Rotary Drilling Rig Systems
Overview
Rotary Drilling Rig
Systems
What is drilling Rig ?
A drilling rig is a machine that creates
holes in the earth's subsurface. It can
be used to drill, water, oil and gas wells.
Drilling Rig Acronyms
DP – Drill pipe
HWDP- Heavy weight drill pipe
DC- Drill collar
BOP- Blow out preventer
TDS- Top drive system
WOB-Weight on bit
ROP- Rate of penetration
GPM- Gallon per minutes
SPP- stand pipe pressure
VFD – Variable frequency drive
SCR-Silicon controlled rectifier
Drilling Rig Acronyms
AC-Alternating current
DC- direct current
RIH – Run in hole
POOH- Pull out of hole
PDC -Polycrystalline diamond compact
TSP -Thermally stable polycrystalline diamond
RSS- Rotary steerable system
BHA- Bottom hole assembly
bbl- barrel
Drilling Rig Acronyms
OD- Outer Diameter
ID- Inner Diameter
CRT- Casing Running Tool
EMW- Equivalent Mud Weight
HTHP-High Temperature High Pressure
FOSV-Full Open Safety Valve
MAASP- Maximum Allowable Annulus Surface Pressure
SIDPP-Shut In Drill Pipe Pressure
PPG – Pound Per Gallon
IADC-International Association Of Drilling Contractors
Drilling Rig Acronyms
SICP-Shut In Casing Pressure
SCR-Slow Circulation Rate
TOC- Top Of Cement
TD-Total Depth
TVD- True Vertical Depth
MD-Measured Depth
MOC- Management of Change
LCM-Loss Circulation Material
COC-Certificate of Conformance
CO2-Carbon Dioxide
H2S-Hydrogen Sulphide
Drilling Rig Acronyms
MWD- Measurement While Drilling
LWD- Logging While Drilling
LOT-Leak Off Test
KMW-Kill Mud Weight
ICP-Initial Circulating Pressure
FCP-Final Circulating Pressure
BHP-Bottom Hole Pressure
MW-Mud Weight
ESD-Emergency Shutdown
ERD-Extended Reach Drilling
Drilling Rig Acronyms
WOC – Weight On Cement
HSE-Health Safety and Environment
HCR – High Closing ratio
OSHA-Occupational Safety And Health Administration
OBM-Oil Base Mud
WBM-Water Base Mud
QA-Quality Assurance
QC-Quality Control
OB-Over Balance
UB-Under Balance
Hoisting system
Components
 Drawwork
 Drilling line
 Crown block
 Mast /derrick
 Travelling block
 Hook
 Storage reel spool
Note:
Crown block is located on
top of mast/derrick.
Hoisting System Components
Derrick vs Mast
Gear transmission
 Expensive
 Reliable
 Compact design, light weight
Chain transmission
 Cheaper
 Not reliable
 Bulky and heavy weight
Types Of Draw works
Hoisting System Components
Derrick Mast
Hook
Travelling
block
Dead line
anchor
Drilling line
storage
spool
Crown
Block
Hoisting System Components
The rotary system includes all of the
equipment used to achieve bit rotation
Kelly
system
Top Drive
System
Saver
Sub
Kelly
Upper kelly Cock
SwivelLower
kelly
Cock
Kelly system Parts and Their
functionsPin Type Kelly
Bushing
Pin Square Kelly
Bushing
TDS Components functions
Difference Between Kelly Drive and TDS
Drive
Kelly TDS
Drill string components
Drill pipe
HWDP
Spiral DC
Slick DC
Stabilizer
Drilling Jar
Drill string components
Drill pipe
HWDP
Spiral DC
Slick DC
Stabilizer
Drilling Jar
Dog
leg
What are key seat, dog leg and differential
sticking?
Formation: Is subsurface rock layers that bit will drill. There
may be several formations to be drill to reach target zone.
Kick: is flow of formation fluid into wellbore during drilling. It
happen when drilling fluid (mud) column hydrostatic pressure
is less than formation pressure . Well is shut in with BOP and
formation fluid is circulated out and mud weight is increased.
Formation pressure
Formation pressure is the pressure of fluid contained in pore
space of rockHydrostatic pressure
Is the pressure that is generated by the weight of liquid above
a measurement point, when the liquid is at rest.
P=0.052*MW*Depth
*** MW is the drilling fluid density in pounds per gallon,
*** Depth is the true vertical depth or head "in feet
*** 0.052 is a unit conversion factor
*** P = pressure in psi (pound per square inch)
Formation? Kick? Formation and Hydrostatic
pressure?
Stabilizers are used
to:
Center /stabilize BHA
Control hole deviation.
Reduce the risk of differential sticking.
Ream out doglegs and keyseats.
Dog
leg
What are key seat, dog leg and differential
sticking?
Welded type string
stabilizer
Integral stabilizer
Near Bit stabilizer
String stabilizer
Cross overs
Cross over join two tubular joint of different
threads
Float valve
are plunger or flapper type valves used in
drill string above bit.
It prevent string from plugging by back flow
from annulus to drill string and avoid
