Hazardous Substances at
Moffett Field’s Hangar One:
Challenges and Opportunities
Moffett Field added to “Superfund” List in
1987 because of TCE Contamination
In 2003 Hangar One found to be
source of PCBs in Moffett wetlands
Navy’s proposal to demolish
hangar blocked by public outcry
So Navy removed siding/roof
and coated the frame
Long-Term Management Plan
requires inspections of coating on
• Structural steel frame (excluding the top and bottom
sides of the mezzanine deck).
• Concrete Masonry Unit (CMU) walls surrounding the
six electrical vaults.
• CMU walls surrounding the former hazardous
materials storage room.
• CMU walls that were part of the former toilets.
• Door operating mechanisms (trucks/bolsters, motor
housing, electrical vaults, and drive gear housing).
and sampling of stormwater
and sediment
EPA leading effort to replace pump-and-
treat with new groundwater remedies
Reuse will require mitigation
of vapor intrusion
Aerated floor can be installed with new
concrete slab to prevent vapor intrusion
Existing tunnel and any new
utility corridors must be sealed
and air monitoring will be
necessary after re-covering
The Navy is responsible for
inspection and maintenance of
Hangar One’s epoxy coating as well
as stormwater and sediment
sampling.
The Navy is also responsible for
vapor mitigation in existing buildings.
But it doesn’t want to be.
Any lessee who attaches a new
roof/siding and/or modifies the
hangar floor is likely to incur
Superfund liability.
SOLUTION: Navy pays lessee to take
responsibility for long-term
management of residual
contamination as well as vapor
mitigation, based upon Navy’s
projected costs.
Navy can’t just walk away.
Negotiations among lessee, NASA,
Navy, and EPA are essential.

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Dams
DamsDams
Dams
 
Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01Dams by Luke Camilleri, 3.01
Dams by Luke Camilleri, 3.01
 
Lesson3 tunnel design
Lesson3 tunnel designLesson3 tunnel design
Lesson3 tunnel design
 
Quay failure in barcelona harbour
Quay failure in barcelona harbourQuay failure in barcelona harbour
Quay failure in barcelona harbour
 
Underground construction
Underground constructionUnderground construction
Underground construction
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Stability analysis of mula dam
Stability analysis of mula damStability analysis of mula dam
Stability analysis of mula dam
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
FIELD TOUR REPORT TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...
FIELD TOUR REPORT  TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...FIELD TOUR REPORT  TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...
FIELD TOUR REPORT TOUR TO ISLAMABAD, ABOTABAD, MUREE, MUZAFFARABAD, MANGLA, ...
 
Geomorphology - irrigation on riverine plains
Geomorphology - irrigation on riverine plainsGeomorphology - irrigation on riverine plains
Geomorphology - irrigation on riverine plains
 
DaMS
DaMSDaMS
DaMS
 
S7
S7S7
S7
 
Golden gate bridge
Golden gate bridgeGolden gate bridge
Golden gate bridge
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Dam & Reservoir Structure
Dam & Reservoir StructureDam & Reservoir Structure
Dam & Reservoir Structure
 
Chapter 4 embankment dams
Chapter 4 embankment damsChapter 4 embankment dams
Chapter 4 embankment dams
 
Dams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineeringDams and Reservoirs -Hydraulics engineering
Dams and Reservoirs -Hydraulics engineering
 
Dams
Dams Dams
Dams
 
Dams
DamsDams
Dams
 
Dams and Reservoirs
Dams and ReservoirsDams and Reservoirs
Dams and Reservoirs
 

Semelhante a Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities

060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
Javad Akhtar
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 
01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...
01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...
01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...
Heather Martin, P.E.
 
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfWrite about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
arjuntelecom26
 
Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015
Abner Silva
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Sujit Tharakan
 
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Will Jacobson
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
Filipe Mello
 

Semelhante a Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities (20)

"The Disadvantages of Designing to a Blanket Factor of Safety"
"The Disadvantages of Designing to a Blanket Factor of Safety""The Disadvantages of Designing to a Blanket Factor of Safety"
"The Disadvantages of Designing to a Blanket Factor of Safety"
 
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
060626_Temple_Mills_Bridge_Reconstruction_Javad_Akhtar
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Construction Forensic
Construction ForensicConstruction Forensic
Construction Forensic
 
Groundwater remediation project
Groundwater remediation projectGroundwater remediation project
Groundwater remediation project
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...
01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...
01 Redevelopment of the Proctor Hydroelectric Powerstation - Hydrovision Pape...
 
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdfWrite about the following ethics case studies1. Hyatt Regency Walk.pdf
Write about the following ethics case studies1. Hyatt Regency Walk.pdf
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015
 
Water_Intrusion
Water_IntrusionWater_Intrusion
Water_Intrusion
 
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel ReplacementReport on Madras Atomic Power Station Emass Coolant Channel Replacement
Report on Madras Atomic Power Station Emass Coolant Channel Replacement
 
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
 
Presentazione torino 5 aprile 2016 vancouver con note
Presentazione torino 5 aprile 2016 vancouver con notePresentazione torino 5 aprile 2016 vancouver con note
Presentazione torino 5 aprile 2016 vancouver con note
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
1115
11151115
1115
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
CORROSION PROTECTION FOR AUSTRALIAN SPILLWAY GATES
CORROSION PROTECTION FOR AUSTRALIAN SPILLWAY GATESCORROSION PROTECTION FOR AUSTRALIAN SPILLWAY GATES
CORROSION PROTECTION FOR AUSTRALIAN SPILLWAY GATES
 

Mais de Steve Williams

Mais de Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
 

Último

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 

Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities

  • 1. Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
  • 2. Moffett Field added to “Superfund” List in 1987 because of TCE Contamination
  • 3. In 2003 Hangar One found to be source of PCBs in Moffett wetlands
  • 4. Navy’s proposal to demolish hangar blocked by public outcry
  • 5. So Navy removed siding/roof and coated the frame
  • 6. Long-Term Management Plan requires inspections of coating on • Structural steel frame (excluding the top and bottom sides of the mezzanine deck). • Concrete Masonry Unit (CMU) walls surrounding the six electrical vaults. • CMU walls surrounding the former hazardous materials storage room. • CMU walls that were part of the former toilets. • Door operating mechanisms (trucks/bolsters, motor housing, electrical vaults, and drive gear housing).
  • 7. and sampling of stormwater and sediment
  • 8. EPA leading effort to replace pump-and- treat with new groundwater remedies
  • 9. Reuse will require mitigation of vapor intrusion
  • 10. Aerated floor can be installed with new concrete slab to prevent vapor intrusion
  • 11. Existing tunnel and any new utility corridors must be sealed
  • 12. and air monitoring will be necessary after re-covering
  • 13. The Navy is responsible for inspection and maintenance of Hangar One’s epoxy coating as well as stormwater and sediment sampling. The Navy is also responsible for vapor mitigation in existing buildings. But it doesn’t want to be.
  • 14. Any lessee who attaches a new roof/siding and/or modifies the hangar floor is likely to incur Superfund liability.
  • 15. SOLUTION: Navy pays lessee to take responsibility for long-term management of residual contamination as well as vapor mitigation, based upon Navy’s projected costs. Navy can’t just walk away. Negotiations among lessee, NASA, Navy, and EPA are essential.