Project Initiation Process

  RSS – Resource Scheduling System

Redmine – Project Management System

          Communication

        Monitoring & Control

       Project Closure Process

  Radix Development Methodology

         Annexure: Images

             Contact Us

                                      Page 2
Internal Kick Off Meeting
• Meeting between sales & development team
• Discussion on project requirements, milestones, technical aspects, & expected
  results



        Project Registration
        • Project code generation
        • Project update in Resource Scheduling System & Redmine




                Formal Introductions
                • Introduction of stakeholders
                • Discussion on project objectives & expectations
                • Setting up GoToMeeting & Skype conferencing



                          Project Email Group
                          • Creating single email ID for communication
                          • Adding email IDs of all stakeholders to group email ID
                          • All communication conducted & tracked through this project email group



                                                                                                     Page 3
Projects & Operations executive registers the project into RSS

Project identifiers like Project Name, Project Code, Project Technology, Project Head, and Start & End Date
are entered

Project Type (fixed, monthly, etc) is defined & project hours are allocated


Project Code is used to track the progress


Project Lead/Manager uses RSS to book hours for resources/developers assigned to the project


Hours are booked in RSS for month, resource, and date

Projects & Operations executive compares RSS booked hours (planned hours) with actual hours entered in
Redmine and identifies discrepancies

Appropriate action is taken to mitigate these discrepancies in hours planned and actually spent



                                                                                                              Page 4
We manage all our projects through Redmine

Role based access is given to project team members

We perform below activities in Redmine
 •   Define milestones & project versions
 •   Assign tasks to resources
 •   Log details of time spent
 •   Track progress made
 •   Track issues & change requests
 •   Manage project documents

Redmine also has User Dashboard, My Page, My ToDo, Forums, Wikis, News

Redmine features Software Configuration Management system:
 • Integrated SVN to manage source code
 • Source code can be managed for different project versions
 • Developers commit code in SVN on task completion

                                                                         Page 5
We conduct all communication through Project Email Group
 • Group members include customers, project manager, project lead, project coordinator
 • All email IDs are included in project email group
 • All members can witness and track communication


Conference call using Skype or GoToMeeting
 • Call recording in MP3 Skype Recorder
 • Documenting & publishing minutes of meeting


Periodic reporting on projects
 • Weekly status of project tasks
 • Tasks planned for the next week
 • Open items or tasks in progress




                                                                                         Page 6
Project Health Monitoring
•   Project manager reviews the progress made on the project
•   He mitigates the difference between hours planned for the project and actual hours spent
•   He ensures that the project is completed and delivered on time
•   Quality checks are carried out as part of quality control process
•   Issues are identified and addressed proactively
•   Change requests are managed effectively
•   Clients are kept updated on project status


Project Documentation
• Folder management for easy classification & access to project documentation
• Documentation received from client managed under “client provided” category
• Technical documentation managed under “technical documentation” category




                                                                                               Page 7
Client Feedback
• On project completion, client feedback sheet is exchanged for comments
• Comments are invited for overall project execution, satisfaction level, & service quality
• Feedback is collected on how to further improve our performance and service


Lessons Learned
• Learnings acquired are discussed during team meetings
• Brainstorming to find out what could have been
  done better
• Document the findings and learnings for future
  projects




                                                                                              Page 8
Discovery                                            Support
• Gather the requirements in detail in order to      • Fix any issue reported by the client or internal
  avoid gaps and meet client’s expectation             QA team
• Analysis the requirement and finalized the         • Support post deployment for any technical bugs
  development approach.                                or errors
• Determine and confirm priorities with the client




Planning                                             Implementation
• Identify the Project’s milestones and              • Execute project based on the Schedule
  deliverables                                       • Monitor and controlling development activities
• Risk Analysis                                        to make sure quality of deliverables
• Plan the Quality requirements , Plan the           • Keep client updated with project progress.
  Communication between different stakeholders         Weekly status reports will be send to client
• Schedule the development activities based on       • Demo the deliverables to the client
  the scope and priorities




                                                                                                          Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
India Office
30/B Adarsh Society,
Near Kaashi Parekh Complex,
Swastik Char Rasta, C G Road,
Ahmedabad-380009 Gujarat -India,
Phone : +91-79-32403371
VoIP : +1-718-715-1551

Email : sales@radixweb.com




                                   Page 19

Mais conteúdo relacionado

Mais procurados

Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012
CAMTIC
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
reddvise
 

