1.0   Inspection
2.0   Quality Assurance
3.0   Surplus Disposal
4.0   Source Development
5.0   Registration & Pre-Qualification



                                         1
5.0   REGISTRATION &
      PREQUALIFICATION
      SYSTEM

                         1
                         6
Pre-Qualification/Registration System
                     OBJECTIVES

 To coordinate enhancements to the Computerised Registration
  System as required.
 To assess/pre-qualify all Suppliers through the Supplier
  Evaluation Committee.
 To interact on PQ matters with other ADNOC Group
  Companies for mutual benefit.
 To serve as the Company’s focal point for all Suppliers.
 To monitor Bidder Lists raised by all Departments within the
  Procurement Services Division.
 To develop and apply a common Pre-qualification Procedure.
                                                                 8
The term “Supplier” covers Contractors/
 Consultants/Manufacturers/Vendors –
       both local and overseas.




                                          9
PREQUALIFICATION
 & REGISTRATION
   PROCESS
                   1
                   6
Objective


To generate, maintain and update an
assessed list of highest quality local and
world-wide companies who are capable
of supplying Services and Products
required by ADNOC.


                                             17
What is Prequalification?
The process of evaluating/assessing capabilities of a Supplier for
ADNOC requirements, i.e. to answer the following questions:
 WHO can supply the required Services/Products
 WHAT Services/Products can he supply
 HOW WELL can he supply the required Services/Products,
  i.e. a classification: A, B, C, D or N.
 WHAT is the classification of the Supplier type, taking into
  consideration all other factors, i.e. financial status, quality,
  HES, etc. – Rating is 1, 2, 3, 4 or N.
 WHAT is the Supplier’s overall rating which is the result of
  the combination of the different types, i.e. Contractor, Vendor
  and Manufacturer – Rating is 1, 2, 3, 4 or N.
                                                                     18
What is Prequalification? (Cont.)

The depth of Evaluation/Assessment will depend on
TYPE OF SUPPLIER.

Example: For a Contractor/Consultant whether he is for:

 Major Projects – Construction or Consultancy, or
 Plant Maintenance/Minor Construction, or
 Specialized Services, i.e. IT, Environment related, or
 Manpower Supply, or
 General Services/Administration related.
                                                           19
Benefits
VENDORS
   For a Product:
       List of capable Local Vendors
       Why i.e. who are the Principal Suppliers
       Agency Link between Vendor and Principal,
        i.e. E, A or R type
       Does the Vendor stock the Product
       How good is the Vendor, i.e.:
           Pre-commitment Performance
           Past Supplies record
           Rating of Vendor – 1, 2, 3, 4, N.       20
Benefits (Cont.)

CONTRACTORS/CONSULTANTS

   For a Work Group/Service:
       List of capable Contractors (short list)
       Classification – A, B, C, D, N – for this Service
       Rating of Contractor/Consultant – 1, 2, 3, 4, N
       Performance (not yet fully available):
           Past Tender Enquiry/Award Issued
           Pre-commitment Performance.
                                                            21
Benefits (Cont.)

MANUFACTURERS

 List of capable Local/Overseas Manufacturers
  (short list) for a Product Group.
 Prequalification Status of Manufacturer.

 Product Group Numbers.

 Past Supplies.
                                                 2
                                                 2
Main Pre-qualification/
                        Registration Steps

1. Submittal of Brief Profile by Supplier covering:
    Licences (with Oil & Gas Field Services)
    Services/Products to be Supplied
    Experience
    Evidence of Agencies/Stocks and Manpower
2. Issuance of PQ (Diskettes or appropriate Form)
3. Submittal of documents to prepare for Site Survey
4. Site Survey for physical checking
5. Assessment/Evaluation process
6. Recommendation to Supplier Evaluation Committee (SEC)
   and Approval
7. Data Entry into System
8. Update the System with Performance Data
                                                           2
                                                           3
SUPPLIERS
SITE SURVEY

