Duration
Start Finish
0 TC2A - Manifolding Topsides Modules-(baseline)0 TC2A - Manifolding Topsides Modules-(baseline) 333 13-Mar-15 08-Apr-16
0.D.26 Process System0.D.26 Process System 333 13-Mar-15 08-Apr-16
0.D.26.0000 Sub System Code Level0.D.26.0000 Sub System Code Level 333 13-Mar-15 08-Apr-16
0.D.26.0000.MM1 MM1-Manifold and Pigging0.D.26.0000.MM1 MM1-Manifold and Pigging 333 13-Mar-15 08-Apr-16
0.D.26.0000.MM1.A Milestone0.D.26.0000.MM1.A Milestone 333 13-Mar-15 08-Apr-16
MM1-10010 Effective date (LOI) 0 13-Mar-15*
MM1-101000 Commence Basic & Detail Engineering Modules MM1 0 13-Mar-15*
MM1-101040 HAZID Review Workshop 0 23-Mar-15*
MM1-101060 HAZOP Review Workshop 0 27-Apr-15*
MM1-101080 Commence Fab Modules MM1 0 17-Sep-15
MM1-101020 Completion Basic & Detail Engineering Modules MM1 0 23-Sep-15*
MM1-10070 MCD for MM1 0 24-Mar-16*
MM1-10090 Commence Load-out Modules MM1 0 26-Mar-16*
MM1-101100 Modules MM1 available at Singapore Yard 0 08-Apr-16*
0.D.26.0000.MM1.B Engineering0.D.26.0000.MM1.B Engineering 327 13-Mar-15 01-Apr-16
0.D.26.0000.MM1.B.0 General0.D.26.0000.MM1.B.0 General 321 13-Mar-15 01-Apr-16
0.D.26.0000.MM1.B.0.92 PTSC0.D.26.0000.MM1.B.0.92 PTSC 321 13-Mar-15 01-Apr-16
MM1-10130 General for PMT (Meeting, Project Management, Project Coordination, Engineering review, etc)321 13-Mar-15 01-Apr-16
MM1-1305-PT-00-A-TB-00001MM1 & MM2 - Detailed Engineering Execution Plan 40 13-Mar-15 29-Apr-15
MM1-1305-PT-00-A-TB-00001-1MM1 & MM2 - Detailed Engineering Execution Plan-IDC 8 13-Mar-15* 21-Mar-15
MM1-1305-PT-00-A-TB-00001-2MM1 & MM2 - Detailed Engineering Execution Plan-IFR 6 23-Mar-15 28-Mar-15
MM1-1305-PT-00-A-TB-00001-3MM1 & MM2 - Detailed Engineering Execution Plan-IFD 11 30-Mar-15 10-Apr-15
MM1-1305-PT-00-A-TB-00001-4MM1 & MM2 - Detailed Engineering Execution Plan-IFC 15 11-Apr-15 29-Apr-15
MM1-1305-PT-00-A-KA-00001MM1 & MM2 - Detailed Engineering Coordination Procedure 31 13-Mar-15 17-Apr-15
MM1-1305-PT-00-A-KA-00001-1MM1 & MM2 - Detailed Engineering Coordination Procedure-IDC 8 13-Mar-15* 21-Mar-15
MM1-1305-PT-00-A-KA-00001-2MM1 & MM2 - Detailed Engineering Coordination Procedure-IFR 6 23-Mar-15 28-Mar-15
MM1-1305-PT-00-A-KA-00001-3MM1 & MM2 - Detailed Engineering Coordination Procedure-IFD 0 30-Mar-15 30-Mar-15
MM1-1305-PT-00-A-KA-00001-4MM1 & MM2 - Detailed Engineering Coordination Procedure-IFC 17 30-Mar-15 17-Apr-15
0.D.26.0000.MM1.B.9 3D Modelling0.D.26.0000.MM1.B.9 3D Modelling 65 12-May-15 25-Jul-15
0.D.26.0000.MM1.B.9.92 PTSC0.D.26.0000.MM1.B.9.92 PTSC 65 12-May-15 25-Jul-15
MM1-1305-PT-00-L-RA-00001MM1 & MM2 - PDMS 30% model review report 17 12-May-15 30-May-15
MM1-1305-PT-00-L-RA-00001-1MM1 & MM2 - PDMS 30% model review report-IDC 7 12-May-15* 19-May-15
MM1-1305-PT-00-L-RA-00001-2MM1 & MM2 - PDMS 30% model review report-IFR 4 20-May-15 23-May-15
MM1-1305-PT-00-L-RA-00001-3MM1 & MM2 - PDMS 30% model review report-IFD 0 25-May-15 25-May-15
MM1-1305-PT-00-L-RA-00001-4MM1 & MM2 - PDMS 30% model review report-IFC 6 25-May-15 30-May-15
MM1-1305-PT-00-L-RA-00002MM1 & MM2 - PDMS 60% model review report 17 09-Jun-15 27-Jun-15
MM1-1305-PT-00-L-RA-00002-1MM1 & MM2 - PDMS 60% model review report-IDC 7 09-Jun-15* 16-Jun-15
MM1-1305-PT-00-L-RA-00002-2MM1 & MM2 - PDMS 60% model review report-IFR 4 17-Jun-15 20-Jun-15
MM1-1305-PT-00-L-RA-00002-3MM1 & MM2 - PDMS 60% model review report-IFD 0 22-Jun-15 22-Jun-15
MM1-1305-PT-00-L-RA-00002-4MM1 & MM2 - PDMS 60% model review report-IFC 6 22-Jun-15 27-Jun-15
MM1-1305-PT-00-L-RA-00003MM1 & MM2 - PDMS 90% model review report 17 07-Jul-15 25-Jul-15
MM1-1305-PT-00-L-RA-00003-1MM1 & MM2 - PDMS 90% model review report -IDC 7 07-Jul-15* 14-Jul-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Effective date (LOI)
Commence Basic & Detail Engineering Modules MM1
HAZID Review Workshop
HAZOP Review Workshop
Commence Fab Modules MM1
Completion Basic & Detail Engineering Modules MM1
MCD for MM1
Commence Load-out Modu
Modules MM1 available
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 1 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
2. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-00-L-RA-00003-2MM1 & MM2 - PDMS 90% model review report -IFR 4 15-Jul-15 18-Jul-15
MM1-1305-PT-00-L-RA-00003-3MM1 & MM2 - PDMS 90% model review report -IFD 0 20-Jul-15 20-Jul-15
MM1-1305-PT-00-L-RA-00003-4MM1 & MM2 - PDMS 90% model review report -IFC 6 20-Jul-15 25-Jul-15
0.D.26.0000.MM1.B.S Process & Systems0.D.26.0000.MM1.B.S Process & Systems 79 13-Mar-15 16-Jun-15
0.D.26.0000.MM1.B.S.92 PTSC0.D.26.0000.MM1.B.S.92 PTSC 79 13-Mar-15 16-Jun-15
MM1-1305-PT-30-P-FD-00001MM1 & MM2 - Basic Design Data 47 13-Mar-15 09-May-15
MM1-1305-PT-30-P-FD-00001-1MM1 & MM2 - Basic Design Data-IDC 9 13-Mar-15* 23-Mar-15
MM1-1305-PT-30-P-FD-00001-2MM1 & MM2 - Basic Design Data-IFR 7 24-Mar-15 31-Mar-15
MM1-1305-PT-30-P-FD-00001-3MM1 & MM2 - Basic Design Data-IFD 13 01-Apr-15 15-Apr-15
MM1-1305-PT-30-P-FD-00001-4MM1 & MM2 - Basic Design Data-IFC 18 16-Apr-15 09-May-15
MM1-1305-PT-30-P-RA-00001MM1 & MM2 - Report - HYSYS Simulation 48 13-Mar-15 11-May-15
MM1-1305-PT-30-P-RA-00001-1MM1 & MM2 - Report - HYSYS Simulation-IDC 1 13-Mar-15* 13-Mar-15
MM1-1305-PT-30-P-RA-00001-2MM1 & MM2 - Report - HYSYS Simulation-IFR 17 14-Mar-15 02-Apr-15
MM1-1305-PT-30-P-RA-00001-3MM1 & MM2 - Report - HYSYS Simulation-IFD 13 03-Apr-15 17-Apr-15
MM1-1305-PT-30-P-RA-00001-4MM1 & MM2 - Report - HYSYS Simulation-IFC 17 18-Apr-15 11-May-15
MM1-1305-PT-30-P-RA-00002MM1 & MM2 - Report - Line Sizing 55 03-Apr-15 09-Jun-15
MM1-1305-PT-30-P-RA-00002-1MM1 & MM2 - Report - Line Sizing-IDC 1 03-Apr-15* 03-Apr-15
MM1-1305-PT-30-P-RA-00002-2MM1 & MM2 - Report - Line Sizing-IFR 21 04-Apr-15 29-Apr-15
MM1-1305-PT-30-P-RA-00002-3MM1 & MM2 - Report - Line Sizing-IFD 13 02-May-15 16-May-15
MM1-1305-PT-30-P-RA-00002-4MM1 & MM2 - Report - Line Sizing-IFC 20 18-May-15 09-Jun-15
MM1-1305-PT-30-P-RA-00003MM1 & MM2 - Report - Utility Summary 40 22-Apr-15 10-Jun-15
MM1-1305-PT-30-P-RA-00003-1MM1 & MM2 - Report - Utility Summary-IDC 1 22-Apr-15* 22-Apr-15
MM1-1305-PT-30-P-RA-00003-2MM1 & MM2 - Report - Utility Summary-IFR 6 23-Apr-15 02-May-15
MM1-1305-PT-30-P-RA-00003-3MM1 & MM2 - Report - Utility Summary-IFD 12 04-May-15 16-May-15
MM1-1305-PT-30-P-RA-00003-4MM1 & MM2 - Report - Utility Summary-IFC 21 18-May-15 10-Jun-15
MM1-1305-PT-30-P-CA-00001MM1 & MM2 - Calculation Note - Depressuring 44 23-Mar-15 15-May-15
MM1-1305-PT-30-P-CA-00001-1MM1 & MM2 - Calculation Note - Depressuring -IDC 1 23-Mar-15* 23-Mar-15
MM1-1305-PT-30-P-CA-00001-2MM1 & MM2 - Calculation Note - Depressuring -IFR 12 24-Mar-15 06-Apr-15
MM1-1305-PT-30-P-CA-00001-3MM1 & MM2 - Calculation Note - Depressuring -IFD 13 07-Apr-15 21-Apr-15
MM1-1305-PT-30-P-CA-00001-4MM1 & MM2 - Calculation Note - Depressuring -IFC 18 22-Apr-15 15-May-15
MM1-1305-PT-30-P-CA-00002MM1 & MM2 - Calculation Note - PSV Sizing 44 07-Apr-15 30-May-15
MM1-1305-PT-30-P-CA-00002-1MM1 & MM2 - Calculation Note - PSV Sizing -IDC 1 07-Apr-15* 07-Apr-15
MM1-1305-PT-30-P-CA-00002-2MM1 & MM2 - Calculation Note - PSV Sizing -IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-CA-00002-3MM1 & MM2 - Calculation Note - PSV Sizing -IFD 10 22-Apr-15 06-May-15
MM1-1305-PT-30-P-CA-00002-4MM1 & MM2 - Calculation Note - PSV Sizing -IFC 21 07-May-15 30-May-15
MM1-1305-PT-30-P-XA-00001MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets) 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XA-00001-1MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XA-00001-2MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XA-00001-3MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XA-00001-4MM1 & MM2 - Process Flow Diagram (PFD) (4 Sheets)-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XA-00002MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets) 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XA-00002-1MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IDC 22 13-Mar-15* 07-Apr-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 2 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
3. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-30-P-XA-00002-2MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XA-00002-3MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XA-00002-4MM1 & MM2 - Utility Flow Diagram (UFD) (2 Sheets)-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XA-00003MM1 & MM2 - Material Selection Diagrams (3 Sheets) 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XA-00003-1MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XA-00003-2MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XA-00003-3MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XA-00003-4MM1 & MM2 - Material Selection Diagrams (3 Sheets)-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00001MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00001-1MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00001-2MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00001-3MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00001-4MM1 & MM2 - P&ID Riser Oil Production 1 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00002MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00002-1MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00002-2MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00002-3MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00002-4MM1 & MM2 - P&ID Riser Oil Production 2 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00003MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00003-1MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00003-2MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00003-3MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00003-4MM1 & MM2 - P&ID Riser Oil Production 3 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00004MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00004-1MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IDC22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00004-2MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFR12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00004-3MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFD14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00004-4MM1 & MM2 - P&ID Riser Oil Production 4 - Pig Launcher And Reciever -IFC21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00005MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00005-1MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00005-2MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00005-3MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00005-4MM1 & MM2 - P&ID Riser Oil Production 5 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00006MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00006-1MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00006-2MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00006-3MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00006-4MM1 & MM2 - P&ID Riser Oil Production 6 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00007MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00007-1MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00007-2MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00007-3MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFD 14 22-Apr-15 11-May-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 3 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
4. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-30-P-XB-00007-4MM1 & MM2 - P&ID Riser Oil Production 7 - Pig Launcher And Reciever-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00008MM1 & MM2 - P&ID HP Oil Production Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00008-1MM1 & MM2 - P&ID HP Oil Production Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00008-2MM1 & MM2 - P&ID HP Oil Production Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00008-3MM1 & MM2 - P&ID HP Oil Production Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00008-4MM1 & MM2 - P&ID HP Oil Production Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00009MM1 & MM2 - P&ID HHP Oil Production Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00009-1MM1 & MM2 - P&ID HHP Oil Production Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00009-2MM1 & MM2 - P&ID HHP Oil Production Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00009-3MM1 & MM2 - P&ID HHP Oil Production Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00009-4MM1 & MM2 - P&ID HHP Oil Production Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00010MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets) 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00010-1MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00010-2MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00010-3MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00010-4MM1 & MM2 - P&ID Gas Production Manifold (2 Sheets)-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00011MM1 & MM2 - P&ID Test Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00011-1MM1 & MM2 - P&ID Test Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00011-2MM1 & MM2 - P&ID Test Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00011-3MM1 & MM2 - P&ID Test Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00011-4MM1 & MM2 - P&ID Test Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00012MM1 & MM2 - P&ID Gas Injection Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00012-1MM1 & MM2 - P&ID Gas Injection Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00012-2MM1 & MM2 - P&ID Gas Injection Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00012-3MM1 & MM2 - P&ID Gas Injection Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00012-4MM1 & MM2 - P&ID Gas Injection Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00013MM1 & MM2 - P&ID Water Injection Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00013-1MM1 & MM2 - P&ID Water Injection Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00013-2MM1 & MM2 - P&ID Water Injection Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00013-3MM1 & MM2 - P&ID Water Injection Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00013-4MM1 & MM2 - P&ID Water Injection Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00014MM1 & MM2 - P&ID Gas Export Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00014-1MM1 & MM2 - P&ID Gas Export Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00014-2MM1 & MM2 - P&ID Gas Export Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00014-3MM1 & MM2 - P&ID Gas Export Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00014-4MM1 & MM2 - P&ID Gas Export Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00015MM1 & MM2 - P&ID Gas Lift Manifold 69 13-Mar-15 04-Jun-15
MM1-1305-PT-30-P-XB-00015-1MM1 & MM2 - P&ID Gas Lift Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00015-2MM1 & MM2 - P&ID Gas Lift Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00015-3MM1 & MM2 - P&ID Gas Lift Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00015-4MM1 & MM2 - P&ID Gas Lift Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-XB-00016MM1 & MM2 - P&ID Diesel Manifold 69 13-Mar-15 04-Jun-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 4 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
5. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-30-P-XB-00016-1MM1 & MM2 - P&ID Diesel Manifold-IDC 22 13-Mar-15* 07-Apr-15
MM1-1305-PT-30-P-XB-00016-2MM1 & MM2 - P&ID Diesel Manifold-IFR 12 08-Apr-15 21-Apr-15
MM1-1305-PT-30-P-XB-00016-3MM1 & MM2 - P&ID Diesel Manifold-IFD 14 22-Apr-15 11-May-15
MM1-1305-PT-30-P-XB-00016-4MM1 & MM2 - P&ID Diesel Manifold-IFC 21 12-May-15 04-Jun-15
MM1-1305-PT-30-P-LA-00001MM1 & MM2 - Line List 56 09-Apr-15 16-Jun-15
MM1-1305-PT-30-P-LA-00001-1MM1 & MM2 - Line List-IDC 14 09-Apr-15* 24-Apr-15
MM1-1305-PT-30-P-LA-00001-2MM1 & MM2 - Line List-IFR 10 25-Apr-15 09-May-15
MM1-1305-PT-30-P-LA-00001-3MM1 & MM2 - Line List-IFD 14 11-May-15 26-May-15
MM1-1305-PT-30-P-LA-00001-4MM1 & MM2 - Line List-IFC 18 27-May-15 16-Jun-15
MM1-1305-PT-30-P-XM-00001MM1 & MM2 - Safe Chart 52 08-Apr-15 10-Jun-15
MM1-1305-PT-30-P-XM-00001-1MM1 & MM2 - Safe Chart-IDC 7 08-Apr-15* 15-Apr-15
MM1-1305-PT-30-P-XM-00001-2MM1 & MM2 - Safe Chart-IFR 6 16-Apr-15 22-Apr-15
MM1-1305-PT-30-P-XM-00001-3MM1 & MM2 - Safe Chart-IFD 18 23-Apr-15 16-May-15
MM1-1305-PT-30-P-XM-00001-4MM1 & MM2 - Safe Chart-IFC 21 18-May-15 10-Jun-15
MM1-1305-PT-30-P-XL-00001MM1 & MM2 - ESD Logic Diagram 52 08-Apr-15 10-Jun-15
MM1-1305-PT-30-P-XL-00001-1MM1 & MM2 - ESD Logic Diagram-IDC 7 08-Apr-15* 15-Apr-15
MM1-1305-PT-30-P-XL-00001-2MM1 & MM2 - ESD Logic Diagram-IFR 6 16-Apr-15 22-Apr-15
MM1-1305-PT-30-P-XL-00001-3MM1 & MM2 - ESD Logic Diagram-IFD 18 23-Apr-15 16-May-15
MM1-1305-PT-30-P-XL-00001-4MM1 & MM2 - ESD Logic Diagram-IFC 21 18-May-15 10-Jun-15
MM1-1305-PT-30-P-LA-00002MM1 & MM2 - Alarm / Trip Schedule 52 08-Apr-15 10-Jun-15
MM1-1305-PT-30-P-LA-00002-1MM1 & MM2 - Alarm / Trip Schedule-IDC 7 08-Apr-15* 15-Apr-15
MM1-1305-PT-30-P-LA-00002-2MM1 & MM2 - Alarm / Trip Schedule-IFR 6 16-Apr-15 22-Apr-15
MM1-1305-PT-30-P-LA-00002-3MM1 & MM2 - Alarm / Trip Schedule-IFD 18 23-Apr-15 16-May-15
MM1-1305-PT-30-P-LA-00002-4MM1 & MM2 - Alarm / Trip Schedule-IFC 21 18-May-15 10-Jun-15
MM1-1305-PT-30-X-CA-00001MM1 & MM2 - Calculation Note - Deluge System 53 08-Apr-15 11-Jun-15
MM1-1305-PT-30-X-CA-00001-1MM1 & MM2 - Calculation Note - Deluge System-IDC 1 08-Apr-15* 08-Apr-15
MM1-1305-PT-30-X-CA-00001-2MM1 & MM2 - Calculation Note - Deluge System-IFR 17 09-Apr-15 29-Apr-15
MM1-1305-PT-30-X-CA-00001-3MM1 & MM2 - Calculation Note - Deluge System-IFD 14 02-May-15 18-May-15
MM1-1305-PT-30-X-CA-00001-4MM1 & MM2 - Calculation Note - Deluge System-IFC 21 19-May-15 11-Jun-15
MM1-1305-PT-30-X-CA-00002MM1 & MM2 - Steady State Analysis for Deluge System 51 15-Apr-15 16-Jun-15
MM1-1305-PT-30-X-CA-00002-1MM1 & MM2 - Steady State Analysis for Deluge System-IDC 1 15-Apr-15* 15-Apr-15
MM1-1305-PT-30-X-CA-00002-2MM1 & MM2 - Steady State Analysis for Deluge System-IFR 15 16-Apr-15 06-May-15
MM1-1305-PT-30-X-CA-00002-3MM1 & MM2 - Steady State Analysis for Deluge System-IFD 15 07-May-15 23-May-15
MM1-1305-PT-30-X-CA-00002-4MM1 & MM2 - Steady State Analysis for Deluge System-IFC 20 25-May-15 16-Jun-15
MM1-1305-PT-30-X-XE-10001MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan59 26-Mar-15 05-Jun-15
MM1-1305-PT-30-X-XE-10001-1MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IDC13 26-Mar-15* 09-Apr-15
MM1-1305-PT-30-X-XE-10001-2MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFR12 10-Apr-15 23-Apr-15
MM1-1305-PT-30-X-XE-10001-3MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFD11 24-Apr-15 09-May-15
MM1-1305-PT-30-X-XE-10001-4MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Upper Deck Equipment Layout Plan-IFC23 11-May-15 05-Jun-15
MM1-1305-PT-30-X-XE-10002MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan59 26-Mar-15 05-Jun-15
MM1-1305-PT-30-X-XE-10002-1MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IDC13 26-Mar-15* 09-Apr-15
MM1-1305-PT-30-X-XE-10002-2MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFR12 10-Apr-15 23-Apr-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 5 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
6. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-30-X-XE-10002-3MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFD11 24-Apr-15 09-May-15
MM1-1305-PT-30-X-XE-10002-4MM1 - Hazardous Area Classification - Manifold &Pigging Facilities - Main Deck Equipment Layout Plan-IFC23 11-May-15 05-Jun-15
MM1-1305-PT-30-X-XB-10001MM1 - P&ID Firewater Deluge System 56 08-Apr-15 15-Jun-15
MM1-1305-PT-30-X-XB-10001-1MM1 - P&ID Firewater Deluge System-IDC 10 08-Apr-15* 18-Apr-15
MM1-1305-PT-30-X-XB-10001-2MM1 - P&ID Firewater Deluge System-IFR 11 20-Apr-15 05-May-15
MM1-1305-PT-30-X-XB-10001-3MM1 - P&ID Firewater Deluge System-IFD 15 06-May-15 22-May-15
MM1-1305-PT-30-X-XB-10001-4MM1 - P&ID Firewater Deluge System-IFC 20 23-May-15 15-Jun-15
0.D.26.0000.MM1.B.N Structural0.D.26.0000.MM1.B.N Structural 315 16-Mar-15 21-Mar-16
0.D.26.0000.MM1.B.N.92 PTSC0.D.26.0000.MM1.B.N.92 PTSC 315 16-Mar-15 21-Mar-16
MM1-1305-PT-95-N-RA-10001MM1 - In-place Analysis Report 82 16-Mar-15 22-Jun-15
MM1-1305-PT-95-N-RA-10001-1MM1 - In-place Analysis Report-IDC 0 16-Mar-15* 16-Mar-15
MM1-1305-PT-95-N-RA-10001-2MM1 - In-place Analysis Report-IFR 55 16-Mar-15 21-May-15
MM1-1305-PT-95-N-RA-10001-3MM1 - In-place Analysis Report-IFD 12 22-May-15 04-Jun-15
MM1-1305-PT-95-N-RA-10001-4MM1 - In-place Analysis Report-IFC 15 05-Jun-15 22-Jun-15
MM1-1305-PT-95-N-RA-10002MM1 - Preservice Analysis Report 85 16-Mar-15 25-Jun-15
MM1-1305-PT-95-N-RA-10002-1MM1 - Preservice Analysis Report-IDC 0 16-Mar-15* 16-Mar-15
MM1-1305-PT-95-N-RA-10002-2MM1 - Preservice Analysis Report-IFR 57 16-Mar-15 23-May-15
MM1-1305-PT-95-N-RA-10002-3MM1 - Preservice Analysis Report-IFD 12 25-May-15 06-Jun-15
MM1-1305-PT-95-N-RA-10002-4MM1 - Preservice Analysis Report-IFC 16 08-Jun-15 25-Jun-15
MM1-1305-PT-95-N-RA-10003MM1 - Structural Miscellaneous design 45 06-Jun-15 28-Jul-15
MM1-1305-PT-95-N-RA-10003-1MM1 - Structural Miscellaneous design-IDC 1 06-Jun-15* 06-Jun-15
MM1-1305-PT-95-N-RA-10003-2MM1 - Structural Miscellaneous design-IFR 17 08-Jun-15 26-Jun-15
MM1-1305-PT-95-N-RA-10003-3MM1 - Structural Miscellaneous design-IFD 12 27-Jun-15 10-Jul-15
MM1-1305-PT-95-N-RA-10003-4MM1 - Structural Miscellaneous design-IFC 15 11-Jul-15 28-Jul-15
MM1-1305-PT-95-N-RA-10005MM1 - Weight Control Report 74 28-Mar-15 25-Jun-15
MM1-1305-PT-95-N-RA-10005-1MM1 - Weight Control Report-IDC 33 28-Mar-15* 08-May-15
MM1-1305-PT-95-N-RA-10005-2MM1 - Weight Control Report-IFR 13 09-May-15 23-May-15
MM1-1305-PT-95-N-RA-10005-3MM1 - Weight Control Report-IFD 12 25-May-15 06-Jun-15
MM1-1305-PT-95-N-RA-10005-4MM1 - Weight Control Report-IFC 16 08-Jun-15 25-Jun-15
MM1-1305-PT-95-N-RA-10006MM1 - Seafastening Report 50 30-Jun-15 26-Aug-15
MM1-1305-PT-95-N-RA-10006-1MM1 - Seafastening Report-IDC 1 30-Jun-15* 30-Jun-15
MM1-1305-PT-95-N-RA-10006-2MM1 - Seafastening Report-IFR 16 01-Jul-15 18-Jul-15
MM1-1305-PT-95-N-RA-10006-3MM1 - Seafastening Report-IFD 12 20-Jul-15 01-Aug-15
MM1-1305-PT-95-N-RA-10006-4MM1 - Seafastening Report-IFC 21 03-Aug-15 26-Aug-15
MM1-1305-PT-95-N-LA-00001MM1 & MM2 - Structural Primary & secondary steel MTOs 61 16-Mar-15 28-May-15
MM1-1305-PT-95-N-LA-00001-1MM1 & MM2 - Structural Primary & secondary steel MTOs-IDC 0 16-Mar-15* 16-Mar-15
