Enviar pesquisa
Carregar
Building Conc. 100%
•
0 gostou
•
250 visualizações
S
shiraziadam
Seguir
Denunciar
Compartilhar
Denunciar
Compartilhar
1 de 7
Baixar agora
Baixar para ler offline
Recomendados
Fuel
Fuel
5572066
Kertas kerja perkhemahan 2014
Kertas kerja perkhemahan 2014
SK SRI KERIAN, PARIT BUNTAR
Auskultasi denyutan jantung fetus (kumpulan13)
Auskultasi denyutan jantung fetus (kumpulan13)
Nazirul Arief
Alat khemah
Alat khemah
Nor Suzalima Ab Ghani
Sukatan PBSM thn 5 by fazlina adama
Sukatan PBSM thn 5 by fazlina adama
Fazlina Adama
Bsmm
Bsmm
Hilmi Qimie
R1001 Unit 5
R1001 Unit 5
mechestud
Pbsm ;(
Pbsm ;(
Hanis Hanira
Recomendados
Fuel
Fuel
5572066
Kertas kerja perkhemahan 2014
Kertas kerja perkhemahan 2014
SK SRI KERIAN, PARIT BUNTAR
Auskultasi denyutan jantung fetus (kumpulan13)
Auskultasi denyutan jantung fetus (kumpulan13)
Nazirul Arief
Alat khemah
Alat khemah
Nor Suzalima Ab Ghani
Sukatan PBSM thn 5 by fazlina adama
Sukatan PBSM thn 5 by fazlina adama
Fazlina Adama
Bsmm
Bsmm
Hilmi Qimie
R1001 Unit 5
R1001 Unit 5
mechestud
Pbsm ;(
Pbsm ;(
Hanis Hanira
Ento runway characteristics
Ento runway characteristics
bouet
Abo Oml125
Abo Oml125
ennioeni
Fishing tools
Fishing tools
Nombre Apellidos
Reusable lunar lander
Reusable lunar lander
Michael Interbartolo
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection check
VVIETCIVIL
phase 2ppt.pptx
phase 2ppt.pptx
Gokul408032
CS Unitec Corner Drills and Drive
CS Unitec Corner Drills and Drive
CS Unitec
Rail, sleepers fittings.ppt
Rail, sleepers fittings.ppt
AdityaDubewar2
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaa
wixapps
Mais conteúdo relacionado
Semelhante a Building Conc. 100%
Ento runway characteristics
Ento runway characteristics
bouet
Abo Oml125
Abo Oml125
ennioeni
Fishing tools
Fishing tools
Nombre Apellidos
Reusable lunar lander
Reusable lunar lander
Michael Interbartolo
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection check
VVIETCIVIL
phase 2ppt.pptx
phase 2ppt.pptx
Gokul408032
CS Unitec Corner Drills and Drive
CS Unitec Corner Drills and Drive
CS Unitec
Rail, sleepers fittings.ppt
Rail, sleepers fittings.ppt
AdityaDubewar2
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaa
wixapps
Semelhante a Building Conc. 100%
(9)
Ento runway characteristics
Ento runway characteristics
Abo Oml125
Abo Oml125
Fishing tools
Fishing tools
Reusable lunar lander
Reusable lunar lander
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection check
phase 2ppt.pptx
phase 2ppt.pptx
CS Unitec Corner Drills and Drive
CS Unitec Corner Drills and Drive
Rail, sleepers fittings.ppt
Rail, sleepers fittings.ppt
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaa
Building Conc. 100%
1.
W2.0 132 LF
F-5 2 EA F-4 6 EA Pier 1 7 EA SOG 1,383 SF Footing Steps 9 EA MAT 86 SF 14" CMU Wall 140 LF 8" CMU 5 LF Isolation Joints 20 LF Control Joints 52 LF Oriole Park (23) (176% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:33 AM
2.
Concrete Pad over
Roof Membrane 1,329 SF Oriole Park (14) (147% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:34 AM
3.
Footings ‐ W2.0 Typical
Footing Description Length Width Hieght SFCA Forms QTY Waste % Total Footing 132 2 1 264 10 CY 5% 10.3 CY Formwork None, Using Earth Key Way None CMU Wall Description Length Width Hieght SFCA Forms QTY Waste % Total 14" CMU Wall Grouted 140 1 3 0 16 CY 5% 16.3 CY 8" CMU Wall Grouted 5 0.5 3 0 0 CY 5% 0.3 CY 14" CMU approx QTY 473 ea 8" CMU approx QTY 20 ea Horizontal Rebars (continuous) Description Length Rbar Size # of Rbars Rbar Mult. QTY Waste % Total 3 #5 contin. 154 #5 3 1.043 462 LF 10% 0.27 Tons 508 Length Doweling (old to new) detail 2 #5 4 1.043 8 LF 0% 0.0 Tons 8 Length Rbar Ties Description Length @ (ft) Rbar Size Rbar Mult. QTY Waste % Total #4 @ 48" O.C 1.5 4 #4 0.668 50 LF 10% 0.02 Tons 36 Pieces Wall FTG Corner 24x24 2 6 #5 1.048 12 LF 0% 0.01 Tons 6 Pieces CMU Wall Description Length Width Hieght SFCA Forms QTY Waste % Total 14" CMU Wall Grouted 140 1 3 0 16 CY 5% 16.3 CY 8" CMU Wall Grouted 5 0.5 3 0 0 CY 5% 0.3 CY 14" CMU approx QTY 473 ea 8" CMU approx QTY 20 ea Rebar Description Length @ (ft) Rbar Size Rbar Mult. QTY Waste % Total #4 @ 48" O.C 3.5 2.67 #5 1.043 190 LF 10% 0.11 Tons 78 Pieces NOTE: Budget for 9 Step Footings Total Rbar #5 Length 718 Total Rbar #4 Length 36 TOTAL Airentrained Concrete (3000 psi) CY 10 TOTAL Rbar Tons 0.29
4.
