On



  Project: - procurement of goods &swot analysis of

  logistics in




Submitted in partial fulfillment of the requirements of


 Post Graduate Programme in International Business


                 SOUVIK SINHA


                   PGDIB-11-13



                   FT-(IB)-350




       IILM Graduate School of Management


  16, Knowledge Park-II, Greater Noida – 201306
CERTIFICATE OF SUMMER INTERNSHIP


This is to certify that the project report titled “PROCUREMENT OF GOODS & LOGISTICS
SYSTEM OF MINE LINEPVT. LIMITED” submitted to Institute Of Integrated Learning and
Management, Greater Noida by

SOUVIK SINHA in partial fulfillment of the requirement for the award of Post Graduate
Diploma in Management, (PGDM) is an original work carried out by the below mentioned
student under the guidance and supervision of the below mentioned guides/supervisors. This
work has not been submitted anywhere else for any other degree/diploma under my signature.
The original work was carried out during 3rdMay to 15th June 2012 In Mine line pvt. Limited.

       Signature of the student: __________________________________________

       Name of the student: _____________________________________________

       Dated: _________________________________________________________

       Signature of the Industry Guide: ____________________________________

       Name of the Industry Guide: _______________________________________

       Designation of the Industry Guide: __________________________________

       E-mail Address: _________________________________________________

       Mailing Address: ________________________________________________

       Dated: _____________________
ACKNOWLEDGEMENT


Any activity big or small is a result of collective effort of several individuals. From the very
beginning of human civilization to this complex world, we are dependent on each other for
accomplishment our goals. This project report is also the result of collective effort and support of
several individuals who have been given me their valuable contribution in fulfillment of the
work. Exchange of ideas generates a new object to work in a better way. I extend my gratitude to
all those who imparted support & experience even at the cost of heavy demand of their precious
time and busy schedule. Without their assistance and continuous guidance this project would not
have been completed. My experience from this project has certainly widened my knowledge
arena. I would acknowledge my company mentor MR. SUPRIYA DUTTA and my faculty
mentor Prof.SACHIN SINHA for their valuable guidance, inspiration and encit’sagement on
numerous occasions, which acted as a morale booster in times of problems. I truly appreciate
from inner sanctum of my heart, their thoughtful recommendations that have made this project
successful. First of all, I would like to give special thanks to the almighty whose blessing helped
me to complete this project. Completing a task is never a one man effort. Before explaining my
project report, MR. ROHAN CHAKRABARTY (asst. director of mine line pvt. limited) to
provide a proper guidance and a right approach from time to time, to accomplish the goal. They
shared ideas with me to complete my project. They have always been guiding and suggesting me
like teacher, guide and mentor as well.

I also acknowledge my heartiest gratitude to Mr. AMIT KUMAR a faculty member of IILM
GSM, GERATER NOIDA, who helped me a lot and give me a right direction in completing the
project. I am also grateful to all my faculty members of IILM GSM GREATER NOIDA, who
have helped me in completing this project. It shall be an injustice, if I don’t express thank to my
friends who helped me in completing my project report. It is my earnest duty to express most
gratitude and honor to my parents.                                                        (SOUVIK
SINHA)
DECLARATION


I Souvik sinha of 2nd year PGDM in International Business student, Institute Of Integrated
Learning and Management, hereby declare that the project titled - “Procurement of goods &swot
analysis of logistics in mine line pvt. Limited” as the original work conducted by me and
submitted in the partial fulfillment for degree. The information and data given in the report is
authentic and true to the best of my knowledge.

        I also declare that this project has not been submitted for the award of any other
degree, diploma, literature or recognition earlier.



(SOUVIK SINHA)                                                       prof.Sachin Sinha


Roll No: - FT-(IB)-350              Signature of the college mentor:-


PGDM-(IB):- 2011-13                 Date:-
PREFACE


Unless the knowledge is applied in the practical field, it cannot attain perfection and maturity. A
project work is the scientific and systematic study of real issue and problems with the application
of management principles, concept and skills. The essential ingredients of a project are that it
should contain scientific collection of data its analysis and interpretation that lead to valid
conclusions and feasible suggestion. Project work is an essential part of partial fulfillment of the
syllabus of PGDM in IB. I have prepared this report during my summer training at “MINE
LINE PVT. LIMITED”. This study has given real exposure to company logistics and this study
has given me the confidence to face the real transportation problem and I have learn how
company’s logistic costs is to be reduced. The whole report is to be divided into different
chapters, each dealing with the different aspects of the study the report has been return in a very
comprehensive way with a suitable heading of each chapter. The last chapter deals with some
recommendations which will be help full to the company in countering its competition as well as
having an edge over them. I have tried my best to do justice and be honest in analyzing the topic.
TABLE OF CONTENT:-


SUBJECT                                              PAGE NO:


1. Project title                                        1
2. Certificate                                          2
3. Acknowledgement                                      3
4. Declaration                                          4
5. Preface                                              5
6. Content                                              6
7. Executive summary                                    7
8. Introduction of the company                        8,9,10
9. Introduction of the products                        11
10.       Business environment                       12,13,14
11.       Methodology(research study & field work)    15-25
12.       Data collection                             26-27
13.       Analysis                                    28-38
14.       Findings                                      39
15.       Conclusion                                    40
16.       Learning from sip & References               41
EXECUTIVE SUMMARY


In large business houses like MINE LINE LVT. LTD. where lots of projects
are going on at a same time at different places, the logistics head has to
handle every day a large number of transportation receipts and payments and
also contact the different logistical companies. Mine line pvt. Ltd. Now is
one of the most established names in making flame proof electrical for
modern mining. During my summer training I have completed the project on
“procurement of goods and swot analysis of their logistics system”.
Basically I was working on their transportation system and made a research
report about how mime line pvt. Ltd. Can reduce their transportation costs.
Also I did some field work on the different logistics companies in Kolkata
those companies can deals with mine line and help them for reducing
transportation costs. Also I have submitted a research report regarding their
prospective customers around some certain places like- Orissa,
andhrapradesh, madhyapradesh, Bihar, uttarpradesh, Maharashtra, Gujarat
etc.In my first part, a report is made on a detailed study, company
introduction; in second part I have mentioned various products of mine line
and their brief introduction, in the third part all about the business
environment of mine line pvt. Ltd. Also I have mentioned different
methodology which I have applied in my project, analyzing the secondary
data which I have collected in different sources during my project work.
1. Orientation of the company-


MINE LINE PVT. LTD. now an Indo-European joint venture company. It’s an established name
in modern mining for making flame proof electrical equipments. This company was founded by
a mining engineer in the year of 1978.Headquater of this company situated at
Kolkata.westbengal.the field offices of mine line pvt. Ltd. located at Bilaspur, kottagudem and
singrauli.About 25 years ago Mine Line started as a distant dream. A Mining engineer with
vision set up a tiny cottage industry to manufacture flameproof equipment starting with signaling
transformers plugs and sockets, and lighting transformers.

Company’s infrastructure plays an important role in enabling us to meet the exact requirements
& standards of the industry. The production unit is installed with the latest modern technology
and facilities to improve productivity and quality of our products. From time to time, it upgraded
with the latest techniques and possesses all the necessary facilities to provide top-notch quality
products and services to our valued customers. In Kolkata the Mine Line group currently
employs

       62 workers

       12 engineers and design draftsmen

       20 sales and liaison personnel

Two main factories in Kolkata is covering a space of 20,000 sq ft of covered area located in
Behala and Uluberia have been set up with sophisticated machines imported from Europe to be
able to meet the most stringent standards of quality.


2. History of the company:-


This was founded by a mining engineer in 1978 at Kolkata about a25 years ago.



3. Joint venture of the company:-
In 1990, mine line pvt. Ltd. has been entered into a joint venture with SAIT mining SA of
France. This joint venture is set up under the name of Sait mine line pvt. Ltd.Sait mining of
France is a 75 years old company and the world’s largest manufacturer of flameproof equipment.
They have established joint ventures in China, Turkey, South Africa, Czechoslovakia, Poland,
and South America, Spain and now in India.



4. Innovations of the company:-

Mine line specialization lies in its ability to tailor-make any flame proof electrical equipments to
a client’s specific requirement. Some of the latest innovations are listed below-first company to
develop indigenous electrical for road heading machines (voest Alpine AM-50) under Aphelia of
Vijayawada. More than 33 such machines are running successfully in the Indian mines. First and
only company to indigenize and improve substantially on electrical for mobile machinery for
under coal faces that is load haul dumper, jumbo drills Etc.only Company to supply a totally
integrated project involving design manufacture and commissioning of interface electrical for
power control, Protection & monitoring of a bank of 6 conveyors with total interlacing & control
from Underground flame proof control desk, at kotras Long wall. This company firstly
developed electrical system for introduction of automatic skip loading system for chasnalla
project under USCD with Gullick India, now Joy partnership. This is the only Indian company to
design and manufacture transwitch units of 500KVA and above with fully equipped low voltage
chamber containing 3 circuit breakers having independent control, protection & cable couplers
for direct outgoing supply, fully compatible with international transwiacted units.




5. BOARD OF DIRECTORS:-


        Chairman of the company:-Mr.Birendranath Mukherjee

        Director of the company:- Mrs. Nandini chakravarty
 Executive Director:-Mr. Rohan Chakravarty

 CEO of the company:-Mr. Koushik Ganguly

 General Manager in marketing:-Tapos Mukherjee

 General Manager in Logistics:-Mr. Supriyo dutta
1. Introduction of the products:-

They are making basically flameproof electrical instruments which are used in mines. The
equipments generally bulk in weight. These types of electrical equipments generally prevent the
explosion under the ground. Often only because of spark explosion is happened.



2. Types of product:-

Motor control gear,1100volts flameproof boltless versions, high tension range up to 7200
volts,trannsformers,switch gear,enclouser,couplers,starters,dol gate end box,isolaters for
LHDs,pl tubes etc.


3.Images of their products:-
1. Where company supplying their product in India:-


Dhanbad,bokaro,ramagundem[AndhraPradesh],Bhopal,chirimiri,sodhpur,suhagpur[Orissa],Bhop
alpally[a.p],bilaspur,srirampur,mandarmarri,karba,suhagpir,bisrampur,anuppur[a.p].theyaretrans
portingtheirproductgenerallyJharkhand,andhrapradesh,Orissa,maddhyapradesh etc.