entrance of formation fluid inside drill
string in case of kick.
The circulating system is used to circulate drilling fluid down through the
drill string and up the annulus, carrying out the drilled cuttings from the face
of the bit to surface
Mud pump
Shale
shaker
De-sander De-silter Centrifuge
Rotary
hose
Cut point>74
micron
Cut point>40
micron
Cut point>20
micron
Cut point>4 micron
Stand Pipe
Circulating system components and their function
Cut Point: is Particle size that have specific chance to be removed by solid control
equipment.
The power system is a one of the most important aspect of drilling rig
because it is needed to power up all drilling rig systems (rotary,
circulating, hoisting, blow out preventer and monitoring systems etc.)
VFD –Variable frequency drive
(AC)
SCR –Silicon control rectifier
(DC)
Lighting for Mast
and rig floor
Lighting for Mud
tanks
Lighting for Mini camp
Wire line operation
Blow out Prevention System
What is Blow out?
Blow Out: A blowout is the uncontrolled release of crude oil and/or
natural gas from an oil well or gas well after pressure control systems
have failed.
Blowout Preventer (BOP) is an assembly of specialized valves or similar
mechanical devices installed, during drilling, between the wellhead system
and the drill floor. It is used to seal, control and monitor the well in case of
kick.
Blow out Prevention System
Consists of:
 Accumulator
 BOP control panels
 Annular BOP
 Pipe Ram
 Variable Bore ram
 Blind Ram/Shear Ram BOP
 Mud cross (Drilling spool)
 Kill line
 Choke line
 Choke manifold
 Choke control panel
 Mud gas separator (Poor Boy)
4 Way Valve
• is actually 3 position & 4 way valve
• It can be actuated by remote
panels or can be operated
manually from accumulator to
close or open BOP
Annular BOP
• Can close around any
round tubular
• Can be used to strip
in and out with
pressure in wellbore
Pipe Ram BOP
* Close around
Particular size tubular
Shear Ram BOP
 Used to cut
tubular (DP,
casing, tubing
etc.) in case
uncontrolled well
situation
Choke control panel
It is located on rig floor and is used
to control hydraulic chokes
(automatic choke) of chokemanifold
while circulating out kick.
HCR valve Choke manifold
Poor Boy
Manual Valve
Mud cross / Drilling
spool
Ring gas kit
Rig Monitoring system is used to monitor drilling parameters like mud
tanks volume, ROP, WOB, torque, drill string weight and SPP etc .
Monkey board:
It is derrickman's working platform and
used to rack drill pipe stands.
Misleneous Rig Components
Substructure
Is steel frame foundation on which mast/
derrick and draw work sit. It provide
necessary clearance for BOP stack under
rig floor.
Supports the heavy electrical cables that
feed the power from the control panel to
the rig motors.
Electric Cable Tray:
Fuel Tanks:
Fuel storage tanks for the power
generating system.
Rig Floor
work area or platform on which the rig
crew conducts operations, usually adding
or removing drill pipe to or from the drill
string
Casing stabbing board
Is platform located at +/- 35 ft on mast from
rig floor On the mast where casing hand
help to align casing to stab in on casing
string.
Pipe Basket
It is basket where tubular (DP,DC, HWDP) are
store.
Driller’s Console:
The control panel, located on the rig floor,
where the driller controls drilling operations
Side door Elevators:
A set of clamps that grips drill sting or
casing string to lower or raise in wellbore.
Slip hold drill pipe or casing pipe in rotary
table
Slip:
Single Joint Elevators:
Pick up single joint of tubular from cat walk.
Rig floor Miscellaneous
equipment
Manual Tongs:
The large wrenches used for turning when
making up or breaking out drill pipe,
casing, tubing, or other pipe
Power tong
Power tong is hydraulically operated tong
to speed up making or breaking process of
tubular connections
Hydraulic slip
It is hydraulically operated slip to hold tubular in rotary table
Hydraulic unit
Its provide hydraulic power to operate
power tong , draw work, TDS and BOP
trolley
Safety Clamp:
Its set of gripping elements (dies) to hold
firmly drill collar and prevent slipping of
drill collar from drill collar slip.
Cat head
It is hydraulically operated and used to
apply force to manual tongs with steel wire
for make up or break up of tubular
connections.
Stair
Stair is attached with rig floor for personnel
to go up or come down from rig floor
Weight Indicator:
