SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
What is Six Sigma?

The concepts surrounding the drive to Six Sigma quality are essentially those of statistics and probability. In simple
language, these concepts boil down to, “How confident can I be that what I planned to happen actually will happen?”
Basically, the concept of Six Sigma deals with measuring and improving how close we come to delivering on what we
planned to do.

Anything we do varies, even if only slightly, from the plan. Since no result can exactly match our intention, we usually
think in terms of ranges of acceptability for whatever we plan to do. Those ranges of acceptability (or tolerance limits)
respond to the intended use of the product of our labors–the needs and expectations of the customer.

Here’s an example. Consider how your tolerance limits might be structured to respond to customer expectations in these
two instructions:

“Cut two medium potatoes into quarter-inch cubes.” and “Drill and tap two quarter-inch holes in carbon steel brackets.”

What would be your range of acceptability–or tolerances–for the value quarter-inch? (Hint: a 5/16” potato cube
probably would be acceptable; a 5/16”threaded hole probably would not.)Another consideration in your manufacture
of potato cubes and holes would be the inherent capability of the way you produce the quarter inch dimension–the
capability of the process. Are you hand-slicing potatoes with a knife or are you using a special slicer with preset blades?
Are you drilling holes with a portable drill or are you using a drill press? If we measured enough completed potato
cubes and holes, the capabilities of the various processes would speak to us. Their language would be distribution
curves.

Distribution curves tell us not only how well our processes have done; they also tell us the probability of what our
process will do next. Statisticians group those probabilities in segments of the distribution curve called standard
deviations from the mean. The symbol they use for standard deviation is the lower-case Greek letter sigma.

For any process with a standard distribution (something that looks like a bell-shaped curve), the probability is 68.26%
that the next value will be within one standard deviation from the mean. The probability is 95.44% that the same next
value will fall within two standard deviations. The probability is 99.73% that it will be within three sigma; and 99.994%
that it will be within four sigma.


                                     Four sigma design specification width




         Few Defects                                                                              Few Defects
      (about 60 DPMO)                                                                          (about 60 DPMO)



      -6σ      -5σ     -4σ     -3σ      -2σ     -1σ      0      1σ      2σ       3σ       4σ       5σ      6σ
                 Standard distribution curve with mean, sigma values and
                                  four sigma tolerances.
                       DPMO = Defect Per Million Opportunities
If the range of acceptability, or tolerance limit, for your product is at or outside the four sigma point on the distribution
curve for your process, you are virtually assured of producing acceptable material every time–provided, of course, that
your process is centered and stays centered on your target value.

Unfortunately, even if you can center your process once, it will tend to drift. Experimental data show that most
processes that are in control still drift about 1.5 sigma on either side of their center point over time.




This means that the real probability of a process with tolerance limits at four sigma, producing acceptable material is
actually more like 98.76%, not 99.994%.

To reach near-perfect process output, the process capability curve must fit inside the tolerances such that the tolerances
are at or beyond six standard deviations, or Six Sigma, on the distribution curve. That is why we call our goal Six Sigma
quality.

Quality makes us strong
In the past, conventional wisdom said that high levels of quality cost more in the long run than
poorer quality, raising the price you had to ask for your product and making you less
competitive. Balancing quality with cost was thought to be the key to economic survival. The
surprising discovery of companies which initially developed Six Sigma, or world-class, quality
is that the best quality does not cost more. It actually costs less. The reason for this is
something called cost-of-quality. Cost-of-quality is actually the cost of deviating from quality–
paying for things like rework, scrap and warranty claims. Making things right the first time–
even if it takes more effort to get to that level of performance–actually costs much less than
creating then finding and fixing defects.
Shooting for Six Sigma:
An illustrative fable
The underlying logic of Six Sigma quality involves some
understanding of the role of statistical variation. Here’s a story
about that. Robin Hood is out in the meadow practicing for the
archery contest to be held next week at the castle. After Robin’s
first 100 shots, Friar Tuck, Robin’s Master Black Belt in archery,
adds up the number of hits in the bull’s eye of each target. He finds
that Robin hit within the bull’s eye 68% of the time.