Mais procurados (20)

Scala signature introduction
Scala signature introductionScala signature introduction
Scala signature introduction
 
Chapt 11-slides
Chapt 11-slidesChapt 11-slides
Chapt 11-slides
 
2016Resume_Internal
2016Resume_Internal2016Resume_Internal
2016Resume_Internal
 
Project scope and requirements management
Project scope and requirements managementProject scope and requirements management
Project scope and requirements management
 
Project Scope Management
Project Scope ManagementProject Scope Management
Project Scope Management
 
Pmp 3 chapter
Pmp  3 chapterPmp  3 chapter
Pmp 3 chapter
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
 
PMBoK ed.5 brief overview
PMBoK ed.5 brief overviewPMBoK ed.5 brief overview
PMBoK ed.5 brief overview
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
project Scope management
project Scope management project Scope management
project Scope management
 
Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)
 
Project+ updated prsntn 2012
Project+ updated prsntn 2012Project+ updated prsntn 2012
Project+ updated prsntn 2012
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
Pmbok flow 5_process
Pmbok flow 5_processPmbok flow 5_process
Pmbok flow 5_process
 
Agile project management at primavera
Agile project management at primaveraAgile project management at primavera
Agile project management at primavera
 
PMP chapter(4) INTEGRATION MANAGEMENT
PMP chapter(4) INTEGRATION MANAGEMENTPMP chapter(4) INTEGRATION MANAGEMENT
PMP chapter(4) INTEGRATION MANAGEMENT
 
Graduate trainee program
Graduate trainee programGraduate trainee program
Graduate trainee program
 
Learning from experience: Collaborative Journey towards CMMI
Learning from experience: Collaborative Journey towards CMMILearning from experience: Collaborative Journey towards CMMI
Learning from experience: Collaborative Journey towards CMMI
 
Case Study: BAs join Agile Team to Help Secure U.S. Borders
Case Study: BAs join Agile Team to Help Secure U.S. Borders Case Study: BAs join Agile Team to Help Secure U.S. Borders
Case Study: BAs join Agile Team to Help Secure U.S. Borders
 

Semelhante a Project management-practices

RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
joellemurphey
 
2014 sdlc project and gate process rollout published v6
2014 sdlc project and gate process rollout   published v62014 sdlc project and gate process rollout   published v6
2014 sdlc project and gate process rollout published v6
Jayne Edwards
 
projectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdfprojectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdf
AbdiqadirOsman
 
Web project management
Web project managementWeb project management
Web project management
beutnagel
 
How do you manage a multi agency 1.8 billion rail bridge design and construct...
How do you manage a multi agency 1.8 billion rail bridge design and construct...How do you manage a multi agency 1.8 billion rail bridge design and construct...
How do you manage a multi agency 1.8 billion rail bridge design and construct...
p6academy
 

Semelhante a Project management-practices (20)

rapid productivity methodology
rapid productivity methodologyrapid productivity methodology
rapid productivity methodology
 
Resume - Anil Kumar Krishna
Resume - Anil Kumar KrishnaResume - Anil Kumar Krishna
Resume - Anil Kumar Krishna
 
Profile Meyyappan CV
Profile Meyyappan CVProfile Meyyappan CV
Profile Meyyappan CV
 
My resume
My resumeMy resume
My resume
 
JC_Gabuya_Resume
JC_Gabuya_ResumeJC_Gabuya_Resume
JC_Gabuya_Resume
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project Management
 
Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)
 
Creating high performance project teams 2013
Creating high performance project teams   2013Creating high performance project teams   2013
Creating high performance project teams 2013
 
RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
 
Web Project Management
Web Project ManagementWeb Project Management
Web Project Management
 
E success client-software-development
E success client-software-developmentE success client-software-development
E success client-software-development
 
2014 sdlc project and gate process rollout published v6
2014 sdlc project and gate process rollout   published v62014 sdlc project and gate process rollout   published v6
2014 sdlc project and gate process rollout published v6
 
projectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdfprojectscopemanagement1-140220062122-phpapp01 (1).pdf
projectscopemanagement1-140220062122-phpapp01 (1).pdf
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
ANIn Ahmedabad Feb 2024 | Addressing Challenges in Project Management via Agi...
ANIn Ahmedabad Feb 2024 | Addressing Challenges in Project Management via Agi...ANIn Ahmedabad Feb 2024 | Addressing Challenges in Project Management via Agi...
ANIn Ahmedabad Feb 2024 | Addressing Challenges in Project Management via Agi...
 
