Pro-Active, High Penetration PV Analysis
on Distribution Systems
1
PV Distribution System Modeling Workshop
Santa Clara, CA
DNV GL © 2013 May 6th 2014
Contents
 Introduction
 Objectives of Analyses
 Overview of Approach
 Technical Criteria
 Analysis in SynerGEE
 Modeling Advanced Inverter Functions in SynerGEE
 Conclusion
2
DNV GL © 2013 May 6th 2014
Introduction – DNV GL
 Merger of brands, consolidation of experience and expertise
3
DNV GL © 2013 May 6th 2014
An energy technology powerhouse
4
Offshore wind
Strong expertise in offshore
wind, its support vessels and
connection to the electricity grid
Innovation
Strategic research in energy
storage, smart grids and super
grids; developments of new
standards through joint industry
projects
Testing
Global leader in testing,
inspecting and certifying high-
power and renewable energy
equipment with world class
laboratories
Expert advice
In onshore and offshore wind
power, solar, smart grids, super
grids, infrastructure resilience,
energy markets, regulations and
use
Power player
A strong player across the value
chain: renewable and
conventional power generation,
transmission & distribution and
sustainable energy use
DNV GL © 2013 May 6th 2014
Introduction – Jonathan Flinn
 MEng Mechanical Engineering with Aeronautics, University of Strathclyde, 2004
 MSc Safety, Risk and Reliability Engineering, Heriot-Watt University, 2005
 9 years in DNV GL
 Worked with pipelines, wind energy, arctic operations, wave and tidal energy
 Worked in transmission and distribution since 2011
5
DNV GL © 2013 May 6th 2014
Introduction – Pro-Active Approach
 Developed in co-operation with HECO
 Aim to streamline PV interconnection process
 Objectives:
– Improve PV interconnection process
– Identify limits on a circuit-specific basis
– Facilitate efficient network planning
– Identification of limits in advance
– Identify existing risks
– Compare limits with existing PV penetrations
– Identify future limits to PV integration
– Run hypothetical future PV scenarios up to high PV penetrations
– Identify appropriate mitigation measures
– Developed from list of potential mitigation measures
6
DNV GL © 2013 May 6th 2014
CA Rule 21
7
Complete application received
Screen 1: Connection to distribution system?
Screen 2: Connection to network
Screen 3: Export power causes reverse flow at
voltage regulation devices
Screen 4: Is the aggregate generating facility on
the line section <=15% of line section peak load
Screen 5: Is voltage flicker and/or voltage drop
due to project within IEEE 519 limits
Screen 6: DG <= 10kW
Screen 7: Inverter-based DG <= 250kW
meets IEEE 1547 & UL 1741
Screen 8: SCCR within acceptable limits
Screen 9: Interconnection compatible with line
configuration
Perform
Supplemental Review
Does not qualify for
interconnection under Rule
21
Does supplemental
review determine
requirements?
Company provides the
cost estimate and
schedule for IRS to
determine requirements
Generating Facility
qualifies for
interconnection subject
to requirements, if any,
determined by
supplemental review
Generating
Facility qualifies
for Simplified
Interconnection
no
no
no
yes
yes
no
no
yes
yes
yes
yes
no
no
no
no
yes
yes
yes
yes no
DNV GL © 2013 May 6th 2014
CA Rule 21
8
Complete application received
Screen 1: Connection to distribution system?
Screen 2: Connection to network
Screen 3: Export power causes reverse flow at
voltage regulation devices
Screen 4: Is the aggregate generating facility on
the line section <=15% of line section peak load
Screen 5: Is voltage flicker and/or voltage drop
due to project within IEEE 519 limits
Screen 6: DG <= 10kW
Screen 7: Inverter-based DG <= 250kW
meets IEEE 1547 & UL 1741
Screen 8: SCCR within acceptable limits
Screen 9: Interconnection compatible with line
configuration
Perform
Supplemental Review
Does not qualify for
interconnection under Rule
21
Does supplemental
review determine
requirements?
Company provides the
cost estimate and
schedule for IRS to
determine requirements
Generating Facility
qualifies for
interconnection subject
to requirements, if any,
determined by
supplemental review
Generating
Facility qualifies
for Simplified
Interconnection
no
no
no
yes
yes
no
no
yes
yes
yes
yes
no
no
no
no
yes
yes
yes
yes no
Pro-active approach identifies at
which PV penetrations this will occur
for each feeder/transformer
DNV GL © 2013 May 6th 2014
CA Rule 21
9
Complete application received
Screen 1: Connection to distribution system?
Screen 2: Connection to network
Screen 3: Export power causes reverse flow at
voltage regulation devices
Screen 4: Is the aggregate generating facility on
the line section <=15% of line section peak load
Screen 5: Is voltage flicker and/or voltage drop
due to project within IEEE 519 limits
Screen 6: DG <= 10kW
Screen 7: Inverter-based DG <= 250kW
meets IEEE 1547 & UL 1741
Screen 8: SCCR within acceptable limits
Screen 9: Interconnection compatible with line
configuration
Perform
Supplemental Review
Does not qualify for
interconnection under Rule
21
Does supplemental
review determine
requirements?
Company provides the
cost estimate and
schedule for IRS to
determine requirements
Generating Facility
qualifies for
interconnection subject
to requirements, if any,
determined by
supplemental review
Generating
Facility qualifies
for Simplified
Interconnection
no
no
no
yes
yes
no
no
yes
yes
yes
yes
no
no
no
no
yes
yes
yes
yes no
Pro-active approach identifies
specific limitations for each
feeder/cluster due to different
criteria (thermal loading, voltage
violations, etc.),
DNV GL © 2013 May 6th 2014
CA Rule 21
10
Complete application received
Screen 1: Connection to distribution system?
Screen 2: Connection to network
Screen 3: Export power causes reverse flow at
voltage regulation devices
Screen 4: Is the aggregate generating facility on
the line section <=15% of line section peak load
Screen 5: Is voltage flicker and/or voltage drop
due to project within IEEE 519 limits
Screen 6: DG <= 10kW
Screen 7: Inverter-based DG <= 250kW
meets IEEE 1547 & UL 1741
Screen 8: SCCR within acceptable limits
Screen 9: Interconnection compatible with line
configuration
Perform
Supplemental Review
Does not qualify for
interconnection under Rule
21
Does supplemental
review determine
requirements?
Company provides the
cost estimate and
schedule for IRS to