Friar Tuck plots the results of Robin’s target practice on a chart
called a histogram. The results look something like this. “Note that
the bars in the chart form a curve that looks something like a bell,”
says the friar. “This is a standard distribution curve. Every process
that varies uniformly around a center point will form a plot that
looks like a smooth bell curve, if you make a large enough number
of trials or, in this case, shoot enough arrows.”

Robin scratches his head. Friar Tuck explains that Robin’s process involves selecting straight arrows (raw material);
holding the bow steady and smoothly releasing the bowstring (the human factor); the wood of the bow and the strength
of the string (machinery); and the technique of aiming to center the process on the bull’s eye (calibration and statistical
process control).

                                                    The product of Robin’s process is an arrow in a target. More
                                                    specifically, products that satisfy the customer are arrows that score.
                                                    Arrows outside the third circle on these targets don’t count, so they
                                                    are defects. Robin’s process appears to be 100% within specification.
                                                    In other words, every product produced is acceptable in the eyes of
                                                    the customer.

                                                    “You appear to be a three- to four-sigma archer,” the friar continues.
                                                    “We’d have to measure a lot more holes to know for sure, but let’s
                                                    assume that 99.99% of your shots score, that you’re a four sigma
                                                    shooter.” Robin strides off to tell his merry men.

                                                       The next day, the wind is constantly changing directions; there is a
                                                       light mist. Robin thinks he feels a cold coming on. Whatever the
reason, his process doesn’t stay centered on the mean the way it did before. In fact, it drifts unpredictably as much as 1.5
sigma either side of the mean. Now, instead of producing no defects, after a hundred shots, Robin has produced a defect,
a hole outside the third circle. In fact, instead of 99.99% of his shot scoring only 99.38% do.

While this may not seem as if much has changed, imagine that,
instead of shooting at targets, Robin was laser-drilling holes in
turbine blades. Let’s say there were 100 holes in each blade.
The probability of producing even one defect-free blade would
not be good. (Because the creation of defects would be random,
his process would produce some good blades as well as some
blades with multiple defects.)

Without inspecting everything many times over (not to
mention spending an enormous amount for rework and
rejected material), Robin, the laser driller, would find it
virtually impossible to ever deliver even one set of turbine
blades with properly drilled holes.
Not only would the four-sigma producer have to spend much
Overall Yield vs. Six Sigma Quality Level
                                                        time and money finding and fixing defects before products
      (Distribution Shifted +/- 1.5σ)                   could be shipped, but since inspection cannot find all the defects,
                                                        she would also have to fix problems after they got to
 Number of                                              the customer. The Six Sigma producer, on the other hand, would
parts or steps          +/- 4σ          +/- 6σ          be able to concentrate on only a handful of defects to further
       1              99.379%         99.99966%         improve the process.
       7              95.733%         99.9976%
                                                        How can the tools of Six Sigma quality help? If Robin the
      10              93.96%          99.9966%
                                                        archer were to use those tools to become a Six Sigma
      20               88.29%         99.9932%          sharpshooter instead of a four-sigma marksman, when he went
      40              77.94%          99.9864%          out into the wind and rain, he would still make every shot score.
      60               68.81%         99.9796%          Some arrows might now be in the second circle, but they would
                                                        all still be acceptable to the customer, guaranteeing first prize at
      80              60.75%          99.9728%
                                                        the contest. Robin the laser driller would also succeed; he would
      100              53.64%          99.966%
                                                        be making virtually defect free turbine blades.
      150              39.38%          99.949%
      200              28.77%          99.932%          The steps on the path to Six Sigma quality:
      300              15.43%          99.898%          1. Measurement
                                                        Six Sigma quality means attaining a business wide standard of
      400               8.28%          99.864%
                                                        making fewer than 3.4 mistakes per million opportunities to
      500               4.44%          99.830%
                                                        make a mistake.
      600               2.38%          99.796%          This quality standard includes design, manufacturing, marketing,
      700               1.28%          99.762%          administration, service, support–all facets of the business.
      800               0.69%          99.729%          Everyone has the same quality goal and essentially the same
                                                        method to reach it. While the application to engine design and
      900               0.37%          99.695%
                                                        manufacturing is obvious, the goal of Six Sigma performance–
     1,000              0.20%          99.661%          and most of the same tools–also apply to the softer, more
     1,200             0.06%           99.593%          administrative processes as well.
     5,000                 -           98.314%
                                                        After the improvement project has been clearly defined and
    20,000                 -           96.656%
                                                        bounded, the first element in the process of quality improvement
    70,000                 -           78.820%          is the measurement of performance. Effective measurement
                                                        demands taking a statistical view of all the processes and all the
                                                        problems. This reliance on data and logic is crucial to the
  Since defects are cumulative, as more parts
                                                        pursuit of Six Sigma quality.
 or more operations are added, the chance of
 producing a defective product goes up. With
                                                        The next step is, knowing what to measure. The determination
   process drift as a factor, if the number of
                                                        of sigma level is essentially based on counting defects, so we
   parts or process steps exceeds 1200, four-
                                                        must measure the frequency of defects. Mistakes or defects in a
  sigma processes are virtually incapable of            manufacturing process tend to be relatively easy to define–
    making one good product. On the other               simply a failure to meet a specification. To broaden the
 hand, a Six Sigma process with 1200 parts or           application to other processes and to further improve
    steps would still be producing a yield of           manufacturing, a new definition is helpful: a defect is any
            99.593% good products.                      failure to meet a customer satisfaction requirement, and the
                                                        customer is always the next person in the process.

