The production plan outlines five days of filming from May 10th to October 20th at various farm and nature locations. It lists the cameras, tripods, scripts, and props needed each day, and describes the dirty, layered costumes for the two main protagonists and the ragged clothing for the infected extras. It also identifies the director, camera operator, and actors playing the protagonists and bandits.
Comparison between preliminary task and final product
Production plan d
1. Production Plan for Movie
Trailer
Dates and locations
05/10/13- Primarily shooting in farm, few takes Knights End Field
06/10/13- Knights End field, all day
12/10/13- Avenue Park, most of day, possibly back to warehouse if shooting goes to
plan
19/10/13- Oxbow Crescent, nature reserve for rest of shooting
20/10/10- Abandoned Farm, Avenue Park
Equipment used for Filming
Cameras
Tripod
Scripts
Props
All of these will be needed for each day we plan to shoot.
Props and costumes
Two Main Protagonists (Charlie and Jacob) - Old clothing- Dirty, various layers of
clothing- Jackets, boots, shirts. Backpacks- Various objects including food, torches, tools,
Weapons- Bats
Infected- Dirty and ragged clothing- No props needed
Bandits- Same type of clothing as protagonists, balaclavas if necessary. Weapons- Bats
Personnel
Director and Camera Operator- Ryan Talmage
Protagonists- Angus McCabe, David Roman
Bandits and Infected- Various Extras