facilitate detailed topographical survey. The horizontal traverse accuracy shall be 1 in 20000.<br />3.3 Leveling:<br /> The entire Primary, secondary and all Traverse stations are connected by using Digital level from the known or identified BM to get the elevation or height. The leveling accuracy shall be 12√k.<br />3.4 Detailed Topographical Survey:<br /> From the established primary, secondary and Traverse stations as per specifications all the existing features, shall be captured by using Electronic Total Station.<br />Drawing:<br /> The field data collected with DGPS and Electronic Total Station instruments would be downloaded into computer and as per code drawing will be prepared using Auto CAD. Drawing print out copy shall be taken to field to cross check with ground features. If there is any omission that shall be rectified. Final drawing shall be submitted with all field data in soft copy and report in hard copy.<br />4. Environment Health & Safety:<br /> All the staff and work men shall be provided with necessary personal protective equipment.(Safety jackets, safety helmets and safety shoes) always at site.<br />All the works shall be carried out in order to maintain clean environment and no damage will occur to any property or public amenities.<br />5. Reports<br />The field data collected with DGPS and electronic Total station instruments shall be downloaded into computer and as per code drawing shall be prepared in AutoCAD. Drawing printout copy shall be taken to field and physically cross checked. If there is any omissions or commission shall be rectified. Final drawing shall be submitted with all field data in soft copy and reports in hard copy.<br />