1326 Continues ….. Updates from last week and this week
Before and After … I forgot to include some outside pictures of the project.  I really didn’t take many if any before pictures inside or out. That said this picture and the next 5 are a bit of a before and after. Then some random pictures that didn’t make it into the first slide show. and late breaking changes. You can press the forward and back arrows to see the previous picture.
After… What changed? The white cement block wall and the limestone wall have been removed. The bushes are gone. The foyer door was replaced with one to match the 2 new ones on the patio.
Close up … before Both the white wall and the limestone were damaged. There is a missing post that will be replaced soon. It gave its life in the line of duty. We had to use a chain and a pickup truck to remove the Iron picture window frame…. It was stuck and when it came loose the post was in the way. Window frame 1 post 0. TKO .
After… The patio floor in front of both doors had to be cut out to make the doors fit correctly at grade. The old doors were on a 2 inch high slab  and as usual not standard height. The area will be cemented when it gets a bit warmer.
Before …. No amount of trimming was going to help….
After … Not quite taken from the same location but you get the idea. Well it’s a good thing I decided to match the doors. I put it off because the existing door wasn’t failing. ,,,,, I’ll tell you what happened on the next slide.
The Foyer Door Well taking the old door out went ok. But with the door out the foyer floor started to feel a bit unstable. And the interior walls were shall we say “moving” a bit. Granted the vinyl is already down so I really didn’t want to do it but as I am always reminding myself “bad news never gets better with age”. We cut through the vinyl and into the floor to see exactly what the problem was. Water damage from the seam between the steps and the sill wall.  The floor was anchored at the back wall of the foyer but the front was no longer connected to the sill plate. The sill plate had rotted to the point that it came out in pieces and chunks. So we did much the same as the bedroom floor. We installed a new sill plate and reattached the floor joists. Patched the floor and started the door install. While the door is in, it is not finished but should be soon. Then we will replace the vinyl, install new moldings and repaint. .. One thing leads to another.
Other exterior pictures Need to clean the gutters and get the branch off the roof.
The door etc… The Jelly Jar lights are being replaced by 2 white “carriage shop” lights. The electrician is replacing the wiring to the lights and running conduit under the eves per code.  The stairs are coming out soon. They will be replaced with poured steps much like what is there however hand rails will be added to both sides. Notice the windows on the left have been finished .
Picture Window … Both ends slide to the center to let in the summer breeze.
Inside … Getting ready for carpet The floors are clean, however carpet glue from days gone bye make it look a bit hazy. Notice the floor in front of the table? The difference in the wood was caused by  removing the buckled boards. A piece from an old bedroom closet was just the right thickness to level it out..
Sneak Preview… 	 The countertop for the kitchen. Not the best shot. Has more color than this picture shows. In-Stock from Lowes.
Carpet Day April 18th.And it snowed 3 inches
Don’t panic its only the pad
Master Bedroom
Another master picture
The bedroom that started it all…
Enough with the pad already!!! I heard that!
Carpet finished … The color is Chestnut, but the pictures give off a pink tone to me.   It is not pink.
Lots of big and little things left to do…. Wall plates, door bell, cable outlet ….  Kitchen, bathroom sink drain, basement……
Nice shot of the doors and window.
Master Bedroom The carpet in the bedrooms is a lighter beige.
Master…
Bedroom 2 You can see the color contrast at the door. Both bedroom doors will need to be trimmed  to close correctly.
The windows that started it all …..
Coming Soon … The appliances are being delivered 4/19 Once in place the countertop and sink will be installed. Kitchen finished. The 3rd bedroom renovation has begun. Concrete work will be done 1st week in May. (if it doesn’t snow) Handy barn erected to house lawn tractor etc.

Mais conteúdo relacionado

Mais procurados

Secrets script draft 3
Secrets script draft 3Secrets script draft 3
Secrets script draft 3millienelmes1
 
Kelsey Keighley - FMP First Draft Script
Kelsey Keighley - FMP First Draft ScriptKelsey Keighley - FMP First Draft Script
Kelsey Keighley - FMP First Draft Scriptkelseykiki
 
Secrets script draft 2
Secrets script draft 2Secrets script draft 2
Secrets script draft 2millienelmes1
 
Sacrafices screenplay
Sacrafices screenplaySacrafices screenplay
Sacrafices screenplayAdamLepard
 
10 things i like about the apartment
10 things i like about the apartment10 things i like about the apartment
10 things i like about the apartmentIrman Insani
 
Belchertown State Schools
Belchertown State SchoolsBelchertown State Schools
Belchertown State SchoolsGHS_Rampage
 
