W2.0 132 LF
                                                                                          F-5 2 EA
                                                                                          F-4 6 EA
                                                                                          Pier 1 7 EA
                                                                                          SOG 1,383 SF
                                                                                          Footing Steps 9 EA
                                                                                          MAT 86 SF
                                                                                          14" CMU Wall 140 LF
                                                                                          8" CMU 5 LF
                                                                                          Isolation Joints 20 LF
                                                                                          Control Joints 52 LF




Oriole Park (23) (176% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:33 AM
Concrete Pad over Roof Membrane 1,329 SF




Oriole Park (14) (147% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:34 AM
Footings ‐ W2.0 Typical
                                                            Footing
         Description             Length      Width     Hieght   SFCA Forms        QTY            Waste %             Total 
          Footing                  132         2         1         264         10   CY             5%         10.3            CY
         Formwork               None, Using Earth
          Key Way                 None
                                                           CMU Wall
         Description             Length      Width     Hieght   SFCA Forms        QTY            Waste %             Total 
   14" CMU Wall Grouted           140          1         3          0          16   CY             5%         16.3            CY
    8" CMU Wall Grouted            5          0.5        3          0          0    CY             5%         0.3             CY
    14" CMU approx QTY            473      ea
     8" CMU approx QTY             20      ea
                                                         Horizontal Rebars (continuous)
        Description              Length    Rbar Size # of Rbars Rbar Mult.           QTY         Waste %                             Total 
        3 #5  contin.             154         #5          3       1.043        462     LF         10%         0.27            Tons            508   Length
 Doweling (old to new) detail      2          #5          4       1.043         8      LF          0%         0.0             Tons             8    Length
                                                                      Rbar Ties
         Description             Length      @ (ft)   Rbar Size Rbar Mult.           QTY         Waste %                             Total 
        #4 @ 48" O.C               1.5        4          #4       0.668        50      LF         10%         0.02            Tons            36     Pieces
   Wall FTG Corner 24x24            2         6          #5       1.048        12      LF          0%         0.01            Tons             6     Pieces

                                                           CMU Wall
         Description             Length      Width     Hieght   SFCA Forms           QTY         Waste %             Total 
   14" CMU Wall Grouted           140          1         3          0          16      CY          5%         16.3            CY
    8" CMU Wall Grouted            5          0.5        3          0          0       CY          5%         0.3             CY
    14" CMU approx QTY            473      ea
     8" CMU approx QTY             20      ea
                                                                       Rebar
         Description             Length      @ (ft)   Rbar Size Rbar Mult.         QTY           Waste %                             Total 
        #4 @ 48" O.C               3.5       2.67        #5       1.043        190   LF           10%         0.11            Tons            78     Pieces

NOTE: Budget for 9 Step Footings                                                                                 Total Rbar #5 Length                 718
                                                                                                                 Total Rbar #4 Length                 36

                                                                                            TOTAL Airentrained Concrete (3000 psi) CY                  10
                                                                                                                  TOTAL Rbar Tons                     0.29
Column Footing
Footing Type QTY Length Width     Hieght     CY      Waste %      Total CY   SFCA   Size   Qty    Length    Waste % Total Length   Tons
     F4       9     4      4         1       5.33      5%           5.60      16     #5     8      576        0%        576        0.30
 Top of FTG   9   3.25   3.25      0.67      2.36      5%           2.48      13      ‐     ‐        ‐         ‐          ‐          ‐
     F5       2     5      5         1       1.85      5%           1.94      20     #5    10      200        0%        200        0.10
 Top of FTG   2   4.25   4.25      0.67      0.90      5%           0.94      17      ‐     ‐        ‐         ‐          ‐          ‐


Matt Foundation
 Footing Type QTY Length Width    Hieght     CY      Waste %      Total CY   SFCA   Size   Qty    Length    Waste % Total Length   Tons
    MAT1        1   11    9.25      1        3.77      5%           3.96     40.5    #5    42      850.5      0%        851        0.44
Key Way       33 LF