In this beginning phase, you would select the critical-to-quality characteristics you plan to improve. These would be
based on an analysis of your customer’s requirements–(usually using a tool like Quality Function Deployment.) After
you clearly define your performance standards and validate your measurement system (with gage reliability and
repeatability studies), you would then be able to determine short-term and long-term process capability and actual
process performance (Cp and Cpk).

2. Analysis
The second step is to define performance objectives and identify the sources of process variation. As a business, we
have set Six Sigma performance of all processes within five years as our objective. This must be translated into specific
objectives in each operation and process. To identify sources of variation, after counting the defects we must determine
when, where and how they occur. Many tools can be used to identify the causes of the variation that creates defects.

These include tools that many people have seen before (process mapping, Pareto charts, fishbone diagrams, histograms,
scatter diagrams, run charts) and some that may be new (affinity diagrams, box-and-whisker diagrams, multivariate
analysis, hypothesis testing).

3. Improvement
This phase involves screening for potential causes of variation and discovering interrelationships between them. (The
tool commonly used in this phase is Design of Experiment or DOE.) Understanding these complex interrelationships,
then allows the setting of individual process tolerances that interact to produce the desired result.

4. Control
In the Control Phase, the process of validating the measurement system and evaluating capability is repeated to insure
that improvement occurred. Steps are then taken to control the improved processes. (Some examples of tools used in
this phase are statistical process control, mistake proofing and internal quality audits.)

Words of Wisdom about Quality
If you believe it is natural to have defects, and that quality consists of finding defects and fixing them before they get to
the customer, you are just waiting to go out of business. To improve speed and quality, you must first measure it–and
you must use a common measure.

The common business-wide measures that drive our quality improvement are defects per unit of work and cycle time per
unit of work. These measures apply equally to design, production, marketing, service, support and administration.

Everyone is responsible for producing quality; therefore, everyone must be measured and accountable for quality.
Measuring quality within an organization and pursuing an aggressive rate of improvement is the responsibility of
operational management.

Customers want on-time delivery, a product that works immediately, no early life
failures and a product that is reliable over its lifetime. If the process makes defects,
the customer cannot easily be saved from them by inspection and testing.
A robust design (one that is well within the capabilities of existing processes to
produce it) is the key to increasing customer satisfaction and reducing cost. The
way to a robust design is through concurrent engineering and integrated design
processes.

Because higher quality ultimately reduces costs, the highest quality producer is
most able to be the lowest cost producer and, therefore, the most effective
competitor in the marketplace.


                                  Steven Bonacorsi is a Certified Lean Six Sigma Senior Master Black Belt instructor and coach.
                                  Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and
                                  Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six
                                  Sigma process improvement methodologies. He has led some of the largest deployments in the
                                  world and has saved hundreds of millions with his project teams results.