determine requirements
Generating Facility
qualifies for
interconnection subject
to requirements, if any,
determined by
supplemental review
Generating
Facility qualifies
for Simplified
Interconnection
no
no
no
yes
yes
no
no
yes
yes
yes
yes
no
no
no
no
yes
yes
yes
yes no
Identification of areas of
risk/interest for the feeder, allows
focus of analysis on circuit-
specific issues
DNV GL © 2013 May 6th 2014
System Boundaries
11
Example of system
boundary
One sub-transmission
line, plus all
connected distribution
feeders
DNV GL © 2013 May 6th 2014
Analysis Approach
 Model load independently of solar
– Requires some manipulation of
demand data
 Find peak and minimum daytime load
days
 Run analyses with varying penetrations
of PV
 Use linear interpolation to find
technical limits
12
DNV GL © 2013 May 6th 2014
Analysis Approach
 Use combinations of load profile and PV penetration
13
Load Scenarios
1. Peak Daytime Load
Day
2. Minimum Daytime
Load Day
PV Penetration
Scenarios
1. No PV
2. Existing PV
3. Existing + Queued PV
4. PV = 15% of Peak Load
5. PV = 30% of Peak Load
6. PV = 50% of Peak Load
7. PV = 75% of Peak Load
8. PV = 100% of Peak Load
9. PV = 135% of Peak Load
DNV GL © 2013 May 6th 2014
Technical Criteria
14
Technical Criterion Limit or Trigger
Steady-State Voltage V > 1.05 p.u. or V < 0.95 p.u.
Thermal Loading Loading > 100%
Backfeed Reversal of flow through transformer
Fault Current Available fault current exceeds breaker interrupt rating
Transient Voltage Voltage change > 3% during step change in PV output
Dynamic Voltage Overvoltage / undervoltage due to inverter trips during N-1
Dynamic Frequency Additional load shedding due to inverter trips during N-1
LTC Cycling Increase in LTC operations due to PV operation
DNV GL © 2013 May 6th 2014
LTC Cycling Studies
 An increase in LTC cycling due to PV is not necessarily a significant problem
– If it causes 1 extra operation per week, still very small change
 At some point it could become a problem, causing decrease in time between
maintenance, and LTC lifetime
– Number of increased operations per year can be calculated for each PV
penetration, and compared against a limit defined by utility
15
N
u
m
b
e
r
o
f
E
v
e
n
t
s
Change in Irradiance [W/m2s]
DNV GL © 2013 May 6th 2014
LTC Cycling Studies
 A reverse effect must also be studied:
– PV operation causes reduced current through LTC compared to no-LTC case
– Reduced current may increase LTC contact lifetime
– This effect reverses past point of backfeed, where increased PV causes
increased current
– Chart below comes from Kaukesha UZD LTC Technical Manual
16
DNV GL © 2013 May 6th 2014
Analysis in SynerGEE – Model Setup
 Load and generation on utilization circuits
aggregated to distribution transformers
 PV modeled as generator in SynerGEE (not
negative load)
– Necessary for fault analysis
– Also allows use of irradiance profiles
 Existing generators modeled in existing
locations
 Hypothetical ‘future’ generators placed by
analyst to allow up to 150% PV Penetration
17
DNV GL © 2013 May 6th 2014
Analysis in SynerGEE – Recipe Scripts
 SynerGEE allows use of automated
analysis
– Consecutive load flows run using
‘recipe’ commands
– Outputs saved to specified location
– Ideal for use with 24-hour load profiles
 Model Cleanup scripts can be used to
make changes between analyses
18
DNV GL © 2013 May 6th 2014
Analysis in SynerGEE - Solver
 SynerGEE add-on which further increases flexibility
 Allows changes to be made to model (more than Recipe or ModClean)
 Compiles and post-processes results
 Requires some basic programming skills
 Flexibility is useful in Advanced Inverter Modeling
19
DNV GL © 2013 May 6th 2014
Mitigation of PV Impacts
Mitigant Backfeed Loading Voltage LTC
Cycling
Fault
Current
Dynamics Transients
Energy Storage X X X X
Curtailment X X X X
Inverter power
factor control
X
Inverter
disconnection and
re-closing control
X X
Equipment
upgrades
X X X X
20
DNV GL © 2013 May 6th 2014
Energy Storage
21
Load > PV:
Load is fed by grid
PV > Load:
Load is fed by PV
PV > Load:
Excess PV charges
battery
Load > PV:
Load is fed
by battery
 Mitigates: Backfeed Violations, Voltage Violations
 Energy storage systems can be used to prevent backfeed from occurring
 Simple model in SynerGEE
is to calculate total reverse
power flow and energy
 New battery model in
SynerGEE 5.1 will allow
individual batteries to be
charged and discharged
DNV GL © 2013 May 6th 2014
Curtailments
 Curtailment is a smart inverter function
 Allows utility to either:
– Reduce output from generator to solve problem
– Disconnect generator completely
 Cost to utility is cost of ‘lost’ energy to generator
 Simple model in SynerGEE is same as for energy storage:
– Calculate total energy that would be curtailed to prevent backfeed
22
DNV GL © 2013 May 6th 2014
Inverter Power Factor Control
 Increasing or decreasing VAR output from inverter can regulate local voltage
23
 Single time-step can easily be
modified in SynerGEE
 Automation can run multiple
time-steps consecutively and
identify local voltage problems
using Solver:
Run load flow
Voltage
violation?
Reduce inverter
power factor
Move
to next
time-
step
No
Yes
 Complexity of process can be increased
 In practice staged reduction in power factor will
be necessary to prevent over-correction
DNV GL © 2013 May 6th 2014
Inverter Disconnection and Re-Closing control
 When trips and transient events happen, loss and return of all generators at once
can cause problems due to time delay on LTC
 Smart inverters provide options:
– Ramp up of output
– Variable trip settings
– Variable re-closing settings
24
DNV GL © 2013 May 6th 2014
Comparison of Mitigation Techniques
25
DNV GL © 2013 May 6th 2014
Conclusion
 Pro-Active Approach can help to streamline PV interconnection process
– Can also help to plan equipment upgrades
 Analysis performed in SynerGEE allows flexibility to modify process
– Also allows automation of analysis and post-processing
 Flexibility of SynerGEE also allows approximation of advanced and smart inverter
characteristics
– Integration with energy storage
– Curtailment
– Power factor control
– Output ramping
26
DNV GL © 2013 May 6th 2014
SAFER, SMARTER, GREENER
www.dnvgl.com
Thank you for your attention
27
Jonathan Flinn
Jonathan.flinn@dnvgl.com
(925) 327-3044