              24
Objectives
The Shop Survey covers active Contractors, Vendors & Local
Manufacturers who are registered with us & have previously
provided services/materials with the following objectives:
 To assess Supplier’s capability first-hand and obtain information
  to up-date our Data Bank.
 To reduce lead time & pre-qualification time for each Tender
   (Est. 8 weeks per Tender – if 100 Tenders are issued per year.
   Total Lead Time Reduction 8 weeks x 100 Tenders = 800 weeks)
 To ensure product Quality and Safety levels are met for Project
  execution and Plant operation/maintenance.
 To update and match ADNOC’s requirements with latest
  technological services and products.                              25
Psd presentation 2

Mais conteúdo relacionado

Mais procurados (20)

Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
Sanjiv Mehta_QA.CV
Sanjiv Mehta_QA.CVSanjiv Mehta_QA.CV
Sanjiv Mehta_QA.CV
 
Bruce Kain Professional CV
Bruce Kain Professional CVBruce Kain Professional CV
Bruce Kain Professional CV
 
CVDEC14
CVDEC14CVDEC14
CVDEC14
 
Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016Resume of Richard K Metzner-2016
Resume of Richard K Metzner-2016
 
Draft lytle+resume1 6 28-2017.docx 2
Draft lytle+resume1 6 28-2017.docx  2Draft lytle+resume1 6 28-2017.docx  2
Draft lytle+resume1 6 28-2017.docx 2
 
Curriculum Vitae - Albert Schutzler 01-June 2015
Curriculum Vitae - Albert Schutzler  01-June 2015Curriculum Vitae - Albert Schutzler  01-June 2015
Curriculum Vitae - Albert Schutzler 01-June 2015
 
Brian Aldridge resume 2016
Brian Aldridge resume 2016 Brian Aldridge resume 2016
Brian Aldridge resume 2016
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Resume - Purushoth
Resume - PurushothResume - Purushoth
Resume - Purushoth
 
RESUME - SANTANU GHOSH 2016
RESUME - SANTANU GHOSH 2016RESUME - SANTANU GHOSH 2016
RESUME - SANTANU GHOSH 2016
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
Operations Supervisor Oil Wells
Operations Supervisor Oil WellsOperations Supervisor Oil Wells
Operations Supervisor Oil Wells
 
Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2Procurement quality-management PJM400 Mod2
Procurement quality-management PJM400 Mod2
 
Kailash cv
Kailash cvKailash cv
Kailash cv
 
Resume_Asmita Patel
Resume_Asmita Patel Resume_Asmita Patel
Resume_Asmita Patel
 
2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike2009 Quality Engineer Resume Weathers Mike
2009 Quality Engineer Resume Weathers Mike
 
Betty Deck resume 10.2016
Betty Deck resume 10.2016Betty Deck resume 10.2016
Betty Deck resume 10.2016
 

Destaque

SPF PSD2 Presentation January 2016 V1.1
SPF PSD2 Presentation January 2016 V1.1SPF PSD2 Presentation January 2016 V1.1
SPF PSD2 Presentation January 2016 V1.1
Brendan Jones
 
Coaching presentation171207a
Coaching presentation171207aCoaching presentation171207a
Coaching presentation171207a
semirahid21
 
Lean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence ModelLean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence Model
Fraser Wilkinson
 
customer expectations
customer expectationscustomer expectations
customer expectations
Santosh Kumar
 
Soft skills world corporate ppt for real estate comapny m3 m
Soft skills world corporate ppt for real estate comapny m3 mSoft skills world corporate ppt for real estate comapny m3 m
Soft skills world corporate ppt for real estate comapny m3 m
Soft Skills World
 

Destaque (20)

SPF PSD2 Presentation January 2016 V1.1
SPF PSD2 Presentation January 2016 V1.1SPF PSD2 Presentation January 2016 V1.1
SPF PSD2 Presentation January 2016 V1.1
 
Coaching presentation171207a
Coaching presentation171207aCoaching presentation171207a
Coaching presentation171207a
 