Web project management
Web project managementWeb project management
Web project management
 
How do you manage a multi agency 1.8 billion rail bridge design and construct...
How do you manage a multi agency 1.8 billion rail bridge design and construct...How do you manage a multi agency 1.8 billion rail bridge design and construct...
How do you manage a multi agency 1.8 billion rail bridge design and construct...
 
Pm training day 3
Pm training   day 3Pm training   day 3
Pm training day 3
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 

Último

What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...
AnaBeatriz125525
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Último (20)

Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
 
New Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9loNew Product Development.kjiy7ggbfdsddggo9lo
New Product Development.kjiy7ggbfdsddggo9lo
 
What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
Engagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideEngagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed Guide
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Potato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdfPotato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdf
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 

Project management-practices

  • 2. Project Initiation Process RSS – Resource Scheduling System Redmine – Project Management System Communication Monitoring & Control Project Closure Process Radix Development Methodology Annexure: Images Contact Us Page 2
  • 3. Internal Kick Off Meeting • Meeting between sales & development team • Discussion on project requirements, milestones, technical aspects, & expected results Project Registration • Project code generation • Project update in Resource Scheduling System & Redmine Formal Introductions • Introduction of stakeholders • Discussion on project objectives & expectations • Setting up GoToMeeting & Skype conferencing Project Email Group • Creating single email ID for communication • Adding email IDs of all stakeholders to group email ID • All communication conducted & tracked through this project email group Page 3
  • 4. Projects & Operations executive registers the project into RSS Project identifiers like Project Name, Project Code, Project Technology, Project Head, and Start & End Date are entered Project Type (fixed, monthly, etc) is defined & project hours are allocated Project Code is used to track the progress Project Lead/Manager uses RSS to book hours for resources/developers assigned to the project Hours are booked in RSS for month, resource, and date Projects & Operations executive compares RSS booked hours (planned hours) with actual hours entered in Redmine and identifies discrepancies Appropriate action is taken to mitigate these discrepancies in hours planned and actually spent Page 4
  • 5. We manage all our projects through Redmine Role based access is given to project team members We perform below activities in Redmine • Define milestones & project versions • Assign tasks to resources • Log details of time spent • Track progress made • Track issues & change requests • Manage project documents Redmine also has User Dashboard, My Page, My ToDo, Forums, Wikis, News Redmine features Software Configuration Management system: • Integrated SVN to manage source code • Source code can be managed for different project versions • Developers commit code in SVN on task completion Page 5
  • 6. We conduct all communication through Project Email Group • Group members include customers, project manager, project lead, project coordinator • All email IDs are included in project email group • All members can witness and track communication Conference call using Skype or GoToMeeting • Call recording in MP3 Skype Recorder • Documenting & publishing minutes of meeting Periodic reporting on projects • Weekly status of project tasks • Tasks planned for the next week • Open items or tasks in progress Page 6
  • 7. Project Health Monitoring • Project manager reviews the progress made on the project • He mitigates the difference between hours planned for the project and actual hours spent • He ensures that the project is completed and delivered on time • Quality checks are carried out as part of quality control process • Issues are identified and addressed proactively • Change requests are managed effectively • Clients are kept updated on project status Project Documentation • Folder management for easy classification & access to project documentation • Documentation received from client managed under “client provided” category • Technical documentation managed under “technical documentation” category Page 7
  • 8. Client Feedback • On project completion, client feedback sheet is exchanged for comments • Comments are invited for overall project execution, satisfaction level, & service quality • Feedback is collected on how to further improve our performance and service Lessons Learned • Learnings acquired are discussed during team meetings • Brainstorming to find out what could have been done better • Document the findings and learnings for future projects Page 8
  • 9. Discovery Support • Gather the requirements in detail in order to • Fix any issue reported by the client or internal avoid gaps and meet client’s expectation QA team • Analysis the requirement and finalized the • Support post deployment for any technical bugs development approach. or errors • Determine and confirm priorities with the client Planning Implementation • Identify the Project’s milestones and • Execute project based on the Schedule deliverables • Monitor and controlling development activities • Risk Analysis to make sure quality of deliverables • Plan the Quality requirements , Plan the • Keep client updated with project progress. Communication between different stakeholders Weekly status reports will be send to client • Schedule the development activities based on • Demo the deliverables to the client the scope and priorities Page 9