The Job Card System
Ross Hilton
Asian Development Bank
AGILE
AUDIT
MANAGEMENT
+
Where is it from?
 Agile Management tool, (especially project based work)
 Originally developed for software development
 Especially suited to small teams of highly skilled
specialists who work alone in ever changing areas
 Suited to Audit Management
 Promotes autonomy (self management and organisation).
 Allows for rapid changes and flexibility.
+
Agile Management
 1980s Japan, an extension of Kaizen manufacturing
 Kaizen = kai (“change”) zen (“good”)
 Regular product updates, each a little bit better.
 Kaizen led to rapid copying and developing of new
products required flexible and adaptable management. (CD
players, MP3 players, cameras, mobile phones, DVD
players etc)
 1990s Software development, rapid and flexible delivery of
software solutions.
 Speed to market. Beat the competition.
+
Agile Management
 Autonomy (self management and decision making)
 All team members are equally important for their
specialisation
 Focus on the outcome not the process (flexible)
 Team focused
 Fast delivery in complex and changing environment
+
Card Agile:
 Uses a series of task cards to document tasks
 The task cards are displayed on a wall to allow selection
 Suits large teams working on disparate tasks (as in Audits)
+
Task Apportioning:
 Story cards are openly displayed, usually on a wall
 The cards are in some degree of order of priority OR prioritised
High/Medium/Low
 Staff are almost freelance contractors. They can pick a card
that meets their interest or skill sets and take it off the wall.
 Cards are signed out and signed in.
+
Simple Task Card:
As a working mother
I need my children
cared for between 9am
and 5pm today
So that I can work an 8
hour day without
returning home.
Owner
Requirement (not solution)
Reason and objective
+
The Task Card:
As a XXXXXXXXX
I need XXXXXXXXXX
So that XXXXXXXXXXXX
Clearly defined
client, customer, owner, who can
confirm delivery, correctness and
suitability.
Clearly defined REQUIREMENT
(not deliverable) that can be
understood, converted to a
deliverable and completed
Clearly defined purpose for the
requirement to assist in converting
to a deliverable and for testing after
delivery.
+
Task Testing:
 When Tasks are completed the cards are returned and placed
in a “awaiting testing” area of the wall.
 Testing is carried out by either a manager, a peer, preferably
the task owner from the card.
 Testing follows the card sequence backwards: “So that
XXXXXX”, “I need XXXXXX”. The test is does the completed
task meet these two requirements.
 After satisfactory testing the Task Cards are placed in a
Completed section of the wall.
+
Problems with Card Agile:
 Who writes up the cards? Usually it’s the team who are
determining the tasks.
 All tasks are not equal. Team members will pick the easy or
interesting tasks, and leave the unpleasant ones on the wall
hoping someone else will do them.
 Who tests the completed tasks. Usually other members of the
team (peer review) – not the client.
 Card doesn’t determine the process, only the outcome.
+
Communication”
 Team communication is achieved by two mechanisms:
 The constant review of the Project Wall Task Cards provides on
going communication of the status of the project. The team can
physically see and judge the progress of the project by the
number of cards completed, the number awaiting testing, the
number in high, medium and low priority.
 Daily “Stand Up” meetings lasting 10-15 minutes, where each
member of the team briefly talks about:
 what they did yesterday,
 What they plan to do today
 Any problems or issues that are affecting progress.
+
Empowerment:
 Team members can pick any Task Card they think they can
complete.
 This allows younger or less experienced team members to try
new tasks and push their limits.
 The tasks are sufficiently small and discrete that the failure in
testing of one has only a minor impact on the project.
+
The Electronic Wall:
 Although Task Cards are stuck to the wall, they should also be
copied onto an electronic record system where they can be
analysed:
 Average time per task
 Average time per team member
 Test failure rates (overall and by team member)
 Overall Audit progress as percentage completed.
+
Typical Task Card Wall:
+
QUESTIONS?

Mais conteúdo relacionado

Mais procurados

Kepner tregoe approach to problem solving
Kepner tregoe approach to problem solvingKepner tregoe approach to problem solving
Kepner tregoe approach to problem solving
Rhenmar Galvez
 
Stages of problem solving presentation
Stages of problem solving presentationStages of problem solving presentation
Stages of problem solving presentation
bbaugh
 
T19 performance testing effort - estimation or guesstimation revised
T19   performance testing effort - estimation or guesstimation revisedT19   performance testing effort - estimation or guesstimation revised
T19 performance testing effort - estimation or guesstimation revised
TEST Huddle
 
Copy of switch client presentation
Copy of switch  client presentationCopy of switch  client presentation
Copy of switch client presentation
Montserrat Lobos
 

Mais procurados (20)

Cause And Effect Analysis For Quality Management Powerpoint Presentation Slides
Cause And Effect Analysis For Quality Management Powerpoint Presentation SlidesCause And Effect Analysis For Quality Management Powerpoint Presentation Slides
Cause And Effect Analysis For Quality Management Powerpoint Presentation Slides
 
