Expt No:
Date:
FLEXURAL STRENGTH OF CONCRETE
AIM:
To determine the Flexure strength (Modulus of rupture) of concrete of a given
proportion.
APPARATUS:
Steel prism moulds of the following sizes will be used:
(a) 100 X 100 X 500 when maximum size of aggregate is less than 20 mm.
(b) 150 X 150 X 700 when maximum size of aggregate is up to 30 mm.
The testing machine may be of any reliable type of sufficient capacity for the tests
and capable of applying the load 4kN (400kg/min) for the 150 mm specimen and at a rate
of 1.8 kN (180 kg/min) for the 100 mm specimen .The bed of the testing machine should be
provided with 2 steel rollers, 38 mm in diameter, on which the specimen is to be supported
and these rollers shall be so mounted that the distance from c/c is 600mm for 150 mm
specimen or 400 mm for 400 mm specimens .The applied through two similar rollers
mounted at the third point of the supporting span that is spaced at 200or 133 mm c/c. The
load shall be divided equally between the two loading rollers and all rollers shall be
mounted in such a manner that the load is applied axially and without subjecting the
specimen to any torsion or restrains.
PRINCIPLE:
When concrete is subjected to bending tensile and bending compressive stress and
in many cases, direct shear stresses are developed .The most common plain concrete is
subjected to flexure is a highway pavement and the strength concrete for pavement is
commonly evaluated by means of bending tests. Flexure test is intended to give the flexural
strength of concrete in tension. The flexural strength is also easily carried out and more
convenient than the crushing test for use in field, since in this test much small loads are
required.
The flexural strength of the specimen shall be expressed as the modulus of rupture and
shall be calculated to the nearest 0.05 N/mm2
.
fct = Pl/bd2
…………….(1)
fct = 3Pa/bd2
…………….(2)
OBSERVATIONS AND CALCULATIONS:
Grade of concrete =
Maximum ratio =
Water content ratio =
Dimension of the specimen selected =
b (mm) =
d (mm) =
a (mm) =
l (mm) =
Load at failure, P (kN) =
Since a>200mm equation (1) can be used.
Modulus of rupture, fct = Pl/bd2
a = distance between line of fracture and the near the support measured on the center line
of the tenth side of the specimen.
b = is the measured width of the specimen in mm.
d = is the measured height of the specimen in mm at the point of failure.
l = is the length in mm of the span on which the specimen was supported.
P = is the maximum load in N (kg) applied on the specimen.
In case a >200 mm for 150mm specimen, equation (1) can be used and a >133 mm for 100
mm specimen.
In case 170<a<200 mm for 150 mm specimen, equation (2) can be used and
110< a<133 mm for 100 mm specimen.
PROCEDURE:
1) With 20 mm maximum size of aggregate cast 3 prism of size150X150X700 mm. Take
mix proportion as1: 1.45:3.64, W/C ratio =0.43, for this take
Coarse aggregate =21.84 kg (218.4N), Fine aggregate= 8.7 kg (87N), Cement = 6 kg (60N),
Water=2.58 l.
2) The mould shall be filled in two layer to be rammed more than 100 times by a standard
steel ramming road 25mm2
at one end and 400 mm long having a weight of 20 N (2kg).
Suitable vibrator may also do ramming of each layer.
3) After casting the mould shall be covered with wet cloths or gunny bags, remolded after
24 hours and wet cured for 27 days. Specimens shall be tested immediately after removal of
water whilst they are still in wet condition. The dimensions of the each specimen shall be
noted before testing.
4) The bearing surface of the supporting and loading rollers shall be whipped clean and or
any loose sand or other material removed from the surface of specimens where they are to
make contact with the rollers .The specimen shall be then placed in the machine in such a
manner that the load shall be applied to the upper most surface as cast in the mould along
two lines spaced 200 mm or 133 mm apart .The axis of the specimen shall be carefully
aligned with the axis of loading device. No packing shall be used between the bearing
surfaces of the specimen and the rollers .The load shall be applied with shock and
increasing continuously at a rate such that the extreme fiber stress increase at approximately
0.7 N/mm2
(7 kg/cm2
)/minute that is at a rate of loading of 4 kN (400kg)/minute for 150
mm specimens and at a rate of 1.8 kN (180 kg/minute). For 100 mm specimens, the load
shall be increased until the specimen fails and the maximum load applied to the test shall be
recorded. The appearance of the fracture faces concrete and any unique features in the type
of failure shall be noted.
RESULT:
Modulus of rupture of concrete of the given mix = N/mm2