Management Challenges In Turbulent Times
Management Challenges In Turbulent TimesManagement Challenges In Turbulent Times
Management Challenges In Turbulent Times
 
Performance reviews September 2014
Performance reviews September 2014Performance reviews September 2014
Performance reviews September 2014
 
Lean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence ModelLean Management Journal Tata Business Excellence Model
Lean Management Journal Tata Business Excellence Model
 
Making The Business Case For Online Employee Training
Making The Business Case For  Online Employee TrainingMaking The Business Case For  Online Employee Training
Making The Business Case For Online Employee Training
 
PMG Nov 2012 Moving to Agile
PMG Nov 2012 Moving to Agile PMG Nov 2012 Moving to Agile
PMG Nov 2012 Moving to Agile
 
PMG May 2012 When Good Products Go Bad - Product Liability
PMG May 2012 When Good Products Go Bad - Product LiabilityPMG May 2012 When Good Products Go Bad - Product Liability
PMG May 2012 When Good Products Go Bad - Product Liability
 
PCV2013 The Leadership Role for Product Managers
PCV2013  The Leadership Role for Product ManagersPCV2013  The Leadership Role for Product Managers
PCV2013 The Leadership Role for Product Managers
 
customer expectations
customer expectationscustomer expectations
customer expectations
 
World Class Hr Practices
World Class Hr PracticesWorld Class Hr Practices
World Class Hr Practices
 
PMG Oct 2011 Patents and intellectual property 101 for product managers final
PMG Oct 2011 Patents and intellectual property 101 for product managers finalPMG Oct 2011 Patents and intellectual property 101 for product managers final
PMG Oct 2011 Patents and intellectual property 101 for product managers final
 
Khoj aur parivartan a change management workshop for maruti associates
Khoj aur parivartan  a change management workshop for maruti associatesKhoj aur parivartan  a change management workshop for maruti associates
Khoj aur parivartan a change management workshop for maruti associates
 
Swot development, 1st step of Change Management
Swot development, 1st step of Change ManagementSwot development, 1st step of Change Management
Swot development, 1st step of Change Management
 
Elegant Solutions: Breaktrough Thinking the Toyota Way (a ChangeThis Manifest...
Elegant Solutions: Breaktrough Thinking the Toyota Way (a ChangeThis Manifest...Elegant Solutions: Breaktrough Thinking the Toyota Way (a ChangeThis Manifest...
Elegant Solutions: Breaktrough Thinking the Toyota Way (a ChangeThis Manifest...
 
Lean in Troubled Times
Lean in Troubled TimesLean in Troubled Times
Lean in Troubled Times
 
5 Tips to Significantly Improve Efficiency and Output of Your Meetings
5 Tips to Significantly Improve Efficiency and Output of Your Meetings5 Tips to Significantly Improve Efficiency and Output of Your Meetings
5 Tips to Significantly Improve Efficiency and Output of Your Meetings
 
The Cost Crisis
The Cost CrisisThe Cost Crisis
The Cost Crisis
 
Beyond ISO 9001 : Benefits to SMEs
Beyond ISO 9001 : Benefits to SMEsBeyond ISO 9001 : Benefits to SMEs
Beyond ISO 9001 : Benefits to SMEs
 
Soft skills world corporate ppt for real estate comapny m3 m
Soft skills world corporate ppt for real estate comapny m3 mSoft skills world corporate ppt for real estate comapny m3 m
Soft skills world corporate ppt for real estate comapny m3 m
 

Semelhante a Psd presentation 2

1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
SCOTT SITTNER
 
UX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, FjordUX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT
 
P. Petti - Resume 4-15-15
P. Petti - Resume 4-15-15P. Petti - Resume 4-15-15
P. Petti - Resume 4-15-15
Pamela Petti
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
Addisu15
 
Supplier Quality Improvement
Supplier Quality ImprovementSupplier Quality Improvement
Supplier Quality Improvement
gstevick1980
 
OST Energy - Global Services
OST Energy - Global Services OST Energy - Global Services
OST Energy - Global Services
Sion Haswell
 