Mais conteúdo relacionado

Mais procurados

Virtual Power Plant - Becky Harrison, Progress Energy
Virtual Power Plant - Becky Harrison, Progress EnergyVirtual Power Plant - Becky Harrison, Progress Energy
Virtual Power Plant - Becky Harrison, Progress EnergyEnergy Network marcus evans
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice ReportPaul Soko
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_oAllan Lewis
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRick Case, PMP, P.E.
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15Lin Zhang, PhD
 
NASPI_BPA_EPG_LSE_SDVCA_031816-F
NASPI_BPA_EPG_LSE_SDVCA_031816-FNASPI_BPA_EPG_LSE_SDVCA_031816-F
NASPI_BPA_EPG_LSE_SDVCA_031816-FLin Zhang, PhD
 
Analyses and monitoring of 132 k v grid using etap software
Analyses and monitoring of 132 k v grid using etap softwareAnalyses and monitoring of 132 k v grid using etap software
Analyses and monitoring of 132 k v grid using etap softwareArslan Sajjad
 
L3_Power_SIMnews_42
L3_Power_SIMnews_42L3_Power_SIMnews_42
L3_Power_SIMnews_42Sean Bradley
 

Mais procurados (20)

2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
 
storagePMR
storagePMRstoragePMR
storagePMR
 
2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...
2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...
2014 PV Distribution System Modeling Workshop: High Penetration PV Control Co...
 
2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...
2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...
2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...
 