2. Clients:-

                                               Mine Line India, boasts of a list of proud and
                                               satisfied clients comprising top mining
                                               companies like Eastern Coalfields, Mahanadi
                                               Coalfields, Tata Iron & Steel, Kirloskar
                                               Brothers besides many other private sector
                                               mining companies.

                                               Subsidiaries Of Coal India Limited.

                                                       Eastern Coalfields Ltd., Sanctoria,
                                                       Dst.Burdwan, West Bengal

                                                       North Eastern Coalfields Ltd., Dispur,
                                                       Guwahati, Assam

                                                       Bharat Coking Coal Ltd., Koyla
                                                       Bhawan, Koyla Nagar, Dhanbad

                                                       South Eastern Coalfields Ltd., Seepat
                                                       Road, Bilaspur

                                                       Northern Coalfields Ltd., Singrauli,
                                                       Dst.Sidhi
Central Coalfields Ltd., Darbhanga
       House, Ranchi

       Mahanadi Coalfields Ltd., Uce Burla,
       Sambalpur

       Western Coalfields Ltd., Coal Estate,
       Civil Lines, Nagpur


Other Coal Companies -

       The Singareni Collieries Co. Ltd.,
       Kothagudem, Dst.Khammam

       The Tata Iron & Steel Co. Ltd.,
       Jamadoba

       Monnet Ispat Ltd., New Delhi


OEM Partners -

A.P.Heavy Machinery & Engineering Ltd.
Kondapalli, Eimco Elecon India Ltd.,
Vallabhvidyanagar, Gujarat, Elecon
Engineering Ltd., Vallabhvidyanagar, Gujarat,
Mather & Platt Pumps Ltd., Chinchwad, Pune,
Kirloskar Brothers Ltd., Kirloskarwadi,
Dst.Sangli, Vishwa Industrial Co. Pvt. Ltd.,
Calcutta, Bengal Tools Ltd., Calcutta, Risansi
Industries, Kanpur, Rampur Engineering Co.,
New Delhi, Suburban Industrial Works(Lessee),
Calcutta, Krishna Electricals, Bokaro, Salzgitter
Hydraulics Pvt. Ltd., Hyderabad,P&H Joy
Mining Machinery India Ltd.,
Hyderabad,Bharat Earth Movers Ltd., KGF,
Karnataka


Overseas Customers -

       Becker Mining Systems Gmbh,
       Friedrichsthal, Germany

       Sait Mining S.A., Saverne, France

       Talleres Zitron, Madrid, Spain
4. Distribution channel:-




                 PRODUCTION PLANT




                  Transportation
                    Production plant
                  agencies

 Field offices




BILASPUR           KOTTAGUDEM             SINGARAULI




  DC                  DC                    DC




                               CLIENTS/CUSTOMERS
Research study


   My project is all about the procurement of goods and SWOT analysis of the logistics

   system of the company. due to the company’s concern I made research report and

   submitted to the company which is help them to reducing their transportation costs and

   my project is also shown different kind of transportation modes as well as various way to

   procure their goods which is should effective for I have studied the company’s previous

   year’s bills file and note down all places where mine line has transported their goods &

   calculate total transportation costs. At last I came to know that Because of transportation

   logistics from January, 2011 to January, 2012 company spends the amount of Rs.

   2300000. Mine line is transporting their goods in different places throughout the India

   like andhrapradesh, Jharkhand, Bihar, Orissa, madhyapradesh etc.basically this company

   Chooses road or highway mode of transportation like transport through trucks. In this

   case mine line is following the “POINT –TO-POINT “transportation network. Like that-




                     Point of

                 origin


                                                                    Point of

                                                                destination


 In the case of point-to-point network quit common for long distance hauls on the national
   highway.
 The point of origin and point of destination are fixed. Complete truck loading is assured
       for both ways.

The company mine line is generally following this transporting mode. Due to this mode they are
suffering few problems like-


       Disadvantages of point to point network:-

    If a city pair is not served, goods are out of luck, as there is no way to get to a destination
       if they use that highway route network.

    The frequency of truck or vehicle may be reduced because a point-to-point system
       requires a large number of combinatory, as the number of city pairs is increased by many
       magnitudes.


    To reducing their transportation costs they can follow the” HUB AND SPOKE”
       transportation mode. It would be safer & time consuming than previous one. Not only
       that they can also take the warehouse had concept to get more available to have the
       customers decreased their transportation costs.


'Hub & Spoke' strategy in the transportation has lots of opportunities to decrease the
transportation costs of the company. Making HUB at Kolkata and spoke at major other location
where having major demands. Like if we take the places of Andhra Pradesh, madhyapradesh,
Orissa, Jharkhand in the context of good prospects or demand of product’s point of view. Then
we come to know that how this mode is useful for the transportation. If we set up a main hub at
Kolkata and open spokes in those places where having a major demand of the products
andhrapradesh, madhyapradesh, Jharkhand etc.in that way company reduce their transportation
costs and more available to the customers those are living from those areas.


       Hub and Spoke Network:-
 The hub acts like a central feeder point to the distribution centers, which are at the
       strategic locations spread across the geographical area.


    High volume and high-speed shipment takes place from hub to DC through the shortest
       routes called spokes.


    The trans-shipment of consignment is done at DC for distribution across the local area.




                                                                  DC (ANDHRAPRADESH)




                                   MOTHER HUB

                               (KOLKATA)




   DC (JHARKHAND)                                                            DC (ORISSA)




                                                        DC (MADHYAPRADESH)




    WHY HUB AND SPOKE SHOULD BE USED TO REDUCE THE

       TRANSPORTATION COSTS?


-It helped to ensure that connecting flights belonged to the airline
-It emphasized service to large cities.
-Aircraft arrived at predictable (albeit intense) intervals, generally lessening workload for the
airport staff and air traffic controllers.
-Routing all traffic through a hub allows airlines to operate more efficiently while controlling
costs. The hub is a central location from which the day to day operations of the airline can be
managed. Keeping operations in a central location minimizes staffing as well as supply
inventory.
-The hub and spoke system increases aircraft utilization and passenger load factors.

-For a network of n nodes, only n - 1 routes are necessary to connect all nodes; that is, the upper
bound is n - 1, and the complexity is O (n). This compares favorably to


the                        routes, or O(n2), that would be required to connect each node to every
other node in a point-to-point network. For example, in a system with 10 destinations, the spoke-
hub system requires only 9 routes to connect all destinations, while a true point-to-point system
would require 45 routes.

-The small number of routes generally leads to more efficient use of transportation resources. For
example, aircraft are more likely to fly at full capacity, and can often fly routes more than once a
day.

-Complicated operations, such as package sorting and accounting, can be carried out at the hub,
rather than at every node.

-Spokes are simple, and new ones can be created easily.

The following two points are the major advantages that the hub-and-spoke system had initially
brought to the airline business; however some disadvantages had been developed later due to
changes in external environmental factors.


1. Encouraged the rapid growth in the airline business-

The hub-and-spoke system since developed after deregulation, has allowed a rapid growth in
size, competition strategy and traffic demand in the airline business. However, as suggested by
Wells and Younger (2004 4) this had resulted in operational inefficiencies at periods of slow
economy; with airlines resulting in very poor financial performances.

As a result of this, some airlines restructure their business model to return to the point-to-point
system and move out of the constant need for a large hub, and utilise hubs in a more uniform
matter in terms of arrivals and departures. This phenomenon is known as the rolling hubs.


2. Efficient use of scarce transportation resources-


The system has less number of routes connecting all spokes enabling a more efficient use of
scarce transportation resources. This however had small airports and economies of smaller
regions suffering as per the reduced capacity. As a result this encouraged airports to agree with
low cost carriers to offer low airport fees and commissions from local businesses to bring in
traffic and passenger flow.

The passenger market favored this type of airline business as lower fares were rolled out to the
market from these smaller hubs; which caused great competition to full service carriers that were
operating with large amount of airport fees to use large hubs, and can no longer return to these
small hub markets as it is not cost efficient and are dominated by low cost carriers.

Also there are some disadvantages of hub & spoke but in this case these disadvantages are not a
big deal for company’s growth.


       Disadvantages of hub-and-spoke;-

1. Congestion and delays at hub airports

2. Discontinuous use of airport facilities

3. Airport dependency
Apart from third party logistics and applying for Hub & Spoke model I also suggest them for
decreasing the rate of logistical costs of the company which is WAREHOUSE concept. If the
company mine line pvt. Ltd. open warehouses or take a warehouse in a rental basis around those
places where they have good prospective customer’s like-Bhubaneswar, kottagudem, singarauli,
dhanbad etc.


     Characteristics of three warehouses:-




                       Private                Public                  Contract

Investment             High                   None                    Very little




Flexibility in         Material handling,     Location                Location
                       storage & throughput
                       planning




Cost per unit stored   Inversely related to   Low                     Inversely related to
                       volumes                                        volumes




Level of controls      High                   Low                     Medium
Adequacy of goods           High                     Low                      High
stored




Risk                        Due to change in         Minimal                  Minimal
                            market demand




           is the best option for mine line pvt. Limited to reducing their transportation costs.
           Because there are few reasons behind it. They are following:-

       •   These are the product specific warehouse facilities acquired for use for a specific period
           against fixed charges.

       •   A contract warehouse can provide the benefits of both private and public warehouses.

The resources such as labor, material handling equipment, storage arrangement, and
communication equipment can be used on sharing basis with depositors from the same industry
to economize on operating cost.

The company mine line pvt. Limited are basically deals with the bulk goods. they are making the
flame proof equipments. in that case contract warehouse is the best option for them. not only that
but also in that case investment costs is is also very low, Adequacy of goods stored is very high
etc.


        Designing a Warehousing System:-
In designing a warehousing system, the following basic questions relating to this flow become
significant.

        How many warehouses should we have?

        Where should we locate them?

        What should be the size or capacity of each of them?


1.      How many warehouses should we have?

The cost of warehousing is directly proportional to the number of warehouses, while the
transportation cost goes down with an increase in warehouse numbers as shown:




                                                Total costs                     Warehousing




                        Cost




                                                                           Transportation

                                    No. of Warehouses


2.      Where should we locate them?

Quantitative techniques for warehouse site selection:


      For Single Depot Location-
   Center of Gravity of Area Model

               Center of Gravity of Load Model

               Center of Gravity of Tones-Kilometers Model


1. for Single Depot Location-

         Center of Gravity of Area Model-

A map of marketing areas may be drawn and a sheet representing the area may be balanced. The
point where the sheet gets balanced is the site for warehouse location. This point is expected to
be at minimum average distance from all the locations in the area. Quantitative techniques for
warehouse site selection:

This may be illustrated visually by imagining a sheet having holes representing the customer
locations and their demand load of annual purchases. Weights are hung on each hole in
proportion to the demand load. The points at which the model sheet gets balanced gives the
center of weights.