A device for measuring the weight of the
drill string.
IBOP ( Inside Blow Out Preventer)
It is plunger type flow control valve that
only permit fluid to pump down and work
as check valve.
It must kept open on rig floor to be used
in well control situation.
Full opening safety valve
It is ball type safety valve used for
controlling flow from drill string in well
control situation.
A L shape key is used to open and close
this valve.
It must kept in open position on rig
Lifting subs
lifting sub is used with drill collar, elevator
is latched with lifting sub and drill collar is
lowered in or pull out from bore hole
Lifting Cap
It is make up on tubular box to pick up or
lay down tubular with air host hook.
Chain Tong
Used to screw in two tubular manually.
Mud Bucket
Is barrel type device used around drill pipe to collect
mud and drain to flow line while POOH.
BOP trolley
It is located below rig, mounted on track
guide. It is used for handling BOP stack for
installation and removal BOP from well
head.
Cat walk and V-door
Cat walk is ramp structure from where
tubular are picked up to rig floor by air
hoists.
Where as V-door is opening on rig floor
that provide access to bring tubular from
cat walk with air hoists
Air Hoist
It is pneumatically operated
wench used to pick up
tubular from cat walk.
Tricone Bit Breaker
This is piece of equipment which is used to
make up or break out tricone bit from drill
string by applying required torque with
manual tongs.
PDC Breaker
It is used to make up or break out PDC bit
from drill string.
Rat hole
Is hole on rig floor cased with pipe and is
used to rack kelly.
Mouse hole
Is also hole on rig floor cased with pipe and
is used to place drill pipe for making up
connection.
Dog house
Used as store on rig floor to place rig
equipment.
Flow line
It is large OD pipe which take mud return
from BOP stack bell nipple to shale shaker.
Drill pipe circulating head
It is device make up with drill string with circulating hose or
high pressure checkson lines for following purposes.
** PT casing through drill string with cement unit
** Performing cement job through stinger.
** For circulating through string to change out rotary hose or
wash pipe.Casing circulating head
Make up to casing string with hose
washing down any tight spot (restriction)
while running casing.
Circulating hose
It is made up between circulating head and stand
pipe for circulation.
Drill pipe Cement stringer
It is used to perform casing cement job with inner string. It is
stabbed into casing shoe and cement is pumped through
inner string.
Chiksan line loop
It is high pressure line used for cement pumping
job and casing/tubing pressure testing.
Chiksan swivel:
It has ball bearing and have ability to
rotate for aligning connection of swivel to
make up with chiksan line.
Low torque valve
is a valve which can be easily operated with
a bar and is used with chiksan line to
Pressure test chiksan line .
Degasser
It is located on down stream of shale shaker on mud tank
and is used to remove any entrap gas in mud while controlling gas kick
Agitator :
Are used to agitate mud to prevent settling down of solids from mud.
mud tanks miscellaneous
equipment
Mud
Is mixture of water and chemicals used as drilling fluid to drill the well mainly for remo
Cutting and to overcome formation pressure.
Mixing Hopper
Used to mix mud chemicals in mud tanks.
Mud gun
Used to shear/mix mud in the mud tank it is usually installed near to
Corner of mixing tank. It enhance agitation of mud, Where agitation by
agitator is limited, as agitator is installed in the middle of tank.
It can be used to transfer mud between the mud tanks.
Mud balance
It is used to measure mud weight in pcf or ppg.
Mud cup and mud funnel
Mud cup is used to collect mud sample.
Mud funnel is used to measure mud viscosity.
Trip Tank
Is 50 to 60 bbl tank used to monitor well while RIH and POOH.
Reserve tank
Is mud tank where extra mud is prepared
and stored and can be transferred to active
tank when needed.Water tank
Store water for mixing mud, cement slurry
or for draw work brake cooling purposes
Diesel tank
Store diesel for mixing oil base mud, OBM
is used to drill reactive shale
Active tank
Is mud tank from where mud is sucked and
pump to well and is same tank where
return come back.
Drilling Rig General Lay out
Drilling rig Online Courses
Email:info@rigskills.com
Website: Rigskills.com