                                  The AIT Group, Inc.
                                  Steven Bonacorsi, Vice President, MBA, MS-CIS, PMP
                                  Lean Six Sigma Master Black Belt
                                  3135 South Price Road, Suite 115
                                  Chandler, AZ 85248-3549
                                  Phone: +(1) 888.826.2484
                                  sbonacorsi@comcast.net
                                  http://www.linkedin.com/in/stevenbonacorsi
                                  http://www.theaitgroup.com

Mais conteúdo relacionado

Mais de Steven Bonacorsi

Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonaldsSteven Bonacorsi
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis EnergySteven Bonacorsi
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study PromappSteven Bonacorsi
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case StudySteven Bonacorsi
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans OlexSteven Bonacorsi
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma TemplatesSteven Bonacorsi
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studiesSteven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement SummitSteven Bonacorsi
 
Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan RyanSteven Bonacorsi
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Steven Bonacorsi
 

Mais de Steven Bonacorsi (20)

Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Improving Your Strategic Focus & Performance Dan Ryan
Improving Your Strategic Focus & Performance   Dan RyanImproving Your Strategic Focus & Performance   Dan Ryan
Improving Your Strategic Focus & Performance Dan Ryan
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 

Último

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 

Último (20)

Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

What Is Six Sigma

  • 1. What is Six Sigma? The concepts surrounding the drive to Six Sigma quality are essentially those of statistics and probability. In simple language, these concepts boil down to, “How confident can I be that what I planned to happen actually will happen?” Basically, the concept of Six Sigma deals with measuring and improving how close we come to delivering on what we planned to do. Anything we do varies, even if only slightly, from the plan. Since no result can exactly match our intention, we usually think in terms of ranges of acceptability for whatever we plan to do. Those ranges of acceptability (or tolerance limits) respond to the intended use of the product of our labors–the needs and expectations of the customer. Here’s an example. Consider how your tolerance limits might be structured to respond to customer expectations in these two instructions: “Cut two medium potatoes into quarter-inch cubes.” and “Drill and tap two quarter-inch holes in carbon steel brackets.” What would be your range of acceptability–or tolerances–for the value quarter-inch? (Hint: a 5/16” potato cube probably would be acceptable; a 5/16”threaded hole probably would not.)Another consideration in your manufacture of potato cubes and holes would be the inherent capability of the way you produce the quarter inch dimension–the capability of the process. Are you hand-slicing potatoes with a knife or are you using a special slicer with preset blades? Are you drilling holes with a portable drill or are you using a drill press? If we measured enough completed potato cubes and holes, the capabilities of the various processes would speak to us. Their language would be distribution curves. Distribution curves tell us not only how well our processes have done; they also tell us the probability of what our process will do next. Statisticians group those probabilities in segments of the distribution curve called standard deviations from the mean. The symbol they use for standard deviation is the lower-case Greek letter sigma. For any process with a standard distribution (something that looks like a bell-shaped curve), the probability is 68.26% that the next value will be within one standard deviation from the mean. The probability is 95.44% that the same next value will fall within two standard deviations. The probability is 99.73% that it will be within three sigma; and 99.994% that it will be within four sigma. Four sigma design specification width Few Defects Few Defects (about 60 DPMO) (about 60 DPMO) -6σ -5σ -4σ -3σ -2σ -1σ 0 1σ 2σ 3σ 4σ 5σ 6σ Standard distribution curve with mean, sigma values and four sigma tolerances. DPMO = Defect Per Million Opportunities
  • 2. If the range of acceptability, or tolerance limit, for your product is at or outside the four sigma point on the distribution curve for your process, you are virtually assured of producing acceptable material every time–provided, of course, that your process is centered and stays centered on your target value. Unfortunately, even if you can center your process once, it will tend to drift. Experimental data show that most processes that are in control still drift about 1.5 sigma on either side of their center point over time. This means that the real probability of a process with tolerance limits at four sigma, producing acceptable material is actually more like 98.76%, not 99.994%. To reach near-perfect process output, the process capability curve must fit inside the tolerances such that the tolerances are at or beyond six standard deviations, or Six Sigma, on the distribution curve. That is why we call our goal Six Sigma quality. Quality makes us strong In the past, conventional wisdom said that high levels of quality cost more in the long run than poorer quality, raising the price you had to ask for your product and making you less competitive. Balancing quality with cost was thought to be the key to economic survival. The surprising discovery of companies which initially developed Six Sigma, or world-class, quality is that the best quality does not cost more. It actually costs less. The reason for this is something called cost-of-quality. Cost-of-quality is actually the cost of deviating from quality– paying for things like rework, scrap and warranty claims. Making things right the first time– even if it takes more effort to get to that level of performance–actually costs much less than creating then finding and fixing defects.
