SlideShare uma empresa Scribd logo
1 de 2
Baixar para ler offline
GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR
Madeley Elite Recreational Centre
The new Cross fit and Indoor Rock-climbing
Centre has the potential to unleash a new lease
of life into an old and dated building.
Maximising on the space available, has in turn
developed 3 floors designed to increase fitness
for its clients.
This is no ordinary way off training it is a body
specific challenge based training facility that
increases your heart rate and endurance levels.
Equipment and apparatus are unique to the
venue and has skilled trainers who will take you
through this obstacle based training course.
This buildings takes circuit based training
To be able to design a successful adaptation of a
listed building, it is important to understand how
conservation works and what listing means.
There are many different approaches that some
conservationist’s deem acceptable, especially when
it comes to major alterations of heritage buildings.
Adaptation and Renovation of listed buildings is
sometimes controversial, this is due to what
methods people deem acceptable. Do you restore
or renovate a building? A lot more can be done to
buildings than is thought, and no one part of a
building is specifically listed, but one part of a
building could hold the interest into its Heritage
value. The Anstice Buildings façade and porch are
possibly the only key areas of the building that has
not been majorly altered over the years. This being
said it is the key area of my design that has
remained. Within my research there is always
contradictions when adapting buildings. My design
approach does push the boundaries, but is is a
design that will ensure the
buildings usefulness.
The Research
The Use
The M.E.R.C Designed by Samson Oakley
A 12 metre high in door rock climbing centre as the rear of the building can
accommodate for 15 people at a time, the venue could be beneficial to
companies looking to hire the facilities for team building exercises.
Accessible changing facilities are provided and a lift extended through all
floors.
Three Group specific exercise class’s are located on the 3rd floor, which
could be utilised for HIIT , Exercise to Music, Pilates, Yoga and Spin Fitness.
theses rooms also have the potential for hiring by the hour.
REAR PERSPECTIVE
FRONT PERSPECTIVE
LIBRARY
3DPLANS
INTERNALS VIEWS
ROOF PLAN
TECHNICAL
The system is designed to convert mechanical energy into
electrical energy. Ultra efficient electronics and high
speed data systems allow this elaborate system to
distribute electricity with minimal losses. Every module
can produce up to 15 watts (please see brochures for
more information on equipment).
New state of the art equipment connects to the national
grid and makes use of the energy you use in your
workout. Cross Trainers, Recumberment Bikes and Spin
Cycles will be used (please see brochures for more in-
formation on equipment).
SUSTAINABILTIY
PRECEDENT STUDIESDESIGN DEVELOPMENT
NORTH ELEVATIONSOUTH ELEVATIONEAST ELEVATION WEST ELEVATION
BUILDING IN CONTEXTSITE LOCATION
Original 102 Grande:
 Panel height (maximum): 3000 mm.
 Panel width (maximum): 3000 mm.
 Panel depth: 25 or 30 mm.
 Horizontal joint and vertical joint: 20, 25 or 30 mm.
 Fastening holes: Oval 5 x 10 mm.
 Ventilation holes (in panel lower edge): Oval 5 x 15 mm.
 Material thickness: Steel, 1.20 mm.
 Fasteners: Visible
Gullwing Drainage Detail Windows placed to maximise on natural sunlight

Mais conteúdo relacionado

Destaque

Destaque (6)

DfUbook_methods-tools
DfUbook_methods-toolsDfUbook_methods-tools
DfUbook_methods-tools
 
Kuantum Fiziği Tarihi
Kuantum Fiziği TarihiKuantum Fiziği Tarihi
Kuantum Fiziği Tarihi
 
Startup Weekend Intro
Startup Weekend IntroStartup Weekend Intro
Startup Weekend Intro
 
Fiskeldi við eyjafjord
Fiskeldi við eyjafjordFiskeldi við eyjafjord
Fiskeldi við eyjafjord
 
Actis City Catalogue 2016 kiosque_corner_mobilier_urbain
Actis City Catalogue 2016 kiosque_corner_mobilier_urbainActis City Catalogue 2016 kiosque_corner_mobilier_urbain
Actis City Catalogue 2016 kiosque_corner_mobilier_urbain
 
3. Factores Riesgo Ocupacional
3. Factores Riesgo Ocupacional3. Factores Riesgo Ocupacional
3. Factores Riesgo Ocupacional
 

