Overcoming the Challenges of Large Capital
Programs/Projects
Applying Lessons Learned from Extended Power Uprates
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
Introduction
■ Effective capital program/project delivery is a critical competency for any electric utility to achieve high performance
■ However, project scope creep, schedule delays, and cost increases have become the rule rather than the exception
■ Over the past 10 years, the electric utility industry has seen large demands on its projects and construction management organizations
to ensure compliance with a number of concerns, including:
• Plant retrofits and conversions
• Ash pond closures
• Fukushima modifications
• Security upgrade requirements
• Extended power uprates (EPUs)
■ Large capital programs/projects come with a variety of complicated planning, implementation, and workforce/vendor management
challenges
■ Using EPU projects as an example, we will provide you with ways to overcome these challenges for any large capital program/project
1
Lessons learned from extended power uprates can be applied to any large capital program/project.
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
Overview of Power Uprates
■ Power uprates allow utilities to generate more electricity from their existing nuclear plants
■ Since the 1970s, the NRC has approved 154 uprates, which have collectively added generating capacity equivalent to about seven new
reactors
■ Three types of uprates are available to a nuclear plant operator: measurement uncertainty recapture, stretch, and extended
■ As shown in the table above, implementing EPUs presents the biggest project challenges, given the need to significantly modify major
pieces of plant equipment
2
Power Uprate Type
Increase to Licensed
Power Levels
Plant and System Impacts
Measurement uncertainty recapture < 2%
Implementing improved techniques for calculating reactor
power, e.g., utilizing state-of-the-art devices to more precisely
measure feedwater flow
Stretch 2 to 7%
Changing instrumentation settings without major plant
modifications
Extended 7 to 20%
Significantly modifying to major pieces of non-nuclear
equipment, e.g., high-pressure turbines, condensate pumps
and motors, main generators, and transformers
Source: www.nrc.gov, Backgrounder on Power Uprates for Nuclear Plants
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
EPU Project Challenges
EPU projects pose significant scope, implementation, and workforce management challenges
■ Scope
• Scope is fluid as the EPU project is implemented
• Outages are typically much bigger in scope than a refueling outage, requiring the significant change-outs or upgrades of major
equipment
• Changes to the plant configuration (structures, equipment, and systems) must be precisely documented
■ Implementation
• In many cases, the work is done while other units are still in operation
• A high degree of project control rigor is required to accurately track cost and schedule against evolving scope
• Physical security, ALARA limits, lock-out/tag-out requirements, etc., make the work environment very complex
■ Workforce management
• A large number of skilled teams (craft workers and supervisors) that may have never worked together are involved
• Some trades and/or skills are likely to be in short supply
• Many workers are new to a nuclear plant work environment and lack knowledge of nuclear safety and quality standards
3
Sources:
1. IAEA Nuclear Energy Series No. NP-T-3.9, Power Uprate in Nuclear Power Plants: Guidelines and Experience, 2011
2. Von Lazar, Laszlo, “Lessons Learned from Successful Nuclear Uprate Projects”, Nuclear Power International Magazine, Volume 6, No. 4, July/August 2013
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
Lessons Learned from Recent EPU Efforts
■ Planning for contingences is critical. In some cases:
• Actual costs more than doubled over initially planned costs
• Outage durations were as much as 25% longer than planned
• Additional outages were required to complete the work
■ Costs and schedules should include contingencies for productivity issues, replacing vs. repairing components, and licensing delays
• Preliminary cost estimates, based on conceptual scope, may not capture all of the work necessary to complete the project
• Some components that are initially expected to be repaired or recertified will require replacement, i.e., during configuration control
verification, perform a detailed drawing walk-down of pumps, motors, valve controls, etc., to minimize scope surprises
• Major construction activities at an operating nuclear plant, many of which occur in remote and radiologic-controlled portions of the
plant, can cause significant implementation difficulties and delays
– Space for installation can be extremely tight and may require removal or working around hundreds of interferences
– Productivity can be slowed due to the specialized and time-consuming procedures to ensure worker safety in radiologic-
controlled and electrically sensitive areas of the plant
• Increasingly conservative regulatory requirements outside of a company’s control can cause significant licensing delays
■ Obtaining and retaining experienced workers is a challenge
■ Active management of vendors is required to ensure productivity is maintained, issues are raised, and progress is on schedule
4
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
EPU Project Keys to Success
5
■ Encourage workforce collaboration and the ability of employees to voice concerns early and often to
avoid costly errors, re-work, and safety hazards, i.e., maintain a focus on quality and safety
■ Develop a self-critical culture focused on improvement and efficiency
■ Recognize that the EPU team can not anticipate all the changes that will occur during the project
■ Utilize project management technology where possible to improve efficiency and communication
■ Hold regular project team meetings and invite senior leadership periodically to reinforce the priority of
the project
Work Environment
Planning
■ Be honest and realistic about the complexity and uniqueness of the EPU project; investing early in
planning and current state analysis can save a lot of rework
■ Recognize that the planning process continues all the way to project completion and that the EPU team
should always be looking to improve costs, schedule, and general efficiency
■ Make benchmarking trips and incorporate lessons learned and insights, e.g., NEDO-33159, from recent
EPU and stretch uprates projects into planning
■ Bring in field engineers and/or craft supervisors early in the process for review and comment on actual