07 adhikari aps spp - epri-sandia pv symp - 05102016
07 adhikari aps spp - epri-sandia pv symp - 0510201607 adhikari aps spp - epri-sandia pv symp - 05102016
07 adhikari aps spp - epri-sandia pv symp - 05102016
 
Virtual Power Plant - Becky Harrison, Progress Energy
Virtual Power Plant - Becky Harrison, Progress EnergyVirtual Power Plant - Becky Harrison, Progress Energy
Virtual Power Plant - Becky Harrison, Progress Energy
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
 
13 tansy ssa grid int @ epri_sandia 2016
13 tansy ssa grid int @ epri_sandia 201613 tansy ssa grid int @ epri_sandia 2016
13 tansy ssa grid int @ epri_sandia 2016
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_o
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disaster
 
NMRESGI_Virtual Power Plants and Large Scale Renewable Integration_Johnson 8-...
NMRESGI_Virtual Power Plants and Large Scale Renewable Integration_Johnson 8-...NMRESGI_Virtual Power Plants and Large Scale Renewable Integration_Johnson 8-...
NMRESGI_Virtual Power Plants and Large Scale Renewable Integration_Johnson 8-...
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15
 
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
 
NASPI_BPA_EPG_LSE_SDVCA_031816-F
NASPI_BPA_EPG_LSE_SDVCA_031816-FNASPI_BPA_EPG_LSE_SDVCA_031816-F
NASPI_BPA_EPG_LSE_SDVCA_031816-F
 
14 berdner hawaiian adv inverters
14 berdner   hawaiian adv inverters14 berdner   hawaiian adv inverters
14 berdner hawaiian adv inverters
 
Analyses and monitoring of 132 k v grid using etap software
Analyses and monitoring of 132 k v grid using etap softwareAnalyses and monitoring of 132 k v grid using etap software
Analyses and monitoring of 132 k v grid using etap software
 
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
 
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
 
L3_Power_SIMnews_42
L3_Power_SIMnews_42L3_Power_SIMnews_42
L3_Power_SIMnews_42
 

Destaque

Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...idescitation
 
vivint-case-study
vivint-case-studyvivint-case-study
vivint-case-studyTodd Newman
 
Southern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid ImpactsSouthern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid ImpactsCenter for Sustainable Energy
 
Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016Nathan Sender
 
Vivint Wireless How to De-Risk a New Venture & Build a Better ISP - Luke L...
Vivint Wireless   How to De-Risk a New Venture & Build a Better ISP  - Luke L...Vivint Wireless   How to De-Risk a New Venture & Build a Better ISP  - Luke L...
Vivint Wireless How to De-Risk a New Venture & Build a Better ISP - Luke L...Lounge47
 
SCE rate update to KCTA 120209
SCE rate update to KCTA 120209SCE rate update to KCTA 120209
SCE rate update to KCTA 120209KernTax
 
Apps for Good: Space monkey's Fashion Disaster APP Pitch Presentation
Apps for Good: Space monkey's Fashion Disaster APP Pitch PresentationApps for Good: Space monkey's Fashion Disaster APP Pitch Presentation
Apps for Good: Space monkey's Fashion Disaster APP Pitch PresentationcardinalwisemanICT
 
Edison : vivint rates pp
Edison : vivint rates ppEdison : vivint rates pp
Edison : vivint rates ppTydus Queiroz
 
Home Security and Home Automation Products and Services with Vivint
Home Security and Home Automation Products and Services with VivintHome Security and Home Automation Products and Services with Vivint
Home Security and Home Automation Products and Services with VivintVivint Smart Home
 
History of Vivint Home Security
History of Vivint Home SecurityHistory of Vivint Home Security
History of Vivint Home SecurityVivint Smart Home
 
Solar rooftop in bangalore
Solar rooftop in bangaloreSolar rooftop in bangalore
Solar rooftop in bangaloresai
 
Case studies – Ed Hill – Specialised Solar Systems
Case studies – Ed Hill – Specialised Solar SystemsCase studies – Ed Hill – Specialised Solar Systems
Case studies – Ed Hill – Specialised Solar SystemsIIED
 

Destaque (18)

2014 PV Reliability, Operations & Maintenance Workshop: PV System Health Char...
2014 PV Reliability, Operations & Maintenance Workshop: PV System Health Char...2014 PV Reliability, Operations & Maintenance Workshop: PV System Health Char...
2014 PV Reliability, Operations & Maintenance Workshop: PV System Health Char...
 
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
2014 PV Reliability, Operations & Maintenance Workshop: O&M with SCADA, AlsoE...
 
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
 
2014 PV Distribution System Modeling Workshop: Purpose of Advanced Inverters-...
2014 PV Distribution System Modeling Workshop: Purpose of Advanced Inverters-...2014 PV Distribution System Modeling Workshop: Purpose of Advanced Inverters-...
2014 PV Distribution System Modeling Workshop: Purpose of Advanced Inverters-...
 
vivint-case-study
vivint-case-studyvivint-case-study
vivint-case-study
 
Southern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid ImpactsSouthern California Edison: Utility Bills and Grid Impacts
Southern California Edison: Utility Bills and Grid Impacts
 
Resume' - Bryan
Resume' - BryanResume' - Bryan
Resume' - Bryan
 
Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016
 
Vivint Wireless How to De-Risk a New Venture & Build a Better ISP - Luke L...
Vivint Wireless   How to De-Risk a New Venture & Build a Better ISP  - Luke L...Vivint Wireless   How to De-Risk a New Venture & Build a Better ISP  - Luke L...
Vivint Wireless How to De-Risk a New Venture & Build a Better ISP - Luke L...
 
