This is the report given by Hank Iori and John Signorelli on October 21,2014 at the Belle Harbor Property Owners Association meeting at PS114 in Belle Harbor, Queens, NY.
Beach Access Plaza - Presentation at BHPOA on October 21, 2014
1. Belle Harbor Property Owners Association
1
General Membership Meeting
October 21st, 2014
Report on Sidewalk & Street Repair at the Beach Walls
in Belle Harbor & Neponsit
Hank Iori / John Signorelli
2. Timeline of Events
âąMet with Malinda Katz, Queens Borough President â June 18, 2014
âąMet with Dalila Hall, Queens Commissioner DOT & DDC reps.
Received PP presentation Project SANDHW24 â August 20, 2014
âąMet with BHPOAâs/NPOA team to discuss design â August/September
âąBHPOA/NPOA review of DOTâs Designs & sent reply to DOT â Sept. 15th
âąBHPOA/NPOA submitted Draft Designs to DOT September 23, 2014
âąDOT response to BHPOA/NPOA designs - September 24, 2014
âąCouncilman Eric Ulrich & Assemblyman Phil Goldfeder objection to
DOTâs response and non community involvement in
planning. September 24, 2014
âąBHPOA/NHOA recommendations to DOT for immediate delay of contract
âąBHPOA/NPOA Restating 4 open end items to DOT - October 2, 2014
2
3. Cover Page
To better identify the exact locations covered by the Neponsit/Belle Harbor and Broad Channel
project we suggest:
Title Page
RECONSTRUCTION
Beach Access â Streets and Sidewalks in Neponsit/Belle Harbor and Broad Channel
Streets
3
4. Beach 127th
4
Beach 149th
Page 3 to 18 and 21
Bottom Left hand Corner change first line to: Reconstruction of Neponsit/Belle Harbor
8. âą The NYC DOT project is considered Final
âą Funded by FEMA for ~ 11.4 million dollars
âą Start 4th quarter of 2014 and completed spring 2015
8
Project ID: SANDHW24
Rockaway Beach â B127 through B149
DOTâs Project Statement
9. Page 14
The item ASPHALT MACADAM PAVEMENT, 8â Thick (ITEM NO 4.01 RAI) â suggest that
Pervious Asphalt be considered in lieu of Asphalt. This may allow for greater drainage of
rainwater and less water in our storm drains ending in Jamaica Bay.
9
10. Title missing NEW BEAM
No street, sidewalk and beam
measurements and
Section design of new beam
Page 15
The streets are not âDead End Streetsâ but rather Rockaway Beach - Beach
Access Plazaâs with access and egress.
10
11. âą Not Dead End Streets
âą Incorrect Information
âą No Access to Beach
âą Unconcern for Safety
âą Lack of Best Practices
11
Project ID: SANDHW24
Rockaway Beach â B127 through B149
DOTâS Power Point Misconceptions
12. âą Are Beach Access and Egress Streets
âą Used by 10s of thousands of People
âą Residents
âą Visitors
âą Vacationers
âą US Parks Dept.
âą Emergency Crew Vehicles (ATV)
âą Commercial Workers
âą Mister Softy
12
Project ID: SANDHW24
Rockaway Beach â B127 through B149
Beach Facts!
18. Key People Involved in Community Planning for Project
Hank Iori â President BHPOA
Amanda Agoglia â President NPOA
Linda Benigno â Ex VP â BHPOA
John Signorelli â VP â BHPOA
Rose Klein â VP - BHPOA
Jacqueline Tansey â VP - BHPOA
Peter Larkin â Treasurer â BHPOA
Rose Marie Curley â Secretary â BHPOA
Eric Ulrich â NYC Council Representative
Phillip Goldfeder â NYS Assenbly Representative
Joseph Addabbo â NYS Senate Representative
Michael Bracci â Bracci Ironworks
Geoff âJeffâ Rawling â Gifted Community Artist
Walter Meyer â CEO â Local Office Landscaping Architecture
18
27. âą No consultation with BHPOA/NPOA
âą No consultation with Commuity Board 14
âą No consultation with community officials
(Assemblyman, Senator, Councilman, etc.
âą No use of the Street Design Manual â NYC
DOT, 2009
27
Project ID: SANDHW24
Rockaway Beach â B127 through B149
DOT did not seek out community input as part of the process!
28. âą Recognize the unique character Belle Harbor/Neponsit Community
âą Promote safety for children, elderly & those with disabilities
âą Enhance access and egress for the beach
âą Attractiveness
âą Enhanced form and function â esthetically pleasing
âą Coherent design
âą Build World Class Beach Access Plazas.
28
Project ID: SANDHW24
Rockaway Beach â B127 through B149
What the goal should be for both the NYC DOT and community!
29. âą Include the communities in the project process.
âą Identify the beach streets as Beach Access and Egress Plazas.
âą Address our recommendations.
âą DOT/DDC resubmit to the community a new beach front proposal.
29
Project ID: SANDHW24
Rockaway Beach â B127 through B149
What we are asking from DOT, DDC, & DP&R is âa win win solutionâ!
30. 30
Project ID: SANDHW24
Rockaway Beach â B127 through B149
29A
BHPOA/NPOA Open Items Stated To DOT
1. Contract immediately placed on hold or withdrawn
2. Two copies of the original contracts and all revisions forwarded
3. Specific cost analysis of expense differences
4. Submitted design ideas seriously considered and used
31. 31
Thank You!
Please give us your comments to our email
address:
BELLEHARBORPOA@gmail.com
NPOA@Neponsit.org
Notas do Editor
Belle Harbor Property Owners Association
Project ID: SANDHW24
Rockaway Beach â B127 through B149
.Not Dead End Streets
.Incorrect Information
.No Access to Beach
.Unconcern for Safety
Lack of Best Practices
DOTâs omittance of the community input as part of the process