configuration vs. drawings and equipment installation implications
■ Hold combined design reviews with members from different disciplines; utilize the experience and
expertise from each discipline to come up with a collectively better solution
■ Develop integrated work packages to improve efficiency and overall performance
Sources:
1. IAEA Nuclear Energy Series No. NP-T-3.9, Power Uprate in Nuclear Power Plants: Guidelines and Experience, 2011
2. Von Lazar, Laszlo, “Lessons Learned from Successful Nuclear Uprate Projects,” Nuclear Power International Magazine, Volume 6, No. 4, July/August 2013
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
EPU Project Keys to Success (Cont’d)
6
Vendor/ Contractor
Alignment
■ Align vendors and contractors with project objectives and the uniqueness of the project
■ Ensure vendors and contractors are aware of and held to the tenets of nuclear safety and align their
nuclear safety culture with that of your company
■ Work collaboratively with contractors and combine cost, schedule, and human performance monitoring
tools and processes
■ Ensure contracts have clear terms and conditions and are very specific in scope and timing
■ Plan for vendor handoffs of work products and resolve disputes promptly to reduce idle vendor time
Implementation
■ Manage like a large-scale engineering, procurement, and construction project and not like a
modifications project or refueling outage, e.g., funding is stage-gated
■ Collect accurate data and monitor relevant performance metrics throughout the EPU project
■ Conduct periodic independent project audits using industry experts with previous EPU experience
■ Involve employees who will operate the plant during implementation
■ Ensure operating staff are adequately trained on how the plant will operate after the power uprate, e.g.,
operations, maintenance, engineering, radiation protection personnel, etc.
■ Update all affected documentation, e.g., operating and maintenance procedures, to reflect the new
operating conditions
■ Focus on procedure development, training, and simulator modeling to help verify actual plant response
vs. expected plant response in power uprated conditions
Sources:
1. IAEA Nuclear Energy Series No. NP-T-3.9, Power Uprate in Nuclear Power Plants: Guidelines and Experience, 2011
2. Von Lazar, Laszlo, “Lessons Learned from Successful Nuclear Uprate Projects,” Nuclear Power International Magazine, Volume 6, No. 4, July/August 2013
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
How ScottMadden Can Help
7
ScottMadden
Capital
Program/Project
Assistance
Perform a top-to-bottom
assessment of the capital
program to position it for
success from the start
Capital Program
Assessment
Capital
Program/Project
Management
Capital
Program/Project Tools
and Performance
Reporting
Assist in establishing and
implementing the organization
and governance to successfully
deliver the program/project
Assist in establishing and
implementing the tools and
performance reporting to
successfully control and monitor
the program/project
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
Capital Program Assessment Overview
ScottMadden’s Capital Program Assessment examines how the capital program is implemented—from top to bottom—with a look
at the PMO and a review of the performance reporting and tools in place.
8
Program Management Office
Step 1: Capital Program Analysis Step 2: Process Evaluation
Copyright © 2013 by ScottMadden. All rights reserved.
5
Constructability activities within alliance projects are being introduced later in the cradle to grave construction process
than is typical for large project management
Findings
Constructability – Cost Savings Driver
Current lack of a constructability process across all the elements of the construction cradle to grave process is a
significant driver in NEA cost estimates being high
Best In Class Projects Typical NEA Project
ScottMadden’s approach analyzes these critical areas to provide a detailed assessment
of your capital program with actionable recommendations.
Step 6: Recommendations and Action Plan
EPU Project
Step 4: Execution Assessment
Step 3: Organization Analysis
Step 5:
Performance Reporting and Tools Evaluation
ScottMadden
Capital
Program/Project
Assistance
Capital Program
Assessment
Capital
Program/Project
Management
Capital
Program/Project Tools
and Performance
Reporting
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
Capital Program/Project Management Overview
9
Focus On
 Organization and governance
 Functional relationship
management
 Partnership with other entities
Tools
 Performance Dashboard
 Issue List (high impact and level)
 Monthly Progress Report
 Risk Analysis and Mitigation Plan (high impact and
level)
 Inter-project coordination
 Inter-project resource
coordination
 Cross functionalities
 Best practice usage
 Documentation
management
 Project milestones
 Costs
 Times
 Business/technical goals
 Projects List
 Project Procedures
 Project Dashboard
 Milestones Tracking
 Issue List (Aggregated)
 Risk Analysis and Mitigation Plan (Aggregated)
 Weekly and Monthly Progress Reports
 Project Plan
 Project Documentation Management
 Milestones Tracking
 Risk Analysis and Mitigation Plan
 Change Request Management
 Issue List Management
 Project Baseline and Progress Report
 Weekly Progress Meeting Minutes
 Weekly Progress Report
 Monthly Progress Report
Program
Manager
Project Office
Project Managers
ScottMadden
Capital
Program/Project
Assistance
Capital Program
Assessment
Capital
Program/Project
Management
Capital
Program/Project Tools
and Performance
Reporting
Copyright © 2021 by ScottMadden, Inc. All rights reserved.
Capital Program/Project Management Tools and
Performance Reporting Overview
10
F.G.P. PROJECTS DRIVING BOARD
Status
Tendency
(previous)
Tendency
(actual)
TIME COST (Euro) Open issues
Order Project Description
Project
Manager
Type Impact 30-Apr-01 31-M ay-01
Baseline
Start
Baseline
End
Forecast
End
Budget
Actual Forecast & Critical Points
CMFR0027 PRGT00PB Powerbrain Sorrenti F M 1-Nov-00 31-Aug-01 31-Aug-01 26,550 26,085 26,550
CMEV0007 PRGT1572 Impl. Verrone Plant Serafino F M 15-Jan-01 28-Sep-01 28-Sep-01 82,633 0 82,633
CMSP0015 PRGT2982 HRMS new. Devel. Pukly F H 1-Jan-01 31-Dec-01 31-Dec-01 108,785 0 108,785
CMSP0015 PRGT3044 Web professional Pukly F M 15-Apr-01 31-Dec-01 31-Dec-01 71,975 0 71,975
CMSP0039 PRGT0017 Estesa Di Carlo O L 7-May-01 30-Jun-01 30-Jun-01 23,750 0 23,750
CMSP0015 PRGT3047 I.I.S. HR FGP Pukly F L 1-Jan-01 31-Jul-01 31-Jul-01 77,468 0 77,468