                                           Total 4000 psi Conc.    14.92                    Total Rbar #5 Length        1627
                                                                                             TOTAL Rbar Tons            0.85
Pier ‐ P1
                                                      Footing
       Description         Length     Width      Hieght   SFCA Forms          QTY         Waste %             Total 
      Footing (7 ea)        1.34      1.67        1.67        63        1       CY          5%          1.3            CY
       Formwork              81       SFCA
                                                            Virticle Rebars
       Description         Length    Rbar Size # of Rbars Rbar Mult.       QTY            Waste %                             Total 
       (8) #6 Vert.         1.34        #6          8       1.502       75   LF             10%        0.06            Tons            83    Length
       (8) #6 Vert.         2.25        #6          4       1.502       63   LF            110%        0.10            Tons            132   Length
                                                                Rbar Ties
       Description         Length      @ (ft)   Rbar Size Rbar Mult.          QTY         Waste %                             Total 
   #3 Collar Ties 8" O.C      6        0.67        #3       0.376       84      LF         10%         0.02            Tons             2     Pieces


                                                                                                          Total Rbar #6 Length                 215
                                                                                                          Total Rbar #3 Length                 92

                                                                                     TOTAL Airentrained Concrete (3000 psi) CY                   1

                                                                                                              TOTAL Rbar Tons                  0.18
Slab on Grade
          Description                   Length   Hieght    SF           QTY        Waste %     Total 
Concrete 3000 PSI, Broom Finish            ‐      0.34    1383         17     CY     5%       18        CY
     WWF,6x6 w2.1 x 2.1w                   ‐        ‐     1383        1383    SF    10%      1521       SF
      10 Mil Vapor Barrier                 ‐        ‐     1383        1383    SF    10%      1521       SF
   4" Compacted Stone Base                 ‐      0.34    1383         17     CY    10%       19        CY
        Isolation Joints                  20        ‐       ‐          20     LF     0%       20        LF
 Control & Construction Joints            52        ‐       ‐          52     LF     0%       52        LF



                                  Slab on Grade (On Roof) Low Side
          Description                   Length   Hieght     SF          QTY      Waste %      Total 
    2" Light Weight Conc.                  ‐      0.17     717         5      CY   5%         5      CY
     2" Concrete Topping                   ‐      0.17     717         5      CY   5%         5      CY

                                  Slab on Grade (On Roof) High Side
           Description                  Length   Hieght     SF          QTY        Waste %    Total 
     2" Light Weight Conc.                 ‐      0.17     613         4      CY     5%       4         CY
      2" Concrete Topping                  ‐      0.17     613         4      CY     5%       4         CY
Styrofoam High Load Insulation             ‐       4.5     613        613     SF     5%      644        SF
      1/2" Cement Board                    ‐       0.5     613        613     SF     5%      644        SF
Concrete Wall Foundation (Elevator)
                                                Wall Foundation
       Description        Length      Width     Hieght     SFCA Forms        QTY    Waste %           Total 
        Concrete           24.75       0.67       4            0        2      CY     5%       2.6             CY
        Concrete           8.25        0.83       4            0        1      CY     5%       1.1             CY
       Formwork             264     SFCA
                                                  Horizontal Rebars (continuous)
       Description        Length    Rbar Size # of Rbars Rbar Mult.          QTY    Waste %                           Total 
      #5 @ 12" O.C         24.75       #5          4       1.043        99     LF    10%       0.06            Tons            109   Length
      #5 @ 12" O.C         8.25        #5          4       1.043        33     LF    10%       0.02            Tons            36    Length
                                                                Rbar Ties
      Description         Length      @ (ft)   Rbar Size   Rbar Mult.       QTY     Waste %                           Total 
  Dowels ‐ #5 @ 12" O.C    6.34        1          #5         1.043      157   LF     10%       0.09            Tons            27     Pieces




                                                                                                  Total Rbar #5 Length                 318
                                                                                                     Total Rbar Tons                   0.15
                                                                                                  Total FormWK (SFCA)                  264
                                                                                        Total CY Airentrained 3500 psi Conc.             4

Mais conteúdo relacionado

Semelhante a Building Conc. 100%

Ento runway characteristics
Ento runway characteristicsEnto runway characteristics
Ento runway characteristicsbouet
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125ennioeni
 
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs  as per IS 456 with deflection checkDesign tables 2 way slabs  as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection checkVVIETCIVIL
 
CS Unitec Corner Drills and Drive
CS Unitec Corner Drills and DriveCS Unitec Corner Drills and Drive
CS Unitec Corner Drills and DriveCS Unitec
 