This model takes into consideration both loads and distances to arrive at the optimum
transportation cost. The final solution is obtained after applying trail and error methods several
times.


2.       for Multiple Depot Location-


      For planning the chain of warehouse the management will have to do a cost-benefit
         analysis.

      The factors influencing a decision on multiple warehouses locations are:

Market Size

      Area Coverage by each warehouse
 Product type

     Demand pattern- continuous or seasonal

     Customer service level

 Mine line can set their own warehouse or take the warehouse as a contract basis like that:-


                                         ANDAMARRI(DC)




                                       ANDHRAPRADESH
BELLAMPALLI(DC)                                                                   RAMAGUNDEM(DC)

                                       (WAREHOUSE IN
                                       BHOOPALPALLY)


 SINGARAULI(DC)
                                                                             KOTTAGUDEM(DC)




                                    YELLANDA(DC)




 At first open or borrow a warehouse in Bhoopalpaly at andhrapradesh and then open few spoke s
 or distribution channel in different places in andhrapradesh where their demand of the product is
 very high.

 Also should follow the same plan to reduce the transportation costs in the case of
 madhyapradesh, Jharkhand. Like that:-
Annupur (dc)


                                                                                          Sohagpur (dc)


       Baikhanthapur (dc)

                                                      Madhyapradesh(w

                                                  arehouse in bilaspur)

                                                                                         Chirimiri (dc)
       Karba (dc)




                                                  Bisrampur (dc)




 In the case of Jharkhand company follow the same rule, at first take the warehouse in dhanbad and open
 spoke or distribution channel in different places in jharkhand.like that:-


                                      EKKRA, BCCL(DC)




                                        JHARKHAND
BOKARO (DC)
                                    (WAREHOUSE IN
                                                                                   W.B & BIHAR (DC)
                                    DHANBAD)
DATA COLLECTION


 Data collection is an important part of my project. Because according to company’s concern I

 have to find out the logistics companies those have cheaper rate and offering various

 transportation mode as well as facilities. in this project I need to find out a way through that

 company can reduce their transportation costs and also with the help of the research report

 they can developed their transportation system. has why I have lots of data from the

 different logistics companies in Kolkata those company can be help the Mine line pvt. Ltd.

 and assist them regarding their logistics system and which is really effective for reducing

 their transportation costs’ have collected data from those following company regarding

 their charges, which kind of transportation mode they generally used, what kind of facilities

 they are providing etc.the companies are-


Cpmc Relocation & Logistics Pvt Ltd
Strand Bank Rd
Kolkata
033 4021 9000

Inland Road Transport (P) Ltd
(09910589358)-Behala., 265, Pen Banerjee Road, Parnasree, (09910589358)
Kolkata
08929 516784

Domestic Packers Movers Kolkata
Poddar Court, 18, Rabindra Sarani,
Kolkata, WB
033 2225 3503
Economic Transport Organization Ltd

     Dutta Properties Building
     B.B.T Road, Post Office Govindpur, Kolkata
     09051280883
    Spectra Logistics
     228/A, Acharya Jagadish Chandra Bose Road, Rabindrasadan, Circus Ave, Bhawanipur
     Kolkata
     033 22871777
Allied Aviation Pvt. Ltd.

     13/4, Sayed Sally Lane, 3RD Floor
     Kolkata - West Bengal
     09311128466
Radhika Express Private Limited

20,Coal Berth,Hoboken Road,( Inside Shivam Kanta ),Jain Kunj, Kolkatta-700088


Jain Transport Company

7h, Dr R K Banerjee Sarani, Ballygunge, Kolkatta-700019


United Clearing Agency
159, Anandapur R R Plot Lp 43/4, Kolkatta-700107



Hindusthan Road Liners
71, Metcalfe Street, Suit No 303 3rd Floor, Tireeta Bazar, Kolkatta-700073


`
Mahavir Roadways Private Limited
Babu Trunk Road,Maheshtala, Kolkatta-700141
SWOT ANALYSIS OF THE LOGISTICS SYSTEM OF

                                      THE COMPANY


     STREANGTH:-

Basically company is following a simple transportation network. Generally they go through the
point –to-point transportation network. Which is safe for transportation of bulky goods than
the others networks. Loading & unloading is happened in between the point of starting from
point of destination. That is less chance for wastages of goods.

Also mine lone pvt. Limited go through the with the transporting agencies like-Raj transporting
agency. They are transporting their goods from production house to destination place with the
help of transporting agencies. This is smart way ti cost cutting of transportation. It is a way to
smooth transporting process without any interruption. They have a strong point that is the
effective utilization of transporting agencies because type’s transportation agencies are very
responsible to taking the order and delivery the goods timely and safely to the customers.


     WEAKNESS:-

The company mine line pvt. Limited has also few weak points in the context of logistics. Only
because of that they are paying huge money per year for their transportation. Previous year
company has near about twenty laks which is should not be paid .this problem has created only
because of their using the point-to-point network.ots a big weak point for them. Point-to-point
network quit common for long distance hauls on the national highway. in this case point of
origin & point of destination are fixed. Complete truck loading is assured for both ways.




     OPPORTUNITY:-
Mining is an important part of every economy. In a world that is already facing shortages of
some of the important minerals and metals like petroleum and coal, the demand for such
products is only bound to increase with time. Meeting those demands will be a challenge for the
mining and minerals industry worldwide. With the increasing efforts in R&D and technological
innovations, the mining and minerals industry has developed huge Human resource
requirements. There is already a shortage of skilled workforce throughout the world.
Developments are taking place rapidly and many companies in this sector are expanding their
operations and are working on new projects like the refinery being constructed by Reliance
Industries Limited in Jamnagar. Also Bharat Petroleum is conducting R&D For value added
products and alternate fuels. So to conclude, it can be said that mining and minerals sector has a
bright future, be it in terms of employment or technology.
There are few reasons behind good future and prospect of the modern mining industry in India

as well as others countries .they are following:-


   1. India’s Variety and Abundance of Resources-

Speaking only about identified reserves, India has the fourth-largest coal reserves in the world
and significant reserves of bauxite, titanium ore, chromites, diamonds, and limestone. Gold,
copper, zinc and uranium reserves have also been identified, though in a more limited volume.


In terms of production, India ranks 3rd in production of coal & lignite (80% of the mines in India
are coal mines), 2nd in barites, 4th in iron ore, 5th in bauxite, and 7th in manganese ore.



   2. Recent Discovery-

“India has, till date, explored only 7-9% of the mineral resources as against almost 100%
geophysical and geochemical surveys in countries such as Australia”. This was revealed in
September 2011 in a report titled Opportunities “launched by Ernst & Young at a conference
organized by the Federation of Indian Mineral Industries in Bangalore.Metals price and the high
level of dependency of the country for gold urge India to enter in a more comprehensive
exploration of the potential resources of the country. Recent discoveries had shown how large
this potential might be.


   3. India’s Long History of Mining-

India’s long history of mining, dated back to the first millennium BC with linkages to the Indus
Valley Civilization, demonstrates the geological potential of the country and explains its strong
mining tradition. Prestigious mining schools, often established by the British, trains highly
qualified scientific and mining engineering professionals.



4. A Highly Qualified Scientific and Mining Engineering Community-

The choice 4.f India as the host country for the 10th International Symposium on Rock
Fragmentation by Blasting (New Delhi, November 2012) is enough to demonstrate the high
respect the Indian scientific community is held by the worldwide experts in that field. The
Fragblast Symposia represents the most important event in disseminating the latest advances in
the science and technology of rock fragmentation by blasting and other related means.


“The first symposium was held in Sweden in 1983 and since then it has been convened at
intervals of 3 - 4 years at different locations around the world. These locations, selected standing
International Committee from among several competing submissions, are chosen on the basis of
prominence of mining activities and R&D initiatives of the host country.
   5. Strategic Location for Export-

India’s geographical location makes the country a perfect hub for raw materials or metals
exportation to both the developed European markets and the fast-developing Asian
markets. Iron ore, steel and aluminum are massively exported to China, UE and Japan.
Roughly, 50% of the steel produced in India is exported, and 50% of this total is exported
to China.



6. Strong Internal Demand Especially For Coal and Gold-
India maintained a spectacular growth for the last year and might keep on booming at least until
2030. In order to fuel that development, Indian demand for metals and minerals will continue to
grow accordingly.


According to a 2010 report from the McKinsey Global Institute “700 to 900 million square
meters of commercial and residential space needs to be built – or a new Chicago every year (…)
2,5 billion square meters of roads will have to be paved, 20 times the capacity added in the past
decade (…) [and] 7400 kilometers of metros and subways will need to be constructed, 20 times
the capacity added in the past decade “The new gold discoveries will also be easily absorbed by
the internal demand. India is and will remain for long, the world's largest consumer of gold and
the world’s largest gold jewelry market.



7. Strong Anti-Corruption and Fight against Illegal Mining Initiatives-

“Known for corruption in its political, regulatory, and legal systems, India needs to take this
issue head-on by instituting new controls, as soon as possible, as corruption continues to damage
its markets (…) While the government struggles to modernize the bureaucracy and corruption is
a challenge that must be overcome.” Potential corruption opportunities arise, inter alia, during
the license attribution process. Obtaining a license by corrupting an official means you
are illegally exploiting the ore. Corruption leading to faulty undervaluation of exported quantities
for tax and royalties avoidance purpose has also been recently reported to be common practice in
India.


Since 2006, India set an example of an efficient and pro-active fighting policy against illegal
mining and corruption. This is a long-term policy but appointing the retired tough independent
Supreme Court Judge N. Santos Hedge as Lokayukta (Ombudsman) of Karnataka state has been
a strong political sign. He soon unveiled a massive illegal iron ore mining involving some of the
richest families and mighty politicians of the country. As a first outcome of this fighting policy,
the famous eddy’s where sent to jail and actions have been announced against 617 officials,
including Ministers. Upholding this policy might improve India’s ranking and hopefully
contribute to attract additional national and foreign investments.
NOW A DAYS INCREASING THE DEMAND OF FLAMEPROOF ELECTRICAL EQUIPMENTS
BECAUSE MOST OF THE MINING COMPANIES ARE ASKING FOR THESE TYPES OF
EQUEPMENTS TO PREVENT THE EXPLOSION.NOW OFTEN EXPLOSION IS HAPPENING UNDER
THE GROPUND DUE TO VARIOUS CAUSES AND MINING COMPANIES ARE SUFFERING
REGARDING THESE KIND OF ACCIDENT NOT ONLY THAT BUT ALSO NUMBER OF PEOPLE
THOSE ARE WORKING IN UNDERGROUND THOSE ARE DYING DUE TO THESE KIND OF
EXPLOSIONS.NUMBERS OF FOREIGN AND DOMESTIC COMPANIES AREV GOING TO OPEN
THEIR NEW BRANCHES IN THE EASTERN ZONE LIKE JHARKHABD,ORISSA,BIHAR ETC.THE
MINING COMPANIES THOSE ARE BELONGS TO THESE STATES WOULD BE GOOD PROSPECTS
FOR MINE LINE PRIVATE LIMITED.