Column Footing Footing Type QTY Length
Width Hieght CY Waste % Total CY SFCA Size Qty Length Waste % Total Length Tons F4 9 4 4 1 5.33 5% 5.60 16 #5 8 576 0% 576 0.30 Top of FTG 9 3.25 3.25 0.67 2.36 5% 2.48 13 ‐ ‐ ‐ ‐ ‐ ‐ F5 2 5 5 1 1.85 5% 1.94 20 #5 10 200 0% 200 0.10 Top of FTG 2 4.25 4.25 0.67 0.90 5% 0.94 17 ‐ ‐ ‐ ‐ ‐ ‐ Matt Foundation Footing Type QTY Length Width Hieght CY Waste % Total CY SFCA Size Qty Length Waste % Total Length Tons MAT1 1 11 9.25 1 3.77 5% 3.96 40.5 #5 42 850.5 0% 851 0.44 Key Way 33 LF Total 4000 psi Conc. 14.92 Total Rbar #5 Length 1627 TOTAL Rbar Tons 0.85
5.
Pier ‐ P1
Footing Description Length Width Hieght SFCA Forms QTY Waste % Total Footing (7 ea) 1.34 1.67 1.67 63 1 CY 5% 1.3 CY Formwork 81 SFCA Virticle Rebars Description Length Rbar Size # of Rbars Rbar Mult. QTY Waste % Total (8) #6 Vert. 1.34 #6 8 1.502 75 LF 10% 0.06 Tons 83 Length (8) #6 Vert. 2.25 #6 4 1.502 63 LF 110% 0.10 Tons 132 Length Rbar Ties Description Length @ (ft) Rbar Size Rbar Mult. QTY Waste % Total #3 Collar Ties 8" O.C 6 0.67 #3 0.376 84 LF 10% 0.02 Tons 2 Pieces Total Rbar #6 Length 215 Total Rbar #3 Length 92 TOTAL Airentrained Concrete (3000 psi) CY 1 TOTAL Rbar Tons 0.18
6.
Slab on Grade
Description Length Hieght SF QTY Waste % Total Concrete 3000 PSI, Broom Finish ‐ 0.34 1383 17 CY 5% 18 CY WWF,6x6 w2.1 x 2.1w ‐ ‐ 1383 1383 SF 10% 1521 SF 10 Mil Vapor Barrier ‐ ‐ 1383 1383 SF 10% 1521 SF 4" Compacted Stone Base ‐ 0.34 1383 17 CY 10% 19 CY Isolation Joints 20 ‐ ‐ 20 LF 0% 20 LF Control & Construction Joints 52 ‐ ‐ 52 LF 0% 52 LF Slab on Grade (On Roof) Low Side Description Length Hieght SF QTY Waste % Total 2" Light Weight Conc. ‐ 0.17 717 5 CY 5% 5 CY 2" Concrete Topping ‐ 0.17 717 5 CY 5% 5 CY Slab on Grade (On Roof) High Side Description Length Hieght SF QTY Waste % Total 2" Light Weight Conc. ‐ 0.17 613 4 CY 5% 4 CY 2" Concrete Topping ‐ 0.17 613 4 CY 5% 4 CY Styrofoam High Load Insulation ‐ 4.5 613 613 SF 5% 644 SF 1/2" Cement Board ‐ 0.5 613 613 SF 5% 644 SF
7.
Concrete Wall Foundation (Elevator)
Wall Foundation Description Length Width Hieght SFCA Forms QTY Waste % Total Concrete 24.75 0.67 4 0 2 CY 5% 2.6 CY Concrete 8.25 0.83 4 0 1 CY 5% 1.1 CY Formwork 264 SFCA Horizontal Rebars (continuous) Description Length Rbar Size # of Rbars Rbar Mult. QTY Waste % Total #5 @ 12" O.C 24.75 #5 4 1.043 99 LF 10% 0.06 Tons 109 Length #5 @ 12" O.C 8.25 #5 4 1.043 33 LF 10% 0.02 Tons 36 Length Rbar Ties Description Length @ (ft) Rbar Size Rbar Mult. QTY Waste % Total Dowels ‐ #5 @ 12" O.C 6.34 1 #5 1.043 157 LF 10% 0.09 Tons 27 Pieces Total Rbar #5 Length 318 Total Rbar Tons 0.15 Total FormWK (SFCA) 264 Total CY Airentrained 3500 psi Conc. 4