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Rig components
Rig componentsRig components
Rig components
 
introduction to directional drilling
introduction to directional drillingintroduction to directional drilling
introduction to directional drilling
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
Drilling engineering zaidi
Drilling engineering zaidiDrilling engineering zaidi
Drilling engineering zaidi
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Drilling Engineering - Drill Bit
Drilling Engineering - Drill BitDrilling Engineering - Drill Bit
Drilling Engineering - Drill Bit
 
Drilling tools
Drilling toolsDrilling tools
Drilling tools
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigs
 
Rotary System
Rotary SystemRotary System
Rotary System
 
Liner hanger design and operations
Liner hanger design and operationsLiner hanger design and operations
Liner hanger design and operations
 
Introduction to drilling
Introduction to drillingIntroduction to drilling
Introduction to drilling
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Well intervention
Well interventionWell intervention
Well intervention
 
Casing design
Casing designCasing design
Casing design
 
Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
Casing design
Casing designCasing design
Casing design
 

Semelhante a Rotary drilling rig systems overview

رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsرضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsReza Mostafavi Tabatabaei
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )amrhaggag
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptxHayder Al Ali
 
Ilustrated drilling dictionary (1)
Ilustrated drilling dictionary (1)Ilustrated drilling dictionary (1)
Ilustrated drilling dictionary (1)Mouloud Issaad
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234Afsal Ameen c
 
Drilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundDrilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Equipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petrolerosEquipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petrolerosJohann Quintanar
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdfDrilling Manual
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptxTuralEmirli
 
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solutionرضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over SolutionReza Mostafavi Tabatabaei
 
Basic drilling engineering
Basic drilling engineeringBasic drilling engineering
Basic drilling engineeringSaad Raja
 

Semelhante a Rotary drilling rig systems overview (20)

176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
6 day.pptx
6 day.pptx6 day.pptx
6 day.pptx
 
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutionsرضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
Ilustrated drilling dictionary (1)
Ilustrated drilling dictionary (1)Ilustrated drilling dictionary (1)
Ilustrated drilling dictionary (1)
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234
 
Drilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton AspelundDrilling engineering glossary, Sigve Hamilton Aspelund
Drilling engineering glossary, Sigve Hamilton Aspelund
 
Equipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petrolerosEquipos usados en perforación de pozos petroleros
Equipos usados en perforación de pozos petroleros
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptx
 
رضا مصطفوی طباطبایی
رضا مصطفوی طباطباییرضا مصطفوی طباطبایی
رضا مصطفوی طباطبایی
 
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solutionرضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
رضا مصطفوی طباطبایی Reza Mostafavi Tabatabaei, HWO, Hydraulic Work over Solution
 
Basic drilling engineering
Basic drilling engineeringBasic drilling engineering
Basic drilling engineering
 
chapterfive.ppt
chapterfive.pptchapterfive.ppt
chapterfive.ppt
 
DE Module 2.pptx
DE Module 2.pptxDE Module 2.pptx
DE Module 2.pptx
 
Drilling - Qazma English
Drilling - Qazma EnglishDrilling - Qazma English
Drilling - Qazma English
 

Último

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Último (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Rotary drilling rig systems overview