Why Vivint?
Why Vivint?Why Vivint?
Why Vivint?
 
Southern California Edison
Southern California EdisonSouthern California Edison
Southern California Edison
 
SCE rate update to KCTA 120209
SCE rate update to KCTA 120209SCE rate update to KCTA 120209
SCE rate update to KCTA 120209
 
Apps for Good: Space monkey's Fashion Disaster APP Pitch Presentation
Apps for Good: Space monkey's Fashion Disaster APP Pitch PresentationApps for Good: Space monkey's Fashion Disaster APP Pitch Presentation
Apps for Good: Space monkey's Fashion Disaster APP Pitch Presentation
 
Edison : vivint rates pp
Edison : vivint rates ppEdison : vivint rates pp
Edison : vivint rates pp
 
Home Security and Home Automation Products and Services with Vivint
Home Security and Home Automation Products and Services with VivintHome Security and Home Automation Products and Services with Vivint
Home Security and Home Automation Products and Services with Vivint
 
History of Vivint Home Security
History of Vivint Home SecurityHistory of Vivint Home Security
History of Vivint Home Security
 
Solar rooftop in bangalore
Solar rooftop in bangaloreSolar rooftop in bangalore
Solar rooftop in bangalore
 
Case studies – Ed Hill – Specialised Solar Systems
Case studies – Ed Hill – Specialised Solar SystemsCase studies – Ed Hill – Specialised Solar Systems
Case studies – Ed Hill – Specialised Solar Systems
 

Semelhante a 2014 PV Distribution System Modeling Workshop: Pro-active, high penetration PV studies on distribution systems: Jonathan Flinn, DNV GL

Design of Low-Voltage Distributed Photovoltaic Systems Oriented to Improve ...
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to   Improve ...Design of Low-Voltage Distributed Photovoltaic Systems Oriented to   Improve ...
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to Improve ...IRJET Journal
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseDNVGLEnergy
 
Best practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studiesBest practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studiesLeonardo ENERGY
 
Integrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdfIntegrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdfHeangsokleap1
 
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-AustraliaSteven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australiagoldwindaus
 
V2G Cohort: The Future
V2G Cohort: The FutureV2G Cohort: The Future
V2G Cohort: The FutureKTN
 
5 cired2013 planning of power distribution systems
5   cired2013 planning of power distribution systems5   cired2013 planning of power distribution systems
5 cired2013 planning of power distribution systemsDutch Power
 
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...Wajdi Bellil
 
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...IRJET Journal
 
ACTIVE DISTRIBUTION SYSTEM MANAGEMENT
ACTIVE DISTRIBUTION SYSTEM MANAGEMENTACTIVE DISTRIBUTION SYSTEM MANAGEMENT
ACTIVE DISTRIBUTION SYSTEM MANAGEMENTdavidtrebolle
 
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdfShow & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdfSIFOfgem
 
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab OPAL-RT TECHNOLOGIES
 
Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...
Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...
Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...IRJET Journal
 

Semelhante a 2014 PV Distribution System Modeling Workshop: Pro-active, high penetration PV studies on distribution systems: Jonathan Flinn, DNV GL (20)

Design of Low-Voltage Distributed Photovoltaic Systems Oriented to Improve ...
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to   Improve ...Design of Low-Voltage Distributed Photovoltaic Systems Oriented to   Improve ...
Design of Low-Voltage Distributed Photovoltaic Systems Oriented to Improve ...
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
 
Best practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studiesBest practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studies
 
Integrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdfIntegrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdf
 
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-AustraliaSteven-Nethery-Technical-Sales-Manager-Goldwind-Australia
Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia
 
seminar1.ppt
seminar1.pptseminar1.ppt
seminar1.ppt
 
V2G Cohort: The Future
V2G Cohort: The FutureV2G Cohort: The Future
V2G Cohort: The Future
 
5 cired2013 planning of power distribution systems
5   cired2013 planning of power distribution systems5   cired2013 planning of power distribution systems
5 cired2013 planning of power distribution systems
 
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
 
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
Simulation studies on developed Solar PV Array based Multipurpose EV Charger ...
 
