Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Cosmetic Surgery Project
1. RIPE Network Coordination Centre
Cosmetic Surgery Project
Filiz Yilmaz RIPE 60, May 2010, Praha http://www.ripe.net 1
2. RIPE Network Coordination Centre
Before
• RIPE 58 Announced Plan
- Draft in-house
- Get confirmation from AP WG Chairs
- Publish the draft to community
- After 1 month of review
• Publish or
• Iterate above depending on the feedback received
• Six policy documents to be reviewed
Filiz Yilmaz RIPE 60, May 2010, Praha http://www.ripe.net 2
3. RIPE Network Coordination Centre
Done that
• Created web page
- http://www.ripe.net/ripe/updated-documents/
• Published Draft
- Autonomous System (AS) Number Assignment
Policies
Filiz Yilmaz RIPE 60, May 2010, Praha http://www.ripe.net 3
4. RIPE Network Coordination Centre
Then
• Mostly positive feedback
• One concern about “validity of ASNs” injection
- Beyond textual?
• WG Chairs: Run the full PDP
Filiz Yilmaz RIPE 60, May 2010, Praha http://www.ripe.net 4
5. RIPE Network Coordination Centre
Now
• Different than agreed methodology
• Two options
A. Omit the change causing concern and move ahead
as previously agreed
B. Run the full PDP but for ALL documents
• Proposals will be made
• Please choose!
Filiz Yilmaz RIPE 60, May 2010, Praha http://www.ripe.net 5
6. RIPE Network Coordination Centre
Answers?
Filiz Yilmaz RIPE 60, May 2010, Praha http://www.ripe.net 3