INTRODUCTION
• Work measurement is the application of techniques designed
to establish the time for a qualified worker to carry out
specified jobs at a defined level of performance.
• We have seen how total time to manufacture a product is
increased by:
adding undesirable features to product,
bad operation of the processes, and
ineffective time added because of worker and management.
• All this leads to decreased productivity.
INTRODUCTION
• Method study is one of principal techniques by which
work content in the product manufacture or process
could be decreased.
• Method study is, then, a technique to reduce the work
content mainly by eliminating unnecessary movements
by workers and/or materials and/or equipments.
• However, even after that, there could be substantial
unnecessary time taken for the process because of lack
of management control and/or inaction of worker.
INTRODUCTION
• Work measurement (WM) is concerned with
investigating, reducing and eliminating ineffective
time, whatever may be the cause.
• WM is the means of measuring the time taken in the
performance of an operation or series of operations in
such a way that the ineffective time is shown up and
can be separated out.
• In practice, proving existence of the ineffective time
is the most difficult task.
• After existence is proved, nature and extent is easy to
see!
INTRODUCTION
• WM is also used to set standard times to carry out the
work, so that any ineffective time is not included later.
• Since, standard times are set for all the activities
through WM, it has earned bad reputation amongst
workers.
• Major reason for that has been the initial focus of the
WM methods, which essentially targeted only the
worker controllable ineffective times.
• Management controllable ineffective times were ignored
traditionally.
INTRODUCTION
Two critical issues in work study:
1. Method study should precede the work
measurement, always.
2. Elimination of management controllable ineffective
time should precede the elimination of the
ineffective time within the control of the workers.
OBJECTIVES OF WM
• To determine the standard cost and as an aid in
preparing budgets.
• To balance the crew activities and those jobs
requiring several workers.
• To determine scheduling and planing work.
• To determine effectiveness of the machine.
• To balance production lines for new models or new
products.
• To make cost estimate of new products.
OBJECTIVES OF WM
• To determine time standards to be used for providing
a basis for wage incentive plans.
• To determine time standards to be used for providing
a basis for labour cost control.
COMPONENTS OF WM
• Element - An element is distinct part of specified job
selected for convenience of observation, method and
analysis
• Performance rating- Rating speed of the operator is
matter of judgement on the part of time study
analyst .
• Allowance - It's time allow the worker to recover
from fatigue and to attend the personal needs.
• Standard time - The time consumed from an avg
worker, at an avg speed, under normal working
conditions.
COMPONENTS OF WM
ELEMENT
• A repetitive element is an element which occurs in
every work cycle of the job.
• An occasional element does not occur in each work
cycle of the job, but which may occur at regular or
irregular intervals. e.g. machine setting.
• For a constant element, the basic time remains constant
whenever it is performed. e.g. switch the machine on.
• A variable element is an element for which the basic
time varies in relation to some characteristics of the
product, equipment or process, e.g. dimensions, weight,
quality etc. e.g. push trolley of parts to next shop.
COMPONENTS OF WM
• A manual element is an element performed by a
worker.
• A machine element is automatically performed by a
power-driven machine (or process).
• A governing element occupies a longer time than any
of the other elements which are being performed
concurrently. e.g. boil kettle of water, while setting out
teapot and cups.
• A foreign element is observed during a study which,