Semelhante a a1 boards

Eco-September-2013-001
Eco-September-2013-001Eco-September-2013-001
Eco-September-2013-001Mark Kelly
 
Catalogo keiser
Catalogo keiser Catalogo keiser
Catalogo keiser Energy Lab
 
Design_standards_CONFERENCE_BUILDINGS_EX.pdf
Design_standards_CONFERENCE_BUILDINGS_EX.pdfDesign_standards_CONFERENCE_BUILDINGS_EX.pdf
Design_standards_CONFERENCE_BUILDINGS_EX.pdfBinhabSultan
 
How To Achieve a Green Energy Workspace
How To Achieve a Green Energy WorkspaceHow To Achieve a Green Energy Workspace
How To Achieve a Green Energy WorkspaceOakland Air
 
How You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisHow You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisStatybos Akademija
 
PUPN_August_2015_LBD_Article
PUPN_August_2015_LBD_ArticlePUPN_August_2015_LBD_Article
PUPN_August_2015_LBD_ArticleLeigh Diskin
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Gobrianholmes
 
National tennis court
National tennis courtNational tennis court
National tennis courtElinda Fariz
 
MGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docx
MGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docxMGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docx
MGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docxannandleola
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Gonickhull
 
Matthew Thomas Education Sector Portfolio 2011
Matthew Thomas   Education Sector Portfolio 2011Matthew Thomas   Education Sector Portfolio 2011
Matthew Thomas Education Sector Portfolio 2011Matthewthomas11
 
Optimizing The Data Centre Environment
Optimizing The Data Centre EnvironmentOptimizing The Data Centre Environment
Optimizing The Data Centre Environmentmixalisg
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)Arthur Wilson
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)DarrenTofu
 

Semelhante a a1 boards (20)

WPOE training complex facilitates hands-on education
WPOE training complex facilitates hands-on educationWPOE training complex facilitates hands-on education
WPOE training complex facilitates hands-on education
 
Eco-September-2013-001
Eco-September-2013-001Eco-September-2013-001
Eco-September-2013-001
 
Catalogo keiser
Catalogo keiser Catalogo keiser
Catalogo keiser
 
Design_standards_CONFERENCE_BUILDINGS_EX.pdf
Design_standards_CONFERENCE_BUILDINGS_EX.pdfDesign_standards_CONFERENCE_BUILDINGS_EX.pdf
Design_standards_CONFERENCE_BUILDINGS_EX.pdf
 
How To Achieve a Green Energy Workspace
How To Achieve a Green Energy WorkspaceHow To Achieve a Green Energy Workspace
How To Achieve a Green Energy Workspace
 
How You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisHow You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance Analysis
 
PUPN_August_2015_LBD_Article
PUPN_August_2015_LBD_ArticlePUPN_August_2015_LBD_Article
PUPN_August_2015_LBD_Article
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Go
 
Duke engine technology (redial engine)
Duke engine technology (redial engine)Duke engine technology (redial engine)
Duke engine technology (redial engine)
 
National tennis court
National tennis courtNational tennis court
National tennis court
 
MGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docx
MGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docxMGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docx
MGT 214OPERATIONS MANAGEMENTCHAPTER 06Layout DecisionsPr.docx
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Go
 
Matthew Thomas Education Sector Portfolio 2011
Matthew Thomas   Education Sector Portfolio 2011Matthew Thomas   Education Sector Portfolio 2011
Matthew Thomas Education Sector Portfolio 2011
 
Optimizing The Data Centre Environment
Optimizing The Data Centre EnvironmentOptimizing The Data Centre Environment
Optimizing The Data Centre Environment
 
Enginestand
EnginestandEnginestand
Enginestand
 
Quije
QuijeQuije
Quije
 
Enginestand edited
Enginestand editedEnginestand edited
Enginestand edited
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
Axis TLB Ltd
Axis TLB LtdAxis TLB Ltd
Axis TLB Ltd
 

Mais de samson oakley

SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plansamson oakley
 
SL020 & SL022 - sections
SL020 & SL022 - sectionsSL020 & SL022 - sections
SL020 & SL022 - sectionssamson oakley
 
SL015 - second and third Floor
SL015 - second and third FloorSL015 - second and third Floor
SL015 - second and third Floorsamson oakley
 