Mais conteúdo relacionado

Mais procurados

Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)Dave Madhav
 
Concrete Compressive Strength
Concrete Compressive Strength Concrete Compressive Strength
Concrete Compressive Strength Mahmoud Hassan
 
Testing of hardened concrete
Testing of hardened concreteTesting of hardened concrete
Testing of hardened concreteJ C
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumenpradip dangar
 
Quality tests for aggregates and concrete mix design
Quality tests for aggregates and concrete mix designQuality tests for aggregates and concrete mix design
Quality tests for aggregates and concrete mix designAyaz khan
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Make Mannan
 
Structural Design
Structural DesignStructural Design
Structural DesignVj NiroSh
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concreteRajesh Prasad
 
Concrete corrosion
Concrete corrosionConcrete corrosion
Concrete corrosionAhmed Faraj
 
Los Angeles Abrasion Test.pptx
Los Angeles Abrasion Test.pptxLos Angeles Abrasion Test.pptx
Los Angeles Abrasion Test.pptxNUR
 
Compressivestrength concrete
Compressivestrength concreteCompressivestrength concrete
Compressivestrength concreteAr. Bhanu Pratap
 
workability test of concrete
workability test of concreteworkability test of concrete
workability test of concreteKaran Patel
 
Non destructive test
Non destructive test   Non destructive test
Non destructive test NIRAV SHAH
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009 Avinash Kumar Gupta
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concretePramod GK
 

Mais procurados (20)

Fineness air permeability final (1)
Fineness air permeability final (1)Fineness air permeability final (1)
Fineness air permeability final (1)
 
Concrete Compressive Strength
Concrete Compressive Strength Concrete Compressive Strength
Concrete Compressive Strength
 
Testing of hardened concrete
Testing of hardened concreteTesting of hardened concrete
Testing of hardened concrete
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumen
 
Pile Foundations
Pile FoundationsPile Foundations
Pile Foundations
 
Quality tests for aggregates and concrete mix design
Quality tests for aggregates and concrete mix designQuality tests for aggregates and concrete mix design
Quality tests for aggregates and concrete mix design
 
Special concrete
Special concreteSpecial concrete
Special concrete
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
 
Structural Design
Structural DesignStructural Design
Structural Design
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
 
Durability of concrete
Durability of concreteDurability of concrete
Durability of concrete
 
Concrete corrosion
Concrete corrosionConcrete corrosion
Concrete corrosion
 
Los Angeles Abrasion Test.pptx
Los Angeles Abrasion Test.pptxLos Angeles Abrasion Test.pptx
Los Angeles Abrasion Test.pptx
 
Compressivestrength concrete
Compressivestrength concreteCompressivestrength concrete
Compressivestrength concrete
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
 
Non destructive test
Non destructive test   Non destructive test
Non destructive test
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concrete
 

Semelhante a Flexural strength

IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET Journal
 
350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank designHarish Mahavar
 
TEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETETEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETEJaswanth J
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowAnchit Agrawal
 
Influence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbelsInfluence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbelsIAEME Publication
 
Influence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbelsInfluence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbelsIAEME Publication
 
Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Ab van den Bos
 
C09 m-403032016 som
C09 m-403032016 somC09 m-403032016 som
C09 m-403032016 somvinodh kumar
 
F fabrics layers on strengthened reinforced concrete short corbels
F fabrics layers on strengthened reinforced concrete short corbelsF fabrics layers on strengthened reinforced concrete short corbels
F fabrics layers on strengthened reinforced concrete short corbelsIAEME Publication
 