Rail, sleepers fittings.ppt
Rail, sleepers  fittings.pptRail, sleepers  fittings.ppt
Rail, sleepers fittings.pptAdityaDubewar2
 
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaaIea59 optimiz tobita aaa
Iea59 optimiz tobita aaawixapps
 

Semelhante a Building Conc. 100% (9)

Ento runway characteristics
Ento runway characteristicsEnto runway characteristics
Ento runway characteristics
 
Abo Oml125
Abo Oml125Abo Oml125
Abo Oml125
 
Fishing tools
Fishing toolsFishing tools
Fishing tools
 
Reusable lunar lander
Reusable lunar landerReusable lunar lander
Reusable lunar lander
 
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs  as per IS 456 with deflection checkDesign tables 2 way slabs  as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection check
 
phase 2ppt.pptx
phase 2ppt.pptxphase 2ppt.pptx
phase 2ppt.pptx
 
CS Unitec Corner Drills and Drive
CS Unitec Corner Drills and DriveCS Unitec Corner Drills and Drive
CS Unitec Corner Drills and Drive
 
Rail, sleepers fittings.ppt
Rail, sleepers  fittings.pptRail, sleepers  fittings.ppt
Rail, sleepers fittings.ppt
 
Iea59 optimiz tobita aaa
Iea59 optimiz tobita aaaIea59 optimiz tobita aaa
Iea59 optimiz tobita aaa
 