CMSP0028 PRGT0014 Engine Sperim. Appl. Brezigar O M 12-Apr-01 31-Dec-01 31-Dec-01 158,479 0 158,479
Total 549,640 26,085 549,640
Legend
Type Compulsory (O) Impact High (H) Status Critical Tendency Flat
Firm(F) Medium(M) Medium Raising
Opportunity (O) Low (L) On track Falling
CODE NAME TYPE
ORDER XXX XXX Date 05/17/2001
PROJECT PRGTnnnn Implementation Compulsory Firm Opportunity
Description: References Architecture
Client: Operating System: Windows NT
Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT
IT Client Manager: Data Base: TBD
User Legal Entity/Functions: IT Application Manager:
IT Architect:
Impact on other Projects/Applications Notes Operating Costs Forecast
Operational: TBD
Maintenance: TBD
Milestones Issues
Start 28-Feb-01 Initial Budget 40,949
End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10
End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489
Expected gap 0.00% Expected gap -6.01% Closed Issues 20
Total Issues 30
% Open Issues/Total Issues 33.33%
Overall Project Status Best Practice Adherence
Impact:
Supplier:
Costs (Euro)
Project Characteristics
50% 100% 150% 200%
total cost forecast
50% 100% 150% 200%
total duration forecast
actual
today
CRITICAL MEDIUM GOOD HIGH MEDIUM LOW 0 1 2 3 4
CODE NAME TYPE
ORDER XXX XXX Date 05/17/2001
PROJECT PRGTnnnn Implementation Compulsory Firm Opportunity
Description: References Architecture
Client: Operating System: Windows NT
Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT
IT Client Manager: Data Base: TBD
User Legal Entity/Functions: IT Application Manager:
IT Architect:
Impact on other Projects/Applications Notes Operating Costs Forecast
Operational: TBD
Maintenance: TBD
Milestones Issues
Start 28-Feb-01 Initial Budget 40,949
End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10
End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489
Expected gap 0.00% Expected gap -6.01% Closed Issues 20
Total Issues 30
% Open Issues/Total Issues 33.33%
Overall Project Status Best Practice Adherence
Impact:
Supplier:
Costs (Euro)
Project Characteristics
50% 100% 150% 200%
total cost forecast
50% 100% 150% 200%
total duration forecast
actual
today
CRITICAL MEDIUM GOOD HIGH MEDIUM LOW 0 1 2 3 4
CODE NAME TYPE
ORDER XXX XXX Date 05/17/2001
PROJECT PRGTnnnn Implementation Compulsory Firm Opportunity
Description: References Architecture
Client: Operating System: Windows NT
Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT
IT Client Manager: Data Base: TBD
User Legal Entity/Functions: IT Application Manager:
IT Architect:
Impact on other Projects/Applications Notes Operating Costs Forecast
Operational: TBD
Maintenance: TBD
Milestones Issues
Start 28-Feb-01 Initial Budget 40,949
End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10
End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489
Expected gap 0.00% Expected gap -6.01% Closed Issues 20
Total Issues 30
% Open Issues/Total Issues 33.33%
Overall Project Status Best Practice Adherence
Impact:
Supplier:
Costs (Euro)
Project Characteristics
50% 100% 150% 200%
total cost forecast
50% 100% 150% 200%
total duration forecast
actual
today
CRITICAL MEDIUM GOOD HIGH MEDIUM LOW 0 1 2 3 4
PROJECT PRGTnnnn Implementation MONTHLY STATUS REPORT
REF. 1 / 24
MONTH MARZO 2001
PHASE PROTOTIPAZIONE
PROJECT STATUS
E’ stato definito il System Integrator. E' stato definito il Piano di progetto.
E' stata impostata la proposta di Struttura Organizzativa di Progetto. E' stata impostata la baseline per i costi di Progetto
Sono state attivate le Procedure di Gestione Scope Change Request, di Gestione Issue List e di Gestione della Documentazione.
E' stato Definito il tool di gestione della documentazione di Progetto. E' stata impostata l'Analisi del Rischio.
OPEN ISSUES ACTIONS RESPONSILE DUE DATE
1 - L'Ambiente di Prototipazione non è disponibile. Predisporre ambiente prototipazione IT Project Manager 06/04/01
NEXT STEPS
Ufficializzazione Struttura Organizzativa di progetto. Definizione dei componenti dei team da parte dei Responsabili/Referenti.
Verifica profilo di spesa e budget Architettura Tecnologica. Impostazione attività di Quality Assurance.
APPROVED CHANGE REQUESTS
Nr. Description Approval Allocated
Date Contingency
15000
19108
21356
25130
28733
33000
38114
34303
36545
40949
15020
19208
21531
25355
29058
33375
34678
36920 38489
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Gen
01
Feb
01
Mar
01
Apr
01
Mag
01
Giu
01
Lug
01
Ago
01
Set
01
Ott
01
Nov
01
Dic
01
Gen
02
Feb
02
Mar
02
Apr
02
Mag
02
Giu
02
Lug
02
Ago
02
Set
02
Ott
02
Nov
02
Dic
02
Gen
03
Feb
03
Mar
03
Baseline (Core) Baseline (Contingency)
Actual Forecast
J
a
n
-
0
1
F
e
b
-
0
1
M
a
r
-
0
1
A
p
r
-
0
1
M
a
y
-
0
1
J
u
n
-
0
1
J
u
l
-
0
1
A
u
g
-
0
1
S
e
p
-
0
1
O
c
t
-
0
1
N
o
v
-
0
1
D
e
c
-
0
1
J
a
n
-
0
2
F
e
b
-
0
2
M
a
r
-
0
2
A
p
r
-
0
2
M
a
y
-
0
2
J
u
n
-
0
2
J
u
l
-
0
2
A
u
g
-
0
2
S
e
p
-
0
2
O
c
t
-
0
2
N
o
v
-
0
2
D
e
c
-
0
2
J
a
n
-
0
3
F
e
b
-
0
3
M
a
r
-
0
3
A
p
r
-
0
3
Capability Release Design 1
Capability Release Design 2
System Test Set Up and Realisation 1
System Test Set Up and Realisation 2
Test & Training
Start Up
Support
ORDER COMM NameComm BASELINE VS ACTUAL VS FORECAST F.G.P.
PROJECT PRGTnnnn Implementation
COST (Euro)
Cost Type Cost Element Baseline Actual Forecast Notes
Development & Implementation 18,550 2,434 18,550
External Resources 0 0 0
Operational/Applicational Mngt 3,783 3,783 3,783
Total System Development 22,333 6,217 22,333
HW/SW Design & Consultancy 1,572 1,572 1,572
HW/SW Acquisition 6,500 6,500 6,500 I costi relativi all'architettura tecnologica saranno dettagliati al termine
SW Licences 3,145 3,145 3,145 della fase di definizione dei requisiti
Total HW/SW Mgnt 11,217 11,217 11,217
Total External Costs 33,550 17,434 33,550
Total Internal Resources 4,564 1,674 4,564
Partial Project Total 38,114 19,108 38,114
Contingency 2,835 100 375 Sono state attivate 3 Scope Change Request
Overall Project Total 40,949 19,208 38,489
HW/SW
Management
System
Development
Back to index
Performance Dashboard
Cost Tracking
Project Scorecard
Risk Map
Progress Report
Schedule
Costs Detail
Data Migration and Go-Live
Resources
Change Management
Project Governance
Low
High
Low High
Value
Manageability
Data Migration and Go-Live
Project Documentation
Resources
Change Management
Project Governance
Project Management
Technological Architecture
Application
Legacy Systems
Interfaces
Project Management
Technological Architecture
Application
Legacy Systems
Interfaces
Project Documentation
ScottMadden
Capital
Program/Project
Assistance
Capital Program
Assessment
Capital
Program/Project
Management
Capital
Program/Project Tools
and Performance
Reporting