MM1-1305-PT-95-N-LA-00001-2MM1 & MM2 - Structural Primary & secondary steel MTOs-IFR 24 16-Mar-15 11-Apr-15
MM1-1305-PT-95-N-LA-00001-3MM1 & MM2 - Structural Primary & secondary steel MTOs-IFD 0 13-Apr-15 13-Apr-15
MM1-1305-PT-95-N-LA-00001-4MM1 & MM2 - Structural Primary & secondary steel MTOs-IFC 37 13-Apr-15 28-May-15
MM1-1305-PT-95-N-LA-00002MM1 & MM2 - Structural Tertiary Steel MTOs 67 04-May-15 20-Jul-15
MM1-1305-PT-95-N-LA-00002-1MM1 & MM2 - Structural Tertiary Steel MTOs-IDC 1 04-May-15* 04-May-15
MM1-1305-PT-95-N-LA-00002-2MM1 & MM2 - Structural Tertiary Steel MTOs-IFR 25 05-May-15 02-Jun-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 6 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
7. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-LA-00002-3MM1 & MM2 - Structural Tertiary Steel MTOs-IFD 0 03-Jun-15 03-Jun-15
MM1-1305-PT-95-N-LA-00002-4MM1 & MM2 - Structural Tertiary Steel MTOs-IFC 41 03-Jun-15 20-Jul-15
MM1-1305-PT-95-N-LA-00003MM1 & MM2 - Structural Miscellaneous MTOs 68 22-Jun-15 09-Sep-15
MM1-1305-PT-95-N-LA-00003-1MM1 & MM2 - Structural Miscellaneous MTOs-IDC 0 22-Jun-15* 22-Jun-15
MM1-1305-PT-95-N-LA-00003-2MM1 & MM2 - Structural Miscellaneous MTOs-IFR 24 22-Jun-15 18-Jul-15
MM1-1305-PT-95-N-LA-00003-3MM1 & MM2 - Structural Miscellaneous MTOs-IFD 0 20-Jul-15 20-Jul-15
MM1-1305-PT-95-N-LA-00003-4MM1 & MM2 - Structural Miscellaneous MTOs-IFC 44 20-Jul-15 09-Sep-15
MM1-1305-PT-95-N-LA-00004MM1 & MM2 - Structural Grating MTOs 71 23-Jun-15 14-Sep-15
MM1-1305-PT-95-N-LA-00004-1MM1 & MM2 - Structural Grating MTOs-IDC 1 23-Jun-15* 23-Jun-15
MM1-1305-PT-95-N-LA-00004-2MM1 & MM2 - Structural Grating MTOs-IFR 25 24-Jun-15 22-Jul-15
MM1-1305-PT-95-N-LA-00004-3MM1 & MM2 - Structural Grating MTOs-IFD 0 23-Jul-15 23-Jul-15
MM1-1305-PT-95-N-LA-00004-4MM1 & MM2 - Structural Grating MTOs-IFC 45 23-Jul-15 14-Sep-15
MM1-1305-PT-95-N-XG-01001MM1 & MM2 - Structural General Notes 47 24-Mar-15 20-May-15
MM1-1305-PT-95-N-XG-01001-1MM1 & MM2 - Structural General Notes-IDC 1 24-Mar-15* 24-Mar-15
MM1-1305-PT-95-N-XG-01001-2MM1 & MM2 - Structural General Notes-IFR 18 25-Mar-15 14-Apr-15
MM1-1305-PT-95-N-XG-01001-3MM1 & MM2 - Structural General Notes-IFD 11 15-Apr-15 27-Apr-15
MM1-1305-PT-95-N-XG-01001-4MM1 & MM2 - Structural General Notes-IFC 17 29-Apr-15 20-May-15
MM1-1305-PT-95-N-XG-01002MM1 & MM2 - Typical Weld Details 49 24-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01002-1MM1 & MM2 - Typical Weld Details-IDC 1 24-Mar-15* 24-Mar-15
MM1-1305-PT-95-N-XG-01002-2MM1 & MM2 - Typical Weld Details-IFR 20 25-Mar-15 16-Apr-15
MM1-1305-PT-95-N-XG-01002-3MM1 & MM2 - Typical Weld Details-IFD 10 17-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01002-4MM1 & MM2 - Typical Weld Details-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-01003MM1 & MM2 - Typical Connection Details 48 02-Apr-15 30-May-15
MM1-1305-PT-95-N-XG-01003-1MM1 & MM2 - Typical Connection Details-IDC 1 02-Apr-15* 02-Apr-15
MM1-1305-PT-95-N-XG-01003-2MM1 & MM2 - Typical Connection Details-IFR 20 03-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-01003-3MM1 & MM2 - Typical Connection Details-IFD 9 27-Apr-15 09-May-15
MM1-1305-PT-95-N-XG-01003-4MM1 & MM2 - Typical Connection Details-IFC 18 11-May-15 30-May-15
MM1-1305-PT-95-N-XG-01004MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01004-1MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01004-2MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01004-3MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01004-4MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 1-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-01005MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01005-1MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01005-2MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01005-3MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01005-4MM1 & MM2 - Typical Ladder Arrangement & Details - sheet 2-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-01006MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01006-1MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01006-2MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01006-3MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01006-4MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 1-IFC 18 02-May-15 22-May-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 7 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
8. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-01007MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01007-1MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01007-2MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01007-3MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01007-4MM1 & MM2 - Typical Stair Arrangement & Details - Sheet 2-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-01008MM1 & MM2 - Typical Plating & Grating Arrangement & Details 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01008-1MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01008-2MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01008-3MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01008-4MM1 & MM2 - Typical Plating & Grating Arrangement & Details-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-01009MM1 & MM2 - Typical Handrail Arrangement & Details 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01009-1MM1 & MM2 - Typical Handrail Arrangement & Details-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01009-2MM1 & MM2 - Typical Handrail Arrangement & Details-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01009-3MM1 & MM2 - Typical Handrail Arrangement & Details-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01009-4MM1 & MM2 - Typical Handrail Arrangement & Details-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-01010MM1 & MM2 - Typical Drain Outlet Details 45 28-Mar-15 22-May-15
MM1-1305-PT-95-N-XG-01010-1MM1 & MM2 - Typical Drain Outlet Details-IDC 1 28-Mar-15* 28-Mar-15
MM1-1305-PT-95-N-XG-01010-2MM1 & MM2 - Typical Drain Outlet Details-IFR 17 30-Mar-15 17-Apr-15
MM1-1305-PT-95-N-XG-01010-3MM1 & MM2 - Typical Drain Outlet Details-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-01010-4MM1 & MM2 - Typical Drain Outlet Details-IFC 18 02-May-15 22-May-15
MM1-1305-PT-95-N-XG-12001MM1 - Drawing Index 64 24-Mar-15 09-Jun-15
MM1-1305-PT-95-N-XG-12001-1MM1 - Drawing Index-IDC 1 24-Mar-15* 24-Mar-15
MM1-1305-PT-95-N-XG-12001-2MM1 - Drawing Index-IFR 27 25-Mar-15 24-Apr-15
MM1-1305-PT-95-N-XG-12001-3MM1 - Drawing Index-IFD 0 25-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12001-4MM1 - Drawing Index-IFC 36 25-Apr-15 09-Jun-15
MM1-1305-PT-95-N-XG-12002MM1 - Structural Perspective View 52 29-Apr-15 30-Jun-15
MM1-1305-PT-95-N-XG-12002-1MM1 - Structural Perspective View-IDC 0 29-Apr-15* 29-Apr-15
MM1-1305-PT-95-N-XG-12002-2MM1 - Structural Perspective View-IFR 24 29-Apr-15 28-May-15
MM1-1305-PT-95-N-XG-12002-3MM1 - Structural Perspective View-IFD 0 29-May-15 29-May-15
MM1-1305-PT-95-N-XG-12002-4MM1 - Structural Perspective View-IFC 28 29-May-15 30-Jun-15
MM1-1305-PT-95-N-XG-12003MM1 - Deck Load Plan 32 29-Apr-15 06-Jun-15
MM1-1305-PT-95-N-XG-12003-1MM1 - Deck Load Plan-IDC 0 29-Apr-15* 29-Apr-15
MM1-1305-PT-95-N-XG-12003-2MM1 - Deck Load Plan-IFR 20 29-Apr-15 23-May-15
MM1-1305-PT-95-N-XG-12003-3MM1 - Deck Load Plan-IFD 0 25-May-15 25-May-15
MM1-1305-PT-95-N-XG-12003-4MM1 - Deck Load Plan-IFC 12 25-May-15 06-Jun-15
MM1-1305-PT-95-N-XG-12004MM1 - Upper Deck Primary Framing Plan 36 02-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12004-1MM1 - Upper Deck Primary Framing Plan-IDC 19 02-Apr-15* 23-Apr-15
MM1-1305-PT-95-N-XG-12004-2MM1 - Upper Deck Primary Framing Plan-IFR 4 24-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-12004-3MM1 - Upper Deck Primary Framing Plan-IFD 0 02-May-15 02-May-15
MM1-1305-PT-95-N-XG-12004-4MM1 - Upper Deck Primary Framing Plan-IFC 13 02-May-15 16-May-15
MM1-1305-PT-95-N-XG-12005MM1 - Mezzanine Deck Primary Framing Plan 36 31-Mar-15 14-May-15
MM1-1305-PT-95-N-XG-12005-1MM1 - Mezzanine Deck Primary Framing Plan-IDC 19 31-Mar-15* 21-Apr-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 8 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
9. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-12005-2MM1 - Mezzanine Deck Primary Framing Plan-IFR 5 22-Apr-15 27-Apr-15
MM1-1305-PT-95-N-XG-12005-3MM1 - Mezzanine Deck Primary Framing Plan-IFD 0 29-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-12005-4MM1 - Mezzanine Deck Primary Framing Plan-IFC 12 29-Apr-15 14-May-15
MM1-1305-PT-95-N-XG-12006MM1 - Main Deck Primary Framing Plan 36 28-Mar-15 12-May-15
MM1-1305-PT-95-N-XG-12006-1MM1 - Main Deck Primary Framing Plan-IDC 19 28-Mar-15* 18-Apr-15
MM1-1305-PT-95-N-XG-12006-2MM1 - Main Deck Primary Framing Plan-IFR 6 20-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12006-3MM1 - Main Deck Primary Framing Plan-IFD 0 27-Apr-15 27-Apr-15
MM1-1305-PT-95-N-XG-12006-4MM1 - Main Deck Primary Framing Plan-IFC 11 27-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12007MM1 - Truss Row 89 & Row 90 36 28-Mar-15 12-May-15
MM1-1305-PT-95-N-XG-12007-1MM1 - Truss Row 89 & Row 90-IDC 18 28-Mar-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12007-2MM1 - Truss Row 89 & Row 90-IFR 6 18-Apr-15 24-Apr-15
MM1-1305-PT-95-N-XG-12007-3MM1 - Truss Row 89 & Row 90-IFD 0 25-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12007-4MM1 - Truss Row 89 & Row 90-IFC 12 25-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12008MM1 - Truss Row 91 & Row 92 36 28-Mar-15 12-May-15
MM1-1305-PT-95-N-XG-12008-1MM1 - Truss Row 91 & Row 92-IDC 19 28-Mar-15* 18-Apr-15
MM1-1305-PT-95-N-XG-12008-2MM1 - Truss Row 91 & Row 92-IFR 6 20-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12008-3MM1 - Truss Row 91 & Row 92-IFD 0 27-Apr-15 27-Apr-15
MM1-1305-PT-95-N-XG-12008-4MM1 - Truss Row 91 & Row 92-IFC 11 27-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12009MM1 - Truss Row 93 & Row 94 34 02-Apr-15 14-May-15
MM1-1305-PT-95-N-XG-12009-1MM1 - Truss Row 93 & Row 94-IDC 17 02-Apr-15* 21-Apr-15
MM1-1305-PT-95-N-XG-12009-2MM1 - Truss Row 93 & Row 94-IFR 6 22-Apr-15 29-Apr-15
MM1-1305-PT-95-N-XG-12009-3MM1 - Truss Row 93 & Row 94-IFD 0 02-May-15 02-May-15
MM1-1305-PT-95-N-XG-12009-4MM1 - Truss Row 93 & Row 94-IFC 11 02-May-15 14-May-15
MM1-1305-PT-95-N-XG-12010MM1 - Truss Row 1A 36 28-Mar-15 12-May-15
MM1-1305-PT-95-N-XG-12010-1MM1 - Truss Row 1A-IDC 18 28-Mar-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12010-2MM1 - Truss Row 1A-IFR 6 18-Apr-15 24-Apr-15
MM1-1305-PT-95-N-XG-12010-3MM1 - Truss Row 1A-IFD 0 25-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12010-4MM1 - Truss Row 1A-IFC 12 25-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12011MM1 - Truss Row 1B 36 28-Mar-15 12-May-15
MM1-1305-PT-95-N-XG-12011-1MM1 - Truss Row 1B-IDC 18 28-Mar-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12011-2MM1 - Truss Row 1B-IFR 7 18-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12011-3MM1 - Truss Row 1B-IFD 0 27-Apr-15 27-Apr-15
MM1-1305-PT-95-N-XG-12011-4MM1 - Truss Row 1B-IFC 11 27-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12012MM1 - Truss Row 1C 35 31-Mar-15 13-May-15
