Acknowledgement 
I express my sincere thanks to Mr. ……………… 
(S.S.E./Tele Railnet) and Mr. ………………….. 
(S.S.E./Tele Railnet) for his invaluable support and 
guidance throughout the work.
CONTENTS 
• 1. introduction 
• 2. Objective of the project. 
• 3.Railnet arrangement at HQ Gorakhpur 
• 4. Equipment used in Railnet 
• 5. Features 
• 6. power supply arrangement 
• 7. failure and Trouble shooting. 
• 8. Suggestion to minimize failure 
• 10. Conclusion.
Introduction 
Indian Railways have decided to set up their own 
Corporate 
Wide Information System (CWIS) called RAILNET to 
provide computer connectivity between Railway 
Board with Zonal Railways, Production Units, 
Centralized 
Training Institutes , RDSO, CORE & major training 
Centers .
OBJECTIVE OF THE PROJECT 
The main objective of the project are – 
• To study the various equipment used in the 
Railnet . 
• To understand the installation and construction 
of the equipment 
• Failure and trouble shooting . 
• Maintenance of the system.
V LAN 
V LAN is configured on layer 3 switch ports in Railnet Gorakhpur . 
A virtual LAN, commonly known as a VLAN, is a group of hosts with a 
common set of requirements that communicate as if they were 
attached to the same broadcast domain, regardless of their physical 
location. 
VLANs are created to provide the segmentation services traditionally 
provided by routers in LAN configurations 
The IP provided at VLAN is 172.16.11.1 and subnet is 255.255.255
Equipments used in Railnet 
Synchronous Transport Module (STM)-1: 
•The STM-1 (Synchronous Transport Module level-1) is the SDH 
ITU-T fiber optical network transmission standard ,it is the 
information structure. 
•The basic rate of STM 1 is 155.520 mbps . 
•In Railnet Gorakhpur “ Tejas TJ 100 CP “ STM – 1 Is in use . 
•Input Voltage Range Normal Operation: -40V to –60V DC . 
•Fuse 6A Slow Blow Glass fuse. Field replaceable
Equipments used in Railnet 
 ROUTER-A 
device that forward data packets along networks. A router is connected 
to two or more logically separate network with network address 
 MAKE- CISCO 2800 series . 
One Router, having 4 WAN ports used in Railnet , Gorakhpur. 
IP: 10.24.2.2 
 The 2800 Series supports Secure Sockets Layer . 
 Network interfaces can be upgraded in the field to accommodate future 
technologies. 
 Several types of slots are available to add connectivity and services in 
the future on an "integrate-as-you-grow" basis. 
 The Cisco 2800 supports more than 90 modules .
SWITCH – 
 In networks , a device that filters and forward packets 
between LAN segments. 
It works using the destination address of individual frames. 
 It can have 16/24/48 port one port is used to receive data 
from router and all other to connect. T.S. Console port use 
for programming switch locally. 
 one big difference between layer 2 and layer 3 switches is 
that we are able to do routing in intranetworking with 
Layer 3 switches which is not possible to do with layer 2
 In N.E. Railway the layer- 3 switch is of Cisco 3750-G, which has 
24 10/100/1000 Ethernet port and four SFP ports. 
 The Cisco Catalyst 3750 Series stacks up to 9 switches as a single 
logical unit for a total of 468 Ethernet ports 
 IPv6 Capable—Getting Ready for the Future 
 A working stack is self-managing and self-configuring. When 
switches are added or removed, the master switch automatically 
updates all the routing tables to reflect changes.
 The layer 2 switch is of Cisco 2950 series . 
 The Catalyst 2950 Series Intelligent Ethernet Switches, is a 
fixed configuration, stackable switch that provides Fast 
Ethernet . 
 When a Catalyst 2950 Switch is combined with a Catalyst 3550 
Series Switch, the solution can enable IP routing from the 
edge to the core of the network. 
 Embedded in Catalyst 2950 Series switches is the Cisco Cluster 
Management Suite (CMS) Software, which allows users to 
simultaneously configure and troubleshoot multiple Catalyst 
desktop switches using a standard Web browser.
MODEM – 
A device that converts serial data from a computer to 
analog data for transmission over ordinary or leaded 
telephone lines and converts analog data back to digital 
at receiving end . 
this is used when the terminal is to be connected a 
system located at remote locations . 
In Railnet Gorakhpur one Dial up modem is in use .