Building Conc. 100%

  • 1. W2.0 132 LF F-5 2 EA F-4 6 EA Pier 1 7 EA SOG 1,383 SF Footing Steps 9 EA MAT 86 SF 14" CMU Wall 140 LF 8" CMU 5 LF Isolation Joints 20 LF Control Joints 52 LF Oriole Park (23) (176% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:33 AM
  • 2. Concrete Pad over Roof Membrane 1,329 SF Oriole Park (14) (147% of Scale); MD stadium 100%; Projects 10 v1.0; 12/1/2011 01:34 AM
  • 3. Footings ‐ W2.0 Typical Footing Description Length Width Hieght SFCA Forms QTY Waste % Total  Footing 132 2 1 264 10 CY 5% 10.3 CY Formwork None, Using Earth Key Way None CMU Wall Description Length Width Hieght SFCA Forms QTY Waste % Total  14" CMU Wall Grouted 140 1 3 0 16 CY 5% 16.3 CY 8" CMU Wall Grouted 5 0.5 3 0 0 CY 5% 0.3 CY 14" CMU approx QTY 473 ea 8" CMU approx QTY 20 ea Horizontal Rebars (continuous) Description Length Rbar Size # of Rbars Rbar Mult. QTY Waste % Total  3 #5  contin. 154 #5 3 1.043 462 LF 10% 0.27 Tons 508 Length Doweling (old to new) detail 2 #5 4 1.043 8 LF 0% 0.0 Tons 8 Length Rbar Ties Description Length   @ (ft) Rbar Size Rbar Mult. QTY Waste % Total  #4 @ 48" O.C 1.5 4 #4 0.668 50 LF 10% 0.02 Tons 36 Pieces Wall FTG Corner 24x24 2 6 #5 1.048 12 LF 0% 0.01 Tons 6 Pieces CMU Wall Description Length Width Hieght SFCA Forms QTY Waste % Total  14" CMU Wall Grouted 140 1 3 0 16 CY 5% 16.3 CY 8" CMU Wall Grouted 5 0.5 3 0 0 CY 5% 0.3 CY 14" CMU approx QTY 473 ea 8" CMU approx QTY 20 ea Rebar Description Length   @ (ft) Rbar Size Rbar Mult. QTY Waste % Total  #4 @ 48" O.C 3.5 2.67 #5 1.043 190 LF 10% 0.11 Tons 78 Pieces NOTE: Budget for 9 Step Footings Total Rbar #5 Length 718 Total Rbar #4 Length 36 TOTAL Airentrained Concrete (3000 psi) CY 10 TOTAL Rbar Tons 0.29
  • 4. Column Footing Footing Type QTY Length Width  Hieght CY  Waste % Total CY SFCA Size Qty Length Waste % Total Length Tons F4 9 4 4 1 5.33 5% 5.60 16 #5 8 576 0% 576 0.30 Top of FTG 9 3.25 3.25 0.67 2.36 5% 2.48 13 ‐ ‐ ‐ ‐ ‐ ‐ F5 2 5 5 1 1.85 5% 1.94 20 #5 10 200 0% 200 0.10 Top of FTG 2 4.25 4.25 0.67 0.90 5% 0.94 17 ‐ ‐ ‐ ‐ ‐ ‐ Matt Foundation Footing Type QTY Length Width  Hieght CY  Waste % Total CY SFCA Size Qty Length Waste % Total Length Tons MAT1 1 11 9.25 1 3.77 5% 3.96 40.5 #5 42 850.5 0% 851 0.44 Key Way 33 LF Total 4000 psi Conc. 14.92 Total Rbar #5 Length 1627 TOTAL Rbar Tons 0.85
  • 5. Pier ‐ P1 Footing Description Length Width Hieght SFCA Forms QTY Waste % Total  Footing (7 ea) 1.34 1.67 1.67 63 1 CY 5% 1.3 CY Formwork 81 SFCA Virticle Rebars Description Length Rbar Size # of Rbars Rbar Mult. QTY Waste % Total  (8) #6 Vert. 1.34 #6 8 1.502 75 LF 10% 0.06 Tons 83 Length (8) #6 Vert. 2.25 #6 4 1.502 63 LF 110% 0.10 Tons 132 Length Rbar Ties Description Length   @ (ft) Rbar Size Rbar Mult. QTY Waste % Total  #3 Collar Ties 8" O.C 6 0.67 #3 0.376 84 LF 10% 0.02 Tons 2 Pieces Total Rbar #6 Length 215 Total Rbar #3 Length 92 TOTAL Airentrained Concrete (3000 psi) CY 1 TOTAL Rbar Tons 0.18
  • 6. Slab on Grade Description Length Hieght SF QTY Waste % Total  Concrete 3000 PSI, Broom Finish ‐ 0.34 1383 17 CY 5% 18 CY WWF,6x6 w2.1 x 2.1w ‐ ‐ 1383 1383 SF 10% 1521 SF 10 Mil Vapor Barrier ‐ ‐ 1383 1383 SF 10% 1521 SF 4" Compacted Stone Base ‐ 0.34 1383 17 CY 10% 19 CY Isolation Joints 20 ‐ ‐ 20 LF 0% 20 LF Control & Construction Joints 52 ‐ ‐ 52 LF 0% 52 LF Slab on Grade (On Roof) Low Side Description Length Hieght SF QTY Waste % Total  2" Light Weight Conc.  ‐ 0.17 717 5 CY 5% 5 CY 2" Concrete Topping ‐ 0.17 717 5 CY 5% 5 CY Slab on Grade (On Roof) High Side Description Length Hieght SF QTY Waste % Total  2" Light Weight Conc.  ‐ 0.17 613 4 CY 5% 4 CY 2" Concrete Topping ‐ 0.17 613 4 CY 5% 4 CY Styrofoam High Load Insulation ‐ 4.5 613 613 SF 5% 644 SF 1/2" Cement Board ‐ 0.5 613 613 SF 5% 644 SF
  • 7. Concrete Wall Foundation (Elevator) Wall Foundation Description Length Width Hieght SFCA Forms QTY Waste % Total  Concrete 24.75 0.67 4 0 2 CY 5% 2.6 CY Concrete 8.25 0.83 4 0 1 CY 5% 1.1 CY Formwork 264 SFCA Horizontal Rebars (continuous) Description Length Rbar Size # of Rbars Rbar Mult. QTY Waste % Total  #5 @ 12" O.C 24.75 #5 4 1.043 99 LF 10% 0.06 Tons 109 Length #5 @ 12" O.C 8.25 #5 4 1.043 33 LF 10% 0.02 Tons 36 Length Rbar Ties Description Length   @ (ft) Rbar Size Rbar Mult. QTY Waste % Total  Dowels ‐ #5 @ 12" O.C 6.34 1 #5 1.043 157 LF 10% 0.09 Tons 27 Pieces Total Rbar #5 Length 318 Total Rbar Tons 0.15 Total FormWK (SFCA) 264 Total CY Airentrained 3500 psi Conc. 4