      THREATS:-

       Increasing the oil prices

       Unstable world economy

       Market competition
       Natural disaster like-Global worming
Charts 1–Incresing transportation costs in last five years:-




                    25




                    20




                    15




                    10




                     5




                     0
                           2007                    2009                   2011




       Interpretation-

If we look after the last five years of transportation expenses then we will see that how their
logistical costs is increasing in every year, which is clearly mentioned on this graph. in the year
of 2007 the transportation costs was 11laks,in the year 2008 it was 15 lakhs,on the year 2009 the
costs was 16laks,in the year 2010 costs was 19 laks and previous it was 23 lakhs
Chart2-The different location where they are transporting

   the goods:-




                                            places



                                                                              Dhanbad & Bihar
                                                                              Andhrapradesj
                                                                              Madhyapradesh
                                                                              France
                                                                              China




       Interpretation-

This company is generally transporting the goods on different places or our country as well as
outside of India, like-France, china etc.but the company is doing their business heavily on around
India, like-andhrapradesh, madhyapradesh, Jharkhand & Bihar. That’s why mine line
transporting their goods through the national highway with the help of different transporting
agencies. in that case they are following point-to-point network.
Chart3-The different kinds of transportation modes which

       are followed by the company:-



                                 Transportation modes




                                                                                 Road or highway
                                                                                 Water
                                                                                 Air




         Interpretation-

This company is basically doing their business in our country. That’s why company transporting
their goods through the road or national highway. They are using this mode more than water and
air.
Charts-4 what kind of motor vehicle they generally use for

their bulky goods Transportation?


 8

 7

 6

 5
                                                                                    Column1
 4
                                                                                    Column2
 3                                                                                  Column3

 2

 1

 0
           10 wheeler        small truck        container




     Interpretation-

     When they are transporting their bulky electrical equipments from their plant to the clients

     they generally uses the 10 wheeler truck, almost 70% transportation is happened with the

     help of this. Also they us small truck but in the very few cases mine line is transporting their

     goods through container.
Chart-5 How increase the oil price in every year-


  8

  7

  6

  5
                                                                                     Series 3
  4
                                                                                     Series 2
  3                                                                                  Series 1
  2

  1

  0
           yr2006             yr2008           yr2010            yr2012




Interpretation-


In every year increasing the oil pricing is the one of the cause behind their increasing
transportation costs. Like an example in the year of 2006 oil price was rs.3 per litr. Then in
the year of 2008 oil price increased up to rs.4 per ltr. In 2010 the price was rs.4.5 per ltr.
And this year it is grow up to rs.7 per ltr.
FINDINGS

1. By analyzing the survey we can say that approximately increasing the transportation
   costs is one of the main barriers of company’s yearly turnover.
2. Apart from those area like Jharkhand,Orissa,andhrapradesh,madhyapradesh,bihar,
    China, France etc number of states and area like uttarpradesh, gujrat, maharastra
   etc would very prospective customers carrying area for the company.
3. They are generally uses the road as a transportation mode but if they are going for
   the air as well as water then it might be very useful for their logistics system.
4. In the case of bulky goods transportation mine line is used to 10 wheeler and small
   truck. For that they are paying very high amount of money because in that case need
   number of trucks for transporting huge electrical equipments at a time. But if they
   transporting their goods through the big container then it might be cheaper than
   previous.
5. To avoid the increasing rate of oil price they can utilize the vehicle those are running
   with the help of natural gases.
CONCLUSION


   The project on procurement of goods & SWOT analysis of the logistics
system of the company Mine line pvt. Ltd. gives the deep understanding of all the
aspect of corporate logistics system, which covers all the key area of
transportation along with all the glamour features such as warehousing facilities,
ambience, and staff with the apt attitude to provide all the comfort required by the
clients at a right time. I have tried my level best to cover all the aspect of the
logistics system of the company Mine line pvt. Ltd. offices along with the
competitor’s analysis of the logistical point of view. In spite of some limitations,
the project is completed covering the detail study of corporate logistics. Really,
this project was like a challenge for me, I have accepted and completed with the
best of our efforts, knowledge and skills. The study gives some of the conclusion,
which is follows:



    Pure it established a strong position and how the company Mine line pvt.
     Ltd. is doing their transportation in market.


    Mine line brand doing well in the market of modern mining.



    SAIT mining is the greatest brand in France (Europe) brand so it is
     greatest strength in the business.


    There is a huge competition in mining sector.
   .

    Eventually I conclude by saying that I fell top of the world when I think
     about my association which is having their business not only with the
     country but also having their business outside the country with this brand.
It makes me feel top of the world when I say that I have worked with Mine
             line Private Limited.




                             LEARNING FROM SIP


This is the second time I have visited a compamy.but it’s a first time I was working

throughout six weeks in an industry’s .I made a full project report regarding company’s

logistics system. That was a great experience for me. Also I worked with my industrial

mentor who is the logistical head of the company have learned lots of thing from him

corporate logistics and how company use this system for transporting the goods. Also i have

learned till now which I studied throughout one year about logistics in my pgdm-IB course

how this is applied in practical world. This is the one of the most important learning from

sip. Through these types of learning I can easily understand my own subject very well.

Because practical knowledge is always more effective than bookish knowledge. These types of

industrial experience will obviously help my future career.
 References:-


www.mine line pvt. Ltd.com


www.mining industries.com


www.logistics company in Kolkata.com


Company magazine

Mais conteúdo relacionado

Mais procurados

Project Report on Study Of BPO HR Consultancy
Project Report on Study Of BPO HR ConsultancyProject Report on Study Of BPO HR Consultancy
Project Report on Study Of BPO HR ConsultancyKumari Swati
 
MBA Summer Training Project Report
MBA Summer Training Project Report MBA Summer Training Project Report
MBA Summer Training Project Report Aparna Sharma
 
Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...
Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...
Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...Avinash Labade
 
Summer training projects titles
Summer training projects titlesSummer training projects titles
Summer training projects titlesAmritansh Mishra
 
Project Report on Performance Appraisal (College Copy)-Final
Project Report on Performance Appraisal (College Copy)-FinalProject Report on Performance Appraisal (College Copy)-Final
Project Report on Performance Appraisal (College Copy)-Finalpmpankajpm
 
Project work
Project workProject work
Project workbtulsi
 
MBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENT
MBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENTMBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENT
MBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENTSalim Palayi
 
Summer Training Report on Financial Performance Analysis for MBA
 Summer Training Report on Financial Performance Analysis for MBA Summer Training Report on Financial Performance Analysis for MBA
Summer Training Report on Financial Performance Analysis for MBAMegha Bansal
 
Organisational Study Report
Organisational Study ReportOrganisational Study Report
Organisational Study ReportAbraham Joseph
 
Bba marketing internship project
Bba marketing internship projectBba marketing internship project
Bba marketing internship projectPranaySharma66
 
Performance appraisal project
Performance appraisal projectPerformance appraisal project
Performance appraisal projectAmal James
 
HRM project on Training And development
HRM project on Training And developmentHRM project on Training And development
HRM project on Training And developmentjaygadhia0701
 
A project report on financial statement analysis
A project report on financial statement analysisA project report on financial statement analysis
A project report on financial statement analysisProjects Kart
 
Summer internship report
Summer internship reportSummer internship report
Summer internship reportKrishna Bhawsar
 
Internship Report BBA
Internship Report BBAInternship Report BBA
Internship Report BBAIshaq Ahmed
 
MBA marketing (summer internship report)
MBA marketing (summer internship report)MBA marketing (summer internship report)
MBA marketing (summer internship report)MANUJ SINGH
 

Mais procurados (20)

Project Report on Study Of BPO HR Consultancy
Project Report on Study Of BPO HR ConsultancyProject Report on Study Of BPO HR Consultancy
Project Report on Study Of BPO HR Consultancy
 
MBA Summer Training Project Report
MBA Summer Training Project Report MBA Summer Training Project Report
MBA Summer Training Project Report
 
Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...
Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...
Financial Statement Analysis With The Help of Ratios (Suyesh Metel Pressing p...
 
Summer training projects titles
Summer training projects titlesSummer training projects titles
Summer training projects titles
 
Project Report on Performance Appraisal (College Copy)-Final
Project Report on Performance Appraisal (College Copy)-FinalProject Report on Performance Appraisal (College Copy)-Final
Project Report on Performance Appraisal (College Copy)-Final
 
Project work
Project workProject work
Project work
 
MBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENT
MBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENTMBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENT
MBA HR PROJECT REPORT ON TRAINING AND DEVELOPMENT
 
MBA PROJECT
MBA PROJECTMBA PROJECT
MBA PROJECT
 
Summer Training Report on Financial Performance Analysis for MBA
 Summer Training Report on Financial Performance Analysis for MBA Summer Training Report on Financial Performance Analysis for MBA
Summer Training Report on Financial Performance Analysis for MBA
 
Industrial Internship Report
Industrial Internship ReportIndustrial Internship Report
Industrial Internship Report
 
internship report
internship reportinternship report
internship report
 
Organisational Study Report
Organisational Study ReportOrganisational Study Report
Organisational Study Report
 
Bba marketing internship project
Bba marketing internship projectBba marketing internship project
Bba marketing internship project
 
Performance appraisal project
Performance appraisal projectPerformance appraisal project
Performance appraisal project
 
HRM project on Training And development
HRM project on Training And developmentHRM project on Training And development
HRM project on Training And development
 
A project report on financial statement analysis
A project report on financial statement analysisA project report on financial statement analysis
A project report on financial statement analysis
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
Internship Report BBA
Internship Report BBAInternship Report BBA
Internship Report BBA
 