Mais conteúdo relacionado

Mais procurados

Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Energy Construction Forum
 
Pmo presentation
Pmo presentation Pmo presentation
Pmo presentation Bradr998
 
Accelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability ProgramsAccelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability ProgramsSchneider Electric
 
Industrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.docIndustrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.docRay Hawksley
 
Market Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryMarket Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryUKTI2014
 
John Lushetsky | The DOE Solar Program
John Lushetsky | The DOE Solar ProgramJohn Lushetsky | The DOE Solar Program
John Lushetsky | The DOE Solar ProgramGW Solar Institute
 
Introduction to Energy Performance Contracting
Introduction to Energy Performance ContractingIntroduction to Energy Performance Contracting
Introduction to Energy Performance ContractingZAINI ABDUL WAHAB
 
Webinar: Energy Data - The New Profit Lever
Webinar: Energy Data - The New Profit LeverWebinar: Energy Data - The New Profit Lever
Webinar: Energy Data - The New Profit LeverUrjanet
 
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...Project Controls Expo
 
Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...
Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...
Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...OECD Environment
 
OST Energy - Global Services
OST Energy - Global Services OST Energy - Global Services
OST Energy - Global Services Sion Haswell
 
Renovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against GlobalRenovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against GlobalSayan Aich PE, MIET(UK)
 
2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense
2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense
2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making SenseCytel
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt
 
DLV Engineers Energy and Power profile 24Oct16
DLV Engineers Energy and Power profile 24Oct16DLV Engineers Energy and Power profile 24Oct16
DLV Engineers Energy and Power profile 24Oct16Kobus Morgan
 

Mais procurados (20)

Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...
 
2 sun shot perspective-pathways to reducing pv lcoe
2   sun shot perspective-pathways to reducing pv lcoe2   sun shot perspective-pathways to reducing pv lcoe
2 sun shot perspective-pathways to reducing pv lcoe
 
Managing Generation Assets
Managing Generation AssetsManaging Generation Assets
Managing Generation Assets
 
Pmo presentation
Pmo presentation Pmo presentation
Pmo presentation
 
Accelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability ProgramsAccelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability Programs
 
Energy Efficiency Reducing Impact Energy
Energy Efficiency Reducing Impact EnergyEnergy Efficiency Reducing Impact Energy
Energy Efficiency Reducing Impact Energy
 
Industrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.docIndustrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.doc
 
10 pv o&amp;m budgeting - pricing &amp; practices - epri v1
10   pv o&amp;m budgeting - pricing &amp; practices - epri v110   pv o&amp;m budgeting - pricing &amp; practices - epri v1
10 pv o&amp;m budgeting - pricing &amp; practices - epri v1
 
Market Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryMarket Briefing. USA. 28th January
Market Briefing. USA. 28th January
 
John Lushetsky | The DOE Solar Program
John Lushetsky | The DOE Solar ProgramJohn Lushetsky | The DOE Solar Program
John Lushetsky | The DOE Solar Program
 
Introduction to Energy Performance Contracting
Introduction to Energy Performance ContractingIntroduction to Energy Performance Contracting
Introduction to Energy Performance Contracting
 
6 designing for pv life cycle value
6   designing for pv life cycle value6   designing for pv life cycle value
6 designing for pv life cycle value
 
Webinar: Energy Data - The New Profit Lever
Webinar: Energy Data - The New Profit LeverWebinar: Energy Data - The New Profit Lever
Webinar: Energy Data - The New Profit Lever
 
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
Project Controls Expo - 31st Oct 2012 - The Practical use of Earned Value for...
 
Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...
Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...
Peter Hobson, SDCL - Introductory Presentation: Sustainable Development Capit...
 
OST Energy - Global Services
OST Energy - Global Services OST Energy - Global Services
OST Energy - Global Services
 
Renovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against GlobalRenovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against Global
 
2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense
2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense
2014Q1-0127_USAW_CONF_Weitz_When Outsourcing Stops Making Sense
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12
 
DLV Engineers Energy and Power profile 24Oct16
DLV Engineers Energy and Power profile 24Oct16DLV Engineers Energy and Power profile 24Oct16
DLV Engineers Energy and Power profile 24Oct16
 

Semelhante a Overcoming the Challenges of Large Capital Programs/Projects

Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsScottMadden, Inc.
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guidelineZuzi Evangelista
 
Resume - Jason Lewis
Resume - Jason LewisResume - Jason Lewis
Resume - Jason LewisJason Lewis
 
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Stavros Thomas
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfVincent Bui
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
William Kelvin ParkerZ to A
William Kelvin ParkerZ to A William Kelvin ParkerZ to A
William Kelvin ParkerZ to A Kelvin Parker
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood ResumeJohn Hopwood
 