In-depth problem solving tool
In-depth problem solving toolIn-depth problem solving tool
In-depth problem solving tool
 
Kepner tregoe approach to problem solving
Kepner tregoe approach to problem solvingKepner tregoe approach to problem solving
Kepner tregoe approach to problem solving
 
Stages of problem solving presentation
Stages of problem solving presentationStages of problem solving presentation
Stages of problem solving presentation
 
Neotys PAC - Stephen Townshend
Neotys PAC - Stephen TownshendNeotys PAC - Stephen Townshend
Neotys PAC - Stephen Townshend
 
How to Make a Good Idea Great
How to Make a Good Idea GreatHow to Make a Good Idea Great
How to Make a Good Idea Great
 
Seven tools of quality for pmp exam
Seven tools of quality for pmp examSeven tools of quality for pmp exam
Seven tools of quality for pmp exam
 
Software estimation and measurement
Software estimation and measurementSoftware estimation and measurement
Software estimation and measurement
 
Decision Making Process
Decision Making ProcessDecision Making Process
Decision Making Process
 
Software Estimation - part 1 of 2
Software Estimation - part 1 of 2Software Estimation - part 1 of 2
Software Estimation - part 1 of 2
 
Hs300 m4 5 dm rational process
Hs300 m4 5 dm rational processHs300 m4 5 dm rational process
Hs300 m4 5 dm rational process
 
Kepner tregoe Presentation
Kepner tregoe Presentation Kepner tregoe Presentation
Kepner tregoe Presentation
 
T19 performance testing effort - estimation or guesstimation revised
T19   performance testing effort - estimation or guesstimation revisedT19   performance testing effort - estimation or guesstimation revised
T19 performance testing effort - estimation or guesstimation revised
 
Problem Resolution Using DMAIC with Matt Hansen at StatStuff
Problem Resolution Using DMAIC with Matt Hansen at StatStuffProblem Resolution Using DMAIC with Matt Hansen at StatStuff
Problem Resolution Using DMAIC with Matt Hansen at StatStuff
 
Copy of switch client presentation
Copy of switch  client presentationCopy of switch  client presentation
Copy of switch client presentation
 
Shift from high-quality decision making to high-velocity decision-making.
Shift from high-quality decision making to high-velocity decision-making.Shift from high-quality decision making to high-velocity decision-making.
Shift from high-quality decision making to high-velocity decision-making.
 
How to Get Stuff Delivered
How to Get Stuff DeliveredHow to Get Stuff Delivered
How to Get Stuff Delivered
 
Projects Process v01
Projects Process v01Projects Process v01
Projects Process v01
 
Problem solving overview
Problem solving overviewProblem solving overview
Problem solving overview
 
Software Quality for Developers
Software Quality for DevelopersSoftware Quality for Developers
Software Quality for Developers
 

Semelhante a the Use of Job Cards to facilitate Audit management

Release planning using feature points
Release planning using feature pointsRelease planning using feature points
Release planning using feature points
Madhur Kathuria
 
Sumit Resume 27th June
Sumit Resume 27th JuneSumit Resume 27th June
Sumit Resume 27th June
Sumit Singla
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
smumbahelp
 
CUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9i
CUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9iCUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9i
CUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9i
Akash Gupta
 
Suja resume- Business Analyst
Suja resume- Business AnalystSuja resume- Business Analyst
Suja resume- Business Analyst
Suja Selvamani
 
Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa Keshav
 
Sheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docx
Sheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docxSheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docx
Sheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docx
lesleyryder69361
 
KV_ResumeAttachment_Updated 24112015
KV_ResumeAttachment_Updated 24112015KV_ResumeAttachment_Updated 24112015
KV_ResumeAttachment_Updated 24112015
Chau Kek Voon
 

Semelhante a the Use of Job Cards to facilitate Audit management (20)

Software Test Estimation
Software Test EstimationSoftware Test Estimation
Software Test Estimation
 
Release planning using feature points
Release planning using feature pointsRelease planning using feature points
Release planning using feature points
 
Sumit Resume 27th June
Sumit Resume 27th JuneSumit Resume 27th June
Sumit Resume 27th June
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
CUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9i
CUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9iCUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9i
CUSTOMER CARE ADMINISTRATION-developer-2000 and oracle 9i
 
Calvin Diaz updated resume
Calvin Diaz updated resumeCalvin Diaz updated resume
Calvin Diaz updated resume
 
Calvin Diaz updated resume
Calvin Diaz updated resumeCalvin Diaz updated resume
Calvin Diaz updated resume
 
Suja resume- Business Analyst
Suja resume- Business AnalystSuja resume- Business Analyst
Suja resume- Business Analyst
 
Project Management and Organization
Project Management and OrganizationProject Management and Organization
Project Management and Organization
 
ABC of Agile (Scrum & Extreme Programming)
ABC of Agile (Scrum & Extreme Programming)ABC of Agile (Scrum & Extreme Programming)
ABC of Agile (Scrum & Extreme Programming)
 
Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)Deepa_Resume (Manual Testing _2 years Exp_Updated)
Deepa_Resume (Manual Testing _2 years Exp_Updated)
 
Sheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docx
Sheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docxSheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docx
Sheet1Fertilizing The LawnDecisionsNitrogenPhosphorusPotash121418O.docx
 
Integration Test Engineer
Integration Test EngineerIntegration Test Engineer
Integration Test Engineer
 
Integration Test Engineer
Integration Test EngineerIntegration Test Engineer
Integration Test Engineer
 
KV_ResumeAttachment_Updated 24112015
KV_ResumeAttachment_Updated 24112015KV_ResumeAttachment_Updated 24112015
KV_ResumeAttachment_Updated 24112015
 
Quality project management
Quality project managementQuality project management
Quality project management
 
Taguchi method
Taguchi methodTaguchi method
Taguchi method
 
Prognition (current state business process analysis)
Prognition (current state business process analysis)Prognition (current state business process analysis)
Prognition (current state business process analysis)
 
Problem Solving Methodology 2011 - 2014
Problem Solving Methodology 2011 - 2014Problem Solving Methodology 2011 - 2014
Problem Solving Methodology 2011 - 2014
 
2018-Case-Study.pdf
2018-Case-Study.pdf2018-Case-Study.pdf
2018-Case-Study.pdf
 

Último

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Último (20)

2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

the Use of Job Cards to facilitate Audit management

  • 1. + The Job Card System Ross Hilton Asian Development Bank AGILE AUDIT MANAGEMENT
  • 2. + Where is it from?  Agile Management tool, (especially project based work)  Originally developed for software development  Especially suited to small teams of highly skilled specialists who work alone in ever changing areas  Suited to Audit Management  Promotes autonomy (self management and organisation).  Allows for rapid changes and flexibility.
  • 3. + Agile Management  1980s Japan, an extension of Kaizen manufacturing  Kaizen = kai (“change”) zen (“good”)  Regular product updates, each a little bit better.  Kaizen led to rapid copying and developing of new products required flexible and adaptable management. (CD players, MP3 players, cameras, mobile phones, DVD players etc)  1990s Software development, rapid and flexible delivery of software solutions.  Speed to market. Beat the competition.
  • 4. + Agile Management  Autonomy (self management and decision making)  All team members are equally important for their specialisation  Focus on the outcome not the process (flexible)  Team focused  Fast delivery in complex and changing environment
  • 5. + Card Agile:  Uses a series of task cards to document tasks  The task cards are displayed on a wall to allow selection  Suits large teams working on disparate tasks (as in Audits)
  • 6. + Task Apportioning:  Story cards are openly displayed, usually on a wall  The cards are in some degree of order of priority OR prioritised High/Medium/Low  Staff are almost freelance contractors. They can pick a card that meets their interest or skill sets and take it off the wall.  Cards are signed out and signed in.
  • 7. + Simple Task Card: As a working mother I need my children cared for between 9am and 5pm today So that I can work an 8 hour day without returning home. Owner Requirement (not solution) Reason and objective
  • 8. + The Task Card: As a XXXXXXXXX I need XXXXXXXXXX So that XXXXXXXXXXXX Clearly defined client, customer, owner, who can confirm delivery, correctness and suitability. Clearly defined REQUIREMENT (not deliverable) that can be understood, converted to a deliverable and completed Clearly defined purpose for the requirement to assist in converting to a deliverable and for testing after delivery.
  • 9. + Task Testing:  When Tasks are completed the cards are returned and placed in a “awaiting testing” area of the wall.  Testing is carried out by either a manager, a peer, preferably the task owner from the card.  Testing follows the card sequence backwards: “So that XXXXXX”, “I need XXXXXX”. The test is does the completed task meet these two requirements.  After satisfactory testing the Task Cards are placed in a Completed section of the wall.
  • 10. + Problems with Card Agile:  Who writes up the cards? Usually it’s the team who are determining the tasks.  All tasks are not equal. Team members will pick the easy or interesting tasks, and leave the unpleasant ones on the wall hoping someone else will do them.  Who tests the completed tasks. Usually other members of the team (peer review) – not the client.  Card doesn’t determine the process, only the outcome.
  • 11. + Communication”  Team communication is achieved by two mechanisms:  The constant review of the Project Wall Task Cards provides on going communication of the status of the project. The team can physically see and judge the progress of the project by the number of cards completed, the number awaiting testing, the number in high, medium and low priority.  Daily “Stand Up” meetings lasting 10-15 minutes, where each member of the team briefly talks about:  what they did yesterday,  What they plan to do today  Any problems or issues that are affecting progress.
  • 12. + Empowerment:  Team members can pick any Task Card they think they can complete.  This allows younger or less experienced team members to try new tasks and push their limits.  The tasks are sufficiently small and discrete that the failure in testing of one has only a minor impact on the project.
  • 13. + The Electronic Wall:  Although Task Cards are stuck to the wall, they should also be copied onto an electronic record system where they can be analysed:  Average time per task  Average time per team member  Test failure rates (overall and by team member)  Overall Audit progress as percentage completed.