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden ConcreteVTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden ConcreteSachin dyavappanavar
 
Gte ii-readytoprint
Gte ii-readytoprintGte ii-readytoprint
Gte ii-readytoprintjagadish108
 
Lecture chapter 1u
Lecture chapter 1uLecture chapter 1u
Lecture chapter 1urgo-amo
 
Design of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptxDesign of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptxSharpEyu
 
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...IAEME Publication
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concreteSelva Prakash
 
Types of Pavements.pptx
Types of Pavements.pptxTypes of Pavements.pptx
Types of Pavements.pptxssuser33b5501
 

Semelhante a Flexural strength (20)

IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...IRJET-  	  Experimental Study on Partial Replacement of Coarse Aggregate by C...
IRJET- Experimental Study on Partial Replacement of Coarse Aggregate by C...
 
CE 6306 STRENGTH OF MATERIALS
CE 6306 STRENGTH OF MATERIALSCE 6306 STRENGTH OF MATERIALS
CE 6306 STRENGTH OF MATERIALS
 
350 kl overhead water intze tank design
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
 
TEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETETEST ON HARDENED CONCRETE
TEST ON HARDENED CONCRETE
 
Structural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
 
Influence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbelsInfluence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbels
 
Influence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbelsInfluence of fabrics layers on strengthened reinforced concrete short corbels
Influence of fabrics layers on strengthened reinforced concrete short corbels
 
Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)Heron, vol 50, no 2 (2005)
Heron, vol 50, no 2 (2005)
 
C09 m-403032016 som
C09 m-403032016 somC09 m-403032016 som
C09 m-403032016 som
 
F fabrics layers on strengthened reinforced concrete short corbels
F fabrics layers on strengthened reinforced concrete short corbelsF fabrics layers on strengthened reinforced concrete short corbels
F fabrics layers on strengthened reinforced concrete short corbels
 
D013142435
D013142435D013142435
D013142435
 
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden ConcreteVTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
VTU CBCS SCHEME Concrete Technology. Tests on Harden Concrete
 
Gte ii-readytoprint
Gte ii-readytoprintGte ii-readytoprint
Gte ii-readytoprint
 
Footing design
Footing designFooting design
Footing design
 
Lecture chapter 1u
Lecture chapter 1uLecture chapter 1u
Lecture chapter 1u
 
bridge final ppt.pptx
bridge final ppt.pptxbridge final ppt.pptx
bridge final ppt.pptx
 
Design of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptxDesign of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptx
 
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
REHABILITATION OF NORMAL AND REACTIVE POWDER REINFORCED CONCRETE BEAMS USING ...
 
Split tensile strength in concrete
Split tensile strength in concreteSplit tensile strength in concrete
Split tensile strength in concrete
 
Types of Pavements.pptx
Types of Pavements.pptxTypes of Pavements.pptx
Types of Pavements.pptx
 

Mais de SHAMJITH KM

Salah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdfSalah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdfSHAMJITH KM
 
Construction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture NotesConstruction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture NotesSHAMJITH KM
 
Construction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture NotesConstruction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture NotesSHAMJITH KM
 
Construction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture NotesConstruction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture NotesSHAMJITH KM
 
Construction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture NotesConstruction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture NotesSHAMJITH KM
 
Computing fundamentals lab record - Polytechnics
Computing fundamentals lab record - PolytechnicsComputing fundamentals lab record - Polytechnics
Computing fundamentals lab record - PolytechnicsSHAMJITH KM
 
Concrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsConcrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsSHAMJITH KM
 
Concrete Technology Study Notes
Concrete Technology Study NotesConcrete Technology Study Notes
Concrete Technology Study NotesSHAMJITH KM
 
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളുംനബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളുംSHAMJITH KM
 
Design of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc fileDesign of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc fileSHAMJITH KM
 
Design of simple beam using staad pro
Design of simple beam using staad proDesign of simple beam using staad pro
Design of simple beam using staad proSHAMJITH KM
 
Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)SHAMJITH KM
 
Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)SHAMJITH KM
 
Python programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - KalamasseryPython programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - KalamasserySHAMJITH KM
 
Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)SHAMJITH KM
 
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)SHAMJITH KM
 
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)SHAMJITH KM
 
CAD Lab model viva questions
CAD Lab model viva questions CAD Lab model viva questions
CAD Lab model viva questions SHAMJITH KM
 
Brain Computer Interface (BCI) - seminar PPT
Brain Computer Interface (BCI) -  seminar PPTBrain Computer Interface (BCI) -  seminar PPT
Brain Computer Interface (BCI) - seminar PPTSHAMJITH KM
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only noteSHAMJITH KM
 

Mais de SHAMJITH KM (20)

Salah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdfSalah of the Prophet (ﷺ).pdf
Salah of the Prophet (ﷺ).pdf
 
Construction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture NotesConstruction Materials and Engineering - Module IV - Lecture Notes
Construction Materials and Engineering - Module IV - Lecture Notes
 
Construction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture NotesConstruction Materials and Engineering - Module III - Lecture Notes
Construction Materials and Engineering - Module III - Lecture Notes
 
Construction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture NotesConstruction Materials and Engineering - Module II - Lecture Notes
Construction Materials and Engineering - Module II - Lecture Notes
 
Construction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture NotesConstruction Materials and Engineering - Module I - Lecture Notes
Construction Materials and Engineering - Module I - Lecture Notes
 
Computing fundamentals lab record - Polytechnics
Computing fundamentals lab record - PolytechnicsComputing fundamentals lab record - Polytechnics
Computing fundamentals lab record - Polytechnics
 
Concrete lab manual - Polytechnics
Concrete lab manual - PolytechnicsConcrete lab manual - Polytechnics
Concrete lab manual - Polytechnics
 
Concrete Technology Study Notes
Concrete Technology Study NotesConcrete Technology Study Notes
Concrete Technology Study Notes
 
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളുംനബി(സ)യുടെ നമസ്കാരം -  രൂപവും പ്രാര്ത്ഥനകളും
നബി(സ)യുടെ നമസ്കാരം - രൂപവും പ്രാര്ത്ഥനകളും
 
Design of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc fileDesign of simple beam using staad pro - doc file
Design of simple beam using staad pro - doc file
 
Design of simple beam using staad pro
Design of simple beam using staad proDesign of simple beam using staad pro
Design of simple beam using staad pro
 
Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)Python programs - PPT file (Polytechnics)
Python programs - PPT file (Polytechnics)
 
Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)Python programs - first semester computer lab manual (polytechnics)
Python programs - first semester computer lab manual (polytechnics)
 
Python programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - KalamasseryPython programming Workshop SITTTR - Kalamassery
Python programming Workshop SITTTR - Kalamassery
 
Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)Analysis of simple beam using STAAD Pro (Exp No 1)
Analysis of simple beam using STAAD Pro (Exp No 1)
 
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures I - STUDENT NOTE BOOK (Polytechnics Revision 2015)
 
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
Theory of structures II - STUDENT NOTE BOOK (Polytechnics Revision 2015)
 
CAD Lab model viva questions
CAD Lab model viva questions CAD Lab model viva questions
CAD Lab model viva questions
 
Brain Computer Interface (BCI) - seminar PPT
Brain Computer Interface (BCI) -  seminar PPTBrain Computer Interface (BCI) -  seminar PPT
Brain Computer Interface (BCI) - seminar PPT
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only note
 