MBA marketing (summer internship report)
MBA marketing (summer internship report)MBA marketing (summer internship report)
MBA marketing (summer internship report)
 
MBA HR Project Topics
MBA HR Project TopicsMBA HR Project Topics
MBA HR Project Topics
 

Semelhante a Summer training report

ACC Value Added Products/vivek gupta
ACC Value Added Products/vivek guptaACC Value Added Products/vivek gupta
ACC Value Added Products/vivek guptaVivek Gupta
 
Kara pavan final sip presentation
Kara pavan final sip presentationKara pavan final sip presentation
Kara pavan final sip presentationKaraPavan1
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc1988chandan
 
Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...
Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...
Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...Amrinderbhalla
 
Project report on marketing process of i.l. kota
Project report on marketing process of i.l. kotaProject report on marketing process of i.l. kota
Project report on marketing process of i.l. kotaVijay Dewani
 
Shubham chaudhary project
Shubham chaudhary projectShubham chaudhary project
Shubham chaudhary projectAnand Pandey
 
Final report
Final reportFinal report
Final reportAMSADO
 
Project report for exide
Project report for exideProject report for exide
Project report for exideBIPLAB DIKSHIT
 
Ashapura Minechem
Ashapura MinechemAshapura Minechem
Ashapura MinechemMeet Haria
 
Vish al r kotadiya.en. no.107440592054
Vish al r kotadiya.en. no.107440592054Vish al r kotadiya.en. no.107440592054
Vish al r kotadiya.en. no.107440592054VISHAL KOTADIYA
 
sanket teknolite report
sanket teknolite reportsanket teknolite report
sanket teknolite reportSanket Kubal
 
Vishal bhayani roll no.10
Vishal bhayani roll no.10Vishal bhayani roll no.10
Vishal bhayani roll no.10Rajesh Patel
 
A PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATION
A PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATIONA PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATION
A PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATIONSagar Anand
 
A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...Anand Kumar Tiwari
 
CCIL SUMMER TRAINING PROJECT REPORT-2015
CCIL SUMMER TRAINING PROJECT REPORT-2015CCIL SUMMER TRAINING PROJECT REPORT-2015
CCIL SUMMER TRAINING PROJECT REPORT-2015Rajat Bansal
 
SUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumarSUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumarDeepak kumar
 
A STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOAN
A STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOANA STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOAN
A STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOANANKAJMAURYAmaurya
 

Semelhante a Summer training report (20)

ACC Value Added Products/vivek gupta
ACC Value Added Products/vivek guptaACC Value Added Products/vivek gupta
ACC Value Added Products/vivek gupta
 
Kara pavan final sip presentation
Kara pavan final sip presentationKara pavan final sip presentation
Kara pavan final sip presentation
 
Contract Procurement Management Report of Ntpc
Contract Procurement Management Report of  NtpcContract Procurement Management Report of  Ntpc
Contract Procurement Management Report of Ntpc
 
Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...
Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...
Comparative study-of-ulip-plans-offered-by-icici-prudential-and-other-life-in...
 
Jagdishsodha
JagdishsodhaJagdishsodha
Jagdishsodha
 
Project report on marketing process of i.l. kota
Project report on marketing process of i.l. kotaProject report on marketing process of i.l. kota
Project report on marketing process of i.l. kota
 
Shubham chaudhary project
Shubham chaudhary projectShubham chaudhary project
Shubham chaudhary project
 
Final report
Final reportFinal report
Final report
 
Project report for exide
Project report for exideProject report for exide
Project report for exide
 
Ashapura Minechem
Ashapura MinechemAshapura Minechem
Ashapura Minechem
 
Vish al r kotadiya.en. no.107440592054
Vish al r kotadiya.en. no.107440592054Vish al r kotadiya.en. no.107440592054
Vish al r kotadiya.en. no.107440592054
 
sanket teknolite report
sanket teknolite reportsanket teknolite report
sanket teknolite report
 
Vishal bhayani roll no.10
Vishal bhayani roll no.10Vishal bhayani roll no.10
Vishal bhayani roll no.10
 
A PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATION
A PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATIONA PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATION
A PROJECT REPORT ON EXPORT PROCESS AND DOCUMENTATION
 
A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...A project report on dlw export procedure to non railway customer by anand kum...
A project report on dlw export procedure to non railway customer by anand kum...
 
Internship Report
Internship ReportInternship Report
Internship Report
 
CCIL SUMMER TRAINING PROJECT REPORT-2015
CCIL SUMMER TRAINING PROJECT REPORT-2015CCIL SUMMER TRAINING PROJECT REPORT-2015
CCIL SUMMER TRAINING PROJECT REPORT-2015
 
Final Project
Final ProjectFinal Project
Final Project
 
SUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumarSUMMER INTERNSHIP REPORT - Deepak kumar
SUMMER INTERNSHIP REPORT - Deepak kumar
 
A STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOAN
A STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOANA STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOAN
A STUDY OF LOAN ADVANCES WITH SPECIAL REFERENCE TO HOME LOAN
 

Último

定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一
定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一
定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一fjjwgk
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Discovery Institute
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...RegineManuel2
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024Bruce Bennett
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
Ch. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdfCh. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdfJamalYaseenJameelOde
 
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一F La
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一Fs sss
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxKindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxLesterJayAquino
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Riya Pathan
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一2s3dgmej
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一Fs
 
定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一z zzz
 
Application deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfApplication deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfCyril CAUDROY
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 

Último (20)

定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一
定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一
定制(ECU毕业证书)埃迪斯科文大学毕业证毕业证成绩单原版一比一
 
Digital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, IndiaDigital Marketing Training Institute in Mohali, India
Digital Marketing Training Institute in Mohali, India
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
Drawing animals and props.pptxDrawing animals and props.pptxDrawing animals a...
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
Ch. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdfCh. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdf
 
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
办理(NUS毕业证书)新加坡国立大学毕业证成绩单原版一比一
 
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一 定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
定制(UOIT学位证)加拿大安大略理工大学毕业证成绩单原版一比一
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docxKindergarten-DLL-MELC-Q3-Week 2 asf.docx
Kindergarten-DLL-MELC-Q3-Week 2 asf.docx
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
定制(NYIT毕业证书)美国纽约理工学院毕业证成绩单原版一比一
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
 
定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一定制英国克兰菲尔德大学毕业证成绩单原版一比一
定制英国克兰菲尔德大学毕业证成绩单原版一比一
 
Application deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdfApplication deck- Cyril Caudroy-2024.pdf
Application deck- Cyril Caudroy-2024.pdf
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 