Aaps Quality Agreement Presentation Share
Aaps Quality Agreement Presentation   ShareAaps Quality Agreement Presentation   Share
Aaps Quality Agreement Presentation Share
RalphDillon
 

Semelhante a Psd presentation 2 (20)

1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
 
SPLC 2018 Summit: Strategies for specifying sustainable products services
SPLC 2018 Summit: Strategies for specifying sustainable products services SPLC 2018 Summit: Strategies for specifying sustainable products services
SPLC 2018 Summit: Strategies for specifying sustainable products services
 
UXStrat 2019 - System Design by Nur Karadeniz
UXStrat 2019 - System Design by Nur KaradenizUXStrat 2019 - System Design by Nur Karadeniz
UXStrat 2019 - System Design by Nur Karadeniz
 
UX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, FjordUX STRAT Europe 2019: Nur Karadeniz, Fjord
UX STRAT Europe 2019: Nur Karadeniz, Fjord
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
P. Petti - Resume 4-15-15
P. Petti - Resume 4-15-15P. Petti - Resume 4-15-15
P. Petti - Resume 4-15-15
 
Quality & Reliability Consultant
Quality & Reliability ConsultantQuality & Reliability Consultant
Quality & Reliability Consultant
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Cleaning Sponge Case Study by Dragon Sourcing
Cleaning Sponge Case Study by Dragon SourcingCleaning Sponge Case Study by Dragon Sourcing
Cleaning Sponge Case Study by Dragon Sourcing
 
JAYANT KUMAR
JAYANT KUMARJAYANT KUMAR
JAYANT KUMAR
 
idoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdfidoc.pub_iatf-auditor-guidepdf.pdf
idoc.pub_iatf-auditor-guidepdf.pdf
 
Supplier Quality Improvement
Supplier Quality ImprovementSupplier Quality Improvement
Supplier Quality Improvement
 
OST Energy - Global Services
OST Energy - Global Services OST Energy - Global Services
OST Energy - Global Services
 
Nanthakumar_SQA (1)
Nanthakumar_SQA (1)Nanthakumar_SQA (1)
Nanthakumar_SQA (1)
 
Aaps Quality Agreement Presentation Share
Aaps Quality Agreement Presentation   ShareAaps Quality Agreement Presentation   Share
Aaps Quality Agreement Presentation Share
 
Operationalizing Enterprise Adoption of DevOps in the Application Economy
Operationalizing Enterprise Adoption of DevOps in the Application EconomyOperationalizing Enterprise Adoption of DevOps in the Application Economy
Operationalizing Enterprise Adoption of DevOps in the Application Economy
 
Case study based on production, financial and social audits
Case study based on production, financial and social auditsCase study based on production, financial and social audits
Case study based on production, financial and social audits
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 
Supplier Evaluation.Number 2
Supplier Evaluation.Number 2Supplier Evaluation.Number 2
Supplier Evaluation.Number 2
 
Vendor certification
Vendor certificationVendor certification
Vendor certification
 

Mais de semirahid21

Mais de semirahid21 (9)

Benefits of kaizen
Benefits of kaizenBenefits of kaizen
Benefits of kaizen
 
Survival
SurvivalSurvival
Survival
 
Chap006 service quality
Chap006 service qualityChap006 service quality
Chap006 service quality
 
34
3434
34
 
33
3333
33
 
33
3333
33
 
33
3333
33
 
Hilux production dates
Hilux production datesHilux production dates
Hilux production dates
 
Bsc presentation
Bsc presentationBsc presentation
Bsc presentation
 

Último

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Último (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Psd presentation 2