Último

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 

Último (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 

Flexural strength

  • 1. Expt No: Date: FLEXURAL STRENGTH OF CONCRETE AIM: To determine the Flexure strength (Modulus of rupture) of concrete of a given proportion. APPARATUS: Steel prism moulds of the following sizes will be used: (a) 100 X 100 X 500 when maximum size of aggregate is less than 20 mm. (b) 150 X 150 X 700 when maximum size of aggregate is up to 30 mm. The testing machine may be of any reliable type of sufficient capacity for the tests and capable of applying the load 4kN (400kg/min) for the 150 mm specimen and at a rate of 1.8 kN (180 kg/min) for the 100 mm specimen .The bed of the testing machine should be provided with 2 steel rollers, 38 mm in diameter, on which the specimen is to be supported and these rollers shall be so mounted that the distance from c/c is 600mm for 150 mm specimen or 400 mm for 400 mm specimens .The applied through two similar rollers mounted at the third point of the supporting span that is spaced at 200or 133 mm c/c. The load shall be divided equally between the two loading rollers and all rollers shall be mounted in such a manner that the load is applied axially and without subjecting the specimen to any torsion or restrains. PRINCIPLE: When concrete is subjected to bending tensile and bending compressive stress and in many cases, direct shear stresses are developed .The most common plain concrete is subjected to flexure is a highway pavement and the strength concrete for pavement is commonly evaluated by means of bending tests. Flexure test is intended to give the flexural strength of concrete in tension. The flexural strength is also easily carried out and more convenient than the crushing test for use in field, since in this test much small loads are required. The flexural strength of the specimen shall be expressed as the modulus of rupture and shall be calculated to the nearest 0.05 N/mm2 . fct = Pl/bd2 …………….(1) fct = 3Pa/bd2 …………….(2)
  • 2. OBSERVATIONS AND CALCULATIONS: Grade of concrete = Maximum ratio = Water content ratio = Dimension of the specimen selected = b (mm) = d (mm) = a (mm) = l (mm) = Load at failure, P (kN) = Since a>200mm equation (1) can be used. Modulus of rupture, fct = Pl/bd2
  • 3. a = distance between line of fracture and the near the support measured on the center line of the tenth side of the specimen. b = is the measured width of the specimen in mm. d = is the measured height of the specimen in mm at the point of failure. l = is the length in mm of the span on which the specimen was supported. P = is the maximum load in N (kg) applied on the specimen. In case a >200 mm for 150mm specimen, equation (1) can be used and a >133 mm for 100 mm specimen. In case 170<a<200 mm for 150 mm specimen, equation (2) can be used and 110< a<133 mm for 100 mm specimen. PROCEDURE: 1) With 20 mm maximum size of aggregate cast 3 prism of size150X150X700 mm. Take mix proportion as1: 1.45:3.64, W/C ratio =0.43, for this take Coarse aggregate =21.84 kg (218.4N), Fine aggregate= 8.7 kg (87N), Cement = 6 kg (60N), Water=2.58 l. 2) The mould shall be filled in two layer to be rammed more than 100 times by a standard steel ramming road 25mm2 at one end and 400 mm long having a weight of 20 N (2kg). Suitable vibrator may also do ramming of each layer. 3) After casting the mould shall be covered with wet cloths or gunny bags, remolded after 24 hours and wet cured for 27 days. Specimens shall be tested immediately after removal of water whilst they are still in wet condition. The dimensions of the each specimen shall be noted before testing. 4) The bearing surface of the supporting and loading rollers shall be whipped clean and or any loose sand or other material removed from the surface of specimens where they are to make contact with the rollers .The specimen shall be then placed in the machine in such a manner that the load shall be applied to the upper most surface as cast in the mould along two lines spaced 200 mm or 133 mm apart .The axis of the specimen shall be carefully aligned with the axis of loading device. No packing shall be used between the bearing surfaces of the specimen and the rollers .The load shall be applied with shock and increasing continuously at a rate such that the extreme fiber stress increase at approximately 0.7 N/mm2 (7 kg/cm2 )/minute that is at a rate of loading of 4 kN (400kg)/minute for 150 mm specimens and at a rate of 1.8 kN (180 kg/minute). For 100 mm specimens, the load
  • 4. shall be increased until the specimen fails and the maximum load applied to the test shall be recorded. The appearance of the fracture faces concrete and any unique features in the type of failure shall be noted. RESULT: Modulus of rupture of concrete of the given mix = N/mm2