Summer training report

  • 1. On Project: - procurement of goods &swot analysis of logistics in Submitted in partial fulfillment of the requirements of Post Graduate Programme in International Business SOUVIK SINHA PGDIB-11-13 FT-(IB)-350 IILM Graduate School of Management 16, Knowledge Park-II, Greater Noida – 201306
  • 2. CERTIFICATE OF SUMMER INTERNSHIP This is to certify that the project report titled “PROCUREMENT OF GOODS & LOGISTICS SYSTEM OF MINE LINEPVT. LIMITED” submitted to Institute Of Integrated Learning and Management, Greater Noida by SOUVIK SINHA in partial fulfillment of the requirement for the award of Post Graduate Diploma in Management, (PGDM) is an original work carried out by the below mentioned student under the guidance and supervision of the below mentioned guides/supervisors. This work has not been submitted anywhere else for any other degree/diploma under my signature. The original work was carried out during 3rdMay to 15th June 2012 In Mine line pvt. Limited. Signature of the student: __________________________________________ Name of the student: _____________________________________________ Dated: _________________________________________________________ Signature of the Industry Guide: ____________________________________ Name of the Industry Guide: _______________________________________ Designation of the Industry Guide: __________________________________ E-mail Address: _________________________________________________ Mailing Address: ________________________________________________ Dated: _____________________
  • 3. ACKNOWLEDGEMENT Any activity big or small is a result of collective effort of several individuals. From the very beginning of human civilization to this complex world, we are dependent on each other for accomplishment our goals. This project report is also the result of collective effort and support of several individuals who have been given me their valuable contribution in fulfillment of the work. Exchange of ideas generates a new object to work in a better way. I extend my gratitude to all those who imparted support & experience even at the cost of heavy demand of their precious time and busy schedule. Without their assistance and continuous guidance this project would not have been completed. My experience from this project has certainly widened my knowledge arena. I would acknowledge my company mentor MR. SUPRIYA DUTTA and my faculty mentor Prof.SACHIN SINHA for their valuable guidance, inspiration and encit’sagement on numerous occasions, which acted as a morale booster in times of problems. I truly appreciate from inner sanctum of my heart, their thoughtful recommendations that have made this project successful. First of all, I would like to give special thanks to the almighty whose blessing helped me to complete this project. Completing a task is never a one man effort. Before explaining my project report, MR. ROHAN CHAKRABARTY (asst. director of mine line pvt. limited) to provide a proper guidance and a right approach from time to time, to accomplish the goal. They shared ideas with me to complete my project. They have always been guiding and suggesting me like teacher, guide and mentor as well. I also acknowledge my heartiest gratitude to Mr. AMIT KUMAR a faculty member of IILM GSM, GERATER NOIDA, who helped me a lot and give me a right direction in completing the project. I am also grateful to all my faculty members of IILM GSM GREATER NOIDA, who have helped me in completing this project. It shall be an injustice, if I don’t express thank to my friends who helped me in completing my project report. It is my earnest duty to express most gratitude and honor to my parents. (SOUVIK SINHA)
  • 4. DECLARATION I Souvik sinha of 2nd year PGDM in International Business student, Institute Of Integrated Learning and Management, hereby declare that the project titled - “Procurement of goods &swot analysis of logistics in mine line pvt. Limited” as the original work conducted by me and submitted in the partial fulfillment for degree. The information and data given in the report is authentic and true to the best of my knowledge. I also declare that this project has not been submitted for the award of any other degree, diploma, literature or recognition earlier. (SOUVIK SINHA) prof.Sachin Sinha Roll No: - FT-(IB)-350 Signature of the college mentor:- PGDM-(IB):- 2011-13 Date:-
  • 5. PREFACE Unless the knowledge is applied in the practical field, it cannot attain perfection and maturity. A project work is the scientific and systematic study of real issue and problems with the application of management principles, concept and skills. The essential ingredients of a project are that it should contain scientific collection of data its analysis and interpretation that lead to valid conclusions and feasible suggestion. Project work is an essential part of partial fulfillment of the syllabus of PGDM in IB. I have prepared this report during my summer training at “MINE LINE PVT. LIMITED”. This study has given real exposure to company logistics and this study has given me the confidence to face the real transportation problem and I have learn how company’s logistic costs is to be reduced. The whole report is to be divided into different chapters, each dealing with the different aspects of the study the report has been return in a very comprehensive way with a suitable heading of each chapter. The last chapter deals with some recommendations which will be help full to the company in countering its competition as well as having an edge over them. I have tried my best to do justice and be honest in analyzing the topic.
  • 6. TABLE OF CONTENT:- SUBJECT PAGE NO: 1. Project title 1 2. Certificate 2 3. Acknowledgement 3 4. Declaration 4 5. Preface 5 6. Content 6 7. Executive summary 7 8. Introduction of the company 8,9,10 9. Introduction of the products 11 10. Business environment 12,13,14 11. Methodology(research study & field work) 15-25 12. Data collection 26-27 13. Analysis 28-38 14. Findings 39 15. Conclusion 40 16. Learning from sip & References 41
  • 7. EXECUTIVE SUMMARY In large business houses like MINE LINE LVT. LTD. where lots of projects are going on at a same time at different places, the logistics head has to handle every day a large number of transportation receipts and payments and also contact the different logistical companies. Mine line pvt. Ltd. Now is one of the most established names in making flame proof electrical for modern mining. During my summer training I have completed the project on “procurement of goods and swot analysis of their logistics system”. Basically I was working on their transportation system and made a research report about how mime line pvt. Ltd. Can reduce their transportation costs. Also I did some field work on the different logistics companies in Kolkata those companies can deals with mine line and help them for reducing transportation costs. Also I have submitted a research report regarding their prospective customers around some certain places like- Orissa, andhrapradesh, madhyapradesh, Bihar, uttarpradesh, Maharashtra, Gujarat etc.In my first part, a report is made on a detailed study, company introduction; in second part I have mentioned various products of mine line and their brief introduction, in the third part all about the business environment of mine line pvt. Ltd. Also I have mentioned different methodology which I have applied in my project, analyzing the secondary data which I have collected in different sources during my project work.
  • 8.
  • 9.
  • 10. 1. Orientation of the company- MINE LINE PVT. LTD. now an Indo-European joint venture company. It’s an established name in modern mining for making flame proof electrical equipments. This company was founded by a mining engineer in the year of 1978.Headquater of this company situated at Kolkata.westbengal.the field offices of mine line pvt. Ltd. located at Bilaspur, kottagudem and singrauli.About 25 years ago Mine Line started as a distant dream. A Mining engineer with vision set up a tiny cottage industry to manufacture flameproof equipment starting with signaling transformers plugs and sockets, and lighting transformers. Company’s infrastructure plays an important role in enabling us to meet the exact requirements & standards of the industry. The production unit is installed with the latest modern technology and facilities to improve productivity and quality of our products. From time to time, it upgraded with the latest techniques and possesses all the necessary facilities to provide top-notch quality products and services to our valued customers. In Kolkata the Mine Line group currently employs 62 workers 12 engineers and design draftsmen 20 sales and liaison personnel Two main factories in Kolkata is covering a space of 20,000 sq ft of covered area located in Behala and Uluberia have been set up with sophisticated machines imported from Europe to be able to meet the most stringent standards of quality. 2. History of the company:- This was founded by a mining engineer in 1978 at Kolkata about a25 years ago. 3. Joint venture of the company:-
  • 11. In 1990, mine line pvt. Ltd. has been entered into a joint venture with SAIT mining SA of France. This joint venture is set up under the name of Sait mine line pvt. Ltd.Sait mining of France is a 75 years old company and the world’s largest manufacturer of flameproof equipment. They have established joint ventures in China, Turkey, South Africa, Czechoslovakia, Poland, and South America, Spain and now in India. 4. Innovations of the company:- Mine line specialization lies in its ability to tailor-make any flame proof electrical equipments to a client’s specific requirement. Some of the latest innovations are listed below-first company to develop indigenous electrical for road heading machines (voest Alpine AM-50) under Aphelia of Vijayawada. More than 33 such machines are running successfully in the Indian mines. First and only company to indigenize and improve substantially on electrical for mobile machinery for under coal faces that is load haul dumper, jumbo drills Etc.only Company to supply a totally integrated project involving design manufacture and commissioning of interface electrical for power control, Protection & monitoring of a bank of 6 conveyors with total interlacing & control from Underground flame proof control desk, at kotras Long wall. This company firstly developed electrical system for introduction of automatic skip loading system for chasnalla project under USCD with Gullick India, now Joy partnership. This is the only Indian company to design and manufacture transwitch units of 500KVA and above with fully equipped low voltage chamber containing 3 circuit breakers having independent control, protection & cable couplers for direct outgoing supply, fully compatible with international transwiacted units. 5. BOARD OF DIRECTORS:-  Chairman of the company:-Mr.Birendranath Mukherjee  Director of the company:- Mrs. Nandini chakravarty
  • 12.  Executive Director:-Mr. Rohan Chakravarty  CEO of the company:-Mr. Koushik Ganguly  General Manager in marketing:-Tapos Mukherjee  General Manager in Logistics:-Mr. Supriyo dutta
  • 13.
  • 14. 1. Introduction of the products:- They are making basically flameproof electrical instruments which are used in mines. The equipments generally bulk in weight. These types of electrical equipments generally prevent the explosion under the ground. Often only because of spark explosion is happened. 2. Types of product:- Motor control gear,1100volts flameproof boltless versions, high tension range up to 7200 volts,trannsformers,switch gear,enclouser,couplers,starters,dol gate end box,isolaters for LHDs,pl tubes etc. 3.Images of their products:-
  • 15.
  • 16. 1. Where company supplying their product in India:- Dhanbad,bokaro,ramagundem[AndhraPradesh],Bhopal,chirimiri,sodhpur,suhagpur[Orissa],Bhop alpally[a.p],bilaspur,srirampur,mandarmarri,karba,suhagpir,bisrampur,anuppur[a.p].theyaretrans portingtheirproductgenerallyJharkhand,andhrapradesh,Orissa,maddhyapradesh etc. 2. Clients:- Mine Line India, boasts of a list of proud and satisfied clients comprising top mining companies like Eastern Coalfields, Mahanadi Coalfields, Tata Iron & Steel, Kirloskar Brothers besides many other private sector mining companies. Subsidiaries Of Coal India Limited. Eastern Coalfields Ltd., Sanctoria, Dst.Burdwan, West Bengal North Eastern Coalfields Ltd., Dispur, Guwahati, Assam Bharat Coking Coal Ltd., Koyla Bhawan, Koyla Nagar, Dhanbad South Eastern Coalfields Ltd., Seepat Road, Bilaspur Northern Coalfields Ltd., Singrauli, Dst.Sidhi
  • 17. Central Coalfields Ltd., Darbhanga House, Ranchi Mahanadi Coalfields Ltd., Uce Burla, Sambalpur Western Coalfields Ltd., Coal Estate, Civil Lines, Nagpur Other Coal Companies - The Singareni Collieries Co. Ltd., Kothagudem, Dst.Khammam The Tata Iron & Steel Co. Ltd., Jamadoba Monnet Ispat Ltd., New Delhi OEM Partners - A.P.Heavy Machinery & Engineering Ltd. Kondapalli, Eimco Elecon India Ltd., Vallabhvidyanagar, Gujarat, Elecon Engineering Ltd., Vallabhvidyanagar, Gujarat, Mather & Platt Pumps Ltd., Chinchwad, Pune, Kirloskar Brothers Ltd., Kirloskarwadi, Dst.Sangli, Vishwa Industrial Co. Pvt. Ltd., Calcutta, Bengal Tools Ltd., Calcutta, Risansi Industries, Kanpur, Rampur Engineering Co., New Delhi, Suburban Industrial Works(Lessee), Calcutta, Krishna Electricals, Bokaro, Salzgitter
  • 18. Hydraulics Pvt. Ltd., Hyderabad,P&H Joy Mining Machinery India Ltd., Hyderabad,Bharat Earth Movers Ltd., KGF, Karnataka Overseas Customers - Becker Mining Systems Gmbh, Friedrichsthal, Germany Sait Mining S.A., Saverne, France Talleres Zitron, Madrid, Spain
  • 19. 4. Distribution channel:- PRODUCTION PLANT Transportation Production plant agencies Field offices BILASPUR KOTTAGUDEM SINGARAULI DC DC DC CLIENTS/CUSTOMERS
  • 20.