  • 1. Rotary Drilling Rig Systems Overview
  • 3. What is drilling Rig ? A drilling rig is a machine that creates holes in the earth's subsurface. It can be used to drill, water, oil and gas wells.
  • 4. Drilling Rig Acronyms DP – Drill pipe HWDP- Heavy weight drill pipe DC- Drill collar BOP- Blow out preventer TDS- Top drive system WOB-Weight on bit ROP- Rate of penetration GPM- Gallon per minutes SPP- stand pipe pressure VFD – Variable frequency drive SCR-Silicon controlled rectifier
  • 5. Drilling Rig Acronyms AC-Alternating current DC- direct current RIH – Run in hole POOH- Pull out of hole PDC -Polycrystalline diamond compact TSP -Thermally stable polycrystalline diamond RSS- Rotary steerable system BHA- Bottom hole assembly bbl- barrel
  • 6. Drilling Rig Acronyms OD- Outer Diameter ID- Inner Diameter CRT- Casing Running Tool EMW- Equivalent Mud Weight HTHP-High Temperature High Pressure FOSV-Full Open Safety Valve MAASP- Maximum Allowable Annulus Surface Pressure SIDPP-Shut In Drill Pipe Pressure PPG – Pound Per Gallon IADC-International Association Of Drilling Contractors
  • 7. Drilling Rig Acronyms SICP-Shut In Casing Pressure SCR-Slow Circulation Rate TOC- Top Of Cement TD-Total Depth TVD- True Vertical Depth MD-Measured Depth MOC- Management of Change LCM-Loss Circulation Material COC-Certificate of Conformance CO2-Carbon Dioxide H2S-Hydrogen Sulphide
  • 8. Drilling Rig Acronyms MWD- Measurement While Drilling LWD- Logging While Drilling LOT-Leak Off Test KMW-Kill Mud Weight ICP-Initial Circulating Pressure FCP-Final Circulating Pressure BHP-Bottom Hole Pressure MW-Mud Weight ESD-Emergency Shutdown ERD-Extended Reach Drilling
  • 9. Drilling Rig Acronyms WOC – Weight On Cement HSE-Health Safety and Environment HCR – High Closing ratio OSHA-Occupational Safety And Health Administration OBM-Oil Base Mud WBM-Water Base Mud QA-Quality Assurance QC-Quality Control OB-Over Balance UB-Under Balance
  • 10. Hoisting system Components  Drawwork  Drilling line  Crown block  Mast /derrick  Travelling block  Hook  Storage reel spool Note: Crown block is located on top of mast/derrick.
  • 13. Gear transmission  Expensive  Reliable  Compact design, light weight Chain transmission  Cheaper  Not reliable  Bulky and heavy weight Types Of Draw works
  • 16. The rotary system includes all of the equipment used to achieve bit rotation Kelly system Top Drive System
  • 17. Saver Sub Kelly Upper kelly Cock SwivelLower kelly Cock Kelly system Parts and Their functionsPin Type Kelly Bushing Pin Square Kelly Bushing
  • 19. Difference Between Kelly Drive and TDS Drive Kelly TDS
  • 20. Drill string components Drill pipe HWDP Spiral DC Slick DC Stabilizer Drilling Jar
  • 21. Drill string components Drill pipe HWDP Spiral DC Slick DC Stabilizer Drilling Jar
  • 22. Dog leg What are key seat, dog leg and differential sticking?
  • 23. Formation: Is subsurface rock layers that bit will drill. There may be several formations to be drill to reach target zone. Kick: is flow of formation fluid into wellbore during drilling. It happen when drilling fluid (mud) column hydrostatic pressure is less than formation pressure . Well is shut in with BOP and formation fluid is circulated out and mud weight is increased. Formation pressure Formation pressure is the pressure of fluid contained in pore space of rockHydrostatic pressure Is the pressure that is generated by the weight of liquid above a measurement point, when the liquid is at rest. P=0.052*MW*Depth *** MW is the drilling fluid density in pounds per gallon, *** Depth is the true vertical depth or head "in feet *** 0.052 is a unit conversion factor *** P = pressure in psi (pound per square inch) Formation? Kick? Formation and Hydrostatic pressure?
  • 24. Stabilizers are used to: Center /stabilize BHA Control hole deviation. Reduce the risk of differential sticking. Ream out doglegs and keyseats. Dog leg What are key seat, dog leg and differential sticking?
  • 27. Cross overs Cross over join two tubular joint of different threads Float valve are plunger or flapper type valves used in drill string above bit. It prevent string from plugging by back flow from annulus to drill string and avoid entrance of formation fluid inside drill string in case of kick.
  • 28.
