Used as hard fills or materials for drainages, crushed concrete is known for its ability to provide a firm base. It packs extremely well, that is why it is preferred in most jobs.
Inexpensive yet dependable, it comes as no surprise why you might want to consider crushed concrete for your next project. But before you delve with that, it is important that you brush up your knowledge with crushed concrete and its different types.
How to Calculate Crushed Concrete Prices for your Project?
1.
2. Used as hard fills or materials for drainages,Used as hard fills or materials for drainages,
crushed concrete is known for its ability tocrushed concrete is known for its ability to
provide a firm base. It packs extremely well,provide a firm base. It packs extremely well,
that is why it is preferred in most jobs.that is why it is preferred in most jobs.
3. Crushed concrete is made from crushed orCrushed concrete is made from crushed or
recycled materials. The pieces are usuallyrecycled materials. The pieces are usually
obtained by the manufacturers from demolishedobtained by the manufacturers from demolished
or collapsed structures.or collapsed structures.
4. Crushed 8 – Equivalent to a Gap8, is screened and gradedCrushed 8 – Equivalent to a Gap8, is screened and graded
to a size of 8 millimeters.to a size of 8 millimeters.
Crushed 20 – Screened and graded to a size of 20Crushed 20 – Screened and graded to a size of 20
millimeters, Crushed 20 concrete is equivalent to Gap20.millimeters, Crushed 20 concrete is equivalent to Gap20.
Crushed 40 – Measuring 40 millimeters, Crushed 40Crushed 40 – Measuring 40 millimeters, Crushed 40
concrete is the most popular choice in constructionconcrete is the most popular choice in construction
projects. Equivalent to a Gap 40.projects. Equivalent to a Gap 40.
Crushed 65 – A heavy-duty material used for commercialCrushed 65 – A heavy-duty material used for commercial
projects, Crushed 65 concrete is screened to a nominalprojects, Crushed 65 concrete is screened to a nominal
size of 65 millimeters.size of 65 millimeters.
5. You can proceed with calculating the prices ofYou can proceed with calculating the prices of
crushed concrete for your project. Here are thecrushed concrete for your project. Here are the
materials you need for the process:materials you need for the process:
•PaperPaper
•PencilPencil
•Measuring TapeMeasuring Tape
•CalculatorCalculator
6. 1. With your measuring tape, measure the concrete1. With your measuring tape, measure the concrete
structure at hand. Take the length, width and height of thestructure at hand. Take the length, width and height of the
edifice. Write down the measurements in footage.edifice. Write down the measurements in footage.
2. With the derived measurements, calculate the volume of2. With the derived measurements, calculate the volume of
the structure. Do so by multiplying the width and thethe structure. Do so by multiplying the width and the
length to come up with the area. Multiply the product withlength to come up with the area. Multiply the product with
the depth to come up with the volume (in cubic feet.) Notethe depth to come up with the volume (in cubic feet.) Note
this measurement.this measurement.
7. 3. Calculate the number of pounds of crushed concrete3. Calculate the number of pounds of crushed concrete
that will be needed in your project. You can come up withthat will be needed in your project. You can come up with
this figure by multiplying the volume by 150, since thethis figure by multiplying the volume by 150, since the
weight of reinforced concrete is pegged at 150 pounds perweight of reinforced concrete is pegged at 150 pounds per
cubic foot. Note the numerical result on your paper.cubic foot. Note the numerical result on your paper.
4. Convert the resulting number – pounds – to US tons,4. Convert the resulting number – pounds – to US tons,
since is the unit of measurement of the crushed concretesince is the unit of measurement of the crushed concrete
sold by retailers. Come up with this number by dividing thesold by retailers. Come up with this number by dividing the
pounds of concrete by 2000.pounds of concrete by 2000.
8. Now that you have solved the number ofNow that you have solved the number of
bags needed for your project, what youbags needed for your project, what you
need to do next is toneed to do next is to
calculate for the budgetcalculate for the budget??