  • 21. Research study My project is all about the procurement of goods and SWOT analysis of the logistics system of the company. due to the company’s concern I made research report and submitted to the company which is help them to reducing their transportation costs and my project is also shown different kind of transportation modes as well as various way to procure their goods which is should effective for I have studied the company’s previous year’s bills file and note down all places where mine line has transported their goods & calculate total transportation costs. At last I came to know that Because of transportation logistics from January, 2011 to January, 2012 company spends the amount of Rs. 2300000. Mine line is transporting their goods in different places throughout the India like andhrapradesh, Jharkhand, Bihar, Orissa, madhyapradesh etc.basically this company Chooses road or highway mode of transportation like transport through trucks. In this case mine line is following the “POINT –TO-POINT “transportation network. Like that- Point of origin Point of destination  In the case of point-to-point network quit common for long distance hauls on the national highway.
  • 22.  The point of origin and point of destination are fixed. Complete truck loading is assured for both ways. The company mine line is generally following this transporting mode. Due to this mode they are suffering few problems like- Disadvantages of point to point network:-  If a city pair is not served, goods are out of luck, as there is no way to get to a destination if they use that highway route network.  The frequency of truck or vehicle may be reduced because a point-to-point system requires a large number of combinatory, as the number of city pairs is increased by many magnitudes.  To reducing their transportation costs they can follow the” HUB AND SPOKE” transportation mode. It would be safer & time consuming than previous one. Not only that they can also take the warehouse had concept to get more available to have the customers decreased their transportation costs. 'Hub & Spoke' strategy in the transportation has lots of opportunities to decrease the transportation costs of the company. Making HUB at Kolkata and spoke at major other location where having major demands. Like if we take the places of Andhra Pradesh, madhyapradesh, Orissa, Jharkhand in the context of good prospects or demand of product’s point of view. Then we come to know that how this mode is useful for the transportation. If we set up a main hub at Kolkata and open spokes in those places where having a major demand of the products andhrapradesh, madhyapradesh, Jharkhand etc.in that way company reduce their transportation costs and more available to the customers those are living from those areas. Hub and Spoke Network:-
  • 23.  The hub acts like a central feeder point to the distribution centers, which are at the strategic locations spread across the geographical area.  High volume and high-speed shipment takes place from hub to DC through the shortest routes called spokes.  The trans-shipment of consignment is done at DC for distribution across the local area. DC (ANDHRAPRADESH) MOTHER HUB (KOLKATA) DC (JHARKHAND) DC (ORISSA) DC (MADHYAPRADESH)  WHY HUB AND SPOKE SHOULD BE USED TO REDUCE THE TRANSPORTATION COSTS? -It helped to ensure that connecting flights belonged to the airline -It emphasized service to large cities.
  • 24. -Aircraft arrived at predictable (albeit intense) intervals, generally lessening workload for the airport staff and air traffic controllers. -Routing all traffic through a hub allows airlines to operate more efficiently while controlling costs. The hub is a central location from which the day to day operations of the airline can be managed. Keeping operations in a central location minimizes staffing as well as supply inventory. -The hub and spoke system increases aircraft utilization and passenger load factors. -For a network of n nodes, only n - 1 routes are necessary to connect all nodes; that is, the upper bound is n - 1, and the complexity is O (n). This compares favorably to the routes, or O(n2), that would be required to connect each node to every other node in a point-to-point network. For example, in a system with 10 destinations, the spoke- hub system requires only 9 routes to connect all destinations, while a true point-to-point system would require 45 routes. -The small number of routes generally leads to more efficient use of transportation resources. For example, aircraft are more likely to fly at full capacity, and can often fly routes more than once a day. -Complicated operations, such as package sorting and accounting, can be carried out at the hub, rather than at every node. -Spokes are simple, and new ones can be created easily. The following two points are the major advantages that the hub-and-spoke system had initially brought to the airline business; however some disadvantages had been developed later due to changes in external environmental factors. 1. Encouraged the rapid growth in the airline business- The hub-and-spoke system since developed after deregulation, has allowed a rapid growth in size, competition strategy and traffic demand in the airline business. However, as suggested by
  • 25. Wells and Younger (2004 4) this had resulted in operational inefficiencies at periods of slow economy; with airlines resulting in very poor financial performances. As a result of this, some airlines restructure their business model to return to the point-to-point system and move out of the constant need for a large hub, and utilise hubs in a more uniform matter in terms of arrivals and departures. This phenomenon is known as the rolling hubs. 2. Efficient use of scarce transportation resources- The system has less number of routes connecting all spokes enabling a more efficient use of scarce transportation resources. This however had small airports and economies of smaller regions suffering as per the reduced capacity. As a result this encouraged airports to agree with low cost carriers to offer low airport fees and commissions from local businesses to bring in traffic and passenger flow. The passenger market favored this type of airline business as lower fares were rolled out to the market from these smaller hubs; which caused great competition to full service carriers that were operating with large amount of airport fees to use large hubs, and can no longer return to these small hub markets as it is not cost efficient and are dominated by low cost carriers. Also there are some disadvantages of hub & spoke but in this case these disadvantages are not a big deal for company’s growth. Disadvantages of hub-and-spoke;- 1. Congestion and delays at hub airports 2. Discontinuous use of airport facilities 3. Airport dependency
  • 26. Apart from third party logistics and applying for Hub & Spoke model I also suggest them for decreasing the rate of logistical costs of the company which is WAREHOUSE concept. If the company mine line pvt. Ltd. open warehouses or take a warehouse in a rental basis around those places where they have good prospective customer’s like-Bhubaneswar, kottagudem, singarauli, dhanbad etc.  Characteristics of three warehouses:- Private Public Contract Investment High None Very little Flexibility in Material handling, Location Location storage & throughput planning Cost per unit stored Inversely related to Low Inversely related to volumes volumes Level of controls High Low Medium
  • 27. Adequacy of goods High Low High stored Risk Due to change in Minimal Minimal market demand is the best option for mine line pvt. Limited to reducing their transportation costs. Because there are few reasons behind it. They are following:- • These are the product specific warehouse facilities acquired for use for a specific period against fixed charges. • A contract warehouse can provide the benefits of both private and public warehouses. The resources such as labor, material handling equipment, storage arrangement, and communication equipment can be used on sharing basis with depositors from the same industry to economize on operating cost. The company mine line pvt. Limited are basically deals with the bulk goods. they are making the flame proof equipments. in that case contract warehouse is the best option for them. not only that but also in that case investment costs is is also very low, Adequacy of goods stored is very high etc.  Designing a Warehousing System:-
  • 28. In designing a warehousing system, the following basic questions relating to this flow become significant. How many warehouses should we have? Where should we locate them? What should be the size or capacity of each of them? 1. How many warehouses should we have? The cost of warehousing is directly proportional to the number of warehouses, while the transportation cost goes down with an increase in warehouse numbers as shown: Total costs Warehousing Cost Transportation No. of Warehouses 2. Where should we locate them? Quantitative techniques for warehouse site selection:  For Single Depot Location-
  • 29. Center of Gravity of Area Model  Center of Gravity of Load Model  Center of Gravity of Tones-Kilometers Model 1. for Single Depot Location- Center of Gravity of Area Model- A map of marketing areas may be drawn and a sheet representing the area may be balanced. The point where the sheet gets balanced is the site for warehouse location. This point is expected to be at minimum average distance from all the locations in the area. Quantitative techniques for warehouse site selection: This may be illustrated visually by imagining a sheet having holes representing the customer locations and their demand load of annual purchases. Weights are hung on each hole in proportion to the demand load. The points at which the model sheet gets balanced gives the center of weights. This model takes into consideration both loads and distances to arrive at the optimum transportation cost. The final solution is obtained after applying trail and error methods several times. 2. for Multiple Depot Location-  For planning the chain of warehouse the management will have to do a cost-benefit analysis.  The factors influencing a decision on multiple warehouses locations are: Market Size  Area Coverage by each warehouse
  • 30.  Product type  Demand pattern- continuous or seasonal  Customer service level Mine line can set their own warehouse or take the warehouse as a contract basis like that:- ANDAMARRI(DC) ANDHRAPRADESH BELLAMPALLI(DC) RAMAGUNDEM(DC) (WAREHOUSE IN BHOOPALPALLY) SINGARAULI(DC) KOTTAGUDEM(DC) YELLANDA(DC) At first open or borrow a warehouse in Bhoopalpaly at andhrapradesh and then open few spoke s or distribution channel in different places in andhrapradesh where their demand of the product is very high. Also should follow the same plan to reduce the transportation costs in the case of madhyapradesh, Jharkhand. Like that:-
  • 31. Annupur (dc) Sohagpur (dc) Baikhanthapur (dc) Madhyapradesh(w arehouse in bilaspur) Chirimiri (dc) Karba (dc) Bisrampur (dc) In the case of Jharkhand company follow the same rule, at first take the warehouse in dhanbad and open spoke or distribution channel in different places in jharkhand.like that:- EKKRA, BCCL(DC) JHARKHAND BOKARO (DC) (WAREHOUSE IN W.B & BIHAR (DC) DHANBAD)
  • 32. DATA COLLECTION Data collection is an important part of my project. Because according to company’s concern I have to find out the logistics companies those have cheaper rate and offering various transportation mode as well as facilities. in this project I need to find out a way through that company can reduce their transportation costs and also with the help of the research report they can developed their transportation system. has why I have lots of data from the different logistics companies in Kolkata those company can be help the Mine line pvt. Ltd. and assist them regarding their logistics system and which is really effective for reducing their transportation costs’ have collected data from those following company regarding their charges, which kind of transportation mode they generally used, what kind of facilities they are providing etc.the companies are- Cpmc Relocation & Logistics Pvt Ltd Strand Bank Rd Kolkata 033 4021 9000 Inland Road Transport (P) Ltd (09910589358)-Behala., 265, Pen Banerjee Road, Parnasree, (09910589358) Kolkata 08929 516784 Domestic Packers Movers Kolkata Poddar Court, 18, Rabindra Sarani, Kolkata, WB 033 2225 3503
  • 33. Economic Transport Organization Ltd Dutta Properties Building B.B.T Road, Post Office Govindpur, Kolkata 09051280883 Spectra Logistics 228/A, Acharya Jagadish Chandra Bose Road, Rabindrasadan, Circus Ave, Bhawanipur Kolkata 033 22871777 Allied Aviation Pvt. Ltd. 13/4, Sayed Sally Lane, 3RD Floor Kolkata - West Bengal 09311128466 Radhika Express Private Limited 20,Coal Berth,Hoboken Road,( Inside Shivam Kanta ),Jain Kunj, Kolkatta-700088 Jain Transport Company 7h, Dr R K Banerjee Sarani, Ballygunge, Kolkatta-700019 United Clearing Agency 159, Anandapur R R Plot Lp 43/4, Kolkatta-700107 Hindusthan Road Liners 71, Metcalfe Street, Suit No 303 3rd Floor, Tireeta Bazar, Kolkatta-700073 ` Mahavir Roadways Private Limited Babu Trunk Road,Maheshtala, Kolkatta-700141
  • 34.