Railnet Dial Up Access 
Railway 
RAS 
MODEM 
MODEM 
MODEM 
MODEM 
MODEM 
DIAL-UP 
Central Switch 
NER ACCESS 
Mail SERVER 
Router
Mail Server- 
The mail server is use to provide e-mail facility to officers . 
The RAILNET mail server in N.E.Railway Gorakhpur runs on operating 
system “Windows server 2000” . 
The RAM is of 512 Mb. 
The processor is 3.2 GHz Intel Zenon. 
All the communication on optical fiber. 
The mail server is HP made and provide an unique email id for 
communication . 
The unique id is like designation..@ner. railnet.gov.in .
LAN EXTENDER 
LAN Extender is a device that use to extend the local area network 
beyond 100 meters through the copper cable. 
LAN extender is connected both side of network. 
THIS IS EXCELLENT FOR ETHERNET DISTANCE EXTENSION OVER 
EXISTING TELEPHONE WIRE WITH JUST ONE PAIR OF TWISTED PAIR 
COPPER WIRE CAN EASILY CONNECT TO ETHERNET. 
In Railnet Gorakhpur Dasan and Atrie made LAN Extender 
is in use .
Media converter 
It is use to divert from one physical medium to other like from CAT 5 to 
OFC . 
In Railnet Gorakhpur Mrotek FCAT01-C and Mrotek FCAT-01 
is in use .
DSLAM 
It is a network device, located in the telephone exchanges of the 
service providers, that connects multiple customer Digital Subscriber 
Lines (DSLs) 
The DSLAM acts like a network switch since its functionality is at Layer 
2 of OSI model . 
In N.E. Railway two numbers of DAS - 3248 DSLAM is in use each 
one having 48 ports .
Features 
Railnet Gorakhpur use various ways to provide internet connectivity 
to its users . 
various number of users are as – 
LAN - 400 users 
Broad band on residence – 96 users 
Dial up - 96 users . 
The IP provided as 172.16.11.1 , in this manner we can provide 
IP .
Power Supply arrangement 
All equipment in RAILNET are work on 230V. AC supply 
In Railnet Gorakhpur two 5 KVA UPS (made by APC 5000 UX model) 
are use to provide power supply . one is main and other is stand by 
distribution board is use to connect all equipments 
Battery : 
Maintenance Free batteries manufactured by Power Systems 
Limited (type EP 26 ) are used. 
Each battery is of 26 AH , 8 batteries in series and 8+8 batteries in 
parallel . 
They work on Oxygen Recombination principle. Requirement 
of water top up is completely eliminated . 
Earthing 
Conventional method of earthing is use in Railnet Gorakhpur. 
Earthing is maintained at less than 1 ohms .
Failures and trouble shooting 
RAILNET 
Following main failure attend by telecom staff in 
Railnet – 
• Power supply failure 
Check the supply if ok than check the fuse and 
earth and rectify it . 
• Link failure 
link down due to link error & Hang of equipment .
 Problem in accessing Internet . 
Reset LAN Extender . 
Check whether LAN driver installed properly 
or not if not install it properly . 
Check cable pair fault and reset it . 
Lead faulty between jack panel to terminal 
Patch card fault 
Test patch card using LAN tester . 
Some times users face conflict in IP it is due to some 
other user use same IP.
Problem in accessing internet at residence 
If there is no ADSL linkup then check for faulty pair and loop 
resistance (should be below 700 ohm). 
If DSLAM hang then reset it . 
If modem is hang reset it on default .
SUGGESTION TO MINIMIZE 
FAILURE 
• All equipment should be installed as their specification 
suggest by RDSO 
• The power supply must be constant 
• Fuse & Earth protection are provided with correct rating 
• Connector & Cable should be right & tight 
• All equipments deal with trend staffs 
• Never use any equipment without UPS or protection 
• Never use any extra unrequited device as load 
• All equipment should be cleaned & well temperature 
maintained 
• Schedule maintenance should be done properly
CONCLUSION 
This project give the idea about the working of 
RAILNET in N.E.Railway Zone . What are the 
equipment and technology are used in it like as 
server , router, switch, modems, LAN extender etc. 
What are the requirements for the RAILNET setup. 
Connectivity diagram of various locations. I have 
also seen what was various faults and how they 
were removed . 
As being a trainee Section engineer I cultivate my 
knowledge during making of this project and it 
was a very nice experience during .
Rail-net Indian railway internet

