2. Table of content
Strategic foundations of the energy policy
Security of supply
Energy at lowest costs
Energy access
PRESENT STRUCTURE OF ELECTRICITY SECTOR
Electricity sector organization
Sector organization
Reforms and measures of accompaniment
STRATEGIC STEPS
3. National Context
National Potential: Prospect
Wind : The more competing
potential
Wind velocity more than 9m/s at 40
meters in many are
Feasible Potential 2020
4,000 MW to 10,000 MW
6 to 15 Billions Euro Investis.
9 to 20Millions T/ year CO2 avoided
2.6 to 5 Millions TOE/ year saved
8,500 to 25,000 new jobs
Feasible Global Potential: 2500
to 6000 MW (9 to 11 m/s)
Feasible Global Potential: 1500
3
to 4000 MW (7.5 to 9.5 m/s)
4. National Context
National Potential: Prospect
Solar: Expectations
Feasible Potential 2020
PVS 1,080 MWp
SWH 1,700,000 m²
CSP 400 MW
6.6 Billions Euro Investment
3 Millions T/year
CO2 avoided
925 Thousand Tep/an saved
12,920 New Jobs
4
5. Strategic foundations of the energy policy
1. Security of supply
• diversification of the forms and sources of
supplying,
• development of the local energy resources,
• reinforcement of facilities and infrastructures,
• consolidation of integrated regional market.
2. Energy at lowest costs
3. Energy access (development of the
rural electrification and use of LPG,
Houses of Energy..)
6. PRESENT STRUCTURE OF
ELECTRICITY SECTOR
• Currently, the electricity sector in Morocco is composed by public
and private operators :
– the Office National de l'Electricité (ONE), entrusted with the
development of energy generation, transmission and distribution
of electricity in part of Moroccan territory (50% of costumers);
– Private producers having Power Purchase Agreements (PPA)
with ONE;
– Local public distribution utilities ;
– Private distribution companies in Casablanca, Rabat, Tangier
and Tetouan.
• The activity of all these operators is regulated by different
ministerial departments : Ministry of Energy and Mines, Ministry of
interior, Ministry of finances, Ministry of economic affairs.
10. Electricity sector organization
Duties Autorities
• Licensing and control of facilities Ministry of Energy and Mines
• Electricity sector policy development
• Electricity system planning Office National de l'Electricité
(Public Utility) ONE
• Power production project development - Office National de l'Electricité
(Public Utility) ONE
- IPP Project developers
• Transmission network project Office National de l'Electricité
development and managment (Public Utility) ONE
• Distribution network project development - Office National de l'Electricité
and management (Public Utility) ONE
- Private Distributors (REDAL
&LYDEC)
- Local Public Utilities
• Rural electrification Office National de l'Electricité
(Public Utility) ONE
11. Sector organization
Power Purshase ONE
Agreements Thermal & Hydropower
Interconnections
Self-Producers
IME & IMA
ONE
Single Buyer
National
Dispatching
Local public
Local public
distribution utilities
distribution utilities
&&
Private distribution
ONE
ONE
Private distribution
companies
companies
Distribution
Distribution
VHV/HV MV LV Rural households
12. Le système électrique national
Production Production Auto-
Interconnexions
ONE Concessionnelle Producteurs
usines hydrauliques JLEC, CED et EET Espagne et Algérie Industriels
centrales thermiques
parcs éoliens
ONE
Acheteur unique
7 régies de distribution 4 Stés délégataires Distribution ONE Transport ONE
• Marrakech;
• Fès; Agences ONE
• LYDEC (Casablanca);
• Meknès;
• REDAL (Rabat);
• Kénitra;
• AMENDIS (Tétouan);
• El Jadida;
• AMENDIS (Tanger)
• Safi;
• Larache
Clients MT et BT 91 Clients THT et HT
13. Reforms and measures of accompaniment
Law on the Energy Efficiency and the
Renewable energies
Adoption in council of Government on May
17th, 2007
Potentiel des Énergies Renouvelables Rabat, le 8/07/07
14. Provisions governing the institutions, legal and lawful
Law relating to the Energy Efficiency and Renewable
Energies;
Recasting of the missions of the CDER
mechanisms of incentive to support the programs of
energy efficiency and renewable energies
autoproduction of electricity extended from 10 MW to
50 MW with guaranty access to the grid,
Progressive liberalization of the sector
15. Autoproduction of electricity extended
from 10 MW to 50 MW
L’ONE est chargé du service public, de la production du
transport et de la distribution de l'énergie électrique ;
loi de 1963 modifiée et complété plusieurs fois
Loi de création de l’ONE relative à l’augmente du seuil de
l’autoproduction de 10 à 50MW
Des personnes publiques ou privées peuvent, sur leur
« demande, être autorisées à produire de l’énergie
électrique, à condition que:
cette production n’excède pas 50 MW ;
qu’elle soit destinée à l’usage exclusif du producteur ;
« qu’elle ne perturbe pas les plans d’alimentation en
« énergie électrique de la zone concernée ;
« que l’excédent de la production qui n’est pas utilisé par « le
producteur pour ses besoins soit vendu « exclusivement à
l’Office national de l’électricité.
16. • «Les modalités de raccordement au réseau
électrique national « sont déterminées par une
convention de raccordement
• conclure, de gré à gré, à la demande des « intéressés,
des conventions de concession de production de
« l’énergie électrique à partir de ressources
énergétiques nationales « fossiles ou renouvelables et
notamment éoliennes, avec des « producteurs ou
des groupements de producteurs constitués à « cette
fin. Les projets de conventions sont approuvés par le
« Conseil d’Administration de l’ONE préalablement à
leur signature
• La totalité de la capacité de production de
« l’ensemble des ouvrages objet des conventions
précitées ne doit « pas être supérieure à 1000 MW. Ce
plafond est augmenté en cas « de besoin par
l’administration sur proposition de l’Office national
« de l’électricité, dans la limite de 2000 MW.
17. STRATEGIC STEPS
• RE Law project (regulation,, access to the grid, energy
production exportation … )
• EE law project (Labeling, Energy Audits,
• RE & EE Support Fund, leverage mechanism: 1 Billion
$ US
• Self Production Encouragement : new limit at 50 MW
• Evolvement of CDER towards a National Agency for
EE & RE
Promotion
• Prime Minister Circular : incitation of Institutions,
Public Organizations and et Local Communities to
integrate EE
and RE in there Investment Programs
18. Tax incentive
The fall of the VAT from 20 to 14% on the
equipment using renewable energies, in
particular the solar-fired heaters. This
fall of the tax will contribute to the
promotion of the national market of
solar-fired heaters
Reductions on custom duties
19. Horizon 2012 / 2020
Program National Development of EnR and
Energy Efficiency of which priority fixed
1)To raise the contribution of ER to 20% of
the national electricity balnace and 10%
of the energy balance by 2012
and
2) To reach 15% of Eneregy consumption
by Energy Efficiency by 2020,