  • 3. Shooting for Six Sigma: An illustrative fable The underlying logic of Six Sigma quality involves some understanding of the role of statistical variation. Here’s a story about that. Robin Hood is out in the meadow practicing for the archery contest to be held next week at the castle. After Robin’s first 100 shots, Friar Tuck, Robin’s Master Black Belt in archery, adds up the number of hits in the bull’s eye of each target. He finds that Robin hit within the bull’s eye 68% of the time. Friar Tuck plots the results of Robin’s target practice on a chart called a histogram. The results look something like this. “Note that the bars in the chart form a curve that looks something like a bell,” says the friar. “This is a standard distribution curve. Every process that varies uniformly around a center point will form a plot that looks like a smooth bell curve, if you make a large enough number of trials or, in this case, shoot enough arrows.” Robin scratches his head. Friar Tuck explains that Robin’s process involves selecting straight arrows (raw material); holding the bow steady and smoothly releasing the bowstring (the human factor); the wood of the bow and the strength of the string (machinery); and the technique of aiming to center the process on the bull’s eye (calibration and statistical process control). The product of Robin’s process is an arrow in a target. More specifically, products that satisfy the customer are arrows that score. Arrows outside the third circle on these targets don’t count, so they are defects. Robin’s process appears to be 100% within specification. In other words, every product produced is acceptable in the eyes of the customer. “You appear to be a three- to four-sigma archer,” the friar continues. “We’d have to measure a lot more holes to know for sure, but let’s assume that 99.99% of your shots score, that you’re a four sigma shooter.” Robin strides off to tell his merry men. The next day, the wind is constantly changing directions; there is a light mist. Robin thinks he feels a cold coming on. Whatever the reason, his process doesn’t stay centered on the mean the way it did before. In fact, it drifts unpredictably as much as 1.5 sigma either side of the mean. Now, instead of producing no defects, after a hundred shots, Robin has produced a defect, a hole outside the third circle. In fact, instead of 99.99% of his shot scoring only 99.38% do. While this may not seem as if much has changed, imagine that, instead of shooting at targets, Robin was laser-drilling holes in turbine blades. Let’s say there were 100 holes in each blade. The probability of producing even one defect-free blade would not be good. (Because the creation of defects would be random, his process would produce some good blades as well as some blades with multiple defects.) Without inspecting everything many times over (not to mention spending an enormous amount for rework and rejected material), Robin, the laser driller, would find it virtually impossible to ever deliver even one set of turbine blades with properly drilled holes.
  • 4. Not only would the four-sigma producer have to spend much Overall Yield vs. Six Sigma Quality Level time and money finding and fixing defects before products (Distribution Shifted +/- 1.5σ) could be shipped, but since inspection cannot find all the defects, she would also have to fix problems after they got to Number of the customer. The Six Sigma producer, on the other hand, would parts or steps +/- 4σ +/- 6σ be able to concentrate on only a handful of defects to further 1 99.379% 99.99966% improve the process. 7 95.733% 99.9976% How can the tools of Six Sigma quality help? If Robin the 10 93.96% 99.9966% archer were to use those tools to become a Six Sigma 20 88.29% 99.9932% sharpshooter instead of a four-sigma marksman, when he went 40 77.94% 99.9864% out into the wind and rain, he would still make every shot score. 60 68.81% 99.9796% Some arrows might now be in the second circle, but they would all still be acceptable to the customer, guaranteeing first prize at 80 60.75% 99.9728% the contest. Robin the laser driller would also succeed; he would 100 53.64% 99.966% be making virtually defect free turbine blades. 150 39.38% 99.949% 200 28.77% 99.932% The steps on the path to Six Sigma quality: 300 15.43% 99.898% 1. Measurement Six Sigma quality means attaining a business wide standard of 400 8.28% 99.864% making fewer than 3.4 mistakes per million opportunities to 500 4.44% 99.830% make a mistake. 600 2.38% 99.796% This quality standard includes design, manufacturing, marketing, 700 1.28% 99.762% administration, service, support–all facets of the business. 