after analysis, is not found to be necessary part of the
job. e.g. degreasing a part that has still to be machined
further.
COMPONENTS OF WM
PERFORMANCE RATING
observed performance
performance rating = x 100
standard performance
COMPONENTS OF WM
ALLOWANCE
• In addition to including relaxation allowances, short rest pauses
could be added over the period of work for an operator.
• Start-up / shut-down allowance
• Cleaning allowance
• Tooling allowance
• Set-up / change-over allowance
• Reject / excess production allowance
• Learning / training allowance
• Policy allowance is an increment, other than the bonus
increment, applied to standard time to provide a satisfactory
level of earning for certain level of performances under
exceptional conditions.
COMPONENTS OF WM
STANDARD TIME
NORMAL (OR) BASIC TIME =
RatingStandard
RatingObserved
timeObserved x
STANDARD TIME = NORMAL TIME +ALLOWANCE
TECHNIQUES FOR WM
• Time study
• Synthesis from standard data
• Pre-determined motion time system [PMTS]
• Analytical estimating
• Work sampling
TIME STUDY
1. Recording the times and rates of working for the
elements of a specified job carried out under specified
conditions,
2. Analyzing the data so as to obtain the time necessary
for carrying out the job at a defined level of
performance.
STEPS IN TIME STUDY
• Break the job elements.
• Record the observed time for each elements by means
of different techniques.
• Establish elemental time values by extending
observed time into normal value for each element by
applying a rating factor.
• Assess relaxation allowance for personal needs ,
physical and mental fatigue invloved in carrying out
each element.
• Add contigency allowance , if any , to arrive at the
standard time to do the job.
STEPS IN TIME STUDY
Observed time
Normal time
Work content
Standard time
applying
rating factor
add relaxation
allowance
add contigency
and other
allowances
required
SYNTHESIS FROM STANDARD DATA
• In many industries , repetitive nature are used in batch
production, in these cases we can use synthesis technique.
• In this synthesis use standard time is computed by adding
various elemental times which constitute the work.
• Standard data are made available for the most known
elemental operations like preparing ,setting , manipulating,
removing, clearing,holding and tightening.
PMTS
• It's defined as a WM technique by which normal or basic
times are establishes for human motions and these time
values are used to build up a time for a job at defined level
of performance.
• It involves thinking or observing through a job , recording
job elements, recording pre established motion units and
calculating performance standard.
• It's an improvement over motion study , its affording
detailed motion analysis , it make to set a measure of time
thata series of motion ought to take
ANALYTICAL ESTIMATING
• It's used to determine the time values for jobs,having long
and non- reptitive operations .
• Time values detemined by using synthetic data , if synthesis
data in not available.
• Estimator shoud have adequate experience of estimating,
motion study, time study and use of standard data.
WORK SAMPLING
• It's a technique of WM , its does not involve stopwatch
measurement , as do many of other technique;
• Instead , its based on simple random sampling techniques ,
derived from statistical sampling theory,
• Work sampling known by follwing names :
1.active sampling
2.ratio delay
3.snap reading and observing
• Purpose of sampling is to estimate at what proportion of a
worker's time is devoted to work activities
USES OF WM
• To compare the efficiency of alternative methods.
Other conditions being equal, the method which takes
the least time will be the best method.
• To balance the work of members of teams, in
association with the multiple activity charts, so that,
as far as possible, each member has tasks taking an
equal time.
• To determine, in association with man and machine
multiple activity charts, the number of machines an
worker can run.
work measurement_operation management

