AUTO-RECLOSING
• it is placed on over head transmission line and nearer to the
CB .
• It is also one of the protective relay.
2
What is
Auto – Reclosing ?
3
Introduction to auto-reclosing scheme
4
Types Of Faults
• Transient Faults
• Semi Permanent faults
• Permanent Faults
Utility Substation Customers
5
6
STEPS TO BE FOLLOWED IN AUTORECLOSING
Visual Check
Check of the
Power Supply
Test of the
Auto-re-closure settings
Functional Testing
(involving operation of
Protective Relays
& Circuit Breaker(s)
INSTALLATION
OPERATION
Scheme Of Operation
• Live bus Dead Line Charging
• Other end closing under synchronism check relay
• Live bus Live line charging
7
Types of Auto Reclosing
1. Medium voltage auto-reclose
• Aim of continuity of supply
• the obvious advantages are continuous supply except for short
duration when tripping and re-closure operations are being performed.
• high speed protection decreases the amount of damage incurred and
thus increases the probability of auto reclosure.
2. High voltage auto-reclose
• main considerations are of stability and synchronizing.
• the fault levels associated are extremely high.
• High speed re-closure in high voltage circuits improves the stability
to a considerable extent on single-circuit ties.
FACTORS TO BE CONSIDERED FOR
AUTO RECLOSING SYSTEM
• Protection Characteristics
• De- Ionization of Fault Arc
• Circuit Breaker Characteristics
• Reclaim Time
• Number of Shots
9
SINGLE PHASE AUTO – RECLOSING
ADVANTAGES:-
•Maintenance of System Integrity
• Reduced switching overvoltage due to reclosing
• Reduced shock to generators.
• Sudden changes in mechanical output are less
• Longer De – ionization time
DISADVANTAGE:-
10
1. Densely interconnected systems.

Where the Loss of a single line is unlikely to
cause loss of synchronism between two ends
2. Dead Time is allowed to be long enough for any
power swings due to fault and tripping allowed
to decay before reclosing

a) Less shock to system than with high speed
A/R
b) Problems of arc de – ionization times, and
circuit breaker operating characterstics are
eliminated.
Delayed Auto-Reclose Application
11
Operating feature of Auto reclosing schemes
• Dead Timer
• Anti Pumping Devices
• Reclaim timer
• CB Lockout
• Manual Closing
• Multi Shot Scheme
12
Auto - Reclose Blocking
• Receipt of transfer Trip
• Manual Trip
• Breaker failure
• Three phase Fault
• Faults On Buses
• Under frequency/ Under voltage load shedding trips
13
Benefits Of Auto - Reclosing
• Minimizing the interruption of supply.
• Maintenance of system stability and Synchronism.
• Minimum Outage and least expenditure of manpower.
• Ability to run substation unattended.
14
CONCLUSION
• Fast clearing of EHV faults is essential to
maintain power quality in an area, because
events on the EHV system affect the
underlying transmission and distribution
systems. Benefits of successful high speed
reclosing on EHV overhead transmission lines
are: improved system stability, reducing the
duration of fault arc, respectively disturbance
time, and economics in system design.
15
Thank you
16

Mais conteúdo relacionado

Mais procurados

protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]moiz89
 
ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)AB Amit
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of GeneratorRahuldey1991
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relayCS V
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3Md Irshad Ahmad
 
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...jbpatel7290
 
Generator protection
Generator protectionGenerator protection
Generator protectionKeshar Rawal
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERsssspp
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Power system protection
Power system protectionPower system protection
Power system protectionAnu Priya
 
Protection schemes and zones
Protection schemes and zonesProtection schemes and zones
Protection schemes and zonesSlides Hub
 

Mais procurados (20)

protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]protection of transmission lines[distance relay protection scheme]
protection of transmission lines[distance relay protection scheme]
 
Auto recloser
Auto recloserAuto recloser
Auto recloser
 
ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)
 
Protection of Transmission lines
Protection of Transmission linesProtection of Transmission lines
Protection of Transmission lines
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Directional over current relay
Directional over current relayDirectional over current relay
Directional over current relay
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3
 
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
Power system-protection-presentation-dated-03-10-2013-integrated-protection-c...
 
Generator protection
Generator protectionGenerator protection
Generator protection
 
SF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKERSF6 CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
 
Fault analysis using z bus
Fault analysis using z busFault analysis using z bus
Fault analysis using z bus
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Relays
RelaysRelays
Relays
 
EXCITATION SYSTEMS
EXCITATION SYSTEMSEXCITATION SYSTEMS
EXCITATION SYSTEMS
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Protection schemes and zones
Protection schemes and zonesProtection schemes and zones
Protection schemes and zones
 

Semelhante a auto-reclosure

Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"michaeljmack
 
Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfYogeshGairola2
 
Auto Reclose Testing
Auto Reclose TestingAuto Reclose Testing
Auto Reclose Testingriam
 
Auto Reclose Function of Distance Relays
Auto Reclose Function of Distance RelaysAuto Reclose Function of Distance Relays
Auto Reclose Function of Distance RelaysToshaliMohapatra
 
Fundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based RelaysFundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based Relaysmichaeljmack
 
ETAP - Coordination and protecion 2
ETAP -  Coordination and protecion 2ETAP -  Coordination and protecion 2
ETAP - Coordination and protecion 2Himmelstern
 
Selective Coodination
Selective CoodinationSelective Coodination
Selective Coodinationmichaeljmack
 
Short Circuit, Protective Device Coordination
Short Circuit, Protective Device CoordinationShort Circuit, Protective Device Coordination
Short Circuit, Protective Device Coordinationmichaeljmack
 