800 0.69% 99.729% Everyone has the same quality goal and essentially the same method to reach it. While the application to engine design and 900 0.37% 99.695% manufacturing is obvious, the goal of Six Sigma performance– 1,000 0.20% 99.661% and most of the same tools–also apply to the softer, more 1,200 0.06% 99.593% administrative processes as well. 5,000 - 98.314% After the improvement project has been clearly defined and 20,000 - 96.656% bounded, the first element in the process of quality improvement 70,000 - 78.820% is the measurement of performance. Effective measurement demands taking a statistical view of all the processes and all the problems. This reliance on data and logic is crucial to the Since defects are cumulative, as more parts pursuit of Six Sigma quality. or more operations are added, the chance of producing a defective product goes up. With The next step is, knowing what to measure. The determination process drift as a factor, if the number of of sigma level is essentially based on counting defects, so we parts or process steps exceeds 1200, four- must measure the frequency of defects. Mistakes or defects in a sigma processes are virtually incapable of manufacturing process tend to be relatively easy to define– making one good product. On the other simply a failure to meet a specification. To broaden the hand, a Six Sigma process with 1200 parts or application to other processes and to further improve steps would still be producing a yield of manufacturing, a new definition is helpful: a defect is any 99.593% good products. failure to meet a customer satisfaction requirement, and the customer is always the next person in the process. In this beginning phase, you would select the critical-to-quality characteristics you plan to improve. These would be based on an analysis of your customer’s requirements–(usually using a tool like Quality Function Deployment.) After you clearly define your performance standards and validate your measurement system (with gage reliability and repeatability studies), you would then be able to determine short-term and long-term process capability and actual process performance (Cp and Cpk). 2. Analysis The second step is to define performance objectives and identify the sources of process variation. As a business, we have set Six Sigma performance of all processes within five years as our objective. This must be translated into specific
  • 5. objectives in each operation and process. To identify sources of variation, after counting the defects we must determine when, where and how they occur. Many tools can be used to identify the causes of the variation that creates defects. These include tools that many people have seen before (process mapping, Pareto charts, fishbone diagrams, histograms, scatter diagrams, run charts) and some that may be new (affinity diagrams, box-and-whisker diagrams, multivariate analysis, hypothesis testing). 3. Improvement This phase involves screening for potential causes of variation and discovering interrelationships between them. (The tool commonly used in this phase is Design of Experiment or DOE.) Understanding these complex interrelationships, then allows the setting of individual process tolerances that interact to produce the desired result. 4. Control In the Control Phase, the process of validating the measurement system and evaluating capability is repeated to insure that improvement occurred. Steps are then taken to control the improved processes. (Some examples of tools used in this phase are statistical process control, mistake proofing and internal quality audits.) Words of Wisdom about Quality If you believe it is natural to have defects, and that quality consists of finding defects and fixing them before they get to the customer, you are just waiting to go out of business. To improve speed and quality, you must first measure it–and you must use a common measure. The common business-wide measures that drive our quality improvement are defects per unit of work and cycle time per unit of work. These measures apply equally to design, production, marketing, service, support and administration. Everyone is responsible for producing quality; therefore, everyone must be measured and accountable for quality. Measuring quality within an organization and pursuing an aggressive rate of improvement is the responsibility of operational management. Customers want on-time delivery, a product that works immediately, no early life failures and a product that is reliable over its lifetime. If the process makes defects, the customer cannot easily be saved from them by inspection and testing. A robust design (one that is well within the capabilities of existing processes to produce it) is the key to increasing customer satisfaction and reducing cost. The way to a robust design is through concurrent engineering and integrated design processes. Because higher quality ultimately reduces costs, the highest quality producer is most able to be the lowest cost producer and, therefore, the most effective competitor in the marketplace. Steven Bonacorsi is a Certified Lean Six Sigma Senior Master Black Belt instructor and coach. Steven Bonacorsi has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies. He has led some of the largest deployments in the world and has saved hundreds of millions with his project teams results. The AIT Group, Inc. Steven Bonacorsi, Vice President, MBA, MS-CIS, PMP Lean Six Sigma Master Black Belt 3135 South Price Road, Suite 115 Chandler, AZ 85248-3549 Phone: +(1) 888.826.2484 sbonacorsi@comcast.net http://www.linkedin.com/in/stevenbonacorsi http://www.theaitgroup.com