Eskom - Grid Connectivity
Eskom - Grid ConnectivityEskom - Grid Connectivity
Eskom - Grid Connectivity
 
Oliver Spink
Oliver SpinkOliver Spink
Oliver Spink
 
ACTIVE DISTRIBUTION SYSTEM MANAGEMENT
ACTIVE DISTRIBUTION SYSTEM MANAGEMENTACTIVE DISTRIBUTION SYSTEM MANAGEMENT
ACTIVE DISTRIBUTION SYSTEM MANAGEMENT
 
Vsc based hvdc
Vsc based hvdcVsc based hvdc
Vsc based hvdc
 
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
2014 PV Distribution System Modeling Workshop: European codes & guidelines fo...
 
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
2014 PV Performance Modeling Workshop: Optimizing PV Designs with HelioScope:...
 
Improving Interconnection: Integrated Distribution Planning
Improving Interconnection: Integrated Distribution PlanningImproving Interconnection: Integrated Distribution Planning
Improving Interconnection: Integrated Distribution Planning
 
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdfShow & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
Show & Tell - Data & Digitalisation, Weather & Predictive Analytics.pdf
 
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
RT15 Berkeley | Grid Intergration Group - Lawrence Berkeley National Lab
 
Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...
Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...
Renewable Energy Integration in Smart Grids: A Review of Recent Solutions to ...
 

Mais de Sandia National Laboratories: Energy & Climate: Renewables

Mais de Sandia National Laboratories: Energy & Climate: Renewables (20)

M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339rM4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
 
Sand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lacSand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lac
 
11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
 
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
 
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
 
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
 
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
 
22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
 
19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project
 
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
17 Salt Reconsolidation
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 
15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project
 
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
 
13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...
 
12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data
 
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
 

Último

Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...Sareena Khatun
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptxpiyushsinghrajput913
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCNAP Global Network
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetkumargunjan9515
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfNAP Global Network
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgergMadhuKothuru
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32JSchaus & Associates
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfSocial Samosa
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsMonica Sydney
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiPriya Reddy
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Global Network
 
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...Call Girls Mumbai
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxScottMeyers35
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfScottMeyers35
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 

Último (20)

Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdfPeace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
Peace-Conflict-and-National-Adaptation-Plan-NAP-Processes-.pdf
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
NAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptxNAP Expo - Delivering effective and adequate adaptation.pptx
NAP Expo - Delivering effective and adequate adaptation.pptx
 
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 

2014 PV Distribution System Modeling Workshop: Pro-active, high penetration PV studies on distribution systems: Jonathan Flinn, DNV GL