MM1-1305-PT-95-N-XG-12012-1MM1 - Truss Row 1C-IDC 17 31-Mar-15* 18-Apr-15
MM1-1305-PT-95-N-XG-12012-2MM1 - Truss Row 1C-IFR 6 20-Apr-15 25-Apr-15
MM1-1305-PT-95-N-XG-12012-3MM1 - Truss Row 1C-IFD 0 27-Apr-15 27-Apr-15
MM1-1305-PT-95-N-XG-12012-4MM1 - Truss Row 1C-IFC 12 27-Apr-15 13-May-15
MM1-1305-PT-95-N-XG-12013MM1 - Upper Deck Joint Details Sheet 1 27 17-Apr-15 21-May-15
MM1-1305-PT-95-N-XG-12013-1MM1 - Upper Deck Joint Details Sheet 1-IDC 1 17-Apr-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12013-2MM1 - Upper Deck Joint Details Sheet 1-IFR 20 18-Apr-15 14-May-15
MM1-1305-PT-95-N-XG-12013-3MM1 - Upper Deck Joint Details Sheet 1-IFD 0 15-May-15 15-May-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 9 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
10. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-12013-4MM1 - Upper Deck Joint Details Sheet 1-IFC 6 15-May-15 21-May-15
MM1-1305-PT-95-N-XG-12014MM1 - Upper Deck Joint Details Sheet 2 27 17-Apr-15 21-May-15
MM1-1305-PT-95-N-XG-12014-1MM1 - Upper Deck Joint Details Sheet 2-IDC 1 17-Apr-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12014-2MM1 - Upper Deck Joint Details Sheet 2-IFR 20 18-Apr-15 14-May-15
MM1-1305-PT-95-N-XG-12014-3MM1 - Upper Deck Joint Details Sheet 2-IFD 0 15-May-15 15-May-15
MM1-1305-PT-95-N-XG-12014-4MM1 - Upper Deck Joint Details Sheet 2-IFC 6 15-May-15 21-May-15
MM1-1305-PT-95-N-XG-12015MM1 - Upper Deck Joint Details Sheet 3 31 17-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12015-1MM1 - Upper Deck Joint Details Sheet 3-IDC 1 17-Apr-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12015-2MM1 - Upper Deck Joint Details Sheet 3-IFR 22 18-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12015-3MM1 - Upper Deck Joint Details Sheet 3-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12015-4MM1 - Upper Deck Joint Details Sheet 3-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12016MM1 - Upper Deck Joint Details sheet 4 31 17-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12016-1MM1 - Upper Deck Joint Details sheet 4-IDC 1 17-Apr-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12016-2MM1 - Upper Deck Joint Details sheet 4-IFR 22 18-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12016-3MM1 - Upper Deck Joint Details sheet 4-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12016-4MM1 - Upper Deck Joint Details sheet 4-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12017MM1 - Upper Deck Joint Details sheet 5 31 17-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12017-1MM1 - Upper Deck Joint Details sheet 5-IDC 1 17-Apr-15* 17-Apr-15
MM1-1305-PT-95-N-XG-12017-2MM1 - Upper Deck Joint Details sheet 5-IFR 22 18-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12017-3MM1 - Upper Deck Joint Details sheet 5-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12017-4MM1 - Upper Deck Joint Details sheet 5-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12018MM1 - Mezzanine Deck Joint Details sheet 1 34 14-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12018-1MM1 - Mezzanine Deck Joint Details sheet 1-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12018-2MM1 - Mezzanine Deck Joint Details sheet 1-IFR 22 15-Apr-15 13-May-15
MM1-1305-PT-95-N-XG-12018-3MM1 - Mezzanine Deck Joint Details sheet 1-IFD 0 14-May-15 14-May-15
MM1-1305-PT-95-N-XG-12018-4MM1 - Mezzanine Deck Joint Details sheet 1-IFC 11 14-May-15 26-May-15
MM1-1305-PT-95-N-XG-12019MM1 - Mezzanine Deck Joint Details sheet 2 34 14-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12019-1MM1 - Mezzanine Deck Joint Details sheet 2-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12019-2MM1 - Mezzanine Deck Joint Details sheet 2-IFR 22 15-Apr-15 13-May-15
MM1-1305-PT-95-N-XG-12019-3MM1 - Mezzanine Deck Joint Details sheet 2-IFD 0 14-May-15 14-May-15
MM1-1305-PT-95-N-XG-12019-4MM1 - Mezzanine Deck Joint Details sheet 2-IFC 11 14-May-15 26-May-15
MM1-1305-PT-95-N-XG-12020MM1 - Mezzanine Deck Joint Details sheet 3 33 15-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12020-1MM1 - Mezzanine Deck Joint Details sheet 3-IDC 1 15-Apr-15* 15-Apr-15
MM1-1305-PT-95-N-XG-12020-2MM1 - Mezzanine Deck Joint Details sheet 3-IFR 24 16-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12020-3MM1 - Mezzanine Deck Joint Details sheet 3-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12020-4MM1 - Mezzanine Deck Joint Details sheet 3-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12021MM1 - Mezzanine Deck Joint Details sheet 4 33 15-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12021-1MM1 - Mezzanine Deck Joint Details sheet 4-IDC 1 15-Apr-15* 15-Apr-15
MM1-1305-PT-95-N-XG-12021-2MM1 - Mezzanine Deck Joint Details sheet 4-IFR 24 16-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12021-3MM1 - Mezzanine Deck Joint Details sheet 4-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12021-4MM1 - Mezzanine Deck Joint Details sheet 4-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12022MM1 - Mezzanine Deck Joint Details sheet 5 33 15-Apr-15 26-May-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 10 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
11. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-12022-1MM1 - Mezzanine Deck Joint Details sheet 5-IDC 1 15-Apr-15* 15-Apr-15
MM1-1305-PT-95-N-XG-12022-2MM1 - Mezzanine Deck Joint Details sheet 5-IFR 24 16-Apr-15 16-May-15
MM1-1305-PT-95-N-XG-12022-3MM1 - Mezzanine Deck Joint Details sheet 5-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12022-4MM1 - Mezzanine Deck Joint Details sheet 5-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12023MM1 - Main Deck Joint Details Sheet 1 34 14-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12023-1MM1 - Main Deck Joint Details Sheet 1-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12023-2MM1 - Main Deck Joint Details Sheet 1-IFR 19 15-Apr-15 09-May-15
MM1-1305-PT-95-N-XG-12023-3MM1 - Main Deck Joint Details Sheet 1-IFD 0 11-May-15 11-May-15
MM1-1305-PT-95-N-XG-12023-4MM1 - Main Deck Joint Details Sheet 1-IFC 14 11-May-15 26-May-15
MM1-1305-PT-95-N-XG-12024MM1 - Main Deck Joint Details Sheet 2 34 14-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12024-1MM1 - Main Deck Joint Details Sheet 2-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12024-2MM1 - Main Deck Joint Details Sheet 2-IFR 19 15-Apr-15 09-May-15
MM1-1305-PT-95-N-XG-12024-3MM1 - Main Deck Joint Details Sheet 2-IFD 0 11-May-15 11-May-15
MM1-1305-PT-95-N-XG-12024-4MM1 - Main Deck Joint Details Sheet 2-IFC 14 11-May-15 26-May-15
MM1-1305-PT-95-N-XG-12025MM1 - Main Deck Joint Details Sheet 3 37 14-Apr-15 29-May-15
MM1-1305-PT-95-N-XG-12025-1MM1 - Main Deck Joint Details Sheet 3-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12025-2MM1 - Main Deck Joint Details Sheet 3-IFR 21 15-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12025-3MM1 - Main Deck Joint Details Sheet 3-IFD 0 13-May-15 13-May-15
MM1-1305-PT-95-N-XG-12025-4MM1 - Main Deck Joint Details Sheet 3-IFC 15 13-May-15 29-May-15
MM1-1305-PT-95-N-XG-12026MM1 - Main Deck Joint Details Sheet 4 37 14-Apr-15 29-May-15
MM1-1305-PT-95-N-XG-12026-1MM1 - Main Deck Joint Details Sheet 4-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12026-2MM1 - Main Deck Joint Details Sheet 4-IFR 21 15-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12026-3MM1 - Main Deck Joint Details Sheet 4-IFD 0 13-May-15 13-May-15
MM1-1305-PT-95-N-XG-12026-4MM1 - Main Deck Joint Details Sheet 4-IFC 15 13-May-15 29-May-15
MM1-1305-PT-95-N-XG-12027MM1 - Main Deck Joint Details Sheet 5 37 14-Apr-15 29-May-15
MM1-1305-PT-95-N-XG-12027-1MM1 - Main Deck Joint Details Sheet 5-IDC 1 14-Apr-15* 14-Apr-15
MM1-1305-PT-95-N-XG-12027-2MM1 - Main Deck Joint Details Sheet 5-IFR 21 15-Apr-15 12-May-15
MM1-1305-PT-95-N-XG-12027-3MM1 - Main Deck Joint Details Sheet 5-IFD 0 13-May-15 13-May-15
MM1-1305-PT-95-N-XG-12027-4MM1 - Main Deck Joint Details Sheet 5-IFC 15 13-May-15 29-May-15
MM1-1305-PT-95-N-XG-12028MM1 - Upper Deck Secondary Framing Plan 29 20-Apr-15 26-May-15
MM1-1305-PT-95-N-XG-12028-1MM1 - Upper Deck Secondary Framing Plan-IDC 15 20-Apr-15* 09-May-15
MM1-1305-PT-95-N-XG-12028-2MM1 - Upper Deck Secondary Framing Plan-IFR 6 11-May-15 16-May-15
MM1-1305-PT-95-N-XG-12028-3MM1 - Upper Deck Secondary Framing Plan-IFD 0 18-May-15 18-May-15
MM1-1305-PT-95-N-XG-12028-4MM1 - Upper Deck Secondary Framing Plan-IFC 8 18-May-15 26-May-15
MM1-1305-PT-95-N-XG-12029MM1 - Mezzanine Deck Secondary Framing Plan 28 18-Apr-15 23-May-15
MM1-1305-PT-95-N-XG-12029-1MM1 - Mezzanine Deck Secondary Framing Plan-IDC 15 18-Apr-15* 08-May-15
MM1-1305-PT-95-N-XG-12029-2MM1 - Mezzanine Deck Secondary Framing Plan-IFR 6 09-May-15 15-May-15
MM1-1305-PT-95-N-XG-12029-3MM1 - Mezzanine Deck Secondary Framing Plan-IFD 0 16-May-15 16-May-15
MM1-1305-PT-95-N-XG-12029-4MM1 - Mezzanine Deck Secondary Framing Plan-IFC 7 16-May-15 23-May-15
MM1-1305-PT-95-N-XG-12030MM1 - Main Deck Secondary Framing plan 28 18-Apr-15 23-May-15
MM1-1305-PT-95-N-XG-12030-1MM1 - Main Deck Secondary Framing plan-IDC 15 18-Apr-15* 08-May-15
MM1-1305-PT-95-N-XG-12030-2MM1 - Main Deck Secondary Framing plan-IFR 6 09-May-15 15-May-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 11 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
12. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-12030-3MM1 - Main Deck Secondary Framing plan-IFD 0 16-May-15 16-May-15
MM1-1305-PT-95-N-XG-12030-4MM1 - Main Deck Secondary Framing plan-IFC 7 16-May-15 23-May-15
MM1-1305-PT-95-N-XG-12031MM1 - Upper Deck Flooring & Handrail Layout 52 23-Apr-15 25-Jun-15
MM1-1305-PT-95-N-XG-12031-1MM1 - Upper Deck Flooring & Handrail Layout-IDC 34 23-Apr-15* 04-Jun-15
MM1-1305-PT-95-N-XG-12031-2MM1 - Upper Deck Flooring & Handrail Layout-IFR 6 05-Jun-15 11-Jun-15
MM1-1305-PT-95-N-XG-12031-3MM1 - Upper Deck Flooring & Handrail Layout-IFD 0 12-Jun-15 12-Jun-15
MM1-1305-PT-95-N-XG-12031-4MM1 - Upper Deck Flooring & Handrail Layout-IFC 12 12-Jun-15 25-Jun-15
MM1-1305-PT-95-N-XG-12032MM1 - Mezzanine Deck Flooring & Handrail Layout 53 23-Apr-15 26-Jun-15
MM1-1305-PT-95-N-XG-12032-1MM1 - Mezzanine Deck Flooring & Handrail Layout-IDC 35 23-Apr-15* 05-Jun-15
MM1-1305-PT-95-N-XG-12032-2MM1 - Mezzanine Deck Flooring & Handrail Layout-IFR 6 06-Jun-15 12-Jun-15
MM1-1305-PT-95-N-XG-12032-3MM1 - Mezzanine Deck Flooring & Handrail Layout-IFD 0 13-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12032-4MM1 - Mezzanine Deck Flooring & Handrail Layout-IFC 12 13-Jun-15 26-Jun-15
MM1-1305-PT-95-N-XG-12033MM1 - Main Deck Flooring & Handrail Layout 54 23-Apr-15 27-Jun-15
MM1-1305-PT-95-N-XG-12033-1MM1 - Main Deck Flooring & Handrail Layout-IDC 36 23-Apr-15* 06-Jun-15
MM1-1305-PT-95-N-XG-12033-2MM1 - Main Deck Flooring & Handrail Layout-IFR 6 08-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12033-3MM1 - Main Deck Flooring & Handrail Layout-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-95-N-XG-12033-4MM1 - Main Deck Flooring & Handrail Layout-IFC 12 15-Jun-15 27-Jun-15
MM1-1305-PT-95-N-XG-12034MM1 - Upper Deck Penetration Layout 52 23-Apr-15 25-Jun-15
MM1-1305-PT-95-N-XG-12034-1MM1 - Upper Deck Penetration Layout-IDC 34 23-Apr-15* 04-Jun-15
MM1-1305-PT-95-N-XG-12034-2MM1 - Upper Deck Penetration Layout-IFR 6 05-Jun-15 11-Jun-15