Mais conteúdo relacionado

Mais procurados

signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
Lokesh Gogia
 

Mais procurados (20)

Industrial training by nakul
Industrial training by nakulIndustrial training by nakul
Industrial training by nakul
 
Indian Railway
Indian Railway  Indian Railway
Indian Railway
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system ppt
 
Summer internship at pgcil
Summer internship at pgcilSummer internship at pgcil
Summer internship at pgcil
 
Hart communication protocol
Hart communication protocolHart communication protocol
Hart communication protocol
 
Password based door lock system using 8051 microcontroller final report
Password based door lock system using 8051 microcontroller final reportPassword based door lock system using 8051 microcontroller final report
Password based door lock system using 8051 microcontroller final report
 
Simple Railway gate automation
Simple Railway gate automationSimple Railway gate automation
Simple Railway gate automation
 
Scada System
Scada  SystemScada  System
Scada System
 
signals and GSM-R in railway ppt
signals and GSM-R in railway pptsignals and GSM-R in railway ppt
signals and GSM-R in railway ppt
 
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYSINDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
INDUSTRIAL TRAINING REPORT ON INDIAN RAILWAYS
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
Power Line Carrier Communication PLCC
Power Line Carrier Communication PLCCPower Line Carrier Communication PLCC
Power Line Carrier Communication PLCC
 
Summer Training Program Report On Embedded system and robot
Summer Training Program Report On Embedded system and robot Summer Training Program Report On Embedded system and robot
Summer Training Program Report On Embedded system and robot
 
Railway Industrial Training Report
Railway Industrial Training ReportRailway Industrial Training Report
Railway Industrial Training Report
 
Input - Output Devices for PLC
Input - Output Devices for PLCInput - Output Devices for PLC
Input - Output Devices for PLC
 
Industrial automation
Industrial automationIndustrial automation
Industrial automation
 
Scada architecture
Scada architectureScada architecture
Scada architecture
 
plc training report
plc training reportplc training report
plc training report
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADA
 

Destaque

History of great indian railways
History of great indian railwaysHistory of great indian railways
History of great indian railways
Aish Warya
 

Destaque (20)

Railnet
RailnetRailnet
Railnet
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway Signalling
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
ppt of summer traning nwr jaipur
ppt of summer traning nwr jaipurppt of summer traning nwr jaipur
ppt of summer traning nwr jaipur
 
History of great indian railways
History of great indian railwaysHistory of great indian railways
History of great indian railways
 
Turnaround Of Railway Business Strategy
Turnaround Of Railway  Business StrategyTurnaround Of Railway  Business Strategy
Turnaround Of Railway Business Strategy
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Telecommunication networks for railways
Telecommunication networks for railwaysTelecommunication networks for railways
Telecommunication networks for railways
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi Shah
 
Training ppt bsnl
Training ppt  bsnlTraining ppt  bsnl
Training ppt bsnl
 
BTS SITE VISIT
BTS SITE VISITBTS SITE VISIT
BTS SITE VISIT
 
Hand book on C&W
Hand book on C&W Hand book on C&W
Hand book on C&W
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
 
Internship report-human resource management-central railway workshop-mysore-b...
Internship report-human resource management-central railway workshop-mysore-b...Internship report-human resource management-central railway workshop-mysore-b...
Internship report-human resource management-central railway workshop-mysore-b...
 