Project management
Project managementProject management
Project managementSrija Kumar
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
Resume AshokHasija 2016Oct
Resume AshokHasija 2016OctResume AshokHasija 2016Oct
Resume AshokHasija 2016OctAshok Hasija
 

Semelhante a Overcoming the Challenges of Large Capital Programs/Projects (20)

Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/Projects
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guideline
 
Resume - Jason Lewis
Resume - Jason LewisResume - Jason Lewis
Resume - Jason Lewis
 
Daniel Baze
Daniel BazeDaniel Baze
Daniel Baze
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
William Kelvin ParkerZ to A
William Kelvin ParkerZ to A William Kelvin ParkerZ to A
William Kelvin ParkerZ to A
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
 
Project management
Project managementProject management
Project management
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
Res414
Res414Res414
Res414
 
Adil Mansoor
Adil MansoorAdil Mansoor
Adil Mansoor
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Resume AshokHasija 2016Oct
Resume AshokHasija 2016OctResume AshokHasija 2016Oct
Resume AshokHasija 2016Oct
 

Mais de ScottMadden, Inc.

Creating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment DecisionsCreating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment DecisionsScottMadden, Inc.
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden, Inc.
 
ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019ScottMadden, Inc.
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden, Inc.
 
ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020ScottMadden, Inc.
 
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...ScottMadden, Inc.
 
Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'ScottMadden, Inc.
 
Technology for HR Shared Services
Technology for HR Shared ServicesTechnology for HR Shared Services
Technology for HR Shared ServicesScottMadden, Inc.
 
Building a Business Case for Shared Services
Building a Business Case for Shared ServicesBuilding a Business Case for Shared Services
Building a Business Case for Shared ServicesScottMadden, Inc.
 
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterFundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterScottMadden, Inc.
 
Next Generation Shared Services Centers
Next Generation Shared Services CentersNext Generation Shared Services Centers
Next Generation Shared Services CentersScottMadden, Inc.
 
California’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck CurveCalifornia’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck CurveScottMadden, Inc.
 
Value of Strategic Direction
Value of Strategic DirectionValue of Strategic Direction
Value of Strategic DirectionScottMadden, Inc.
 
Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission? Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission? ScottMadden, Inc.
 
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...ScottMadden, Inc.
 
Shared Services Customer Satisfaction
Shared Services Customer SatisfactionShared Services Customer Satisfaction
Shared Services Customer SatisfactionScottMadden, Inc.
 
Shared Services Technologies
Shared Services TechnologiesShared Services Technologies
Shared Services TechnologiesScottMadden, Inc.
 

Mais de ScottMadden, Inc. (20)

Creating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment DecisionsCreating IT Value-A Better Way to Make IT Investment Decisions
Creating IT Value-A Better Way to Make IT Investment Decisions
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis
 
ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019ScottMadden HR Shared Services Benchmarking Study Highlights 2019
ScottMadden HR Shared Services Benchmarking Study Highlights 2019
 
ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis ScottMadden Fossil Benchmarking Analysis
ScottMadden Fossil Benchmarking Analysis
 
ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020ScottMadden Finance Shared Services Benchmark Highlights 2020
ScottMadden Finance Shared Services Benchmark Highlights 2020
 
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
The ScottMadden Energy Industry Update Webcast: Everything Counts ... In Larg...
 
Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'Energy Industry Update Webcast: Don't Stop Believin'
Energy Industry Update Webcast: Don't Stop Believin'
 
Technology for HR Shared Services
Technology for HR Shared ServicesTechnology for HR Shared Services
Technology for HR Shared Services
 
Building a Business Case for Shared Services
Building a Business Case for Shared ServicesBuilding a Business Case for Shared Services
Building a Business Case for Shared Services
 
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterFundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
 
Next Generation Shared Services Centers
Next Generation Shared Services CentersNext Generation Shared Services Centers
Next Generation Shared Services Centers
 
California’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck CurveCalifornia’s Combined Cycle Costs in the Age of the Duck Curve
California’s Combined Cycle Costs in the Age of the Duck Curve
 
Value of Strategic Direction
Value of Strategic DirectionValue of Strategic Direction
Value of Strategic Direction
 
Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission? Generation Trends: What are the Impacts on Transmission?
Generation Trends: What are the Impacts on Transmission?
 
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
The Electric Vehicle Market: Utility Perspective and Considerations for Utili...
 
Shared Services Customer Satisfaction
Shared Services Customer SatisfactionShared Services Customer Satisfaction
Shared Services Customer Satisfaction
 
Shared Services Technologies
Shared Services TechnologiesShared Services Technologies
Shared Services Technologies
 
HR Shared Service Expansion
HR Shared Service ExpansionHR Shared Service Expansion
HR Shared Service Expansion
 

Último

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 

Último (20)

Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 

Overcoming the Challenges of Large Capital Programs/Projects

  • 1. Overcoming the Challenges of Large Capital Programs/Projects Applying Lessons Learned from Extended Power Uprates
  • 2. Copyright © 2021 by ScottMadden, Inc. All rights reserved. Introduction ■ Effective capital program/project delivery is a critical competency for any electric utility to achieve high performance ■ However, project scope creep, schedule delays, and cost increases have become the rule rather than the exception ■ Over the past 10 years, the electric utility industry has seen large demands on its projects and construction management organizations to ensure compliance with a number of concerns, including: • Plant retrofits and conversions • Ash pond closures • Fukushima modifications • Security upgrade requirements • Extended power uprates (EPUs) ■ Large capital programs/projects come with a variety of complicated planning, implementation, and workforce/vendor management challenges ■ Using EPU projects as an example, we will provide you with ways to overcome these challenges for any large capital program/project 1 Lessons learned from extended power uprates can be applied to any large capital program/project.
  • 3. Copyright © 2021 by ScottMadden, Inc. All rights reserved. Overview of Power Uprates ■ Power uprates allow utilities to generate more electricity from their existing nuclear plants ■ Since the 1970s, the NRC has approved 154 uprates, which have collectively added generating capacity equivalent to about seven new reactors ■ Three types of uprates are available to a nuclear plant operator: measurement uncertainty recapture, stretch, and extended ■ As shown in the table above, implementing EPUs presents the biggest project challenges, given the need to significantly modify major pieces of plant equipment 2 Power Uprate Type Increase to Licensed Power Levels Plant and System Impacts Measurement uncertainty recapture < 2% Implementing improved techniques for calculating reactor power, e.g., utilizing state-of-the-art devices to more precisely measure feedwater flow Stretch 2 to 7% Changing instrumentation settings without major plant modifications Extended 7 to 20% Significantly modifying to major pieces of non-nuclear equipment, e.g., high-pressure turbines, condensate pumps and motors, main generators, and transformers Source: www.nrc.gov, Backgrounder on Power Uprates for Nuclear Plants
  • 4. Copyright © 2021 by ScottMadden, Inc. All rights reserved. EPU Project Challenges EPU projects pose significant scope, implementation, and workforce management challenges ■ Scope • Scope is fluid as the EPU project is implemented • Outages are typically much bigger in scope than a refueling outage, requiring the significant change-outs or upgrades of major equipment • Changes to the plant configuration (structures, equipment, and systems) must be precisely documented ■ Implementation • In many cases, the work is done while other units are still in operation • A high degree of project control rigor is required to accurately track cost and schedule against evolving scope • Physical security, ALARA limits, lock-out/tag-out requirements, etc., make the work environment very complex ■ Workforce management • A large number of skilled teams (craft workers and supervisors) that may have never worked together are involved • Some trades and/or skills are likely to be in short supply • Many workers are new to a nuclear plant work environment and lack knowledge of nuclear safety and quality standards 3 Sources: 1. IAEA Nuclear Energy Series No. NP-T-3.9, Power Uprate in Nuclear Power Plants: Guidelines and Experience, 2011 2. Von Lazar, Laszlo, “Lessons Learned from Successful Nuclear Uprate Projects”, Nuclear Power International Magazine, Volume 6, No. 4, July/August 2013
  • 5. Copyright © 2021 by ScottMadden, Inc. All rights reserved. Lessons Learned from Recent EPU Efforts ■ Planning for contingences is critical. In some cases: • Actual costs more than doubled over initially planned costs • Outage durations were as much as 25% longer than planned • Additional outages were required to complete the work ■ Costs and schedules should include contingencies for productivity issues, replacing vs. repairing components, and licensing delays • Preliminary cost estimates, based on conceptual scope, may not capture all of the work necessary to complete the project • Some components that are initially expected to be repaired or recertified will require replacement, i.e., during configuration control verification, perform a detailed drawing walk-down of pumps, motors, valve controls, etc., to minimize scope surprises • Major construction activities at an operating nuclear plant, many of which occur in remote and radiologic-controlled portions of the plant, can cause significant implementation difficulties and delays – Space for installation can be extremely tight and may require removal or working around hundreds of interferences – Productivity can be slowed due to the specialized and time-consuming procedures to ensure worker safety in radiologic- controlled and electrically sensitive areas of the plant • Increasingly conservative regulatory requirements outside of a company’s control can cause significant licensing delays ■ Obtaining and retaining experienced workers is a challenge ■ Active management of vendors is required to ensure productivity is maintained, issues are raised, and progress is on schedule 4
  • 6. Copyright © 2021 by ScottMadden, Inc. All rights reserved. EPU Project Keys to Success 5 ■ Encourage workforce collaboration and the ability of employees to voice concerns early and often to avoid costly errors, re-work, and safety hazards, i.e., maintain a focus on quality and safety ■ Develop a self-critical culture focused on improvement and efficiency ■ Recognize that the EPU team can not anticipate all the changes that will occur during the project ■ Utilize project management technology where possible to improve efficiency and communication ■ Hold regular project team meetings and invite senior leadership periodically to reinforce the priority of the project Work Environment Planning ■ Be honest and realistic about the complexity and uniqueness of the EPU project; investing early in planning and current state analysis can save a lot of rework ■ Recognize that the planning process continues all the way to project completion and that the EPU team should always be looking to improve costs, schedule, and general efficiency ■ Make benchmarking trips and incorporate lessons learned and insights, e.g., NEDO-33159, from recent EPU and stretch uprates projects into planning ■ Bring in field engineers and/or craft supervisors early in the process for review and comment on actual configuration vs. drawings and equipment installation implications ■ Hold combined design reviews with members from different disciplines; utilize the experience and expertise from each discipline to come up with a collectively better solution ■ Develop integrated work packages to improve efficiency and overall performance Sources: 1. IAEA Nuclear Energy Series No. NP-T-3.9, Power Uprate in Nuclear Power Plants: Guidelines and Experience, 2011 2. Von Lazar, Laszlo, “Lessons Learned from Successful Nuclear Uprate Projects,” Nuclear Power International Magazine, Volume 6, No. 4, July/August 2013