  • 1. PROCUREMENT SERVICES DIVISION A PRESENTATION ON THE PROCUREMENT SUPPORT DEPARTMENT ACTIVITIES
  • 2. Procurement Support – Main Activities 1.0 Inspection 2.0 Quality Assurance 3.0 Surplus Disposal 4.0 Source Development 5.0 Registration & Pre-Qualification 1
  • 3. 5.0 REGISTRATION & PREQUALIFICATION SYSTEM 1 6
  • 4. Pre-Qualification/Registration System OBJECTIVES  To coordinate enhancements to the Computerised Registration System as required.  To assess/pre-qualify all Suppliers through the Supplier Evaluation Committee.  To interact on PQ matters with other ADNOC Group Companies for mutual benefit.  To serve as the Company’s focal point for all Suppliers.  To monitor Bidder Lists raised by all Departments within the Procurement Services Division.  To develop and apply a common Pre-qualification Procedure. 8
  • 5. The term “Supplier” covers Contractors/ Consultants/Manufacturers/Vendors – both local and overseas. 9
  • 7. Objective To generate, maintain and update an assessed list of highest quality local and world-wide companies who are capable of supplying Services and Products required by ADNOC. 17
  • 8. What is Prequalification? The process of evaluating/assessing capabilities of a Supplier for ADNOC requirements, i.e. to answer the following questions:  WHO can supply the required Services/Products  WHAT Services/Products can he supply  HOW WELL can he supply the required Services/Products, i.e. a classification: A, B, C, D or N.  WHAT is the classification of the Supplier type, taking into consideration all other factors, i.e. financial status, quality, HES, etc. – Rating is 1, 2, 3, 4 or N.  WHAT is the Supplier’s overall rating which is the result of the combination of the different types, i.e. Contractor, Vendor and Manufacturer – Rating is 1, 2, 3, 4 or N. 18
  • 9. What is Prequalification? (Cont.) The depth of Evaluation/Assessment will depend on TYPE OF SUPPLIER. Example: For a Contractor/Consultant whether he is for:  Major Projects – Construction or Consultancy, or  Plant Maintenance/Minor Construction, or  Specialized Services, i.e. IT, Environment related, or  Manpower Supply, or  General Services/Administration related. 19
  • 10. Benefits VENDORS  For a Product:  List of capable Local Vendors  Why i.e. who are the Principal Suppliers  Agency Link between Vendor and Principal, i.e. E, A or R type  Does the Vendor stock the Product  How good is the Vendor, i.e.:  Pre-commitment Performance  Past Supplies record  Rating of Vendor – 1, 2, 3, 4, N. 20
  • 11. Benefits (Cont.) CONTRACTORS/CONSULTANTS  For a Work Group/Service:  List of capable Contractors (short list)  Classification – A, B, C, D, N – for this Service  Rating of Contractor/Consultant – 1, 2, 3, 4, N  Performance (not yet fully available):  Past Tender Enquiry/Award Issued  Pre-commitment Performance. 21
  • 12. Benefits (Cont.) MANUFACTURERS  List of capable Local/Overseas Manufacturers (short list) for a Product Group.  Prequalification Status of Manufacturer.  Product Group Numbers.  Past Supplies. 2 2
  • 13. Main Pre-qualification/ Registration Steps 1. Submittal of Brief Profile by Supplier covering:  Licences (with Oil & Gas Field Services)  Services/Products to be Supplied  Experience  Evidence of Agencies/Stocks and Manpower 2. Issuance of PQ (Diskettes or appropriate Form) 3. Submittal of documents to prepare for Site Survey 4. Site Survey for physical checking 5. Assessment/Evaluation process 6. Recommendation to Supplier Evaluation Committee (SEC) and Approval 7. Data Entry into System 8. Update the System with Performance Data 2 3
  • 15. Objectives The Shop Survey covers active Contractors, Vendors & Local Manufacturers who are registered with us & have previously provided services/materials with the following objectives:  To assess Supplier’s capability first-hand and obtain information to up-date our Data Bank.  To reduce lead time & pre-qualification time for each Tender (Est. 8 weeks per Tender – if 100 Tenders are issued per year. Total Lead Time Reduction 8 weeks x 100 Tenders = 800 weeks)  To ensure product Quality and Safety levels are met for Project execution and Plant operation/maintenance.  To update and match ADNOC’s requirements with latest technological services and products. 25