MM1-1305-PT-95-N-XG-12034-3MM1 - Upper Deck Penetration Layout-IFD 0 12-Jun-15 12-Jun-15
MM1-1305-PT-95-N-XG-12034-4MM1 - Upper Deck Penetration Layout-IFC 12 12-Jun-15 25-Jun-15
MM1-1305-PT-95-N-XG-12035MM1 - Mezzanine Deck Penetration Layout 52 23-Apr-15 25-Jun-15
MM1-1305-PT-95-N-XG-12035-1MM1 - Mezzanine Deck Penetration Layout-IDC 34 23-Apr-15* 04-Jun-15
MM1-1305-PT-95-N-XG-12035-2MM1 - Mezzanine Deck Penetration Layout-IFR 6 05-Jun-15 11-Jun-15
MM1-1305-PT-95-N-XG-12035-3MM1 - Mezzanine Deck Penetration Layout-IFD 0 12-Jun-15 12-Jun-15
MM1-1305-PT-95-N-XG-12035-4MM1 - Mezzanine Deck Penetration Layout-IFC 12 12-Jun-15 25-Jun-15
MM1-1305-PT-95-N-XG-12036MM1 - Main Deck Penetration Layout 51 27-Apr-15 27-Jun-15
MM1-1305-PT-95-N-XG-12036-1MM1 - Main Deck Penetration Layout-IDC 33 27-Apr-15* 06-Jun-15
MM1-1305-PT-95-N-XG-12036-2MM1 - Main Deck Penetration Layout-IFR 6 08-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12036-3MM1 - Main Deck Penetration Layout-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-95-N-XG-12036-4MM1 - Main Deck Penetration Layout-IFC 12 15-Jun-15 27-Jun-15
MM1-1305-PT-95-N-XG-12037MM1 - Lifting Padeye Arrangement & Details Sheet 1 47 29-Apr-15 24-Jun-15
MM1-1305-PT-95-N-XG-12037-1MM1 - Lifting Padeye Arrangement & Details Sheet 1-IDC 0 29-Apr-15* 29-Apr-15
MM1-1305-PT-95-N-XG-12037-2MM1 - Lifting Padeye Arrangement & Details Sheet 1-IFR 31 29-Apr-15 05-Jun-15
MM1-1305-PT-95-N-XG-12037-3MM1 - Lifting Padeye Arrangement & Details Sheet 1-IFD 0 06-Jun-15 06-Jun-15
MM1-1305-PT-95-N-XG-12037-4MM1 - Lifting Padeye Arrangement & Details Sheet 1-IFC 16 06-Jun-15 24-Jun-15
MM1-1305-PT-95-N-XG-12038MM1 - Lifting Padeye Arrangement & Details Sheet 2 47 29-Apr-15 24-Jun-15
MM1-1305-PT-95-N-XG-12038-1MM1 - Lifting Padeye Arrangement & Details Sheet 2-IDC 0 29-Apr-15* 29-Apr-15
MM1-1305-PT-95-N-XG-12038-2MM1 - Lifting Padeye Arrangement & Details Sheet 2-IFR 31 29-Apr-15 05-Jun-15
MM1-1305-PT-95-N-XG-12038-3MM1 - Lifting Padeye Arrangement & Details Sheet 2-IFD 0 06-Jun-15 06-Jun-15
MM1-1305-PT-95-N-XG-12038-4MM1 - Lifting Padeye Arrangement & Details Sheet 2-IFC 16 06-Jun-15 24-Jun-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 12 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
13. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-12039MM1 - Stair Arrangement & Details Sheet 1 50 29-Apr-15 27-Jun-15
MM1-1305-PT-95-N-XG-12039-1MM1 - Stair Arrangement & Details Sheet 1-IDC 32 29-Apr-15* 06-Jun-15
MM1-1305-PT-95-N-XG-12039-2MM1 - Stair Arrangement & Details Sheet 1-IFR 6 08-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12039-3MM1 - Stair Arrangement & Details Sheet 1-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-95-N-XG-12039-4MM1 - Stair Arrangement & Details Sheet 1-IFC 12 15-Jun-15 27-Jun-15
MM1-1305-PT-95-N-XG-12040MM1 - Stair Arrangement & Details Sheet 2 50 29-Apr-15 27-Jun-15
MM1-1305-PT-95-N-XG-12040-1MM1 - Stair Arrangement & Details Sheet 2-IDC 32 29-Apr-15* 06-Jun-15
MM1-1305-PT-95-N-XG-12040-2MM1 - Stair Arrangement & Details Sheet 2-IFR 6 08-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12040-3MM1 - Stair Arrangement & Details Sheet 2-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-95-N-XG-12040-4MM1 - Stair Arrangement & Details Sheet 2-IFC 12 15-Jun-15 27-Jun-15
MM1-1305-PT-95-N-XG-12041MM1 - Ladder Arrangement & Details Sheet 1 50 29-Apr-15 27-Jun-15
MM1-1305-PT-95-N-XG-12041-1MM1 - Ladder Arrangement & Details Sheet 1-IDC 32 29-Apr-15* 06-Jun-15
MM1-1305-PT-95-N-XG-12041-2MM1 - Ladder Arrangement & Details Sheet 1-IFR 6 08-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12041-3MM1 - Ladder Arrangement & Details Sheet 1-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-95-N-XG-12041-4MM1 - Ladder Arrangement & Details Sheet 1-IFC 12 15-Jun-15 27-Jun-15
MM1-1305-PT-95-N-XG-12042MM1 - Ladder Arrangement & Details Sheet 2 50 29-Apr-15 27-Jun-15
MM1-1305-PT-95-N-XG-12042-1MM1 - Ladder Arrangement & Details Sheet 2-IDC 32 29-Apr-15* 06-Jun-15
MM1-1305-PT-95-N-XG-12042-2MM1 - Ladder Arrangement & Details Sheet 2-IFR 6 08-Jun-15 13-Jun-15
MM1-1305-PT-95-N-XG-12042-3MM1 - Ladder Arrangement & Details Sheet 2-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-95-N-XG-12042-4MM1 - Ladder Arrangement & Details Sheet 2-IFC 12 15-Jun-15 27-Jun-15
MM1-1305-PT-95-N-XG-12043MM1 - Mechanical Handling For Main Deck Equipment - sheet 1 29 01-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12043-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IDC 11 01-Jun-15* 12-Jun-15
MM1-1305-PT-95-N-XG-12043-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IFR 6 13-Jun-15 19-Jun-15
MM1-1305-PT-95-N-XG-12043-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IFD 0 20-Jun-15 20-Jun-15
MM1-1305-PT-95-N-XG-12043-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 1-IFC 12 20-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12044MM1 - Mechanical Handling For Main Deck Equipment - sheet 2 29 01-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12044-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IDC 11 01-Jun-15* 12-Jun-15
MM1-1305-PT-95-N-XG-12044-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IFR 6 13-Jun-15 19-Jun-15
MM1-1305-PT-95-N-XG-12044-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IFD 0 20-Jun-15 20-Jun-15
MM1-1305-PT-95-N-XG-12044-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 2-IFC 12 20-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12045MM1 - Mechanical Handling For Main Deck Equipment - sheet 3 29 01-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12045-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IDC 11 01-Jun-15* 12-Jun-15
MM1-1305-PT-95-N-XG-12045-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IFR 6 13-Jun-15 19-Jun-15
MM1-1305-PT-95-N-XG-12045-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IFD 0 20-Jun-15 20-Jun-15
MM1-1305-PT-95-N-XG-12045-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 3-IFC 12 20-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12046MM1 - Mechanical Handling For Main Deck Equipment - sheet 4 29 01-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12046-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IDC 11 01-Jun-15* 12-Jun-15
MM1-1305-PT-95-N-XG-12046-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IFR 6 13-Jun-15 19-Jun-15
MM1-1305-PT-95-N-XG-12046-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IFD 0 20-Jun-15 20-Jun-15
MM1-1305-PT-95-N-XG-12046-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 4-IFC 12 20-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12047MM1 - Mechanical Handling For Main Deck Equipment - sheet 5 29 01-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12047-1MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IDC 11 01-Jun-15* 12-Jun-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 13 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
14. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-95-N-XG-12047-2MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IFR 6 13-Jun-15 19-Jun-15
MM1-1305-PT-95-N-XG-12047-3MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IFD 0 20-Jun-15 20-Jun-15
MM1-1305-PT-95-N-XG-12047-4MM1 - Mechanical Handling For Main Deck Equipment - sheet 5-IFC 12 20-Jun-15 03-Jul-15
MM1-1305-PT-95-N-XG-12048MM1 - Equipment Support- Sheet 1 29 16-Jun-15 18-Jul-15
MM1-1305-PT-95-N-XG-12048-1MM1 - Equipment Support- Sheet 1-IDC 11 16-Jun-15* 27-Jun-15
MM1-1305-PT-95-N-XG-12048-2MM1 - Equipment Support- Sheet 1-IFR 6 29-Jun-15 04-Jul-15
MM1-1305-PT-95-N-XG-12048-3MM1 - Equipment Support- Sheet 1-IFD 0 06-Jul-15 06-Jul-15
MM1-1305-PT-95-N-XG-12048-4MM1 - Equipment Support- Sheet 1-IFC 12 06-Jul-15 18-Jul-15
MM1-1305-PT-95-N-XG-12049MM1 - Equipment Support- Sheet 2 29 16-Jun-15 18-Jul-15
MM1-1305-PT-95-N-XG-12049-1MM1 - Equipment Support- Sheet 2-IDC 11 16-Jun-15* 27-Jun-15
MM1-1305-PT-95-N-XG-12049-2MM1 - Equipment Support- Sheet 2-IFR 6 29-Jun-15 04-Jul-15
MM1-1305-PT-95-N-XG-12049-3MM1 - Equipment Support- Sheet 2-IFD 0 06-Jul-15 06-Jul-15
MM1-1305-PT-95-N-XG-12049-4MM1 - Equipment Support- Sheet 2-IFC 12 06-Jul-15 18-Jul-15
MM1-1305-PT-95-N-XG-12050MM1 - Equipment Support- Sheet 3 29 16-Jun-15 18-Jul-15
MM1-1305-PT-95-N-XG-12050-1MM1 - Equipment Support- Sheet 3-IDC 11 16-Jun-15* 27-Jun-15
MM1-1305-PT-95-N-XG-12050-2MM1 - Equipment Support- Sheet 3-IFR 6 29-Jun-15 04-Jul-15
MM1-1305-PT-95-N-XG-12050-3MM1 - Equipment Support- Sheet 3-IFD 0 06-Jul-15 06-Jul-15
MM1-1305-PT-95-N-XG-12050-4MM1 - Equipment Support- Sheet 3-IFC 12 06-Jul-15 18-Jul-15
MM1-1305-PT-95-N-XG-12051MM1 - Seafastening On Barge Arrangment & Details - Sheet 1 30 29-Jun-15 01-Aug-15
MM1-1305-PT-95-N-XG-12051-1MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IDC 0 29-Jun-15* 29-Jun-15
MM1-1305-PT-95-N-XG-12051-2MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IFR 18 29-Jun-15 18-Jul-15
MM1-1305-PT-95-N-XG-12051-3MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IFD 0 20-Jul-15 20-Jul-15
MM1-1305-PT-95-N-XG-12051-4MM1 - Seafastening On Barge Arrangment & Details - Sheet 1-IFC 12 20-Jul-15 01-Aug-15
MM1-1305-PT-95-N-XG-12052MM1 - Seafastening On Barge Arrangment & Details - Sheet 2 30 29-Jun-15 01-Aug-15
MM1-1305-PT-95-N-XG-12052-1MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IDC 0 29-Jun-15* 29-Jun-15
MM1-1305-PT-95-N-XG-12052-2MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IFR 18 29-Jun-15 18-Jul-15
MM1-1305-PT-95-N-XG-12052-3MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IFD 0 20-Jul-15 20-Jul-15
MM1-1305-PT-95-N-XG-12052-4MM1 - Seafastening On Barge Arrangment & Details - Sheet 2-IFC 12 20-Jul-15 01-Aug-15
MM1-1305-PT-95-N-XG-12053MM1 - Seafastening On Barge Arrangment & Details - Sheet 3 30 29-Jun-15 01-Aug-15
MM1-1305-PT-95-N-XG-12053-1MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IDC 0 29-Jun-15* 29-Jun-15
MM1-1305-PT-95-N-XG-12053-2MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IFR 18 29-Jun-15 18-Jul-15
MM1-1305-PT-95-N-XG-12053-3MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IFD 0 20-Jul-15 20-Jul-15
MM1-1305-PT-95-N-XG-12053-4MM1 - Seafastening On Barge Arrangment & Details - Sheet 3-IFC 12 20-Jul-15 01-Aug-15
MM1-10150 TR/MTO for Primary & Secondary Steel 1 07-Apr-15 07-Apr-15
MM1-10170 TR/MTO for Tertiary Steel 1 09-Jun-15 09-Jun-15
MM1-10190 TR/MTO for Structural Miscellaneous 1 28-Jul-15 28-Jul-15
MM1-10210 TR/MTO for Gratings (including Hilti clip and cartridge) 1 09-Aug-15 09-Aug-15
MM1-1000 TR/MTO for SF and Grillage Material 1 10-Oct-15 10-Oct-15
MM1-1100 Prepare / Submit/ Approve Structural Shop Drawings 185 11-Aug-15 21-Mar-16
0.D.26.0000.MM1.B.L Piping0.D.26.0000.MM1.B.L Piping 312 14-Mar-15 16-Mar-16
0.D.26.0000.MM1.B.L.92 PTSC0.D.26.0000.MM1.B.L.92 PTSC 312 14-Mar-15 16-Mar-16
MM1-1305-PT-00-L-CA-00001MM1 & MM2 - Stress Analysis Report 50 01-Jun-15 28-Jul-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 14 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
15. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-00-L-CA-00001-1MM1 & MM2 - Stress Analysis Report-IDC 20 01-Jun-15* 23-Jun-15
MM1-1305-PT-00-L-CA-00001-2MM1 & MM2 - Stress Analysis Report-IFR 6 24-Jun-15 30-Jun-15