  • 7. Copyright © 2021 by ScottMadden, Inc. All rights reserved. EPU Project Keys to Success (Cont’d) 6 Vendor/ Contractor Alignment ■ Align vendors and contractors with project objectives and the uniqueness of the project ■ Ensure vendors and contractors are aware of and held to the tenets of nuclear safety and align their nuclear safety culture with that of your company ■ Work collaboratively with contractors and combine cost, schedule, and human performance monitoring tools and processes ■ Ensure contracts have clear terms and conditions and are very specific in scope and timing ■ Plan for vendor handoffs of work products and resolve disputes promptly to reduce idle vendor time Implementation ■ Manage like a large-scale engineering, procurement, and construction project and not like a modifications project or refueling outage, e.g., funding is stage-gated ■ Collect accurate data and monitor relevant performance metrics throughout the EPU project ■ Conduct periodic independent project audits using industry experts with previous EPU experience ■ Involve employees who will operate the plant during implementation ■ Ensure operating staff are adequately trained on how the plant will operate after the power uprate, e.g., operations, maintenance, engineering, radiation protection personnel, etc. ■ Update all affected documentation, e.g., operating and maintenance procedures, to reflect the new operating conditions ■ Focus on procedure development, training, and simulator modeling to help verify actual plant response vs. expected plant response in power uprated conditions Sources: 1. IAEA Nuclear Energy Series No. NP-T-3.9, Power Uprate in Nuclear Power Plants: Guidelines and Experience, 2011 2. Von Lazar, Laszlo, “Lessons Learned from Successful Nuclear Uprate Projects,” Nuclear Power International Magazine, Volume 6, No. 4, July/August 2013
  • 8. Copyright © 2021 by ScottMadden, Inc. All rights reserved. How ScottMadden Can Help 7 ScottMadden Capital Program/Project Assistance Perform a top-to-bottom assessment of the capital program to position it for success from the start Capital Program Assessment Capital Program/Project Management Capital Program/Project Tools and Performance Reporting Assist in establishing and implementing the organization and governance to successfully deliver the program/project Assist in establishing and implementing the tools and performance reporting to successfully control and monitor the program/project
  • 9. Copyright © 2021 by ScottMadden, Inc. All rights reserved. Capital Program Assessment Overview ScottMadden’s Capital Program Assessment examines how the capital program is implemented—from top to bottom—with a look at the PMO and a review of the performance reporting and tools in place. 8 Program Management Office Step 1: Capital Program Analysis Step 2: Process Evaluation Copyright © 2013 by ScottMadden. All rights reserved. 5 Constructability activities within alliance projects are being introduced later in the cradle to grave construction process than is typical for large project management Findings Constructability – Cost Savings Driver Current lack of a constructability process across all the elements of the construction cradle to grave process is a significant driver in NEA cost estimates being high Best In Class Projects Typical NEA Project ScottMadden’s approach analyzes these critical areas to provide a detailed assessment of your capital program with actionable recommendations. Step 6: Recommendations and Action Plan EPU Project Step 4: Execution Assessment Step 3: Organization Analysis Step 5: Performance Reporting and Tools Evaluation ScottMadden Capital Program/Project Assistance Capital Program Assessment Capital Program/Project Management Capital Program/Project Tools and Performance Reporting
  • 10. Copyright © 2021 by ScottMadden, Inc. All rights reserved. Capital Program/Project Management Overview 9 Focus On  Organization and governance  Functional relationship management  Partnership with other entities Tools  Performance Dashboard  Issue List (high impact and level)  Monthly Progress Report  Risk Analysis and Mitigation Plan (high impact and level)  Inter-project coordination  Inter-project resource coordination  Cross functionalities  Best practice usage  Documentation management  Project milestones  Costs  Times  Business/technical goals  Projects List  Project Procedures  Project Dashboard  Milestones Tracking  Issue List (Aggregated)  Risk Analysis and Mitigation Plan (Aggregated)  Weekly and Monthly Progress Reports  Project Plan  Project Documentation Management  Milestones Tracking  Risk Analysis and Mitigation Plan  Change Request Management  Issue List Management  Project Baseline and Progress Report  Weekly Progress Meeting Minutes  Weekly Progress Report  Monthly Progress Report Program Manager Project Office Project Managers ScottMadden Capital Program/Project Assistance Capital Program Assessment Capital Program/Project Management Capital Program/Project Tools and Performance Reporting
