1. PT SENTRA INTI NUSA ENERGI (SINERGI) AN EXCLUSIVE AGENT FOR ROSEN INSPECTION IN INDONESIA MENARA GRACIA 2 ND FLOOR JL. H.R. RASUNA SAID KAV. 17 JAKARTA 12940 PHONE 62-21-5200095 FAX. 62-21-5200096 E-MAIL ADDRESS : [email_address]
2. PT. SENTRA INTI NUSA ENERGI BOARD OF MANAGEMENT : Director : Ir. Armyn R. Harap HRD Manager : Lieke Audia Finance Manager : Kosim Hartono Safety Manager : M. Riswanda Technical Manager : Soewarto Marketing Manager : Budisetyawan LICENSES : MIGAS CERTIFICATE INKINDO CERTIFICATE APITINDO CERTIFICATE DEPERDAG CERTIFICATE
3.
4.
5.
6. INTELLIGENT PIGGING PROCESS : Collect pipeline data : QUESTIONNAIRE PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
7.
8.
9.
10.
11.
12. INTELLIGENT PIGGING PROCESS : Geometry Survey / Caliper REPORTING : EGP as a Dummy Pig The results will be used For deciding Running CDP or Not PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
13.
14. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) CDP COMPONENT : PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
15.
16. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) The basic principle of Metal Loss Survey is Magnetic Flux Leakage FLUX LINE DISTRIBUTION W/O FLAW FLUX LINE DISTRIBUTION W/ INTERNAL FLAW FLUX LINE DISTRIBUTION W/ EXTERNAL FLAW PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
17. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) AUTOMATIC ANALYSIS PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
18. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) ROSEN SOFT WARE : ROSOFT ROSEN REPORT PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
19. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) ROSOFT REPORTING PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
20. INTELLIGENT PIGGING PROCESS : Axial Flaw Detector (AFD) The basic principle of Axial Flaw Detector is Hi Resolution Magnetic Flux Leakage PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
21.
22. HI RESOLUTION XYZ MAPPING TOOL PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
23. HI RESOLUTION XYZ MAPPING TOOL PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
24. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) COMPANY EXPERIENCES PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING Completed 2005 10”, 12”, 72 Km Balikpapan Offshore / onshore Ex Contract GE Unocal 5 Completed 2005 6”, 10”, 3 KM Balikpapan, Offshore Ex Contract GE (Short Pig Launcher/receiver) TOTAL Indonesie 4 Completed In progress 2005 2006 16”, 3 lines, 46 KM SES Offshore 16”, 3 KM SES Offshore CNOOC 6 Completed 2005 30”, 145 KM Aceh Onshore / Offshore Gas line w/ Hi CO2 and H2S ExxonMobil 3 Completed 2005 24”, 45 KM Subang – Citarik, Onshore Gas line Pertamina - Moeladi 2 Completed 2003 14”, 63 KM Madura – Gresik Gas line Ex Contract GE W/ dent > 20% Offshore – Onshore KODECO 1 REMARKS YEAR PIPE DIAMETER / LENGTH COMPANY NO
25. INTELLIGENT PIGGING PROCESS : Corrosion Detection Pig (CDP) BEING IN BIDDING PROCESS PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING In Process 2006 16”, 2.8 KM, SES Offshore CNOOC 5 In Process 2006 24” 48 Km BSP ex CPP 4 In Process 2006 26”, 71.8 KM, Jambi South Sumatra 28”, 335 KM, Jambi South Sumatra 24”, 13.8 KM, Jambi South Sumatra CONOCO 3 Waiting for contract signing 2006 8”, 3 lines, 42 KM Malaka Strait KONDUR 2 In Process, price negotiation 2006 8”, 5 sections, 262 KM, South Sumatra MEDCO 1 REMARKS YEAR PIPE DIAMETER / LENGTH COMPANY NO
26. FOR FURTHEER INFORMATION AND QUOTATION PLEASE CONTACT BUDISETYAWAN [email_address] HP 0818 826831 PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING
27. THANK YOU FOR YOUR TIME AND ATTENTION THE END PT. SENTRA INTI NUSA ENERGI – ROSEN INSPECTION INTELLIGENT PIGGING