  • 35. SWOT ANALYSIS OF THE LOGISTICS SYSTEM OF THE COMPANY  STREANGTH:- Basically company is following a simple transportation network. Generally they go through the point –to-point transportation network. Which is safe for transportation of bulky goods than the others networks. Loading & unloading is happened in between the point of starting from point of destination. That is less chance for wastages of goods. Also mine lone pvt. Limited go through the with the transporting agencies like-Raj transporting agency. They are transporting their goods from production house to destination place with the help of transporting agencies. This is smart way ti cost cutting of transportation. It is a way to smooth transporting process without any interruption. They have a strong point that is the effective utilization of transporting agencies because type’s transportation agencies are very responsible to taking the order and delivery the goods timely and safely to the customers.  WEAKNESS:- The company mine line pvt. Limited has also few weak points in the context of logistics. Only because of that they are paying huge money per year for their transportation. Previous year company has near about twenty laks which is should not be paid .this problem has created only because of their using the point-to-point network.ots a big weak point for them. Point-to-point network quit common for long distance hauls on the national highway. in this case point of origin & point of destination are fixed. Complete truck loading is assured for both ways.  OPPORTUNITY:-
  • 36. Mining is an important part of every economy. In a world that is already facing shortages of some of the important minerals and metals like petroleum and coal, the demand for such products is only bound to increase with time. Meeting those demands will be a challenge for the mining and minerals industry worldwide. With the increasing efforts in R&D and technological innovations, the mining and minerals industry has developed huge Human resource requirements. There is already a shortage of skilled workforce throughout the world. Developments are taking place rapidly and many companies in this sector are expanding their operations and are working on new projects like the refinery being constructed by Reliance Industries Limited in Jamnagar. Also Bharat Petroleum is conducting R&D For value added products and alternate fuels. So to conclude, it can be said that mining and minerals sector has a bright future, be it in terms of employment or technology. There are few reasons behind good future and prospect of the modern mining industry in India as well as others countries .they are following:- 1. India’s Variety and Abundance of Resources- Speaking only about identified reserves, India has the fourth-largest coal reserves in the world and significant reserves of bauxite, titanium ore, chromites, diamonds, and limestone. Gold, copper, zinc and uranium reserves have also been identified, though in a more limited volume. In terms of production, India ranks 3rd in production of coal & lignite (80% of the mines in India are coal mines), 2nd in barites, 4th in iron ore, 5th in bauxite, and 7th in manganese ore. 2. Recent Discovery- “India has, till date, explored only 7-9% of the mineral resources as against almost 100% geophysical and geochemical surveys in countries such as Australia”. This was revealed in September 2011 in a report titled Opportunities “launched by Ernst & Young at a conference organized by the Federation of Indian Mineral Industries in Bangalore.Metals price and the high level of dependency of the country for gold urge India to enter in a more comprehensive
  • 37. exploration of the potential resources of the country. Recent discoveries had shown how large this potential might be. 3. India’s Long History of Mining- India’s long history of mining, dated back to the first millennium BC with linkages to the Indus Valley Civilization, demonstrates the geological potential of the country and explains its strong mining tradition. Prestigious mining schools, often established by the British, trains highly qualified scientific and mining engineering professionals. 4. A Highly Qualified Scientific and Mining Engineering Community- The choice 4.f India as the host country for the 10th International Symposium on Rock Fragmentation by Blasting (New Delhi, November 2012) is enough to demonstrate the high respect the Indian scientific community is held by the worldwide experts in that field. The Fragblast Symposia represents the most important event in disseminating the latest advances in the science and technology of rock fragmentation by blasting and other related means. “The first symposium was held in Sweden in 1983 and since then it has been convened at intervals of 3 - 4 years at different locations around the world. These locations, selected standing International Committee from among several competing submissions, are chosen on the basis of prominence of mining activities and R&D initiatives of the host country. 5. Strategic Location for Export- India’s geographical location makes the country a perfect hub for raw materials or metals exportation to both the developed European markets and the fast-developing Asian markets. Iron ore, steel and aluminum are massively exported to China, UE and Japan. Roughly, 50% of the steel produced in India is exported, and 50% of this total is exported to China. 6. Strong Internal Demand Especially For Coal and Gold-
  • 38. India maintained a spectacular growth for the last year and might keep on booming at least until 2030. In order to fuel that development, Indian demand for metals and minerals will continue to grow accordingly. According to a 2010 report from the McKinsey Global Institute “700 to 900 million square meters of commercial and residential space needs to be built – or a new Chicago every year (…) 2,5 billion square meters of roads will have to be paved, 20 times the capacity added in the past decade (…) [and] 7400 kilometers of metros and subways will need to be constructed, 20 times the capacity added in the past decade “The new gold discoveries will also be easily absorbed by the internal demand. India is and will remain for long, the world's largest consumer of gold and the world’s largest gold jewelry market. 7. Strong Anti-Corruption and Fight against Illegal Mining Initiatives- “Known for corruption in its political, regulatory, and legal systems, India needs to take this issue head-on by instituting new controls, as soon as possible, as corruption continues to damage its markets (…) While the government struggles to modernize the bureaucracy and corruption is a challenge that must be overcome.” Potential corruption opportunities arise, inter alia, during the license attribution process. Obtaining a license by corrupting an official means you are illegally exploiting the ore. Corruption leading to faulty undervaluation of exported quantities for tax and royalties avoidance purpose has also been recently reported to be common practice in India. Since 2006, India set an example of an efficient and pro-active fighting policy against illegal mining and corruption. This is a long-term policy but appointing the retired tough independent Supreme Court Judge N. Santos Hedge as Lokayukta (Ombudsman) of Karnataka state has been a strong political sign. He soon unveiled a massive illegal iron ore mining involving some of the richest families and mighty politicians of the country. As a first outcome of this fighting policy, the famous eddy’s where sent to jail and actions have been announced against 617 officials, including Ministers. Upholding this policy might improve India’s ranking and hopefully contribute to attract additional national and foreign investments.
  • 39. NOW A DAYS INCREASING THE DEMAND OF FLAMEPROOF ELECTRICAL EQUIPMENTS BECAUSE MOST OF THE MINING COMPANIES ARE ASKING FOR THESE TYPES OF EQUEPMENTS TO PREVENT THE EXPLOSION.NOW OFTEN EXPLOSION IS HAPPENING UNDER THE GROPUND DUE TO VARIOUS CAUSES AND MINING COMPANIES ARE SUFFERING REGARDING THESE KIND OF ACCIDENT NOT ONLY THAT BUT ALSO NUMBER OF PEOPLE THOSE ARE WORKING IN UNDERGROUND THOSE ARE DYING DUE TO THESE KIND OF EXPLOSIONS.NUMBERS OF FOREIGN AND DOMESTIC COMPANIES AREV GOING TO OPEN THEIR NEW BRANCHES IN THE EASTERN ZONE LIKE JHARKHABD,ORISSA,BIHAR ETC.THE MINING COMPANIES THOSE ARE BELONGS TO THESE STATES WOULD BE GOOD PROSPECTS FOR MINE LINE PRIVATE LIMITED.  THREATS:- Increasing the oil prices Unstable world economy Market competition Natural disaster like-Global worming
  • 40.
  • 41. Charts 1–Incresing transportation costs in last five years:- 25 20 15 10 5 0 2007 2009 2011 Interpretation- If we look after the last five years of transportation expenses then we will see that how their logistical costs is increasing in every year, which is clearly mentioned on this graph. in the year of 2007 the transportation costs was 11laks,in the year 2008 it was 15 lakhs,on the year 2009 the costs was 16laks,in the year 2010 costs was 19 laks and previous it was 23 lakhs
  • 42. Chart2-The different location where they are transporting the goods:- places Dhanbad & Bihar Andhrapradesj Madhyapradesh France China Interpretation- This company is generally transporting the goods on different places or our country as well as outside of India, like-France, china etc.but the company is doing their business heavily on around India, like-andhrapradesh, madhyapradesh, Jharkhand & Bihar. That’s why mine line transporting their goods through the national highway with the help of different transporting agencies. in that case they are following point-to-point network.
  • 43. Chart3-The different kinds of transportation modes which are followed by the company:- Transportation modes Road or highway Water Air Interpretation- This company is basically doing their business in our country. That’s why company transporting their goods through the road or national highway. They are using this mode more than water and air.
  • 44. Charts-4 what kind of motor vehicle they generally use for their bulky goods Transportation? 8 7 6 5 Column1 4 Column2 3 Column3 2 1 0 10 wheeler small truck container Interpretation- When they are transporting their bulky electrical equipments from their plant to the clients they generally uses the 10 wheeler truck, almost 70% transportation is happened with the help of this. Also they us small truck but in the very few cases mine line is transporting their goods through container.
  • 45. Chart-5 How increase the oil price in every year- 8 7 6 5 Series 3 4 Series 2 3 Series 1 2 1 0 yr2006 yr2008 yr2010 yr2012 Interpretation- In every year increasing the oil pricing is the one of the cause behind their increasing transportation costs. Like an example in the year of 2006 oil price was rs.3 per litr. Then in the year of 2008 oil price increased up to rs.4 per ltr. In 2010 the price was rs.4.5 per ltr. And this year it is grow up to rs.7 per ltr.
  • 46. FINDINGS 1. By analyzing the survey we can say that approximately increasing the transportation costs is one of the main barriers of company’s yearly turnover. 2. Apart from those area like Jharkhand,Orissa,andhrapradesh,madhyapradesh,bihar, China, France etc number of states and area like uttarpradesh, gujrat, maharastra etc would very prospective customers carrying area for the company. 3. They are generally uses the road as a transportation mode but if they are going for the air as well as water then it might be very useful for their logistics system. 4. In the case of bulky goods transportation mine line is used to 10 wheeler and small truck. For that they are paying very high amount of money because in that case need number of trucks for transporting huge electrical equipments at a time. But if they transporting their goods through the big container then it might be cheaper than previous. 5. To avoid the increasing rate of oil price they can utilize the vehicle those are running with the help of natural gases.
  • 47. CONCLUSION The project on procurement of goods & SWOT analysis of the logistics system of the company Mine line pvt. Ltd. gives the deep understanding of all the aspect of corporate logistics system, which covers all the key area of transportation along with all the glamour features such as warehousing facilities, ambience, and staff with the apt attitude to provide all the comfort required by the clients at a right time. I have tried my level best to cover all the aspect of the logistics system of the company Mine line pvt. Ltd. offices along with the competitor’s analysis of the logistical point of view. In spite of some limitations, the project is completed covering the detail study of corporate logistics. Really, this project was like a challenge for me, I have accepted and completed with the best of our efforts, knowledge and skills. The study gives some of the conclusion, which is follows:  Pure it established a strong position and how the company Mine line pvt. Ltd. is doing their transportation in market.  Mine line brand doing well in the market of modern mining.  SAIT mining is the greatest brand in France (Europe) brand so it is greatest strength in the business.  There is a huge competition in mining sector. .  Eventually I conclude by saying that I fell top of the world when I think about my association which is having their business not only with the country but also having their business outside the country with this brand.
  • 48. It makes me feel top of the world when I say that I have worked with Mine line Private Limited. LEARNING FROM SIP This is the second time I have visited a compamy.but it’s a first time I was working throughout six weeks in an industry’s .I made a full project report regarding company’s logistics system. That was a great experience for me. Also I worked with my industrial mentor who is the logistical head of the company have learned lots of thing from him corporate logistics and how company use this system for transporting the goods. Also i have learned till now which I studied throughout one year about logistics in my pgdm-IB course how this is applied in practical world. This is the one of the most important learning from sip. Through these types of learning I can easily understand my own subject very well. Because practical knowledge is always more effective than bookish knowledge. These types of industrial experience will obviously help my future career.
  • 49.  References:- www.mine line pvt. Ltd.com www.mining industries.com www.logistics company in Kolkata.com Company magazine