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptxOhiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptxGodwin308555
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisPower System Operation
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalNihal Shiroya
 
Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTafhim Bin Nasir
 
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterOneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterPaul Plavicheanu
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakersKabilesh K
 
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsIeee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsVincent Wedelich, PE MBA
 

Semelhante a auto-reclosure (20)

Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"
 
Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdf
 
Auto Reclose Testing
Auto Reclose TestingAuto Reclose Testing
Auto Reclose Testing
 
Auto Reclose Function of Distance Relays
Auto Reclose Function of Distance RelaysAuto Reclose Function of Distance Relays
Auto Reclose Function of Distance Relays
 
Fundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor-based RelayingFundamentals of Microprocessor-based Relaying
Fundamentals of Microprocessor-based Relaying
 
Fundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based RelaysFundamentals of Microprocessor Based Relays
Fundamentals of Microprocessor Based Relays
 
ETAP - Coordination and protecion 2
ETAP -  Coordination and protecion 2ETAP -  Coordination and protecion 2
ETAP - Coordination and protecion 2
 
Selective Coodination
Selective CoodinationSelective Coodination
Selective Coodination
 
Short Circuit, Protective Device Coordination
Short Circuit, Protective Device CoordinationShort Circuit, Protective Device Coordination
Short Circuit, Protective Device Coordination
 
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptxOhiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
Ohiri-Principles-and-Philosophy-of-Protective-Relaying.pptx
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
 
HV CB testing.pdf
HV CB testing.pdfHV CB testing.pdf
HV CB testing.pdf
 
Testing of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihalTesting of c.b.(hk & hr) nihal
Testing of c.b.(hk & hr) nihal
 
Testing of Circuit Breakers.pptx
Testing of Circuit Breakers.pptxTesting of Circuit Breakers.pptx
Testing of Circuit Breakers.pptx
 
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterOneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft Starter
 
Auto reclosers
Auto reclosersAuto reclosers
Auto reclosers
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
 
IEEE Blue Book
IEEE Blue BookIEEE Blue Book
IEEE Blue Book
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
Ieee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systemsIeee transfer schemes for M-T-M distribution systems
Ieee transfer schemes for M-T-M distribution systems
 

Último

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 

Último (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 

auto-reclosure

  • 1. MINI PROJECT ON AUTO-RECLOSING PRESENTED BY K.Sandeep (10RC1A0228) Patan. Rafi(10RC1A0247) B.Shiva (10RC1A0203) M.Uday teja(10RC1A0232) Under the esteemed guidance of Mr.R.Laveen,M.Tech(Asst.Prof). 1
  • 2. AUTO-RECLOSING • it is placed on over head transmission line and nearer to the CB . • It is also one of the protective relay. 2
  • 3. What is Auto – Reclosing ? 3
  • 5. Types Of Faults • Transient Faults • Semi Permanent faults • Permanent Faults Utility Substation Customers 5
  • 6. 6 STEPS TO BE FOLLOWED IN AUTORECLOSING Visual Check Check of the Power Supply Test of the Auto-re-closure settings Functional Testing (involving operation of Protective Relays & Circuit Breaker(s) INSTALLATION OPERATION
  • 7. Scheme Of Operation • Live bus Dead Line Charging • Other end closing under synchronism check relay • Live bus Live line charging 7
  • 8. Types of Auto Reclosing 1. Medium voltage auto-reclose • Aim of continuity of supply • the obvious advantages are continuous supply except for short duration when tripping and re-closure operations are being performed. • high speed protection decreases the amount of damage incurred and thus increases the probability of auto reclosure. 2. High voltage auto-reclose • main considerations are of stability and synchronizing. • the fault levels associated are extremely high. • High speed re-closure in high voltage circuits improves the stability to a considerable extent on single-circuit ties.
  • 9. FACTORS TO BE CONSIDERED FOR AUTO RECLOSING SYSTEM • Protection Characteristics • De- Ionization of Fault Arc • Circuit Breaker Characteristics • Reclaim Time • Number of Shots 9
  • 10. SINGLE PHASE AUTO – RECLOSING ADVANTAGES:- •Maintenance of System Integrity • Reduced switching overvoltage due to reclosing • Reduced shock to generators. • Sudden changes in mechanical output are less • Longer De – ionization time DISADVANTAGE:- 10
  • 11. 1. Densely interconnected systems.  Where the Loss of a single line is unlikely to cause loss of synchronism between two ends 2. Dead Time is allowed to be long enough for any power swings due to fault and tripping allowed to decay before reclosing  a) Less shock to system than with high speed A/R b) Problems of arc de – ionization times, and circuit breaker operating characterstics are eliminated. Delayed Auto-Reclose Application 11
  • 12. Operating feature of Auto reclosing schemes • Dead Timer • Anti Pumping Devices • Reclaim timer • CB Lockout • Manual Closing • Multi Shot Scheme 12
  • 13. Auto - Reclose Blocking • Receipt of transfer Trip • Manual Trip • Breaker failure • Three phase Fault • Faults On Buses • Under frequency/ Under voltage load shedding trips 13
  • 14. Benefits Of Auto - Reclosing • Minimizing the interruption of supply. • Maintenance of system stability and Synchronism. • Minimum Outage and least expenditure of manpower. • Ability to run substation unattended. 14
  • 15. CONCLUSION • Fast clearing of EHV faults is essential to maintain power quality in an area, because events on the EHV system affect the underlying transmission and distribution systems. Benefits of successful high speed reclosing on EHV overhead transmission lines are: improved system stability, reducing the duration of fault arc, respectively disturbance time, and economics in system design. 15