Mais conteúdo relacionado

Mais procurados

Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
sai precious
 
types of production system
types of production systemtypes of production system
types of production system
ram4181
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
sundar sivam
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
Vivek Shelke
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
Abu Bashar
 

Mais procurados (20)

Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
method study- micromotion vs memo motion
method study- micromotion vs memo motionmethod study- micromotion vs memo motion
method study- micromotion vs memo motion
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work measurement
Work measurementWork measurement
Work measurement
 
types of production system
types of production systemtypes of production system
types of production system
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Method study
Method studyMethod study
Method study
 
Work measurement
Work measurementWork measurement
Work measurement
 
Time study
Time studyTime study
Time study
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Line balancing
Line balancingLine balancing
Line balancing
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Material management & Inventory control
Material management & Inventory controlMaterial management & Inventory control
Material management & Inventory control
 
Work study
Work studyWork study
Work study
 
CAPACITY PLANNING
CAPACITY PLANNINGCAPACITY PLANNING
CAPACITY PLANNING
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 

Semelhante a work measurement_operation management

Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
videoaakash15
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 

Semelhante a work measurement_operation management (20)

work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
 
work-measurement.pptx
work-measurement.pptxwork-measurement.pptx
work-measurement.pptx
 
Work measurement
Work measurementWork measurement
Work measurement
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
WORK MEASUREMENT
WORK MEASUREMENTWORK MEASUREMENT
WORK MEASUREMENT
 
presentation group 5.pptx
presentation group 5.pptxpresentation group 5.pptx
presentation group 5.pptx
 
Production and material management
Production and material managementProduction and material management
Production and material management
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
 
Work study
Work studyWork study
Work study
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
IE training
IE training IE training
IE training
 
IE Training
IE Training IE Training
IE Training
 
Sanket work study-1
Sanket work study-1Sanket work study-1
Sanket work study-1
 
Management tools
Management toolsManagement tools
Management tools
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 

Mais de Saravanan Murugan (7)

Supply chain management unit 5
Supply chain management  unit 5Supply chain management  unit 5
Supply chain management unit 5
 
ISO 9000 standards
ISO 9000 standards ISO 9000 standards
ISO 9000 standards
 
Corporate tax planning
Corporate tax planningCorporate tax planning
Corporate tax planning
 
Meaning &significance of spc
Meaning &significance of spcMeaning &significance of spc
Meaning &significance of spc
 
Starbucks marketing strategy
Starbucks marketing strategyStarbucks marketing strategy
Starbucks marketing strategy
 
Critical incident method_hrm_appraisal
Critical incident method_hrm_appraisalCritical incident method_hrm_appraisal
Critical incident method_hrm_appraisal
 