  • 1. DNV GL © 2013 May 6th 2014 SAFER, SMARTER, GREENERDNV GL © 2013 May 6th 2014 Jonathan Flinn Pro-Active, High Penetration PV Analysis on Distribution Systems 1 PV Distribution System Modeling Workshop Santa Clara, CA
  • 2. DNV GL © 2013 May 6th 2014 Contents  Introduction  Objectives of Analyses  Overview of Approach  Technical Criteria  Analysis in SynerGEE  Modeling Advanced Inverter Functions in SynerGEE  Conclusion 2
  • 3. DNV GL © 2013 May 6th 2014 Introduction – DNV GL  Merger of brands, consolidation of experience and expertise 3
  • 4. DNV GL © 2013 May 6th 2014 An energy technology powerhouse 4 Offshore wind Strong expertise in offshore wind, its support vessels and connection to the electricity grid Innovation Strategic research in energy storage, smart grids and super grids; developments of new standards through joint industry projects Testing Global leader in testing, inspecting and certifying high- power and renewable energy equipment with world class laboratories Expert advice In onshore and offshore wind power, solar, smart grids, super grids, infrastructure resilience, energy markets, regulations and use Power player A strong player across the value chain: renewable and conventional power generation, transmission & distribution and sustainable energy use
  • 5. DNV GL © 2013 May 6th 2014 Introduction – Jonathan Flinn  MEng Mechanical Engineering with Aeronautics, University of Strathclyde, 2004  MSc Safety, Risk and Reliability Engineering, Heriot-Watt University, 2005  9 years in DNV GL  Worked with pipelines, wind energy, arctic operations, wave and tidal energy  Worked in transmission and distribution since 2011 5
  • 6. DNV GL © 2013 May 6th 2014 Introduction – Pro-Active Approach  Developed in co-operation with HECO  Aim to streamline PV interconnection process  Objectives: – Improve PV interconnection process – Identify limits on a circuit-specific basis – Facilitate efficient network planning – Identification of limits in advance – Identify existing risks – Compare limits with existing PV penetrations – Identify future limits to PV integration – Run hypothetical future PV scenarios up to high PV penetrations – Identify appropriate mitigation measures – Developed from list of potential mitigation measures 6
  • 7. DNV GL © 2013 May 6th 2014 CA Rule 21 7 Complete application received Screen 1: Connection to distribution system? Screen 2: Connection to network Screen 3: Export power causes reverse flow at voltage regulation devices Screen 4: Is the aggregate generating facility on the line section <=15% of line section peak load Screen 5: Is voltage flicker and/or voltage drop due to project within IEEE 519 limits Screen 6: DG <= 10kW Screen 7: Inverter-based DG <= 250kW meets IEEE 1547 & UL 1741 Screen 8: SCCR within acceptable limits Screen 9: Interconnection compatible with line configuration Perform Supplemental Review Does not qualify for interconnection under Rule 21 Does supplemental review determine requirements? Company provides the cost estimate and schedule for IRS to determine requirements Generating Facility qualifies for interconnection subject to requirements, if any, determined by supplemental review Generating Facility qualifies for Simplified Interconnection no no no yes yes no no yes yes yes yes no no no no yes yes yes yes no
  • 8. DNV GL © 2013 May 6th 2014 CA Rule 21 8 Complete application received Screen 1: Connection to distribution system? Screen 2: Connection to network Screen 3: Export power causes reverse flow at voltage regulation devices Screen 4: Is the aggregate generating facility on the line section <=15% of line section peak load Screen 5: Is voltage flicker and/or voltage drop due to project within IEEE 519 limits Screen 6: DG <= 10kW Screen 7: Inverter-based DG <= 250kW meets IEEE 1547 & UL 1741 Screen 8: SCCR within acceptable limits Screen 9: Interconnection compatible with line configuration Perform Supplemental Review Does not qualify for interconnection under Rule 21 Does supplemental review determine requirements? Company provides the cost estimate and schedule for IRS to determine requirements Generating Facility qualifies for interconnection subject to requirements, if any, determined by supplemental review Generating Facility qualifies for Simplified Interconnection no no no yes yes no no yes yes yes yes no no no no yes yes yes yes no Pro-active approach identifies at which PV penetrations this will occur for each feeder/transformer
  • 9. DNV GL © 2013 May 6th 2014 CA Rule 21 9 Complete application received Screen 1: Connection to distribution system? Screen 2: Connection to network Screen 3: Export power causes reverse flow at voltage regulation devices Screen 4: Is the aggregate generating facility on the line section <=15% of line section peak load Screen 5: Is voltage flicker and/or voltage drop due to project within IEEE 519 limits Screen 6: DG <= 10kW Screen 7: Inverter-based DG <= 250kW meets IEEE 1547 & UL 1741 Screen 8: SCCR within acceptable limits Screen 9: Interconnection compatible with line configuration Perform Supplemental Review Does not qualify for interconnection under Rule 21 Does supplemental review determine requirements? Company provides the cost estimate and schedule for IRS to determine requirements Generating Facility qualifies for interconnection subject to requirements, if any, determined by supplemental review Generating Facility qualifies for Simplified Interconnection no no no yes yes no no yes yes yes yes no no no no yes yes yes yes no Pro-active approach identifies specific limitations for each feeder/cluster due to different criteria (thermal loading, voltage violations, etc.),
  • 10. DNV GL © 2013 May 6th 2014 CA Rule 21 10 Complete application received Screen 1: Connection to distribution system? Screen 2: Connection to network Screen 3: Export power causes reverse flow at voltage regulation devices Screen 4: Is the aggregate generating facility on the line section <=15% of line section peak load Screen 5: Is voltage flicker and/or voltage drop due to project within IEEE 519 limits Screen 6: DG <= 10kW Screen 7: Inverter-based DG <= 250kW meets IEEE 1547 & UL 1741 Screen 8: SCCR within acceptable limits Screen 9: Interconnection compatible with line configuration Perform Supplemental Review Does not qualify for interconnection under Rule 21 Does supplemental review determine requirements? Company provides the cost estimate and schedule for IRS to determine requirements Generating Facility qualifies for interconnection subject to requirements, if any, determined by supplemental review Generating Facility qualifies for Simplified Interconnection no no no yes yes no no yes yes yes yes no no no no yes yes yes yes no Identification of areas of risk/interest for the feeder, allows focus of analysis on circuit- specific issues