  • 29. The circulating system is used to circulate drilling fluid down through the drill string and up the annulus, carrying out the drilled cuttings from the face of the bit to surface
  • 30. Mud pump Shale shaker De-sander De-silter Centrifuge Rotary hose Cut point>74 micron Cut point>40 micron Cut point>20 micron Cut point>4 micron Stand Pipe Circulating system components and their function Cut Point: is Particle size that have specific chance to be removed by solid control equipment.
  • 31. The power system is a one of the most important aspect of drilling rig because it is needed to power up all drilling rig systems (rotary, circulating, hoisting, blow out preventer and monitoring systems etc.) VFD –Variable frequency drive (AC) SCR –Silicon control rectifier (DC)
  • 36. Blow out Prevention System What is Blow out? Blow Out: A blowout is the uncontrolled release of crude oil and/or natural gas from an oil well or gas well after pressure control systems have failed. Blowout Preventer (BOP) is an assembly of specialized valves or similar mechanical devices installed, during drilling, between the wellhead system and the drill floor. It is used to seal, control and monitor the well in case of kick.
  • 37. Blow out Prevention System Consists of:  Accumulator  BOP control panels  Annular BOP  Pipe Ram  Variable Bore ram  Blind Ram/Shear Ram BOP  Mud cross (Drilling spool)  Kill line  Choke line  Choke manifold  Choke control panel  Mud gas separator (Poor Boy)
  • 38. 4 Way Valve • is actually 3 position & 4 way valve • It can be actuated by remote panels or can be operated manually from accumulator to close or open BOP Annular BOP • Can close around any round tubular • Can be used to strip in and out with pressure in wellbore Pipe Ram BOP * Close around Particular size tubular Shear Ram BOP  Used to cut tubular (DP, casing, tubing etc.) in case uncontrolled well situation Choke control panel It is located on rig floor and is used to control hydraulic chokes (automatic choke) of chokemanifold while circulating out kick.
  • 39. HCR valve Choke manifold Poor Boy Manual Valve Mud cross / Drilling spool Ring gas kit
  • 40. Rig Monitoring system is used to monitor drilling parameters like mud tanks volume, ROP, WOB, torque, drill string weight and SPP etc .
  • 41. Monkey board: It is derrickman's working platform and used to rack drill pipe stands. Misleneous Rig Components Substructure Is steel frame foundation on which mast/ derrick and draw work sit. It provide necessary clearance for BOP stack under rig floor.
  • 42. Supports the heavy electrical cables that feed the power from the control panel to the rig motors. Electric Cable Tray: Fuel Tanks: Fuel storage tanks for the power generating system.
  • 43. Rig Floor work area or platform on which the rig crew conducts operations, usually adding or removing drill pipe to or from the drill string Casing stabbing board Is platform located at +/- 35 ft on mast from rig floor On the mast where casing hand help to align casing to stab in on casing string. Pipe Basket It is basket where tubular (DP,DC, HWDP) are store.
  • 44. Driller’s Console: The control panel, located on the rig floor, where the driller controls drilling operations Side door Elevators: A set of clamps that grips drill sting or casing string to lower or raise in wellbore. Slip hold drill pipe or casing pipe in rotary table Slip: Single Joint Elevators: Pick up single joint of tubular from cat walk. Rig floor Miscellaneous equipment
  • 45. Manual Tongs: The large wrenches used for turning when making up or breaking out drill pipe, casing, tubing, or other pipe Power tong Power tong is hydraulically operated tong to speed up making or breaking process of tubular connections Hydraulic slip It is hydraulically operated slip to hold tubular in rotary table Hydraulic unit Its provide hydraulic power to operate power tong , draw work, TDS and BOP trolley
  • 46. Safety Clamp: Its set of gripping elements (dies) to hold firmly drill collar and prevent slipping of drill collar from drill collar slip. Cat head It is hydraulically operated and used to apply force to manual tongs with steel wire for make up or break up of tubular connections. Stair Stair is attached with rig floor for personnel to go up or come down from rig floor