Kid’S Room Redo
Kid’S Room RedoKid’S Room Redo
Kid’S Room Redotelkinsey
 
The Screaming Script - Final
The Screaming Script - FinalThe Screaming Script - Final
The Screaming Script - Finalairidascironka
 
Choose your destiny
Choose your destinyChoose your destiny
Choose your destinyMsKPrice
 
Script a silent night in
Script a silent night inScript a silent night in
Script a silent night in19001069
 
Black to Blue (Chapter Five - Thou has Sinned)
Black to Blue (Chapter Five - Thou has Sinned)Black to Blue (Chapter Five - Thou has Sinned)
Black to Blue (Chapter Five - Thou has Sinned)Mane Omsy
 
Week 12, alvarez rodriguez litzy nayely group 2
Week 12, alvarez rodriguez litzy nayely group 2Week 12, alvarez rodriguez litzy nayely group 2
Week 12, alvarez rodriguez litzy nayely group 2LitzyAlvarez2
 

Mais procurados (20)

Secrets script draft 3
Secrets script draft 3Secrets script draft 3
Secrets script draft 3
 
Kelsey Keighley - FMP First Draft Script
Kelsey Keighley - FMP First Draft ScriptKelsey Keighley - FMP First Draft Script
Kelsey Keighley - FMP First Draft Script
 
Secrets script draft 2
Secrets script draft 2Secrets script draft 2
Secrets script draft 2
 
Sacrafices screenplay
Sacrafices screenplaySacrafices screenplay
Sacrafices screenplay
 
10 things i like about the apartment
10 things i like about the apartment10 things i like about the apartment
10 things i like about the apartment
 
Artwork
ArtworkArtwork
Artwork
 
Belchertown State Schools
Belchertown State SchoolsBelchertown State Schools
Belchertown State Schools
 
Script for media
Script for mediaScript for media
Script for media
 
Escapism script
Escapism scriptEscapism script
Escapism script
 
Hunted
HuntedHunted
Hunted
 
Script meeting 3rd draft
Script meeting 3rd draftScript meeting 3rd draft
Script meeting 3rd draft
 
Kid’S Room Redo
Kid’S Room RedoKid’S Room Redo
Kid’S Room Redo
 
Script meeting 1 draft
Script meeting 1 draftScript meeting 1 draft
Script meeting 1 draft
 
The Screaming Script - Final
The Screaming Script - FinalThe Screaming Script - Final
The Screaming Script - Final
 
Script meeting 4th draft
Script meeting 4th draftScript meeting 4th draft
Script meeting 4th draft
 
Choose your destiny
Choose your destinyChoose your destiny
Choose your destiny
 
Script a silent night in
Script a silent night inScript a silent night in
Script a silent night in
 
Black to Blue (Chapter Five - Thou has Sinned)
Black to Blue (Chapter Five - Thou has Sinned)Black to Blue (Chapter Five - Thou has Sinned)
Black to Blue (Chapter Five - Thou has Sinned)
 
Week 12, alvarez rodriguez litzy nayely group 2
Week 12, alvarez rodriguez litzy nayely group 2Week 12, alvarez rodriguez litzy nayely group 2
Week 12, alvarez rodriguez litzy nayely group 2
 
1974 ideal camper
1974 ideal camper1974 ideal camper
1974 ideal camper
 

Semelhante a Dad's Remodel 1326 continues

Semelhante a Dad's Remodel 1326 continues (20)

1326 Cunningham - The Basement
1326 Cunningham - The Basement1326 Cunningham - The Basement
1326 Cunningham - The Basement
 
Backed by Real Experience
Backed by Real ExperienceBacked by Real Experience
Backed by Real Experience
 
Strawbale2
Strawbale2Strawbale2
Strawbale2
 
How to build a straw bale home
How to build a straw bale homeHow to build a straw bale home
How to build a straw bale home
 
Home deco - own work
Home deco - own workHome deco - own work
Home deco - own work
 
Home deco - own work
Home deco - own workHome deco - own work
Home deco - own work
 
Bathroom remodel
Bathroom remodelBathroom remodel
Bathroom remodel
 
Moments with straw bale building
Moments with straw bale buildingMoments with straw bale building
Moments with straw bale building
 
Our Strawbale House
Our Strawbale HouseOur Strawbale House
Our Strawbale House
 
updated Mother's Day added pictures
updated Mother's Day added picturesupdated Mother's Day added pictures
updated Mother's Day added pictures
 
Pictures from Mothers Day
Pictures from Mothers DayPictures from Mothers Day
Pictures from Mothers Day
 
COMD 210 Location Description
COMD 210 Location DescriptionCOMD 210 Location Description
COMD 210 Location Description
 
My lego animation
My lego animationMy lego animation
My lego animation
 
A flood, oh no!
A flood, oh no!A flood, oh no!
A flood, oh no!
 