Presentation on indian railway
Presentation on indian railwayPresentation on indian railway
Presentation on indian railway
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 
Base Transceiver Station
Base Transceiver StationBase Transceiver Station
Base Transceiver Station
 

Semelhante a Rail-net Indian railway internet

JVL Industrial Ethernet Expansion Modules for MAC Motors
JVL Industrial Ethernet Expansion Modules for MAC MotorsJVL Industrial Ethernet Expansion Modules for MAC Motors
JVL Industrial Ethernet Expansion Modules for MAC Motors
Electromate
 
461207532-Optical-Ethernet-ppt-pptx (1).pptx
461207532-Optical-Ethernet-ppt-pptx (1).pptx461207532-Optical-Ethernet-ppt-pptx (1).pptx
461207532-Optical-Ethernet-ppt-pptx (1).pptx
shindepoornima94
 
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_ENNokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Juan Boggiano
 

Semelhante a Rail-net Indian railway internet (20)

sem_project_2
sem_project_2sem_project_2
sem_project_2
 
JVL Industrial Ethernet Expansion Modules for MAC Motors
JVL Industrial Ethernet Expansion Modules for MAC MotorsJVL Industrial Ethernet Expansion Modules for MAC Motors
JVL Industrial Ethernet Expansion Modules for MAC Motors
 
CCNA 1
CCNA 1CCNA 1
CCNA 1
 
Acr5 dcb
Acr5 dcbAcr5 dcb
Acr5 dcb
 
Examen1ccna3v5.0
Examen1ccna3v5.0Examen1ccna3v5.0
Examen1ccna3v5.0
 
Experiment no. 1,2 and assignment no.1 cn
Experiment no. 1,2 and assignment no.1 cnExperiment no. 1,2 and assignment no.1 cn
Experiment no. 1,2 and assignment no.1 cn
 
461207532-Optical-Ethernet-ppt-pptx (1).pptx
461207532-Optical-Ethernet-ppt-pptx (1).pptx461207532-Optical-Ethernet-ppt-pptx (1).pptx
461207532-Optical-Ethernet-ppt-pptx (1).pptx
 
C4 L6000 Eth Operation Manual
C4 L6000 Eth Operation ManualC4 L6000 Eth Operation Manual
C4 L6000 Eth Operation Manual
 
Allied Telesis IE510-28GSX
Allied Telesis IE510-28GSXAllied Telesis IE510-28GSX
Allied Telesis IE510-28GSX
 
BACKBONE NETWORKS
BACKBONE NETWORKSBACKBONE NETWORKS
BACKBONE NETWORKS
 
Data center & wireless lan
Data center & wireless lanData center & wireless lan
Data center & wireless lan
 
Des 1024 d manual_en_de
Des 1024 d manual_en_deDes 1024 d manual_en_de
Des 1024 d manual_en_de
 
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_ENNokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
Nokia_Mission-critical_Utilities_Network_Teleprotection_Application_Note_EN
 
A Boost for Ethernet to the Home
A Boost for Ethernet to the HomeA Boost for Ethernet to the Home
A Boost for Ethernet to the Home
 
IRJET- Dynamic Adaption of DCF and PCF Mode of IEEE 802.11 WLAN
IRJET-  	  Dynamic Adaption of DCF and PCF Mode of IEEE 802.11 WLANIRJET-  	  Dynamic Adaption of DCF and PCF Mode of IEEE 802.11 WLAN
IRJET- Dynamic Adaption of DCF and PCF Mode of IEEE 802.11 WLAN
 
IP-Networks for Buses and Trams in Public Transport
IP-Networks for Buses and Trams in Public TransportIP-Networks for Buses and Trams in Public Transport
IP-Networks for Buses and Trams in Public Transport
 
CCNA(R&S) By Ezxprt
CCNA(R&S) By EzxprtCCNA(R&S) By Ezxprt
CCNA(R&S) By Ezxprt
 
Ccna (200 125)
Ccna (200 125)Ccna (200 125)
Ccna (200 125)
 
01 coms 525 tcpip - networking concepts review
01   coms 525 tcpip - networking concepts review01   coms 525 tcpip - networking concepts review
01 coms 525 tcpip - networking concepts review
 
Installing motorola pbn_products
Installing motorola pbn_productsInstalling motorola pbn_products
Installing motorola pbn_products
 

Último

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
fonyou31
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
SoniaTolstoy
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 