  • 11. DNV GL © 2013 May 6th 2014 System Boundaries 11 Example of system boundary One sub-transmission line, plus all connected distribution feeders
  • 12. DNV GL © 2013 May 6th 2014 Analysis Approach  Model load independently of solar – Requires some manipulation of demand data  Find peak and minimum daytime load days  Run analyses with varying penetrations of PV  Use linear interpolation to find technical limits 12
  • 13. DNV GL © 2013 May 6th 2014 Analysis Approach  Use combinations of load profile and PV penetration 13 Load Scenarios 1. Peak Daytime Load Day 2. Minimum Daytime Load Day PV Penetration Scenarios 1. No PV 2. Existing PV 3. Existing + Queued PV 4. PV = 15% of Peak Load 5. PV = 30% of Peak Load 6. PV = 50% of Peak Load 7. PV = 75% of Peak Load 8. PV = 100% of Peak Load 9. PV = 135% of Peak Load
  • 14. DNV GL © 2013 May 6th 2014 Technical Criteria 14 Technical Criterion Limit or Trigger Steady-State Voltage V > 1.05 p.u. or V < 0.95 p.u. Thermal Loading Loading > 100% Backfeed Reversal of flow through transformer Fault Current Available fault current exceeds breaker interrupt rating Transient Voltage Voltage change > 3% during step change in PV output Dynamic Voltage Overvoltage / undervoltage due to inverter trips during N-1 Dynamic Frequency Additional load shedding due to inverter trips during N-1 LTC Cycling Increase in LTC operations due to PV operation
  • 15. DNV GL © 2013 May 6th 2014 LTC Cycling Studies  An increase in LTC cycling due to PV is not necessarily a significant problem – If it causes 1 extra operation per week, still very small change  At some point it could become a problem, causing decrease in time between maintenance, and LTC lifetime – Number of increased operations per year can be calculated for each PV penetration, and compared against a limit defined by utility 15 N u m b e r o f E v e n t s Change in Irradiance [W/m2s]
  • 16. DNV GL © 2013 May 6th 2014 LTC Cycling Studies  A reverse effect must also be studied: – PV operation causes reduced current through LTC compared to no-LTC case – Reduced current may increase LTC contact lifetime – This effect reverses past point of backfeed, where increased PV causes increased current – Chart below comes from Kaukesha UZD LTC Technical Manual 16
  • 17. DNV GL © 2013 May 6th 2014 Analysis in SynerGEE – Model Setup  Load and generation on utilization circuits aggregated to distribution transformers  PV modeled as generator in SynerGEE (not negative load) – Necessary for fault analysis – Also allows use of irradiance profiles  Existing generators modeled in existing locations  Hypothetical ‘future’ generators placed by analyst to allow up to 150% PV Penetration 17
  • 18. DNV GL © 2013 May 6th 2014 Analysis in SynerGEE – Recipe Scripts  SynerGEE allows use of automated analysis – Consecutive load flows run using ‘recipe’ commands – Outputs saved to specified location – Ideal for use with 24-hour load profiles  Model Cleanup scripts can be used to make changes between analyses 18
  • 19. DNV GL © 2013 May 6th 2014 Analysis in SynerGEE - Solver  SynerGEE add-on which further increases flexibility  Allows changes to be made to model (more than Recipe or ModClean)  Compiles and post-processes results  Requires some basic programming skills  Flexibility is useful in Advanced Inverter Modeling 19
  • 20. DNV GL © 2013 May 6th 2014 Mitigation of PV Impacts Mitigant Backfeed Loading Voltage LTC Cycling Fault Current Dynamics Transients Energy Storage X X X X Curtailment X X X X Inverter power factor control X Inverter disconnection and re-closing control X X Equipment upgrades X X X X 20
  • 21. DNV GL © 2013 May 6th 2014 Energy Storage 21 Load > PV: Load is fed by grid PV > Load: Load is fed by PV PV > Load: Excess PV charges battery Load > PV: Load is fed by battery  Mitigates: Backfeed Violations, Voltage Violations  Energy storage systems can be used to prevent backfeed from occurring  Simple model in SynerGEE is to calculate total reverse power flow and energy  New battery model in SynerGEE 5.1 will allow individual batteries to be charged and discharged
  • 22. DNV GL © 2013 May 6th 2014 Curtailments  Curtailment is a smart inverter function  Allows utility to either: – Reduce output from generator to solve problem – Disconnect generator completely  Cost to utility is cost of ‘lost’ energy to generator  Simple model in SynerGEE is same as for energy storage: – Calculate total energy that would be curtailed to prevent backfeed 22
  • 23. DNV GL © 2013 May 6th 2014 Inverter Power Factor Control  Increasing or decreasing VAR output from inverter can regulate local voltage 23  Single time-step can easily be modified in SynerGEE  Automation can run multiple time-steps consecutively and identify local voltage problems using Solver: Run load flow Voltage violation? Reduce inverter power factor Move to next time- step No Yes  Complexity of process can be increased  In practice staged reduction in power factor will be necessary to prevent over-correction
  • 24. DNV GL © 2013 May 6th 2014 Inverter Disconnection and Re-Closing control  When trips and transient events happen, loss and return of all generators at once can cause problems due to time delay on LTC  Smart inverters provide options: – Ramp up of output – Variable trip settings – Variable re-closing settings 24
  • 25. DNV GL © 2013 May 6th 2014 Comparison of Mitigation Techniques 25
  • 26. DNV GL © 2013 May 6th 2014 Conclusion  Pro-Active Approach can help to streamline PV interconnection process – Can also help to plan equipment upgrades  Analysis performed in SynerGEE allows flexibility to modify process – Also allows automation of analysis and post-processing  Flexibility of SynerGEE also allows approximation of advanced and smart inverter characteristics – Integration with energy storage – Curtailment – Power factor control – Output ramping 26
  • 27. DNV GL © 2013 May 6th 2014 SAFER, SMARTER, GREENER www.dnvgl.com Thank you for your attention 27 Jonathan Flinn Jonathan.flinn@dnvgl.com (925) 327-3044