Creations
CreationsCreations
Creations
 
64 Patterson Renovation
64 Patterson Renovation64 Patterson Renovation
64 Patterson Renovation
 
Recycle Wood Pallet Creations
Recycle Wood Pallet CreationsRecycle Wood Pallet Creations
Recycle Wood Pallet Creations
 
before and afters
before and aftersbefore and afters
before and afters
 
2.11.2013 King Street Station
2.11.2013 King Street Station 2.11.2013 King Street Station
2.11.2013 King Street Station
 
House Hunting fun
House Hunting funHouse Hunting fun
House Hunting fun
 

Dad's Remodel 1326 continues

  • 1. 1326 Continues ….. Updates from last week and this week
  • 2. Before and After … I forgot to include some outside pictures of the project. I really didn’t take many if any before pictures inside or out. That said this picture and the next 5 are a bit of a before and after. Then some random pictures that didn’t make it into the first slide show. and late breaking changes. You can press the forward and back arrows to see the previous picture.
  • 3. After… What changed? The white cement block wall and the limestone wall have been removed. The bushes are gone. The foyer door was replaced with one to match the 2 new ones on the patio.
  • 4. Close up … before Both the white wall and the limestone were damaged. There is a missing post that will be replaced soon. It gave its life in the line of duty. We had to use a chain and a pickup truck to remove the Iron picture window frame…. It was stuck and when it came loose the post was in the way. Window frame 1 post 0. TKO .
  • 5. After… The patio floor in front of both doors had to be cut out to make the doors fit correctly at grade. The old doors were on a 2 inch high slab and as usual not standard height. The area will be cemented when it gets a bit warmer.
  • 6. Before …. No amount of trimming was going to help….
  • 7. After … Not quite taken from the same location but you get the idea. Well it’s a good thing I decided to match the doors. I put it off because the existing door wasn’t failing. ,,,,, I’ll tell you what happened on the next slide.
  • 8. The Foyer Door Well taking the old door out went ok. But with the door out the foyer floor started to feel a bit unstable. And the interior walls were shall we say “moving” a bit. Granted the vinyl is already down so I really didn’t want to do it but as I am always reminding myself “bad news never gets better with age”. We cut through the vinyl and into the floor to see exactly what the problem was. Water damage from the seam between the steps and the sill wall. The floor was anchored at the back wall of the foyer but the front was no longer connected to the sill plate. The sill plate had rotted to the point that it came out in pieces and chunks. So we did much the same as the bedroom floor. We installed a new sill plate and reattached the floor joists. Patched the floor and started the door install. While the door is in, it is not finished but should be soon. Then we will replace the vinyl, install new moldings and repaint. .. One thing leads to another.
  • 9. Other exterior pictures Need to clean the gutters and get the branch off the roof.
  • 10. The door etc… The Jelly Jar lights are being replaced by 2 white “carriage shop” lights. The electrician is replacing the wiring to the lights and running conduit under the eves per code. The stairs are coming out soon. They will be replaced with poured steps much like what is there however hand rails will be added to both sides. Notice the windows on the left have been finished .
  • 11. Picture Window … Both ends slide to the center to let in the summer breeze.
  • 12. Inside … Getting ready for carpet The floors are clean, however carpet glue from days gone bye make it look a bit hazy. Notice the floor in front of the table? The difference in the wood was caused by removing the buckled boards. A piece from an old bedroom closet was just the right thickness to level it out..
  • 13. Sneak Preview… The countertop for the kitchen. Not the best shot. Has more color than this picture shows. In-Stock from Lowes.
  • 14. Carpet Day April 18th.And it snowed 3 inches
  • 15. Don’t panic its only the pad
  • 18. The bedroom that started it all…
  • 19. Enough with the pad already!!! I heard that!
  • 20. Carpet finished … The color is Chestnut, but the pictures give off a pink tone to me. It is not pink.
  • 21. Lots of big and little things left to do…. Wall plates, door bell, cable outlet …. Kitchen, bathroom sink drain, basement……
  • 22. Nice shot of the doors and window.
  • 23. Master Bedroom The carpet in the bedrooms is a lighter beige.
  • 25. Bedroom 2 You can see the color contrast at the door. Both bedroom doors will need to be trimmed to close correctly.
  • 26. The windows that started it all …..
  • 27. Coming Soon … The appliances are being delivered 4/19 Once in place the countertop and sink will be installed. Kitchen finished. The 3rd bedroom renovation has begun. Concrete work will be done 1st week in May. (if it doesn’t snow) Handy barn erected to house lawn tractor etc.