Último (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 

Rail-net Indian railway internet

  • 1.
  • 2. Acknowledgement I express my sincere thanks to Mr. ……………… (S.S.E./Tele Railnet) and Mr. ………………….. (S.S.E./Tele Railnet) for his invaluable support and guidance throughout the work.
  • 3. CONTENTS • 1. introduction • 2. Objective of the project. • 3.Railnet arrangement at HQ Gorakhpur • 4. Equipment used in Railnet • 5. Features • 6. power supply arrangement • 7. failure and Trouble shooting. • 8. Suggestion to minimize failure • 10. Conclusion.
  • 4. Introduction Indian Railways have decided to set up their own Corporate Wide Information System (CWIS) called RAILNET to provide computer connectivity between Railway Board with Zonal Railways, Production Units, Centralized Training Institutes , RDSO, CORE & major training Centers .
  • 5. OBJECTIVE OF THE PROJECT The main objective of the project are – • To study the various equipment used in the Railnet . • To understand the installation and construction of the equipment • Failure and trouble shooting . • Maintenance of the system.
  • 6.
  • 7.
  • 8. V LAN V LAN is configured on layer 3 switch ports in Railnet Gorakhpur . A virtual LAN, commonly known as a VLAN, is a group of hosts with a common set of requirements that communicate as if they were attached to the same broadcast domain, regardless of their physical location. VLANs are created to provide the segmentation services traditionally provided by routers in LAN configurations The IP provided at VLAN is 172.16.11.1 and subnet is 255.255.255
  • 9. Equipments used in Railnet Synchronous Transport Module (STM)-1: •The STM-1 (Synchronous Transport Module level-1) is the SDH ITU-T fiber optical network transmission standard ,it is the information structure. •The basic rate of STM 1 is 155.520 mbps . •In Railnet Gorakhpur “ Tejas TJ 100 CP “ STM – 1 Is in use . •Input Voltage Range Normal Operation: -40V to –60V DC . •Fuse 6A Slow Blow Glass fuse. Field replaceable
  • 10.
  • 11. Equipments used in Railnet  ROUTER-A device that forward data packets along networks. A router is connected to two or more logically separate network with network address  MAKE- CISCO 2800 series . One Router, having 4 WAN ports used in Railnet , Gorakhpur. IP: 10.24.2.2  The 2800 Series supports Secure Sockets Layer .  Network interfaces can be upgraded in the field to accommodate future technologies.  Several types of slots are available to add connectivity and services in the future on an "integrate-as-you-grow" basis.  The Cisco 2800 supports more than 90 modules .
  • 12.
  • 13. SWITCH –  In networks , a device that filters and forward packets between LAN segments. It works using the destination address of individual frames.  It can have 16/24/48 port one port is used to receive data from router and all other to connect. T.S. Console port use for programming switch locally.  one big difference between layer 2 and layer 3 switches is that we are able to do routing in intranetworking with Layer 3 switches which is not possible to do with layer 2
  • 14.  In N.E. Railway the layer- 3 switch is of Cisco 3750-G, which has 24 10/100/1000 Ethernet port and four SFP ports.  The Cisco Catalyst 3750 Series stacks up to 9 switches as a single logical unit for a total of 468 Ethernet ports  IPv6 Capable—Getting Ready for the Future  A working stack is self-managing and self-configuring. When switches are added or removed, the master switch automatically updates all the routing tables to reflect changes.
  • 15.  The layer 2 switch is of Cisco 2950 series .  The Catalyst 2950 Series Intelligent Ethernet Switches, is a fixed configuration, stackable switch that provides Fast Ethernet .  When a Catalyst 2950 Switch is combined with a Catalyst 3550 Series Switch, the solution can enable IP routing from the edge to the core of the network.  Embedded in Catalyst 2950 Series switches is the Cisco Cluster Management Suite (CMS) Software, which allows users to simultaneously configure and troubleshoot multiple Catalyst desktop switches using a standard Web browser.
  • 16.
  • 17. MODEM – A device that converts serial data from a computer to analog data for transmission over ordinary or leaded telephone lines and converts analog data back to digital at receiving end . this is used when the terminal is to be connected a system located at remote locations . In Railnet Gorakhpur one Dial up modem is in use .