MM1-1305-PT-00-L-CA-00001-3MM1 & MM2 - Stress Analysis Report-IFD 12 01-Jul-15 14-Jul-15
MM1-1305-PT-00-L-CA-00001-4MM1 & MM2 - Stress Analysis Report-IFC 12 15-Jul-15 28-Jul-15
MM1-1305-PT-00-L-LA-00001MM1 & MM2 - Special Piping Item List 47 12-May-15 04-Jul-15
MM1-1305-PT-00-L-LA-00001-1MM1 & MM2 - Special Piping Item List-IDC 7 12-May-15* 19-May-15
MM1-1305-PT-00-L-LA-00001-2MM1 & MM2 - Special Piping Item List-IFR 4 20-May-15 23-May-15
MM1-1305-PT-00-L-LA-00001-3MM1 & MM2 - Special Piping Item List-IFD 12 25-May-15 06-Jun-15
MM1-1305-PT-00-L-LA-00001-4MM1 & MM2 - Special Piping Item List-IFC 24 08-Jun-15 04-Jul-15
MM1-1305-PT-00-L-LA-00002MM1 & MM2 - TIE-IN Schedule 56 26-May-15 29-Jul-15
MM1-1305-PT-00-L-LA-00002-1MM1 & MM2 - TIE-IN Schedule-IDC 25 26-May-15* 23-Jun-15
MM1-1305-PT-00-L-LA-00002-2MM1 & MM2 - TIE-IN Schedule-IFR 7 24-Jun-15 01-Jul-15
MM1-1305-PT-00-L-LA-00002-3MM1 & MM2 - TIE-IN Schedule-IFD 12 02-Jul-15 15-Jul-15
MM1-1305-PT-00-L-LA-00002-4MM1 & MM2 - TIE-IN Schedule-IFC 12 16-Jul-15 29-Jul-15
MM1-1305-PT-00-L-LA-00003MM1 & MM2 - Manual valve list 49 17-Apr-15 16-Jun-15
MM1-1305-PT-00-L-LA-00003-1MM1 & MM2 - Manual valve list-IDC 7 17-Apr-15* 24-Apr-15
MM1-1305-PT-00-L-LA-00003-2MM1 & MM2 - Manual valve list-IFR 2 25-Apr-15 27-Apr-15
MM1-1305-PT-00-L-LA-00003-3MM1 & MM2 - Manual valve list-IFD 10 29-Apr-15 12-May-15
MM1-1305-PT-00-L-LA-00003-4MM1 & MM2 - Manual valve list-IFC 30 13-May-15 16-Jun-15
MM1-1305-PT-00-L-SA-00001MM1 & MM2 - Addional piping class 46 14-Mar-15 09-May-15
MM1-1305-PT-00-L-SA-00001-1MM1 & MM2 - Addional piping class -IDC 1 14-Mar-15* 14-Mar-15
MM1-1305-PT-00-L-SA-00001-2MM1 & MM2 - Addional piping class -IFR 24 16-Mar-15 11-Apr-15
MM1-1305-PT-00-L-SA-00001-3MM1 & MM2 - Addional piping class -IFD 12 13-Apr-15 25-Apr-15
MM1-1305-PT-00-L-SA-00001-4MM1 & MM2 - Addional piping class -IFC 9 27-Apr-15 09-May-15
MM1-1305-PT-00-L-SA-00002MM1 & MM2 - Pipe support standard 46 06-Apr-15 01-Jun-15
MM1-1305-PT-00-L-SA-00002-1MM1 & MM2 - Pipe support standard -IDC 1 06-Apr-15* 06-Apr-15
MM1-1305-PT-00-L-SA-00002-2MM1 & MM2 - Pipe support standard -IFR 21 07-Apr-15 04-May-15
MM1-1305-PT-00-L-SA-00002-3MM1 & MM2 - Pipe support standard -IFD 12 05-May-15 18-May-15
MM1-1305-PT-00-L-SA-00002-4MM1 & MM2 - Pipe support standard -IFC 12 19-May-15 01-Jun-15
MM1-1305-PT-00-L-DS-00001MM1 & MM2 - Ball valve Data sheets 34 03-Apr-15 15-May-15
MM1-1305-PT-00-L-DS-00001-1MM1 & MM2 - Ball valve Data sheets-IDC 1 03-Apr-15* 03-Apr-15
MM1-1305-PT-00-L-DS-00001-2MM1 & MM2 - Ball valve Data sheets-IFR 12 04-Apr-15 17-Apr-15
MM1-1305-PT-00-L-DS-00001-3MM1 & MM2 - Ball valve Data sheets-IFD 9 18-Apr-15 29-Apr-15
MM1-1305-PT-00-L-DS-00001-4MM1 & MM2 - Ball valve Data sheets-IFC 12 02-May-15 15-May-15
MM1-1305-PT-00-L-DS-00002MM1 & MM2 - Globe Valve Data sheets 33 06-Apr-15 16-May-15
MM1-1305-PT-00-L-DS-00002-1MM1 & MM2 - Globe Valve Data sheets-IDC 0 06-Apr-15* 06-Apr-15
MM1-1305-PT-00-L-DS-00002-2MM1 & MM2 - Globe Valve Data sheets-IFR 12 06-Apr-15 18-Apr-15
MM1-1305-PT-00-L-DS-00002-3MM1 & MM2 - Globe Valve Data sheets-IFD 9 20-Apr-15 02-May-15
MM1-1305-PT-00-L-DS-00002-4MM1 & MM2 - Globe Valve Data sheets-IFC 12 04-May-15 16-May-15
MM1-1305-PT-00-L-DS-00003MM1 & MM2 - Check Data sheets 34 07-Apr-15 19-May-15
MM1-1305-PT-00-L-DS-00003-1MM1 & MM2 - Check Data sheets-IDC 1 07-Apr-15* 07-Apr-15
MM1-1305-PT-00-L-DS-00003-2MM1 & MM2 - Check Data sheets-IFR 12 08-Apr-15 21-Apr-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 15 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
16. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-00-L-DS-00003-3MM1 & MM2 - Check Data sheets-IFD 9 22-Apr-15 05-May-15
MM1-1305-PT-00-L-DS-00003-4MM1 & MM2 - Check Data sheets-IFC 12 06-May-15 19-May-15
MM1-1305-PT-00-L-DS-00004MM1 & MM2 - DBB valve sheets 58 10-Apr-15 19-Jun-15
MM1-1305-PT-00-L-DS-00004-1MM1 & MM2 - DBB valve sheets-IDC 1 10-Apr-15* 10-Apr-15
MM1-1305-PT-00-L-DS-00004-2MM1 & MM2 - DBB valve sheets-IFR 12 11-Apr-15 24-Apr-15
MM1-1305-PT-00-L-DS-00004-3MM1 & MM2 - DBB valve sheets-IFD 9 25-Apr-15 08-May-15
MM1-1305-PT-00-L-DS-00004-4MM1 & MM2 - DBB valve sheets-IFC 36 09-May-15 19-Jun-15
MM1-1305-PT-00-L-DS-00005MM1 & MM2 - SP Item Data Sheet -Valve Interlock 61 12-May-15 21-Jul-15
MM1-1305-PT-00-L-DS-00005-1MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IDC 1 12-May-15* 12-May-15
MM1-1305-PT-00-L-DS-00005-2MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFR 12 13-May-15 26-May-15
MM1-1305-PT-00-L-DS-00005-3MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFD 12 27-May-15 09-Jun-15
MM1-1305-PT-00-L-DS-00005-4MM1 & MM2 - SP Item Data Sheet -Valve Interlock -IFC 36 10-Jun-15 21-Jul-15
MM1-1305-PT-00-L-DS-00006MM1 & MM2 - SP Item Data Sheet - Barred Tee 52 10-Apr-15 12-Jun-15
MM1-1305-PT-00-L-DS-00006-1MM1 & MM2 - SP Item Data Sheet - Barred Tee-IDC 1 10-Apr-15* 10-Apr-15
MM1-1305-PT-00-L-DS-00006-2MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFR 12 11-Apr-15 24-Apr-15
MM1-1305-PT-00-L-DS-00006-3MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFD 9 25-Apr-15 08-May-15
MM1-1305-PT-00-L-DS-00006-4MM1 & MM2 - SP Item Data Sheet - Barred Tee-IFC 30 09-May-15 12-Jun-15
MM1-1305-PT-00-L-DS-00007MM1 & MM2 - SP Item Data Sheet - Bends 70 24-Apr-15 17-Jul-15
MM1-1305-PT-00-L-DS-00007-1MM1 & MM2 - SP Item Data Sheet - Bends-IDC 1 24-Apr-15* 24-Apr-15
MM1-1305-PT-00-L-DS-00007-2MM1 & MM2 - SP Item Data Sheet - Bends-IFR 15 25-Apr-15 15-May-15
MM1-1305-PT-00-L-DS-00007-3MM1 & MM2 - SP Item Data Sheet - Bends-IFD 12 16-May-15 29-May-15
MM1-1305-PT-00-L-DS-00007-4MM1 & MM2 - SP Item Data Sheet - Bends-IFC 42 30-May-15 17-Jul-15
MM1-1305-PT-00-L-DS-00008MM1 & MM2 - SP Item Data Sheets for Sample connection 58 24-Apr-15 03-Jul-15
MM1-1305-PT-00-L-DS-00008-1MM1 & MM2 - SP Item Data Sheets for Sample connection -IDC 1 24-Apr-15* 24-Apr-15
MM1-1305-PT-00-L-DS-00008-2MM1 & MM2 - SP Item Data Sheets for Sample connection -IFR 9 25-Apr-15 08-May-15
MM1-1305-PT-00-L-DS-00008-3MM1 & MM2 - SP Item Data Sheets for Sample connection -IFD 12 09-May-15 22-May-15
MM1-1305-PT-00-L-DS-00008-4MM1 & MM2 - SP Item Data Sheets for Sample connection -IFC 36 23-May-15 03-Jul-15
MM1-1305-PT-00-L-DS-00009MM1 & MM2 - SP Item Data Sheet - Chemcial injection 58 24-Apr-15 03-Jul-15
MM1-1305-PT-00-L-DS-00009-1MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IDC 1 24-Apr-15* 24-Apr-15
MM1-1305-PT-00-L-DS-00009-2MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFR 9 25-Apr-15 08-May-15
MM1-1305-PT-00-L-DS-00009-3MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFD 12 09-May-15 22-May-15
MM1-1305-PT-00-L-DS-00009-4MM1 & MM2 - SP Item Data Sheet - Chemcial injection-IFC 36 23-May-15 03-Jul-15
MM1-1305-PT-00-L-DS-00010MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon 58 24-Apr-15 03-Jul-15
MM1-1305-PT-00-L-DS-00010-1MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IDC 1 24-Apr-15* 24-Apr-15
MM1-1305-PT-00-L-DS-00010-2MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFR 9 25-Apr-15 08-May-15
MM1-1305-PT-00-L-DS-00010-3MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFD 12 09-May-15 22-May-15
MM1-1305-PT-00-L-DS-00010-4MM1 & MM2 - SP Item Data Sheet - Corrosion probe/coupon-IFC 36 23-May-15 03-Jul-15
MM1-1305-PT-00-L-DS-00011MM1 & MM2 - SP Item Data Sheet - Sand probe 58 24-Apr-15 03-Jul-15
MM1-1305-PT-00-L-DS-00011-1MM1 & MM2 - SP Item Data Sheet - Sand probe-IDC 1 24-Apr-15* 24-Apr-15
MM1-1305-PT-00-L-DS-00011-2MM1 & MM2 - SP Item Data Sheet - Sand probe-IFR 9 25-Apr-15 08-May-15
MM1-1305-PT-00-L-DS-00011-3MM1 & MM2 - SP Item Data Sheet - Sand probe-IFD 12 09-May-15 22-May-15
MM1-1305-PT-00-L-DS-00011-4MM1 & MM2 - SP Item Data Sheet - Sand probe-IFC 36 23-May-15 03-Jul-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 16 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
17. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-00-L-DS-00012MM1 & MM2 - SP Item Data Sheet - Quick coupling 70 05-Jun-15 25-Aug-15
MM1-1305-PT-00-L-DS-00012-1MM1 & MM2 - SP Item Data Sheet - Quick coupling-IDC 1 05-Jun-15* 05-Jun-15
MM1-1305-PT-00-L-DS-00012-2MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFR 12 06-Jun-15 19-Jun-15
MM1-1305-PT-00-L-DS-00012-3MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFD 12 20-Jun-15 03-Jul-15
MM1-1305-PT-00-L-DS-00012-4MM1 & MM2 - SP Item Data Sheet - Quick coupling-IFC 45 04-Jul-15 25-Aug-15
MM1-1305-PT-00-L-DS-00013MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR 70 05-Jun-15 25-Aug-15
MM1-1305-PT-00-L-DS-00013-1MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IDC 1 05-Jun-15* 05-Jun-15
MM1-1305-PT-00-L-DS-00013-2MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFR 12 06-Jun-15 19-Jun-15
MM1-1305-PT-00-L-DS-00013-3MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFD 12 20-Jun-15 03-Jul-15
MM1-1305-PT-00-L-DS-00013-4MM1 & MM2 - SP Item Data Sheet - HUB CONNECTOR-IFC 45 04-Jul-15 25-Aug-15
MM1-1305-PT-00-L-XE-10001MM1 - Equipment Layout 40 24-Apr-15 12-Jun-15
MM1-1305-PT-00-L-XE-10001-1MM1 - Equipment Layout-IDC 10 24-Apr-15* 08-May-15
MM1-1305-PT-00-L-XE-10001-2MM1 - Equipment Layout-IFR 6 09-May-15 15-May-15
MM1-1305-PT-00-L-XE-10001-3MM1 - Equipment Layout-IFD 12 16-May-15 29-May-15
MM1-1305-PT-00-L-XE-10001-4MM1 - Equipment Layout-IFC 12 30-May-15 12-Jun-15
MM1-1305-PT-00-L-XE-10002MM1 - Piping layout 43 30-May-15 18-Jul-15
MM1-1305-PT-00-L-XE-10002-1MM1 - Piping layout-IDC 13 30-May-15* 13-Jun-15
MM1-1305-PT-00-L-XE-10002-2MM1 - Piping layout-IFR 6 15-Jun-15 20-Jun-15
MM1-1305-PT-00-L-XE-10002-3MM1 - Piping layout-IFD 12 22-Jun-15 04-Jul-15
MM1-1305-PT-00-L-XE-10002-4MM1 - Piping layout-IFC 12 06-Jul-15 18-Jul-15
MM1-1305-PT-00-L-XF-10003MM1 - Pipe support location plan 43 20-Jun-15 08-Aug-15
MM1-1305-PT-00-L-XF-10003-1MM1 - Pipe support location plan-IDC 13 20-Jun-15* 04-Jul-15
MM1-1305-PT-00-L-XF-10003-2MM1 - Pipe support location plan-IFR 6 06-Jul-15 11-Jul-15
MM1-1305-PT-00-L-XF-10003-3MM1 - Pipe support location plan-IFD 0 13-Jul-15 13-Jul-15
MM1-1305-PT-00-L-XF-10003-4MM1 - Pipe support location plan-IFC 24 13-Jul-15 08-Aug-15
MM1-1305-PT-00-L-XN-10001MM1 - Isometric drawings (n Sheets) 59 16-May-15 23-Jul-15
MM1-1305-PT-00-L-XN-10001-1MM1 - Isometric drawings (n Sheets)-IDC 13 16-May-15* 30-May-15
MM1-1305-PT-00-L-XN-10001-2MM1 - Isometric drawings (n Sheets)-IFR 12 01-Jun-15 13-Jun-15
MM1-1305-PT-00-L-XN-10001-3MM1 - Isometric drawings (n Sheets)-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-00-L-XN-10001-4MM1 - Isometric drawings (n Sheets)-IFC 34 15-Jun-15 23-Jul-15
MM1-1305-PT-00-L-XO-10001MM1 - Pipe support detail drawings 59 16-May-15 23-Jul-15
MM1-1305-PT-00-L-XO-10001-1MM1 - Pipe support detail drawings-IDC 13 16-May-15* 30-May-15
MM1-1305-PT-00-L-XO-10001-2MM1 - Pipe support detail drawings-IFR 12 01-Jun-15 13-Jun-15
MM1-1305-PT-00-L-XO-10001-3MM1 - Pipe support detail drawings-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-00-L-XO-10001-4MM1 - Pipe support detail drawings-IFC 34 15-Jun-15 23-Jul-15
MM1-1305-PT-00-L-LA-00004MM1 & MM2 - Material take-off for Manual Valves 45 23-Apr-15 17-Jun-15
MM1-1305-PT-00-L-LA-00004-1MM1 & MM2 - Material take-off for Manual Valves-IDC 1 23-Apr-15* 23-Apr-15
MM1-1305-PT-00-L-LA-00004-2MM1 & MM2 - Material take-off for Manual Valves-IFR 4 24-Apr-15 29-Apr-15