  • 47. Weight Indicator: A device for measuring the weight of the drill string. IBOP ( Inside Blow Out Preventer) It is plunger type flow control valve that only permit fluid to pump down and work as check valve. It must kept open on rig floor to be used in well control situation. Full opening safety valve It is ball type safety valve used for controlling flow from drill string in well control situation. A L shape key is used to open and close this valve. It must kept in open position on rig
  • 48. Lifting subs lifting sub is used with drill collar, elevator is latched with lifting sub and drill collar is lowered in or pull out from bore hole Lifting Cap It is make up on tubular box to pick up or lay down tubular with air host hook. Chain Tong Used to screw in two tubular manually.
  • 49. Mud Bucket Is barrel type device used around drill pipe to collect mud and drain to flow line while POOH. BOP trolley It is located below rig, mounted on track guide. It is used for handling BOP stack for installation and removal BOP from well head.
  • 50. Cat walk and V-door Cat walk is ramp structure from where tubular are picked up to rig floor by air hoists. Where as V-door is opening on rig floor that provide access to bring tubular from cat walk with air hoists Air Hoist It is pneumatically operated wench used to pick up tubular from cat walk.
  • 51. Tricone Bit Breaker This is piece of equipment which is used to make up or break out tricone bit from drill string by applying required torque with manual tongs. PDC Breaker It is used to make up or break out PDC bit from drill string.
  • 52. Rat hole Is hole on rig floor cased with pipe and is used to rack kelly. Mouse hole Is also hole on rig floor cased with pipe and is used to place drill pipe for making up connection.
  • 53. Dog house Used as store on rig floor to place rig equipment. Flow line It is large OD pipe which take mud return from BOP stack bell nipple to shale shaker.
  • 54. Drill pipe circulating head It is device make up with drill string with circulating hose or high pressure checkson lines for following purposes. ** PT casing through drill string with cement unit ** Performing cement job through stinger. ** For circulating through string to change out rotary hose or wash pipe.Casing circulating head Make up to casing string with hose washing down any tight spot (restriction) while running casing. Circulating hose It is made up between circulating head and stand pipe for circulation. Drill pipe Cement stringer It is used to perform casing cement job with inner string. It is stabbed into casing shoe and cement is pumped through inner string.
  • 55. Chiksan line loop It is high pressure line used for cement pumping job and casing/tubing pressure testing. Chiksan swivel: It has ball bearing and have ability to rotate for aligning connection of swivel to make up with chiksan line. Low torque valve is a valve which can be easily operated with a bar and is used with chiksan line to Pressure test chiksan line .
  • 56. Degasser It is located on down stream of shale shaker on mud tank and is used to remove any entrap gas in mud while controlling gas kick Agitator : Are used to agitate mud to prevent settling down of solids from mud. mud tanks miscellaneous equipment Mud Is mixture of water and chemicals used as drilling fluid to drill the well mainly for remo Cutting and to overcome formation pressure.
  • 57. Mixing Hopper Used to mix mud chemicals in mud tanks. Mud gun Used to shear/mix mud in the mud tank it is usually installed near to Corner of mixing tank. It enhance agitation of mud, Where agitation by agitator is limited, as agitator is installed in the middle of tank. It can be used to transfer mud between the mud tanks.
  • 58. Mud balance It is used to measure mud weight in pcf or ppg. Mud cup and mud funnel Mud cup is used to collect mud sample. Mud funnel is used to measure mud viscosity.
  • 59. Trip Tank Is 50 to 60 bbl tank used to monitor well while RIH and POOH. Reserve tank Is mud tank where extra mud is prepared and stored and can be transferred to active tank when needed.Water tank Store water for mixing mud, cement slurry or for draw work brake cooling purposes Diesel tank Store diesel for mixing oil base mud, OBM is used to drill reactive shale Active tank Is mud tank from where mud is sucked and pump to well and is same tank where return come back.