  • 18. Railnet Dial Up Access Railway RAS MODEM MODEM MODEM MODEM MODEM DIAL-UP Central Switch NER ACCESS Mail SERVER Router
  • 19. Mail Server- The mail server is use to provide e-mail facility to officers . The RAILNET mail server in N.E.Railway Gorakhpur runs on operating system “Windows server 2000” . The RAM is of 512 Mb. The processor is 3.2 GHz Intel Zenon. All the communication on optical fiber. The mail server is HP made and provide an unique email id for communication . The unique id is like designation..@ner. railnet.gov.in .
  • 20. LAN EXTENDER LAN Extender is a device that use to extend the local area network beyond 100 meters through the copper cable. LAN extender is connected both side of network. THIS IS EXCELLENT FOR ETHERNET DISTANCE EXTENSION OVER EXISTING TELEPHONE WIRE WITH JUST ONE PAIR OF TWISTED PAIR COPPER WIRE CAN EASILY CONNECT TO ETHERNET. In Railnet Gorakhpur Dasan and Atrie made LAN Extender is in use .
  • 21.
  • 22. Media converter It is use to divert from one physical medium to other like from CAT 5 to OFC . In Railnet Gorakhpur Mrotek FCAT01-C and Mrotek FCAT-01 is in use .
  • 23.
  • 24. DSLAM It is a network device, located in the telephone exchanges of the service providers, that connects multiple customer Digital Subscriber Lines (DSLs) The DSLAM acts like a network switch since its functionality is at Layer 2 of OSI model . In N.E. Railway two numbers of DAS - 3248 DSLAM is in use each one having 48 ports .
  • 25. Features Railnet Gorakhpur use various ways to provide internet connectivity to its users . various number of users are as – LAN - 400 users Broad band on residence – 96 users Dial up - 96 users . The IP provided as 172.16.11.1 , in this manner we can provide IP .
  • 26. Power Supply arrangement All equipment in RAILNET are work on 230V. AC supply In Railnet Gorakhpur two 5 KVA UPS (made by APC 5000 UX model) are use to provide power supply . one is main and other is stand by distribution board is use to connect all equipments Battery : Maintenance Free batteries manufactured by Power Systems Limited (type EP 26 ) are used. Each battery is of 26 AH , 8 batteries in series and 8+8 batteries in parallel . They work on Oxygen Recombination principle. Requirement of water top up is completely eliminated . Earthing Conventional method of earthing is use in Railnet Gorakhpur. Earthing is maintained at less than 1 ohms .
  • 27. Failures and trouble shooting RAILNET Following main failure attend by telecom staff in Railnet – • Power supply failure Check the supply if ok than check the fuse and earth and rectify it . • Link failure link down due to link error & Hang of equipment .
  • 28.  Problem in accessing Internet . Reset LAN Extender . Check whether LAN driver installed properly or not if not install it properly . Check cable pair fault and reset it . Lead faulty between jack panel to terminal Patch card fault Test patch card using LAN tester . Some times users face conflict in IP it is due to some other user use same IP.
  • 29. Problem in accessing internet at residence If there is no ADSL linkup then check for faulty pair and loop resistance (should be below 700 ohm). If DSLAM hang then reset it . If modem is hang reset it on default .
  • 30. SUGGESTION TO MINIMIZE FAILURE • All equipment should be installed as their specification suggest by RDSO • The power supply must be constant • Fuse & Earth protection are provided with correct rating • Connector & Cable should be right & tight • All equipments deal with trend staffs • Never use any equipment without UPS or protection • Never use any extra unrequited device as load • All equipment should be cleaned & well temperature maintained • Schedule maintenance should be done properly
  • 31. CONCLUSION This project give the idea about the working of RAILNET in N.E.Railway Zone . What are the equipment and technology are used in it like as server , router, switch, modems, LAN extender etc. What are the requirements for the RAILNET setup. Connectivity diagram of various locations. I have also seen what was various faults and how they were removed . As being a trainee Section engineer I cultivate my knowledge during making of this project and it was a very nice experience during .