MM1-1305-PT-00-L-LA-00004-3MM1 & MM2 - Material take-off for Manual Valves-IFD 0 02-May-15 02-May-15
MM1-1305-PT-00-L-LA-00004-4MM1 & MM2 - Material take-off for Manual Valves-IFC 40 02-May-15 17-Jun-15
MM1-1305-PT-00-L-LA-00005MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket 54 26-Jun-15 27-Aug-15
MM1-1305-PT-00-L-LA-00005-1MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IDC 1 26-Jun-15* 26-Jun-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 17 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
18. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-00-L-LA-00005-2MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFR 5 27-Jun-15 02-Jul-15
MM1-1305-PT-00-L-LA-00005-3MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFD 0 03-Jul-15 03-Jul-15
MM1-1305-PT-00-L-LA-00005-4MM1 & MM2 - Material take-off for Stub bolts, nuts and gasket-IFC 48 03-Jul-15 27-Aug-15
MM1-1305-PT-00-L-LA-00006MM1 & MM2 - Material take-off for Pipe Support (Raw Material) 53 30-May-15 30-Jul-15
MM1-1305-PT-00-L-LA-00006-1MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IDC 1 30-May-15* 30-May-15
MM1-1305-PT-00-L-LA-00006-2MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFR 6 01-Jun-15 06-Jun-15
MM1-1305-PT-00-L-LA-00006-3MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFD 0 08-Jun-15 08-Jun-15
MM1-1305-PT-00-L-LA-00006-4MM1 & MM2 - Material take-off for Pipe Support (Raw Material)-IFC 46 08-Jun-15 30-Jul-15
MM1-1305-PT-00-L-LA-00007MM1 & MM2 - Material take-off - Hub Connector 70 11-Jun-15 31-Aug-15
MM1-1305-PT-00-L-LA-00007-1MM1 & MM2 - Material take-off - Hub Connector-IDC 1 11-Jun-15* 11-Jun-15
MM1-1305-PT-00-L-LA-00007-2MM1 & MM2 - Material take-off - Hub Connector-IFR 12 12-Jun-15 25-Jun-15
MM1-1305-PT-00-L-LA-00007-3MM1 & MM2 - Material take-off - Hub Connector-IFD 0 26-Jun-15 26-Jun-15
MM1-1305-PT-00-L-LA-00007-4MM1 & MM2 - Material take-off - Hub Connector-IFC 57 26-Jun-15 31-Aug-15
MM1-10250 TR/MTO for Piping Bulk 1 10-Apr-15 10-Apr-15
MM1-10270 TR/MTO for Manual valves 1 29-Apr-15 29-Apr-15
MM1-10290 TR/MTO for Barred Tee 1 29-Apr-15 29-Apr-15
MM1-10310 TR/MTO for Cuni fittings 1 08-May-15 08-May-15
MM1-10330 TR/MTO for Corrosion, sand probe, sample connection, chemical connection 1 18-May-15 18-May-15
MM1-10350 TR/MTO for 3D Bend (free bare pipe to bending contractor) 1 30-May-15 30-May-15
MM1-10370 TR/MTO for Pipe Supports 1 06-Jun-15 06-Jun-15
MM1-10410 TR/MTO for Piping insulation 1 04-Jul-15 04-Jul-15
MM1-10430 TR/MTO for Bolt nut, gasket and other 1 06-Jul-15 06-Jul-15
MM1-10390 TR/MTO for Quick Coupling 1 09-Jul-15 09-Jul-15
MM1-10450 TR/MTO for Valve Inter-locks 1 16-Sep-15 16-Sep-15
MM1-10470 Prepare / Submit/ Approve Piping Shop Drawings 151 16-Sep-15 16-Mar-16
0.D.26.0000.MM1.B.1 E&I0.D.26.0000.MM1.B.1 E&I 313 13-Mar-15 16-Mar-16
0.D.26.0000.MM1.B.1.92 PTSC0.D.26.0000.MM1.B.1.92 PTSC 313 13-Mar-15 16-Mar-16
MM1-1305-PT-82-E-CA-00001MM1 & MM2 - Electrical Load List 57 04-May-15 08-Jul-15
MM1-1305-PT-82-E-CA-00001-1MM1 & MM2 - Electrical Load List-IDC 10 04-May-15* 14-May-15
MM1-1305-PT-82-E-CA-00001-2MM1 & MM2 - Electrical Load List-IFR 13 15-May-15 29-May-15
MM1-1305-PT-82-E-CA-00001-3MM1 & MM2 - Electrical Load List-IFD 13 30-May-15 13-Jun-15
MM1-1305-PT-82-E-CA-00001-4MM1 & MM2 - Electrical Load List-IFC 21 15-Jun-15 08-Jul-15
MM1-1305-PT-82-E-CA-00002MM1 & MM2 - Electrical Lighting Calculation 32 20-Mar-15 25-Apr-15
MM1-1305-PT-82-E-CA-00002-1MM1 & MM2 - Electrical Lighting Calculation-IDC 9 20-Mar-15* 30-Mar-15
MM1-1305-PT-82-E-CA-00002-2MM1 & MM2 - Electrical Lighting Calculation-IFR 6 31-Mar-15 06-Apr-15
MM1-1305-PT-82-E-CA-00002-3MM1 & MM2 - Electrical Lighting Calculation-IFD 13 07-Apr-15 21-Apr-15
MM1-1305-PT-82-E-CA-00002-4MM1 & MM2 - Electrical Lighting Calculation-IFC 4 22-Apr-15 25-Apr-15
MM1-1305-PT-82-E-XX-00001MM1 & MM2 - Electrical General Drawing and Document Index 36 23-Mar-15 06-May-15
MM1-1305-PT-82-E-XX-00001-1MM1 & MM2 - Electrical General Drawing and Document Index-IDC 9 23-Mar-15* 01-Apr-15
MM1-1305-PT-82-E-XX-00001-2MM1 & MM2 - Electrical General Drawing and Document Index-IFR 13 02-Apr-15 16-Apr-15
MM1-1305-PT-82-E-XX-00001-3MM1 & MM2 - Electrical General Drawing and Document Index-IFD 0 17-Apr-15 17-Apr-15
MM1-1305-PT-82-E-XX-00001-4MM1 & MM2 - Electrical General Drawing and Document Index-IFC 14 17-Apr-15 06-May-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 18 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
19. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-82-E-XX-00002MM1 & MM2 - Electrical Typical Installation Details 48 13-Mar-15 11-May-15
MM1-1305-PT-82-E-XX-00002-1MM1 & MM2 - Electrical Typical Installation Details-IDC 9 13-Mar-15* 23-Mar-15
MM1-1305-PT-82-E-XX-00002-2MM1 & MM2 - Electrical Typical Installation Details-IFR 13 24-Mar-15 07-Apr-15
MM1-1305-PT-82-E-XX-00002-3MM1 & MM2 - Electrical Typical Installation Details-IFD 13 08-Apr-15 22-Apr-15
MM1-1305-PT-82-E-XX-00002-4MM1 & MM2 - Electrical Typical Installation Details-IFC 13 23-Apr-15 11-May-15
MM1-1305-PT-82-E-DS-00001MM1 & MM2 - Electrical Datasheet 30 02-Apr-15 09-May-15
MM1-1305-PT-82-E-DS-00001-1MM1 & MM2 - Electrical Datasheet-IDC 9 02-Apr-15* 11-Apr-15
MM1-1305-PT-82-E-DS-00001-2MM1 & MM2 - Electrical Datasheet-IFR 6 13-Apr-15 18-Apr-15
MM1-1305-PT-82-E-DS-00001-3MM1 & MM2 - Electrical Datasheet-IFD 10 20-Apr-15 04-May-15
MM1-1305-PT-82-E-DS-00001-4MM1 & MM2 - Electrical Datasheet-IFC 5 05-May-15 09-May-15
MM1-1305-PT-82-E-XX-10001MM1 - Electrical Drawing Index 37 23-Mar-15 07-May-15
MM1-1305-PT-82-E-XX-10001-1MM1 - Electrical Drawing Index -IDC 10 23-Mar-15* 02-Apr-15
MM1-1305-PT-82-E-XX-10001-2MM1 - Electrical Drawing Index -IFR 13 03-Apr-15 17-Apr-15
MM1-1305-PT-82-E-XX-10001-3MM1 - Electrical Drawing Index -IFD 0 18-Apr-15 18-Apr-15
MM1-1305-PT-82-E-XX-10001-4MM1 - Electrical Drawing Index -IFC 14 18-Apr-15 07-May-15
MM1-1305-PT-82-E-XX-10002MM1 - Electrical Cable Ladder Support 39 08-May-15 22-Jun-15
MM1-1305-PT-82-E-XX-10002-1MM1 - Electrical Cable Ladder Support-IDC 9 08-May-15* 18-May-15
MM1-1305-PT-82-E-XX-10002-2MM1 - Electrical Cable Ladder Support-IFR 13 19-May-15 02-Jun-15
MM1-1305-PT-82-E-XX-10002-3MM1 - Electrical Cable Ladder Support-IFD 0 03-Jun-15 03-Jun-15
MM1-1305-PT-82-E-XX-10002-4MM1 - Electrical Cable Ladder Support-IFC 17 03-Jun-15 22-Jun-15
MM1-1305-PT-82-E-XJ-10001MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001 39 13-Mar-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10001-1MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IDC 9 13-Mar-15* 23-Mar-15
MM1-1305-PT-82-E-XJ-10001-2MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IFR 13 24-Mar-15 07-Apr-15
MM1-1305-PT-82-E-XJ-10001-3MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IFD 0 08-Apr-15 08-Apr-15
MM1-1305-PT-82-E-XJ-10001-4MM1 - Electrical Single Line Diagram - MOV Distribution Panel 82EL001-IFC 17 08-Apr-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10002MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL00239 13-Mar-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10002-1MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IDC9 13-Mar-15* 23-Mar-15
MM1-1305-PT-82-E-XJ-10002-2MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IFR13 24-Mar-15 07-Apr-15
MM1-1305-PT-82-E-XJ-10002-3MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IFD0 08-Apr-15 08-Apr-15
MM1-1305-PT-82-E-XJ-10002-4MM1 - Electrical Single Line Diagram - Heat Tracing Distribution Panel 82EL002-IFC17 08-Apr-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10003MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL00339 13-Mar-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10003-1MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IDC9 13-Mar-15* 23-Mar-15
MM1-1305-PT-82-E-XJ-10003-2MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IFR13 24-Mar-15 07-Apr-15
MM1-1305-PT-82-E-XJ-10003-3MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IFD0 08-Apr-15 08-Apr-15
MM1-1305-PT-82-E-XJ-10003-4MM1 - Electrical Single Line Diagram - Normal Lighting Distribution Panel 82EL003-IFC17 08-Apr-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10004MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL00439 13-Mar-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10004-1MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IDC9 13-Mar-15* 23-Mar-15
MM1-1305-PT-82-E-XJ-10004-2MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IFR13 24-Mar-15 07-Apr-15
MM1-1305-PT-82-E-XJ-10004-3MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IFD0 08-Apr-15 08-Apr-15
MM1-1305-PT-82-E-XJ-10004-4MM1 - Electrical Single Line Diagram - Emergency Lighting Distribution Panel 82EL004-IFC17 08-Apr-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10005MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL00539 13-Mar-15 27-Apr-15
MM1-1305-PT-82-E-XJ-10005-1MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IDC9 13-Mar-15* 23-Mar-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 19 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
20. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-82-E-XJ-10005-2MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IFR13 24-Mar-15 07-Apr-15
MM1-1305-PT-82-E-XJ-10005-3MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IFD0 08-Apr-15 08-Apr-15
MM1-1305-PT-82-E-XJ-10005-4MM1 - Electrical Single Line Diagram - Escape Lighting Distribution Panel 82EL005-IFC17 08-Apr-15 27-Apr-15
MM1-1305-PT-82-E-TA-10001MM1 - Electrical Cable Schedule 51 10-Apr-15 11-Jun-15
MM1-1305-PT-82-E-TA-10001-1MM1 - Electrical Cable Schedule -IDC 13 10-Apr-15* 24-Apr-15
MM1-1305-PT-82-E-TA-10001-2MM1 - Electrical Cable Schedule -IFR 9 25-Apr-15 08-May-15
MM1-1305-PT-82-E-TA-10001-3MM1 - Electrical Cable Schedule -IFD 13 09-May-15 23-May-15
MM1-1305-PT-82-E-TA-10001-4MM1 - Electrical Cable Schedule -IFC 16 25-May-15 11-Jun-15
MM1-1305-PT-82-E-XT-10001MM1 - Electrical Heat Tracing Interconnection Diagram 39 21-May-15 04-Jul-15
MM1-1305-PT-82-E-XT-10001-1MM1 - Electrical Heat Tracing Interconnection Diagram-IDC 9 21-May-15* 30-May-15
MM1-1305-PT-82-E-XT-10001-2MM1 - Electrical Heat Tracing Interconnection Diagram-IFR 13 01-Jun-15 15-Jun-15
MM1-1305-PT-82-E-XT-10001-3MM1 - Electrical Heat Tracing Interconnection Diagram-IFD 0 16-Jun-15 16-Jun-15
MM1-1305-PT-82-E-XT-10001-4MM1 - Electrical Heat Tracing Interconnection Diagram-IFC 17 16-Jun-15 04-Jul-15
MM1-1305-PT-82-E-XI-10001MM1 - Electrical Heat Tracing Block Diagram 58 25-Apr-15 04-Jul-15
MM1-1305-PT-82-E-XI-10001-1MM1 - Electrical Heat Tracing Block Diagram-IDC 6 25-Apr-15* 05-May-15
MM1-1305-PT-82-E-XI-10001-2MM1 - Electrical Heat Tracing Block Diagram-IFR 13 06-May-15 20-May-15
MM1-1305-PT-82-E-XI-10001-3MM1 - Electrical Heat Tracing Block Diagram-IFD 0 21-May-15 21-May-15
MM1-1305-PT-82-E-XI-10001-4MM1 - Electrical Heat Tracing Block Diagram-IFC 39 21-May-15 04-Jul-15