  • 11. Copyright © 2021 by ScottMadden, Inc. All rights reserved. Capital Program/Project Management Tools and Performance Reporting Overview 10 F.G.P. PROJECTS DRIVING BOARD Status Tendency (previous) Tendency (actual) TIME COST (Euro) Open issues Order Project Description Project Manager Type Impact 30-Apr-01 31-M ay-01 Baseline Start Baseline End Forecast End Budget Actual Forecast & Critical Points CMFR0027 PRGT00PB Powerbrain Sorrenti F M 1-Nov-00 31-Aug-01 31-Aug-01 26,550 26,085 26,550 CMEV0007 PRGT1572 Impl. Verrone Plant Serafino F M 15-Jan-01 28-Sep-01 28-Sep-01 82,633 0 82,633 CMSP0015 PRGT2982 HRMS new. Devel. Pukly F H 1-Jan-01 31-Dec-01 31-Dec-01 108,785 0 108,785 CMSP0015 PRGT3044 Web professional Pukly F M 15-Apr-01 31-Dec-01 31-Dec-01 71,975 0 71,975 CMSP0039 PRGT0017 Estesa Di Carlo O L 7-May-01 30-Jun-01 30-Jun-01 23,750 0 23,750 CMSP0015 PRGT3047 I.I.S. HR FGP Pukly F L 1-Jan-01 31-Jul-01 31-Jul-01 77,468 0 77,468 CMSP0028 PRGT0014 Engine Sperim. Appl. Brezigar O M 12-Apr-01 31-Dec-01 31-Dec-01 158,479 0 158,479 Total 549,640 26,085 549,640 Legend Type Compulsory (O) Impact High (H) Status Critical Tendency Flat Firm(F) Medium(M) Medium Raising Opportunity (O) Low (L) On track Falling CODE NAME TYPE ORDER XXX XXX Date 05/17/2001 PROJECT PRGTnnnn Implementation Compulsory Firm Opportunity Description: References Architecture Client: Operating System: Windows NT Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT IT Client Manager: Data Base: TBD User Legal Entity/Functions: IT Application Manager: IT Architect: Impact on other Projects/Applications Notes Operating Costs Forecast Operational: TBD Maintenance: TBD Milestones Issues Start 28-Feb-01 Initial Budget 40,949 End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10 End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489 Expected gap 0.00% Expected gap -6.01% Closed Issues 20 Total Issues 30 % Open Issues/Total Issues 33.33% Overall Project Status Best Practice Adherence Impact: Supplier: Costs (Euro) Project Characteristics 50% 100% 150% 200% total cost forecast 50% 100% 150% 200% total duration forecast actual today CRITICAL MEDIUM GOOD HIGH MEDIUM LOW 0 1 2 3 4 CODE NAME TYPE ORDER XXX XXX Date 05/17/2001 PROJECT PRGTnnnn Implementation Compulsory Firm Opportunity Description: References Architecture Client: Operating System: Windows NT Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT IT Client Manager: Data Base: TBD User Legal Entity/Functions: IT Application Manager: IT Architect: Impact on other Projects/Applications Notes Operating Costs Forecast Operational: TBD Maintenance: TBD Milestones Issues Start 28-Feb-01 Initial Budget 40,949 End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10 End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489 Expected gap 0.00% Expected gap -6.01% Closed Issues 20 Total Issues 30 % Open Issues/Total Issues 33.33% Overall Project Status Best Practice Adherence Impact: Supplier: Costs (Euro) Project Characteristics 50% 100% 150% 200% total cost forecast 50% 100% 150% 200% total duration forecast actual today CRITICAL MEDIUM GOOD HIGH MEDIUM LOW 0 1 2 3 4 CODE NAME TYPE ORDER XXX XXX Date 05/17/2001 PROJECT PRGTnnnn Implementation Compulsory Firm Opportunity Description: References Architecture Client: Operating System: Windows NT Client Legal Entity/Functions: IT Project Manager: HW Platform: Server Compaq NT IT Client Manager: Data Base: TBD User Legal Entity/Functions: IT Application Manager: IT Architect: Impact on other Projects/Applications Notes Operating Costs Forecast Operational: TBD Maintenance: TBD Milestones Issues Start 28-Feb-01 Initial Budget 40,949 End (Baseline) 31-Mar-03 Actual 19,208 Open Issues 10 End (Estimate to date) 31-Mar-03 Total Cost Forecast 38,489 Expected gap 0.00% Expected gap -6.01% Closed Issues 20 Total Issues 30 % Open Issues/Total Issues 33.33% Overall Project Status Best Practice Adherence Impact: Supplier: Costs (Euro) Project Characteristics 50% 100% 150% 200% total cost forecast 50% 100% 150% 200% total duration forecast actual today CRITICAL MEDIUM GOOD HIGH MEDIUM LOW 0 1 2 3 4 PROJECT PRGTnnnn Implementation MONTHLY STATUS REPORT REF. 1 / 24 MONTH MARZO 2001 PHASE PROTOTIPAZIONE PROJECT STATUS E’ stato definito il System Integrator. E' stato definito il Piano di progetto. E' stata impostata la proposta di Struttura Organizzativa di Progetto. E' stata impostata la baseline per i costi di Progetto Sono state attivate le Procedure di Gestione Scope Change Request, di Gestione Issue List e di Gestione della Documentazione. E' stato Definito il tool di gestione della documentazione di Progetto. E' stata impostata l'Analisi del Rischio. OPEN ISSUES ACTIONS RESPONSILE DUE DATE 1 - L'Ambiente di Prototipazione non è disponibile. Predisporre ambiente prototipazione IT Project Manager 06/04/01 NEXT STEPS Ufficializzazione Struttura Organizzativa di progetto. Definizione dei componenti dei team da parte dei Responsabili/Referenti. Verifica profilo di spesa e budget Architettura Tecnologica. Impostazione attività di Quality Assurance. APPROVED CHANGE REQUESTS Nr. Description Approval Allocated Date Contingency 15000 19108 21356 25130 28733 33000 38114 34303 36545 40949 15020 19208 21531 25355 29058 33375 34678 36920 38489 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 Gen 01 Feb 01 Mar 01 Apr 01 Mag 01 Giu 01 Lug 01 Ago 01 Set 01 Ott 01 Nov 01 Dic 01 Gen 02 Feb 02 Mar 02 Apr 02 Mag 02 Giu 02 Lug 02 Ago 02 Set 02 Ott 02 Nov 02 Dic 02 Gen 03 Feb 03 Mar 03 Baseline (Core) Baseline (Contingency) Actual Forecast J a n - 0 1 F e b - 0 1 M a r - 0 1 A p r - 0 1 M a y - 0 1 J u n - 0 1 J u l - 0 1 A u g - 0 1 S e p - 0 1 O c t - 0 1 N o v - 0 1 D e c - 0 1 J a n - 0 2 F e b - 0 2 M a r - 0 2 A p r - 0 2 M a y - 0 2 J u n - 0 2 J u l - 0 2 A u g - 0 2 S e p - 0 2 O c t - 0 2 N o v - 0 2 D e c - 0 2 J a n - 0 3 F e b - 0 3 M a r - 0 3 A p r - 0 3 Capability Release Design 1 Capability Release Design 2 System Test Set Up and Realisation 1 System Test Set Up and Realisation 2 Test & Training Start Up Support ORDER COMM NameComm BASELINE VS ACTUAL VS FORECAST F.G.P. PROJECT PRGTnnnn Implementation COST (Euro) Cost Type Cost Element Baseline Actual Forecast Notes Development & Implementation 18,550 2,434 18,550 External Resources 0 0 0 Operational/Applicational Mngt 3,783 3,783 3,783 Total System Development 22,333 6,217 22,333 HW/SW Design & Consultancy 1,572 1,572 1,572 HW/SW Acquisition 6,500 6,500 6,500 I costi relativi all'architettura tecnologica saranno dettagliati al termine SW Licences 3,145 3,145 3,145 della fase di definizione dei requisiti Total HW/SW Mgnt 11,217 11,217 11,217 Total External Costs 33,550 17,434 33,550 Total Internal Resources 4,564 1,674 4,564 Partial Project Total 38,114 19,108 38,114 Contingency 2,835 100 375 Sono state attivate 3 Scope Change Request Overall Project Total 40,949 19,208 38,489 HW/SW Management System Development Back to index Performance Dashboard Cost Tracking Project Scorecard Risk Map Progress Report Schedule Costs Detail Data Migration and Go-Live Resources Change Management Project Governance Low High Low High Value Manageability Data Migration and Go-Live Project Documentation Resources Change Management Project Governance Project Management Technological Architecture Application Legacy Systems Interfaces Project Management Technological Architecture Application Legacy Systems Interfaces Project Documentation ScottMadden Capital Program/Project Assistance Capital Program Assessment Capital Program/Project Management Capital Program/Project Tools and Performance Reporting