SL014 - ground and first floor
SL014 - ground and first floorSL014 - ground and first floor
SL014 - ground and first floorsamson oakley
 
intergrated lab layouts 2s - Sheet - SL015 - lab layout plan
intergrated lab layouts 2s - Sheet - SL015 - lab layout planintergrated lab layouts 2s - Sheet - SL015 - lab layout plan
intergrated lab layouts 2s - Sheet - SL015 - lab layout plansamson oakley
 

Mais de samson oakley (9)

GF-0105
GF-0105GF-0105
GF-0105
 
GF-0104
GF-0104GF-0104
GF-0104
 
GA-0012
GA-0012GA-0012
GA-0012
 
SL010 - Roof Plan
SL010 - Roof PlanSL010 - Roof Plan
SL010 - Roof Plan
 
SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plan
 
SL020 & SL022 - sections
SL020 & SL022 - sectionsSL020 & SL022 - sections
SL020 & SL022 - sections
 
SL015 - second and third Floor
SL015 - second and third FloorSL015 - second and third Floor
SL015 - second and third Floor
 
SL014 - ground and first floor
SL014 - ground and first floorSL014 - ground and first floor
SL014 - ground and first floor
 
intergrated lab layouts 2s - Sheet - SL015 - lab layout plan
intergrated lab layouts 2s - Sheet - SL015 - lab layout planintergrated lab layouts 2s - Sheet - SL015 - lab layout plan
intergrated lab layouts 2s - Sheet - SL015 - lab layout plan
 

a1 boards

  • 1. GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR Madeley Elite Recreational Centre The new Cross fit and Indoor Rock-climbing Centre has the potential to unleash a new lease of life into an old and dated building. Maximising on the space available, has in turn developed 3 floors designed to increase fitness for its clients. This is no ordinary way off training it is a body specific challenge based training facility that increases your heart rate and endurance levels. Equipment and apparatus are unique to the venue and has skilled trainers who will take you through this obstacle based training course. This buildings takes circuit based training To be able to design a successful adaptation of a listed building, it is important to understand how conservation works and what listing means. There are many different approaches that some conservationist’s deem acceptable, especially when it comes to major alterations of heritage buildings. Adaptation and Renovation of listed buildings is sometimes controversial, this is due to what methods people deem acceptable. Do you restore or renovate a building? A lot more can be done to buildings than is thought, and no one part of a building is specifically listed, but one part of a building could hold the interest into its Heritage value. The Anstice Buildings façade and porch are possibly the only key areas of the building that has not been majorly altered over the years. This being said it is the key area of my design that has remained. Within my research there is always contradictions when adapting buildings. My design approach does push the boundaries, but is is a design that will ensure the buildings usefulness. The Research The Use The M.E.R.C Designed by Samson Oakley A 12 metre high in door rock climbing centre as the rear of the building can accommodate for 15 people at a time, the venue could be beneficial to companies looking to hire the facilities for team building exercises. Accessible changing facilities are provided and a lift extended through all floors. Three Group specific exercise class’s are located on the 3rd floor, which could be utilised for HIIT , Exercise to Music, Pilates, Yoga and Spin Fitness. theses rooms also have the potential for hiring by the hour. REAR PERSPECTIVE FRONT PERSPECTIVE LIBRARY 3DPLANS INTERNALS VIEWS ROOF PLAN
  • 2. TECHNICAL The system is designed to convert mechanical energy into electrical energy. Ultra efficient electronics and high speed data systems allow this elaborate system to distribute electricity with minimal losses. Every module can produce up to 15 watts (please see brochures for more information on equipment). New state of the art equipment connects to the national grid and makes use of the energy you use in your workout. Cross Trainers, Recumberment Bikes and Spin Cycles will be used (please see brochures for more in- formation on equipment). SUSTAINABILTIY PRECEDENT STUDIESDESIGN DEVELOPMENT NORTH ELEVATIONSOUTH ELEVATIONEAST ELEVATION WEST ELEVATION BUILDING IN CONTEXTSITE LOCATION Original 102 Grande:  Panel height (maximum): 3000 mm.  Panel width (maximum): 3000 mm.  Panel depth: 25 or 30 mm.  Horizontal joint and vertical joint: 20, 25 or 30 mm.  Fastening holes: Oval 5 x 10 mm.  Ventilation holes (in panel lower edge): Oval 5 x 15 mm.  Material thickness: Steel, 1.20 mm.  Fasteners: Visible Gullwing Drainage Detail Windows placed to maximise on natural sunlight