MM1-1305-PT-82-E-XI-10002MM1 - Electrical Lighting Interconnection Diagram 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XI-10002-1MM1 - Electrical Lighting Interconnection Diagram-IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XI-10002-2MM1 - Electrical Lighting Interconnection Diagram-IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XI-10002-3MM1 - Electrical Lighting Interconnection Diagram-IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XI-10002-4MM1 - Electrical Lighting Interconnection Diagram-IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-10001MM1 - Electrical Lighting And Small Power Layout - Main Deck 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XE-10001-1MM1 - Electrical Lighting And Small Power Layout - Main Deck -IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XE-10001-2MM1 - Electrical Lighting And Small Power Layout - Main Deck -IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XE-10001-3MM1 - Electrical Lighting And Small Power Layout - Main Deck -IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XE-10001-4MM1 - Electrical Lighting And Small Power Layout - Main Deck -IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-10002MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XE-10002-1MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XE-10002-2MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XE-10002-3MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XE-10002-4MM1 - Electrical Lighting And Small Power Layout - Mezzanine Deck -IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-10003MM1 - Electrical Lighting And Small Power Layout - Upper Deck 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XE-10003-1MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XE-10003-2MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XE-10003-3MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XE-10003-4MM1 - Electrical Lighting And Small Power Layout - Upper Deck -IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-11001MM1 - Electrical Earthing Layout - Main Deck 35 02-Apr-15 15-May-15
MM1-1305-PT-82-E-XE-11001-1MM1 - Electrical Earthing Layout - Main Deck -IDC 8 02-Apr-15* 10-Apr-15
MM1-1305-PT-82-E-XE-11001-2MM1 - Electrical Earthing Layout - Main Deck -IFR 13 11-Apr-15 25-Apr-15
MM1-1305-PT-82-E-XE-11001-3MM1 - Electrical Earthing Layout - Main Deck -IFD 0 27-Apr-15 27-Apr-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 20 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
21. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-82-E-XE-11001-4MM1 - Electrical Earthing Layout - Main Deck -IFC 14 27-Apr-15 15-May-15
MM1-1305-PT-82-E-XE-11002MM1 - Electrical Earthing Layout - Mezzanine Deck 35 02-Apr-15 15-May-15
MM1-1305-PT-82-E-XE-11002-1MM1 - Electrical Earthing Layout - Mezzanine Deck-IDC 8 02-Apr-15* 10-Apr-15
MM1-1305-PT-82-E-XE-11002-2MM1 - Electrical Earthing Layout - Mezzanine Deck-IFR 13 11-Apr-15 25-Apr-15
MM1-1305-PT-82-E-XE-11002-3MM1 - Electrical Earthing Layout - Mezzanine Deck-IFD 0 27-Apr-15 27-Apr-15
MM1-1305-PT-82-E-XE-11002-4MM1 - Electrical Earthing Layout - Mezzanine Deck-IFC 14 27-Apr-15 15-May-15
MM1-1305-PT-82-E-XE-11003MM1 - Electrical Earthing Layout - Upper Deck 35 02-Apr-15 15-May-15
MM1-1305-PT-82-E-XE-11003-1MM1 - Electrical Earthing Layout - Upper Deck -IDC 8 02-Apr-15* 10-Apr-15
MM1-1305-PT-82-E-XE-11003-2MM1 - Electrical Earthing Layout - Upper Deck -IFR 13 11-Apr-15 25-Apr-15
MM1-1305-PT-82-E-XE-11003-3MM1 - Electrical Earthing Layout - Upper Deck -IFD 0 27-Apr-15 27-Apr-15
MM1-1305-PT-82-E-XE-11003-4MM1 - Electrical Earthing Layout - Upper Deck -IFC 14 27-Apr-15 15-May-15
MM1-1305-PT-82-E-XE-12001MM1 - Electrical Cable Ladder And Support Layout - Main Deck 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XE-12001-1MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XE-12001-2MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XE-12001-3MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XE-12001-4MM1 - Electrical Cable Ladder And Support Layout - Main Deck -IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-12002MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XE-12002-1MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XE-12002-2MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XE-12002-3MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XE-12002-4MM1 - Electrical Cable Ladder And Support Layout - Mezzanine Deck -IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-12003MM1 - Electrical Cable Ladder And Support Layout - Upper Deck 36 24-Apr-15 08-Jun-15
MM1-1305-PT-82-E-XE-12003-1MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IDC 6 24-Apr-15* 04-May-15
MM1-1305-PT-82-E-XE-12003-2MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IFR 13 05-May-15 19-May-15
MM1-1305-PT-82-E-XE-12003-3MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IFD 0 20-May-15 20-May-15
MM1-1305-PT-82-E-XE-12003-4MM1 - Electrical Cable Ladder And Support Layout - Upper Deck-IFC 17 20-May-15 08-Jun-15
MM1-1305-PT-82-E-XE-13001MM1 - Electrical Cable Routing Layout - Main Deck 39 09-May-15 23-Jun-15
MM1-1305-PT-82-E-XE-13001-1MM1 - Electrical Cable Routing Layout - Main Deck-IDC 9 09-May-15* 19-May-15
MM1-1305-PT-82-E-XE-13001-2MM1 - Electrical Cable Routing Layout - Main Deck-IFR 13 20-May-15 03-Jun-15
MM1-1305-PT-82-E-XE-13001-3MM1 - Electrical Cable Routing Layout - Main Deck-IFD 0 04-Jun-15 04-Jun-15
MM1-1305-PT-82-E-XE-13001-4MM1 - Electrical Cable Routing Layout - Main Deck-IFC 17 04-Jun-15 23-Jun-15
MM1-1305-PT-82-E-XE-13002MM1 - Electrical Cable Routing Layout - Mezzanine Deck 39 09-May-15 23-Jun-15
MM1-1305-PT-82-E-XE-13002-1MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IDC 9 09-May-15* 19-May-15
MM1-1305-PT-82-E-XE-13002-2MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IFR 13 20-May-15 03-Jun-15
MM1-1305-PT-82-E-XE-13002-3MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IFD 0 04-Jun-15 04-Jun-15
MM1-1305-PT-82-E-XE-13002-4MM1 - Electrical Cable Routing Layout - Mezzanine Deck -IFC 17 04-Jun-15 23-Jun-15
MM1-1305-PT-82-E-XE-13003MM1 - Electrical Cable Routing Layout - Upper Deck 39 09-May-15 23-Jun-15
MM1-1305-PT-82-E-XE-13003-1MM1 - Electrical Cable Routing Layout - Upper Deck-IDC 9 09-May-15* 19-May-15
MM1-1305-PT-82-E-XE-13003-2MM1 - Electrical Cable Routing Layout - Upper Deck-IFR 13 20-May-15 03-Jun-15
MM1-1305-PT-82-E-XE-13003-3MM1 - Electrical Cable Routing Layout - Upper Deck-IFD 0 04-Jun-15 04-Jun-15
MM1-1305-PT-82-E-XE-13003-4MM1 - Electrical Cable Routing Layout - Upper Deck-IFC 17 04-Jun-15 23-Jun-15
MM1-1305-PT-82-E-LA-00001MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures 80 05-May-15 05-Aug-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 21 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3
22. Activity ID Activity Name Original
Duration
Start Finish
MM1-1305-PT-82-E-LA-00001-1MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IDC 7 05-May-15* 12-May-15
MM1-1305-PT-82-E-LA-00001-2MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFR 24 13-May-15 09-Jun-15
MM1-1305-PT-82-E-LA-00001-3MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFD 0 10-Jun-15 10-Jun-15
MM1-1305-PT-82-E-LA-00001-4MM1 & MM2 - Electrical Material Take-Off - Lighting Fixtures-IFC 49 10-Jun-15 05-Aug-15
MM1-1305-PT-82-E-LA-00002MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories77 11-May-15 07-Aug-15
MM1-1305-PT-82-E-LA-00002-1MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IDC7 11-May-15* 18-May-15
MM1-1305-PT-82-E-LA-00002-2MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFR23 19-May-15 13-Jun-15
MM1-1305-PT-82-E-LA-00002-3MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFD0 15-Jun-15 15-Jun-15
MM1-1305-PT-82-E-LA-00002-4MM1 & MM2 - Electrical Material Take-Off - Cable Ladder/Tray And Accessories-IFC47 15-Jun-15 07-Aug-15
MM1-1305-PT-82-E-LA-00003MM1 & MM2 - Electrical Material Take-Off - Cables 62 18-May-15 28-Jul-15
MM1-1305-PT-82-E-LA-00003-1MM1 & MM2 - Electrical Material Take-Off - Cables-IDC 7 18-May-15* 25-May-15
MM1-1305-PT-82-E-LA-00003-2MM1 & MM2 - Electrical Material Take-Off - Cables-IFR 8 26-May-15 03-Jun-15
MM1-1305-PT-82-E-LA-00003-3MM1 & MM2 - Electrical Material Take-Off - Cables-IFD 0 04-Jun-15 04-Jun-15
MM1-1305-PT-82-E-LA-00003-4MM1 & MM2 - Electrical Material Take-Off - Cables-IFC 47 04-Jun-15 28-Jul-15
MM1-1305-PT-82-E-LA-00004MM1 & MM2 - Electrical Material Take-Off - Cable Glands 77 21-May-15 18-Aug-15
MM1-1305-PT-82-E-LA-00004-1MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IDC 7 21-May-15* 28-May-15
MM1-1305-PT-82-E-LA-00004-2MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFR 22 29-May-15 23-Jun-15
MM1-1305-PT-82-E-LA-00004-3MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFD 0 24-Jun-15 24-Jun-15
MM1-1305-PT-82-E-LA-00004-4MM1 & MM2 - Electrical Material Take-Off - Cable Glands-IFC 48 24-Jun-15 18-Aug-15
MM1-1305-PT-82-E-LA-00005MM1 & MM2 - Electrical Material Take-Off - Junction Boxes 83 02-May-15 06-Aug-15
MM1-1305-PT-82-E-LA-00005-1MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IDC 6 02-May-15* 08-May-15
MM1-1305-PT-82-E-LA-00005-2MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFR 31 09-May-15 13-Jun-15
MM1-1305-PT-82-E-LA-00005-3MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFD 0 15-Jun-15 15-Jun-15
MM1-1305-PT-82-E-LA-00005-4MM1 & MM2 - Electrical Material Take-Off - Junction Boxes-IFC 46 15-Jun-15 06-Aug-15
MM1-1305-PT-82-E-LA-00006MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials 94 21-May-15 08-Sep-15
MM1-1305-PT-82-E-LA-00006-1MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IDC 7 21-May-15* 28-May-15
MM1-1305-PT-82-E-LA-00006-2MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFR 38 29-May-15 11-Jul-15
MM1-1305-PT-82-E-LA-00006-3MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFD 0 13-Jul-15 13-Jul-15
MM1-1305-PT-82-E-LA-00006-4MM1 & MM2 - Electrical Material Take-Off - Miscellaneous Materials-IFC 49 13-Jul-15 08-Sep-15
MM1-1305-PT-82-E-LA-00007MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials 52 15-May-15 14-Jul-15
MM1-1305-PT-82-E-LA-00007-1MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IDC 7 15-May-15* 22-May-15
MM1-1305-PT-82-E-LA-00007-2MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFR 10 23-May-15 03-Jun-15
MM1-1305-PT-82-E-LA-00007-3MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFD 0 04-Jun-15 04-Jun-15
MM1-1305-PT-82-E-LA-00007-4MM1 & MM2 - Electrical Material Take-Off - Steel Support Materials-IFC 35 04-Jun-15 14-Jul-15
MM1-1305-PT-00-I-LA-00009MM1 & MM2 - Ex Equipment Register 68 11-Jun-15 28-Aug-15
MM1-1305-PT-00-I-LA-00009-1MM1 & MM2 - Ex Equipment Register-IDC 27 11-Jun-15* 11-Jul-15
MM1-1305-PT-00-I-LA-00009-2MM1 & MM2 - Ex Equipment Register-IFR 12 13-Jul-15 25-Jul-15
MM1-1305-PT-00-I-LA-00009-3MM1 & MM2 - Ex Equipment Register-IFD 12 27-Jul-15 08-Aug-15
MM1-1305-PT-00-I-LA-00009-4MM1 & MM2 - Ex Equipment Register-IFC 17 10-Aug-15 28-Aug-15
MM1-1305-PT-00-I-SA-00001MM1 & MM2 - Instrument Control and Shutdown Philosophy 64 10-Jun-15 22-Aug-15
MM1-1305-PT-00-I-SA-00001-1MM1 & MM2 - Instrument Control and Shutdown Philosophy-IDC 27 10-Jun-15* 10-Jul-15
MM1-1305-PT-00-I-SA-00001-2MM1 & MM2 - Instrument Control and Shutdown Philosophy-IFR 8 11-Jul-15 20-Jul-15
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
2015 2016
Ghana OCTP Development Project, FPSO
EPC for Module MM1 & MM2
Remaining Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Schedule Level 3
Page 22 of 72
Date Revision Checked Approved
28-Mar-15 Baseline Schedule Level 3