Communication
Communication Communication
Communication
 

Último

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 

work measurement_operation management

  • 2. INTRODUCTION • Work measurement is the application of techniques designed to establish the time for a qualified worker to carry out specified jobs at a defined level of performance. • We have seen how total time to manufacture a product is increased by: adding undesirable features to product, bad operation of the processes, and ineffective time added because of worker and management. • All this leads to decreased productivity.
  • 3. INTRODUCTION • Method study is one of principal techniques by which work content in the product manufacture or process could be decreased. • Method study is, then, a technique to reduce the work content mainly by eliminating unnecessary movements by workers and/or materials and/or equipments. • However, even after that, there could be substantial unnecessary time taken for the process because of lack of management control and/or inaction of worker.
  • 4. INTRODUCTION • Work measurement (WM) is concerned with investigating, reducing and eliminating ineffective time, whatever may be the cause. • WM is the means of measuring the time taken in the performance of an operation or series of operations in such a way that the ineffective time is shown up and can be separated out. • In practice, proving existence of the ineffective time is the most difficult task. • After existence is proved, nature and extent is easy to see!
  • 5. INTRODUCTION • WM is also used to set standard times to carry out the work, so that any ineffective time is not included later. • Since, standard times are set for all the activities through WM, it has earned bad reputation amongst workers. • Major reason for that has been the initial focus of the WM methods, which essentially targeted only the worker controllable ineffective times. • Management controllable ineffective times were ignored traditionally.
  • 6. INTRODUCTION Two critical issues in work study: 1. Method study should precede the work measurement, always. 2. Elimination of management controllable ineffective time should precede the elimination of the ineffective time within the control of the workers.
  • 7. OBJECTIVES OF WM • To determine the standard cost and as an aid in preparing budgets. • To balance the crew activities and those jobs requiring several workers. • To determine scheduling and planing work. • To determine effectiveness of the machine. • To balance production lines for new models or new products. • To make cost estimate of new products.
  • 8. OBJECTIVES OF WM • To determine time standards to be used for providing a basis for wage incentive plans. • To determine time standards to be used for providing a basis for labour cost control.
  • 9. COMPONENTS OF WM • Element - An element is distinct part of specified job selected for convenience of observation, method and analysis • Performance rating- Rating speed of the operator is matter of judgement on the part of time study analyst . • Allowance - It's time allow the worker to recover from fatigue and to attend the personal needs. • Standard time - The time consumed from an avg worker, at an avg speed, under normal working conditions.
  • 10. COMPONENTS OF WM ELEMENT • A repetitive element is an element which occurs in every work cycle of the job. • An occasional element does not occur in each work cycle of the job, but which may occur at regular or irregular intervals. e.g. machine setting. • For a constant element, the basic time remains constant whenever it is performed. e.g. switch the machine on. • A variable element is an element for which the basic time varies in relation to some characteristics of the product, equipment or process, e.g. dimensions, weight, quality etc. e.g. push trolley of parts to next shop.
  • 11. COMPONENTS OF WM • A manual element is an element performed by a worker. • A machine element is automatically performed by a power-driven machine (or process). • A governing element occupies a longer time than any of the other elements which are being performed concurrently. e.g. boil kettle of water, while setting out teapot and cups. • A foreign element is observed during a study which, after analysis, is not found to be necessary part of the job. e.g. degreasing a part that has still to be machined further.
  • 12. COMPONENTS OF WM PERFORMANCE RATING observed performance performance rating = x 100 standard performance
  • 13. COMPONENTS OF WM ALLOWANCE • In addition to including relaxation allowances, short rest pauses could be added over the period of work for an operator. • Start-up / shut-down allowance • Cleaning allowance • Tooling allowance • Set-up / change-over allowance • Reject / excess production allowance • Learning / training allowance • Policy allowance is an increment, other than the bonus increment, applied to standard time to provide a satisfactory level of earning for certain level of performances under exceptional conditions.
  • 14. COMPONENTS OF WM STANDARD TIME NORMAL (OR) BASIC TIME = RatingStandard RatingObserved timeObserved x STANDARD TIME = NORMAL TIME +ALLOWANCE
  • 15. TECHNIQUES FOR WM • Time study • Synthesis from standard data • Pre-determined motion time system [PMTS] • Analytical estimating • Work sampling
  • 16. TIME STUDY 1. Recording the times and rates of working for the elements of a specified job carried out under specified conditions, 2. Analyzing the data so as to obtain the time necessary for carrying out the job at a defined level of performance.
  • 17. STEPS IN TIME STUDY • Break the job elements. • Record the observed time for each elements by means of different techniques. • Establish elemental time values by extending observed time into normal value for each element by applying a rating factor. • Assess relaxation allowance for personal needs , physical and mental fatigue invloved in carrying out each element. • Add contigency allowance , if any , to arrive at the standard time to do the job.
  • 18. STEPS IN TIME STUDY Observed time Normal time Work content Standard time applying rating factor add relaxation allowance add contigency and other allowances required
  • 19. SYNTHESIS FROM STANDARD DATA • In many industries , repetitive nature are used in batch production, in these cases we can use synthesis technique. • In this synthesis use standard time is computed by adding various elemental times which constitute the work. • Standard data are made available for the most known elemental operations like preparing ,setting , manipulating, removing, clearing,holding and tightening.
  • 20. PMTS • It's defined as a WM technique by which normal or basic times are establishes for human motions and these time values are used to build up a time for a job at defined level of performance. • It involves thinking or observing through a job , recording job elements, recording pre established motion units and calculating performance standard. • It's an improvement over motion study , its affording detailed motion analysis , it make to set a measure of time thata series of motion ought to take
  • 21. ANALYTICAL ESTIMATING • It's used to determine the time values for jobs,having long and non- reptitive operations . • Time values detemined by using synthetic data , if synthesis data in not available. • Estimator shoud have adequate experience of estimating, motion study, time study and use of standard data.
  • 22. WORK SAMPLING • It's a technique of WM , its does not involve stopwatch measurement , as do many of other technique; • Instead , its based on simple random sampling techniques , derived from statistical sampling theory, • Work sampling known by follwing names : 1.active sampling 2.ratio delay 3.snap reading and observing • Purpose of sampling is to estimate at what proportion of a worker's time is devoted to work activities
  • 23. USES OF WM • To compare the efficiency of alternative methods. Other conditions being equal, the method which takes the least time will be the best method. • To balance the work of members of teams, in association with the multiple activity charts, so that, as far as possible, each member has tasks taking an equal time. • To determine, in association with man and machine multiple activity charts, the number of machines an worker can run.